Operator E-Jets News Rel 011 Special Edition

Download as pdf or txt
Download as pdf or txt
You are on page 1of 29

Special Edition

SB Efficacy – October 2007


SB Efficacy
October 2007 Special Edition

From the Editor

Dear Customer,

This Special Edition, compiled by EMBRAER Fleet Technical Center (EFTC), brings
information concerning the efficacy of some important Service Bulletins issued by
EMBRAER for the E-Jets Fleet.

In this E-Jets NEWS Special Edition, you will find relevant information that are currently
available to improve aircraft utilization. Main contributors have been identified and,
consequently, SBs that may allow your airline to further reduce flight interruption rate have
been defined.

Should you need further information to support you, please feel free to contact your local
EMBRAER representative.

E-JETS NEWS

Tel: +55 12 3927 7075

Fax: +55 12 3927 5996

E-mail: [email protected]

PROPRIETARY NOTICE

The articles published in E-JETS NEWS are for information only and are an EMBRAER S/A
property. This newsletter must not be reproduced or distributed in whole or in part to a third
party without EMBRAER’s written consent. Also, no article published should be considered
authority-approved data, unless specifically stated.

Page 2
SB Efficacy
October 2007 Special Edition

Index
ASSUMPTIONS AND LIMITATIONS ............................................................................ 5
SB170-21-0028 / SB190-21-0015 IMPROVEMENTS TO THE PACK OUTLET
DUCTS.................................................................................................................................. 6
SB170-21-0029 / SB190-21-0016 AIR MANAGEMENT SYSTEMS CONTROLLER
PROCESSOR BOARD – INCORPORATION OF NEW OPS SOFTWARE (BLACK
LABEL 8.0) .......................................................................................................................... 7
SB190-21-0014 IMPROVEMENT IN CABIN TEMPERATURE................................... 8
SB170-25-0062 / SB190-25-0034 FWD AND AFT LAVATORIES - REPLACEMENT
OF FAUCETS ...................................................................................................................... 9
SB170-27-0024 / SB190-27-0007 INSTALLATION OF NEW MULTIFUNCTION-
SPOILER POWER-CONTROL UNIT PN 414800-1009............................................... 10
SB170-27-0033 / 190-27-0014 REPLACEMENT OF THE SLAT HARNESSES ........ 11
SB190-27-0010 RE-GREASING OF THE FLAP ACTUATORS OUTPUT SEALS
AND BEARINGS............................................................................................................... 12
SB170-29-0017 / SB190-29-0013 HYDRAULIC SYSTEM RESERVOIRS
REPLACEMENT .............................................................................................................. 13
SB170-29-0011 / SB190-29-0007 REPLACEMENT OF THE ENGINE DRIVEN
PUMP (EDP) FROM PN 51164 OR PN 51164-01 OR PN 51164-02 TO PN 51164-03 14
SB170-29-0018 / SB190-29-0014 REPLACEMENT OF THE ENGINE DRIVEN
PUMP (EDP) FROM PN 51164 OR PN 51164-01 OR PN 51164-02 TO PN 51164-04 14
SB170-32-0021 / SB190-32-0003 MAIN LANDING GEAR - SHIMMY DAMPER
REPLACEMENT .............................................................................................................. 15
SB170-32-0025 / SB190-32-0011 MODIFICATION FOR NOSE WHEEL STEERING
CONTROL MODULE (NWSCM) PN 1855A0000-03 TO PN 1855A0000-03
AMENDMENT A .............................................................................................................. 16
SB170-32-0027 / SB190-32-0013 REPLACEMENT OF LANDING GEAR CONTROL
LEVER (LGCL) UNIT BY NEW PN 9037B0001-04 ..................................................... 17
SB170-32-0032 / SB190-32-0018 EMERGENCY PARKING / BRAKE VALVE
(EPBV) REPLACEMENT................................................................................................ 18
SB 190-32-0017 (FLUSHING PROCEDURE FOR BRAKE SYSTEM), SB 190-32-
0019 (SHUTOFF VALVE IMPROVEMENT) AND SB 190-32-0020 (BRAKE
CONTROL VALVE REPLACEMENT)......................................................................... 19
SB170-34-0014 NEW NETWORK INTERFACE MODULE PN 7517964-917
INSTALLATION............................................................................................................... 20
SB170-34-0018 / SB190-34-0008 NEW AIR DATA SMARTPROBE 2015G2H2H-8.. 21
SB170-36-0005 FAN AIR MODULATION VALVE IMPROVEMENTS.................... 22
SB170-36-0007 / SB190-36-0002 PROVISIONS FOR NEW BLEED OVERPRESS
LOGIC................................................................................................................................ 23
SB170-36-0013 / SB190-36-0009 INSTALLATION OF NEW BLEED
OVERPRESSURE SWITCH LOGIC ............................................................................. 23

