1 Denah - Merged
1 Denah - Merged
1 Denah - Merged
150
550
250
RUANG RAPAT LABORATORIUM PEMERIKSAAN
±0.00 ±0.00 ±0.00
RUANG KERJA
±0.00
200
1100
1100
T.WUDHU
75
TERAS
200
-0.05 -0.10
GUDANG
-0.05
75
150
TOILET
-0.05
250
RUANG KABID
±0.00
TERAS
-0.05
200
MUSHOLLA
100
+0.10
DENAH
Skala 1 : 100
Atap +6.70
Atap +5.40
Atap +5.10
18
35
Kanopi +2.65
70
12
Tali Air 3cm
47
12
12
Lampu Sorot
TAMPAK DEPAN
Skala 1 : 100
Atap +6.70
Atap +5.40
Atap +5.10
Plafond +3.70
kanopi +3.10
Kanopi +2.65
Atap +5.40
Atap +5.10
Plafond +3.70
kanopi +3.10 Dinding Komprot
Tali Air tb.3cm Dinding Komprot
Kanopi +2.65
Atap +5.40
Atap +5.10
Plafond +3.70
kanopi +3.10
Kanopi +2.65
Lantai Kerja
Spesi
Lantai ±0.00 Rabat Beton tb.5cm Pas. Batu Bata
Sloof -0.25 Sloof 15/20
Muka Tanah -0.35
Pas. batu Gunung
Pas. Btu Gunung -10.5 Aanstamping
Lantai Kerja
Aanstamping -1.25 Muka Tanah
Pancang Ulin
Pas. Btu Gunung -2.20
900 150
POTONGAN A-A
Skala 1 : 100
Atap +6.70
Atap Multiroof
Usuk Baja Ringan
Atap +5.40
Kasau Baja Ringan
Kuda-kuda Baja Ringan
Atap +5.10
Lantai Kerja
Spesi
Lantai ±0.00 Rabat Beton tb.5cm Pas. Batu Bata
Sloof -0.25 Sloof 15/20
Muka Tanah -0.35
Pas. batu Gunung
Pas. Btu Gunung -10.5 Aanstamping
Lantai Kerja
Aanstamping -1.25 Muka Tanah
Pancang Ulin
Pas. Btu Gunung -2.20
POTONGAN B-B
Skala 1 : 100
1300
150
550
250
RBT Ker.1 Ker.1
Ker.1
200
1100
1100
Ker.1
75
200
Ker.2
Ker.3
Ker.4
75
150
Ker.4 Ker.3
Ker.1
250
Ker.2
200
Ker.1
100
KETERANGAN
Ker. 1 : Keramik 60x60 Polish
Ker. 2 : Keramik 40x40 UnPolish
Ker.3 : Keramik 20x40 UnPolis
Ker.4 : Keramik 30x30 Unpolish
RENCANA KERAMIK
Skala 1 : 100
1300
150
Gypsumboard Gypsumboard Gypsumboard
550
250
+3.70 +3.70 +3.70
Gypsumboard
+3.70
200
1100
1100
Gypsumboard
75
Gypsumboard
200
75
150
Gypsumboard +3.60
Gypsumboard +3.70
250
+3.70
Gypsumboard
200
+3.70
100
RENCANA PLAFOND
Skala 1 : 100
1300
J5 J5
150
J5
J5 J5 J4
550
250
P2 P2
J5
200
P1
1100
1100
J5
75
200
P1
B1
75
P3
P2 P3
150
J2 B1
P1
250
J1 J1 P2
J2
200
J4
100
J3
5 5
A 40
A
5
210
245
265
210
40
DET. BOUWVEN (B1) POT. B-B DET. JENDELA J4 (J4) POT. B-B
Skala 1 : 25 Skala 1 : 25
D D
5 60 5
L 5 60 5 60 5
L
BAHAN
ACESSORIES ENGSEL TANAM, HENDLE, KUNCI, DOOR CLOSER ACESSORIES ENGSEL GESER, HENDLE, KUNCI, DOOR CLOSER
D L
20
BALOK LATAI 13/20
5
D L
7 20