Page 3
SB Efficacy
October 2007 Special Edition

SB170-36-0010 / SB190-36-0005 HIGH STAGE BLEED VALVE AND NACELLE


PRESSURE REGULATING SHUTOFF VALVE PN 1001246-3 INSTALLATION.. 24
SB170-38-0004 / SB190-38-0004 REPLACEMENT OF THE FILL/DRAIN SWITCH
............................................................................................................................................. 25
SB170-38-0008 / SB190-38-0007 WASTE TANK – FLOW DIVERTER
REPLACEMENT .............................................................................................................. 26
SB170-49-0004 APU FADEC SOFTWARE VERSION 02.01.000 ................................ 27
SB190-49-0002 APU FADEC SOFTWARE VERSION 02.01.000 ................................ 28
SB190-73-0009 FADEC (FULL AUTHORITY DIGITAL ENGINE CONTROL)
SOFTWARE UPGRADE - VERSION V5.20.................................................................. 29

Page 4
SB Efficacy
October 2007 Special Edition

Assumptions and Limitations

For this E-Jets NEWS Special Edition, which covers SB Efficacy analysis (interruption rate),
the following were considered:

• The analyses rates are based on flight interruptions from September/06 to


August/07 and are calculated in a 3-month average.

• Rates are based on interruptions and not on PIREPS.

• Systems that can be placed on MEL (Minimum Equipment List) may affect rate
analysis.

• In some cases, where the solution is the same adopted for both EMBRAER
170/190, PRE/POST mod rate evaluations for both fleets are considered.

• Some cases are season-related and the SB Efficacy may be affected.

• Graphs shown are related to most representative failure modes (EFTC Codes).

• The total number of aircraft with SB incorporated includes, besides the aircraft that
accomplished the solution in the field, delivered aircraft with solution factory-
incorporated, thus Post-Mod analysis may show events before SB Released Date.

Page 5
SB Efficacy
October 2007 Special Edition

SB170-21-0028 / SB190-21-0015 Improvements to the Pack Outlet


Ducts

Analysis: SB performance is within expected numbers.

Number of Aircraft with SB Incorporated (Released date):

SB170-21-0028 (Sep29, 2006) = 54

SB190-21-0015 (Sep 29, 2006) = 85

EMBRAER 170 PRE/POST MOD Rates:

ECS_0001 - Air Cond Ducts disconnection Performance

0.09
SB Released
0.08

0.07
Rate per 1000 FH

0.06
0.05

0.04
0.03
0.02

0.01
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER 190 PRE/POST MOD Rates:

ECS_0001 - Air Cond Ducts disconnection Performance

0.18 SB Released
0.16

0.14
Rate per 1000 FH

0.12
0.10

0.08
0.06
0.04

0.02
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 6
SB Efficacy
October 2007 Special Edition

SB170-21-0029 / SB190-21-0016 Air Management Systems Controller


Processor Board – Incorporation of New Ops Software (BLACK
LABEL 8.0)

Analysis: SB performance is within expected numbers. In the EMBRAER 170 Fleet, there
was one reported event as soon as the solution was released which increased the rate (few
Flight Hours available from aircraft that flew with solution installed).

Number of Aircraft with SB Incorporated (Released date):

SB170-21-0029 (Dec 20, 2006) = 130

SB190-21-0016 (Dec 20, 2006) = 85

EMBRAER 170 PRE/POST MOD Rates:

ECS_0016 - FWD/MID E-Bay Fan Fail CAS message Performance

0.80 SB Released
0.70

0.60
Rate per 1000 FH

0.50

0.40

0.30

0.20

0.10

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER 190 PRE/POST MOD Rates:

ECS_0016 - FWD/MID E-Bay Fan Fail CAS message Performance


SB Released
0.70

0.60

0.50
Rate per 1000 FH

0.40

0.30

0.20

0.10

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 7
SB Efficacy
October 2007 Special Edition

SB190-21-0014 Improvement in Cabin Temperature

Analysis: SB performance is within expected numbers. The only EMBRAER 190 event was
due to the Pack by-pass valve, which will be addressed in April/08 by the introduction of a
new valve PN.

Number of Aircraft with SB Incorporated (Released date):

SB190-21-0014 (Sep 29, 2006) = 51

EMBRAER 190 PRE/POST MOD Rates:

ECS_0049 - Temperature Control - 190 Distribution Orifices Performance

0.16 SB Released
0.14

0.12
Rate per 1000 FH

0.10

0.08

0.06

0.04

0.02

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

ECS_0014 - Temperature Control problem Performance

0.16
SB Released
0.14

0.12
Rate per 1000 FH

0.10

0.08

0.06

0.04

0.02

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 8
SB Efficacy
October 2007 Special Edition

SB170-25-0062 / SB190-25-0034 FWD and AFT Lavatories -


Replacement of Faucets

Analysis: SB performance is within expected numbers.

Number of Aircraft with SB Incorporated (Released date):

SB170-25-0062 (Sep 30, 2006) = 38

SB190-25-0034 (Sep 30, 2006) = 56

EMBRAER 170 and EMBRAER 190 PRE/POST MOD Rates:

INT0144 - Lav faucet won´t shut off Performance

0.25 SB Released

0.20
Rate per 1000 FH

0.15

0.10

0.05

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 9
SB Efficacy
October 2007 Special Edition

SB170-27-0024 / SB190-27-0007 Installation of New Multifunction-


Spoiler Power-Control Unit PN 414800-1009

Analysis: SB performance is within expected numbers.

Number of Aircraft with SB Incorporated (Released date):

SB170-27-0024 (Mar 28, 2007) = 14

SB190-27-0007 (Mar 28, 2007) = 63

EMBRAER 170 PRE/POST MOD Rates:

FCS-0151 - MFS - PCU Ram LVDT SVM Performance

0.40
SB Released
0.35

0.30
Rate per 1000 FH

0.25

0.20

0.15

0.10

0.05

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER 190 PRE/POST MOD Rates:

FCS-0151 - MFS - PCU Ram LVDT SVM Performance

0.40 SB Released
0.35

0.30
Rate per 1000 FH

0.25

0.20

0.15

0.10

0.05

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 10
SB Efficacy
October 2007 Special Edition

SB170-27-0033 / 190-27-0014 Replacement of the Slat Harnesses

Note: SB SB170-27-0033 / 190-27-0014 supersedes SB170-27-0016 / 190-27-0006

Analysis: SB performance is within expected numbers. The first production aircraft delivered
with the new Slat Harness was in March 2007.