BALOK LATAI 13/20
255
210
238 205
BAHAN
ACESSORIES ENGSEL TANAM, HENDLE, KUNCI, DOOR CLOSER ACESSORIES ENGSEL GESER, HENDLE, KUNCI, DOOR CLOSER
D L
B 20
BALOK LATAI 13/20
5
6
11
6 D L
A 11
20
6
10 B BALOK LATAI 13/20
5 5
A 260
A
150
195
230
45
DET. JENDELA J5 (J5) POT. B-B DET. PINTU (P1) POT. B-B
Skala 1 : 25 Skala 1 : 25
D D
5 60 5
L 5 60 5 60 5
L
BAHAN
ACESSORIES ENGSEL TANAM, HENDLE, KUNCI, DOOR CLOSER ACESSORIES ENGSEL GESER, HENDLE, KUNCI, DOOR CLOSER
D L
20
BALOK LATAI 13/20
5
7 D L
20
BALOK LATAI 13/20
161
265 215
210
205
36
45
BAHAN
ACESSORIES ENGSEL TANAM, HENDLE, KUNCI, DOOR CLOSER ACESSORIES ENGSEL GESER, HENDLE, KUNCI, DOOR CLOSER
D L
20
B BALOK LATAI 13/20
5
5
150
210
45
5 60 5
L
POT. A-A
150
P.U P.U P.U P.U P.U
250
550
200
P.U P.U P.U P.U P.U
1100
1100
P.U P.U
75
200
P.U P.U
75
P.U P.U P.U
P.U
150
250
200
100
KETERANGAN
P.U : Pancang Ulin Jarak 150
BG
150
BG BG BG
550
250
BG BG BG BG BG BG
BG BG
BG
BG
BG
200
BG BG
BG
1100
1100
BG
75
200
RG BG
BG BG
75
BG
150
BG BG
BG
250
BG BG
BG RG BG
200
BG BG
100
BG
KETERANGAN
BG : Batu Gunung
RG : Rollag
PK PK
150
PK PK PK
250
550
PK PK PK
200
1100
1100
PK PK PK
PK PK PK PK
75
200
75
PK PK PK PK PK
150
250
PK PK PK PK
200
PK PK
100
PK PK
KETERANGAN
PK : Kolom 13X13
RENCANA KOLOM
Skala 1 : 100
1300
150
B.L B.L B.L
550
250
B.L B.L
200
B.L
1100
1100
B.L
75
200
B.L B.L
75
B.L
B.L B.L
B.L
150
B.L
250
B.L B.L
200
B.L
B.L
100
B.L
KETERANGAN
BL : BALOK LATAI 13X13
RB
150
RB RB RB
250
550
RB RB RB RB
RB RB
RB
RB
200
RB RB
RB
1100
1100
RB
75
200
RB
RB
75
RB
RB
150
RB
250
RB RB RB
RB
RB
200
RB RB
100
RB
KETERANGAN
RB : RING BALK 13X13
150
250
550
200
1100
1100
75
200
75
150
250
200
100
RENCANA ATAP
Skala 1 : 100
TABEL PEMBESIAN STRUKTUR BALOK , SLOOF, DAN KOLOM
15 15 13 13
2 D13 2 D13 2 D13 2 D13 13 13
2 D13 2 D13
15
15
20
20
13
13
2 D13 2 D13 2 D13 2 D13
2 D13 2 D13
13 13
2 D13 2 D13 13 13
2 D8 2 D8
13
13
13
13
2 D13 2 D13
2 D8 2 D8
DETAIL STRUKTUR
Skala 1 : 20
60
70
Tandon Air
150
Pipa PVC 2"
Air bersih
ke Tandon
250
550
200
1100
1100
Kran Air
75
Kran Air
200
PDAM
75
Kran Air Pipa PVC 2"
Air bersih PDAM
150
250
200
100
150
550
250
200
1100
1100
Floor Drain
75
200
75
Floor Drain
150
Air Kotor "Closet"
Closet Jongkok
250
Monoblok
Floor Drain Septictank
200
100
Bak Kontrol