Number of Aircraft with SB Incorporated (Released date):

SB170-27-0033 (Jul 31, 2007) = 14

SB190-27-0014 (Jul 31, 2007) = 22

EMBRAER 170 / 190 PRE/POST MOD Rates:

FCS-0065 - Slat Harness Performance


1st delivered acft SB Released
0.20
0.18
0.16
0.14
Rate per 1000 FH

0.12
0.10
0.08
0.06
0.04
0.02
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 11
SB Efficacy
October 2007 Special Edition

SB190-27-0010 Re-Greasing of the Flap Actuators Output Seals and


Bearings

Analysis: SB performance is within expected numbers. The SB Efficacy for this SB shall be
evaluated through a sampling program inspection at 2000/ 4000/ 8000/ 16000 hours with re-
lubricated flap actuators. There was only a Post-Mod event reported to EMBRAER, which is
being followed at supplier to identify the root cause (component tear-down).

Number of Aircraft with SB Incorporated (Released date):

SB190-27-0010 (Feb 16, 2007) = 55

EMBRAER 190 PRE/POST MOD Rates:

FCS-0105 - Flap Actuator Jamming Performance

0.50 SB Released
0.45
0.40
0.35
Rate per 1000 FH

0.30
0.25
0.20
0.15
0.10
0.05
-0.01
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 12
SB Efficacy
October 2007 Special Edition

SB170-29-0017 / SB190-29-0013 Hydraulic System Reservoirs


Replacement

Analysis: SBs performances are within expected numbers.

Number of Aircraft with SB Incorporated (Released date):

SB170-29-0017 (Mar 30, 2007) = 2

SB190-29-0013 (Mar 30, 2007) = 33

EMBRAER 170 PRE/POST MOD Rates:

HYD_0021 - Hydraulic quantity indication failure Performance

0.14 SB Released
0.12

0.10
Rate per 1000 FH

0.08

0.06

0.04

0.02

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER 190 PRE/POST MOD Rates:

HYD_0021 - Hydraulic quantity indication failure Performance

0.70 SB Released
0.60

0.50
Rate per 1000 FH

0.40

0.30

0.20

0.10

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 13
SB Efficacy
October 2007 Special Edition

SB170-29-0011 / SB190-29-0007 Replacement of the Engine Driven


Pump (EDP) from PN 51164 or PN 51164-01 or PN 51164-02 to PN
51164-03

SB170-29-0018 / SB190-29-0014 Replacement of the Engine Driven


Pump (EDP) from PN 51164 or PN 51164-01 or PN 51164-02 to PN
51164-04

Analysis: Although the numbers show a decrease in the failure rate for aircraft flying with
EDP -03, it has still been registered cases of leakage through this version of pump.
Investigation is ongoing to determine the root cause.

Number of Aircraft with SB Incorporated (Released date):

SB170-29-0011 (Oct 03, 2006) = 118 SB170-29-0018 (Aug 07, 2007) = 01

SB190-29-0007 (Oct 03, 2006) = 63 SB190-29-0014 (Aug 07, 2007) = 22

EMBRAER 170 PRE/POST MOD Rates:

HYD_0027 - Hydraulic leakage through EDP Performance

0.30
SB Released
0.25
Rate per 1000 FH

0.20

0.15

0.10

0.05

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER 190 PRE/POST MOD Rates:

HYD_0027 - Hydraulic leakage through EDP Performance

0.16 SB Released
0.14

0.12
Rate per 1000 FH

0.10

0.08

0.06

0.04

0.02

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 14
SB Efficacy
October 2007 Special Edition

SB170-32-0021 / SB190-32-0003 Main Landing Gear - Shimmy Damper


Replacement

Analysis: Based on 170 WWF data, SB performance is within expected numbers.

Number of Aircraft with SB Incorporated (Released date):

SB170-32-0021 (Oct 18, 2005) = 127

SB190-32-0003 (Jul 13, 2006) = 90

EMBRAER 170 PRE/POST MOD Rates:

LDG_0081 - Leakage through shimmy damper Performance

0.08

0.07

0.06
Rate per 1000 FH

0.05

0.04

0.03

0.02

0.01

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 15
SB Efficacy
October 2007 Special Edition

SB170-32-0025 / SB190-32-0011 Modification for Nose Wheel Steering


Control Module (NWSCM) PN 1855A0000-03 to PN 1855A0000-03
AMENDMENT A

Analysis: SB performance is within expected numbers. The root cause (STEER FAIL on
touch down) addressed in the module PN -03A was solved as shown in the graphs below.

Number of Aircraft with SB Incorporated (Released date):

SB170-32-0025 (Aug 22, 2006) = 113

SB190-32-0011 (Aug 21, 2006) = 68

EMBRAER 170 PRE/POST MOD Rates:

LDG_0001 - STEER FAIL on landing Performance

0.04

0.03
Rate per 1000 FH

0.03

0.02

0.02

0.01

0.01
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER 190 PRE/POST MOD Rates:

LDG_0001 - STEER FAIL on landing Performance

0.06

0.05
Rate per 1000 FH

0.04

0.03

0.02

0.01

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 16
SB Efficacy
October 2007 Special Edition

SB170-32-0027 / SB190-32-0013 Replacement of Landing Gear Control


Lever (LGCL) Unit by New PN 9037B0001-04

Analysis: SB performance is within expected numbers.

Number of Aircraft with SB Incorporated (Released date):

SB170-32-0027 (Sep 29, 2006) = 123

SB190-32-0013 (Sep 29, 2006) = 67

EMBRAER 170 PRE/POST MOD Rates:

LDG_0078 - LGCL locked (LGCL -03) Performance

0.04
SB Released
0.04

0.03
Rate per 1000 FH

0.03
0.02

0.02
0.01
0.01

0.00
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER 190 PRE/POST MOD Rates:

LDG_0078 - LGCL locked (LGCL -03) Performance

0.07
SB Released
0.06

0.05
Rate per 1000 FH

0.04

0.03

0.02

0.01

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis


Page 17
SB Efficacy
October 2007 Special Edition

SB170-32-0032 / SB190-32-0018 Emergency Parking / Brake Valve


(EPBV) Replacement

Analysis: Based on 170 WWF data, SB performance is within expected numbers.

Number of Aircraft with SB Incorporated (Released date):

SB170-32-0032 (Jul 23, 2007) = 7

SB190-32-0018 (Jul 30, 2007) = 5

EMBRAER 170 PRE/POST MOD Rates:

LDG_0084 - Emer/Park brake valve failure Performance

0.10
0.09
SB Released
0.08
0.07
Rate per 1000 FH

0.06
0.05
0.04
0.03
0.02
0.01
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 18
SB Efficacy
October 2007 Special Edition

SB 190-32-0017 (Flushing Procedure for Brake System), SB 190-32-


0019 (Shutoff Valve Improvement) and SB 190-32-0020 (Brake Control
Valve Replacement)

Analysis: Data received considers that the mentioned SBs were incorporated together and,
although the data shows an improvement, data received in August showed an increase on
POST MOD events. However an improvement on the brake bleed procedure has shown that
the repeats were considerably reduced. Additionally SB 190-32-0019 removes a filter
downstream the SOV which reduces the contamination inside the valve. EMBRAER is
analyzing the root cause for Brake Faults reports and these SB are not the final solution.

Number of Aircraft with SB Incorporated (Released date):

SB190-32-0017 (Aug 15, 2007 – Rev 1) = 23

SB190-32-0019 (Apr 27, 2007) = 34

SB190-32-0020 (May 14, 2007) = 36

EMBRAER 190 PRE/POST MOD Rates:

LDG_0010 - Brake fault/fail due to unknown cause Performance


SBs Released
2.50

2.00
Rate per 1000 FH

1.50

1.00

0.50

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 19
SB Efficacy
October 2007 Special Edition

SB170-34-0014 New Network Interface Module PN 7517964-917


Installation

Analysis: SB performance is within expected numbers. Field performance shows that


Passenger Address Inoperative events related to hardware failures were effectively
addressed by NIM -917.

Number of Aircraft with SB Incorporated (Released date):

SB170-34-0014 (Mar 02, 2006) = 87

EMBRAER 170 PRE/POST MOD Rates:

AVI-144 - PA - Interphone INOP Performance

0.25

0.20
Rate per 1000 FH

0.15

0.10

0.05

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 20
SB Efficacy
October 2007 Special Edition

SB170-34-0018 / SB190-34-0008 New Air Data SMARTPROBE


2015G2H2H-8

Analysis: SB performance is within expected numbers. Other improvements are also


planned on Primus EPIC Load 21 and ADSP-8A.

Number of Aircraft with SB Incorporated (Released date):

SB170-34-0018 (Sep 19, 2006) = 89

SB190-34-0008 (Sep 19, 2006) = 66

EMBRAER 170 PRE/POST MOD Rates:

AVI-017 - ADS - Fail Performance

0.16 SB Released
0.14

0.12
Rate per 1000 FH

0.10

0.08

0.06

0.04

0.02

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER 190 PRE/POST MOD Rates:

AVI-017 - ADS - Fail Performance

0.40 SB Released
0.35

0.30
Rate per 1000 FH

0.25

0.20

0.15

0.10

0.05

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 21
SB Efficacy
October 2007 Special Edition

SB170-36-0005 FAN AIR Modulation Valve Improvements

Analysis: SB performance is within expected numbers. Part of the BLD_0005 FAV Failure
Performance will be solved with the New Fan Air Valve PN 1002166-5 (170) and 1007086-4
(190), which will be available April 2008. BLD_0012 Bleed Fail CAS message performance
Code will be solved with the new -04 Bleed Valve (Complete testing on -4 configuration:
September, 2008. Field and production plans to be informed upon valve configuration
definition).

Number of Aircraft with SB Incorporated (Released date):

SB170-36-0005 (Marc 16, 2006) = 142

EMBRAER 170 PRE/POST MOD Rates:

BLD_0005 - FAV failure Performance

0.06

0.05
Rate per 1000 FH

0.04

0.03

0.02

0.01

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

BLD_0012 - Bleed Fail CAS message Performance

0.40

0.35

0.30
Rate per 1000 FH

0.25

0.20

0.15

0.10

0.05

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 22
SB Efficacy
October 2007 Special Edition

SB170-36-0007 / SB190-36-0002 Provisions for New Bleed Overpress


Logic

SB170-36-0013 / SB190-36-0009 Installation of New Bleed


Overpressure Switch Logic

Analysis: SB performance is within expected numbers.

Number of Aircraft with SB Incorporated (Released date):

SB170-36-0007 (Nov 21, 2006) = 23 SB170-36-0013 (May 17, 2007) = 13

SB190-36-0002 (Jan 18, 2007) = 53 SB190-36-0009 (May 17, 2007) = 12

EMBRAER 170 PRE/POST MOD Rates:

BLD_0009 - Bleed Overpressure CAS msg Performance

0.18 SB Released SB Released


0.16

0.14
Rate per 1000 FH

0.12
0.10

0.08
0.06
0.04

0.02
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER 190 PRE/POST MOD Rates:

BLD_0009 - Bleed Overpressure CAS msg Performance

0.35
SB Released SB Released
0.30

0.25
Rate per 1000 FH

0.20

0.15

0.10

0.05

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 23
SB Efficacy
October 2007 Special Edition

SB170-36-0010 / SB190-36-0005 High Stage Bleed Valve and Nacelle


Pressure Regulating Shutoff Valve PN 1001246-3 Installation

Analysis: The current valve (-03) still presents wearing related issues mainly on NAPRSOV
position. The new bleed valve -04, which will address the main issues identified in the
current configuration, still not available. Complete testing on -4 configuration expected for
September, 2008. Field and production plans to be informed upon valve configuration
definition. EMBRAER recommends the installation on -03 Mod L6 for the EMBRAER 190
Fleet (October 2007).

Number of Aircraft with SB Incorporated (Released date):

SB170-36-0010 (Oct 11, 2006) = 116

SB190-36-0005 (Oct 19, 2006) = 67

EMBRAER 170 PRE/POST MOD Rates:

Bleed Issues

0.40 SB Released
0.35
0.30
Rate per 1000 FH

0.25
0.20
0.15
0.10
0.05
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER 190 PRE/POST MOD Rates:

Bleed Issues
SB Released
0.80

0.70
0.60
Rate per 1000 FH

0.50

0.40
0.30

0.20
0.10

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 24
SB Efficacy
October 2007 Special Edition

SB170-38-0004 / SB190-38-0004 Replacement of the Fill/Drain Switch

Analysis: SB performance is within expected numbers.

Number of Aircraft with SB Incorporated (Released date and does not consider AIPC
replacement):

SB170-38-0004 (Nov 01, 2006) = 41

SB190-38-0004 (Nov 01, 2006) = 56

EMBRAER 170 PRE/POST MOD Rates:

INT176 - Water system - fill/drain switch inop Performance

0.08 SB Released
0.07

0.06
Rate per 1000 FH

0.05

0.04

0.03

0.02

0.01

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER 190 PRE/POST MOD Rates:

INT176 - Water system - fill/drain switch inop Performance

0.05
SB Released
0.04
Rate per 1000 FH

0.03

0.02

0.01

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 25
SB Efficacy
October 2007 Special Edition

SB170-38-0008 / SB190-38-0007 Waste Tank – Flow Diverter


Replacement

Analysis: SB performance is within expected numbers. The new flow diverter replacement is
recommended to be installed with new Waste Tank Sensor

Number of Aircraft with SB Incorporated (Released date):

SB170-38-0008 (May 22, 2007) = 19

SB190-38-0007 (Apr 20, 2007) = 00

EMBRAER 170 and EMBRAER 190 PRE/POST MOD Rates:

INT234 - Waste tank level sensor inop Performance

0.10 SB Released
0.09
0.08
0.07
Rate per 1000 FH

0.06
0.05
0.04
0.03
0.02
0.01
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 26
SB Efficacy
October 2007 Special Edition

SB170-49-0004 APU FADEC Software Version 02.01.000

Analysis: SB performance is within expected numbers.

Number of Aircraft with SB Incorporated (Released date):

SB170-49-0004 (Aug 16, 2006) = 152

EMBRAER 170 PRE/POST MOD Rates:

APU_0011 - APU Ignitor A/B Fault / Fail Performance

0.16

0.14

0.12
Rate per 1000 FH

0.10

0.08

0.06

0.04

0.02

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

APU_0023 - APU Exciter Box Fault / Fail Performance

0.25

0.20
Rate per 1000 FH

0.15

0.10

0.05

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 27
SB Efficacy
October 2007 Special Edition

SB190-49-0002 APU FADEC Software Version 02.01.000

Analysis: SB performance is within expected numbers.

Concerning the APU Fail Code APU_0023 – APU Exciter Box Fault / Fail Performance,
based on 170 WWF data, SB performance is within expected numbers

Number of Aircraft with SB Incorporated (Released date):

SB190-49-0002 (Aug 16, 2007) = 89

EMBRAER 190 PRE/POST MOD Rates:

APU_0011 - APU Ignitor A/B Fault / Fail Performance

0.14

0.12

0.10
Rate per 1000 FH

0.08

0.06

0.04

0.02

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 28
SB Efficacy
October 2007 Special Edition

SB190-73-0009 FADEC (Full Authority Digital Engine Control) Software


Upgrade - Version V5.20

Analysis: SB performance is within expected numbers.

Number of Aircraft with SB Incorporated (Released date):

SB190-73-0009 (Apr 05, 2007) = 71

EMBRAER 190 PRE/POST MOD Rates:

710001 - Engine exceedance Performance

0.60 SB Released
0.50
Rate per 1000 FH

0.40

0.30

0.20

0.10

0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month

PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE

EMBRAER Consideration: SB Efficacy demonstrated by Data Analysis

Page 29