Operator E-Jets News Rel 011 Special Edition
Operator E-Jets News Rel 011 Special Edition
Operator E-Jets News Rel 011 Special Edition
Dear Customer,
This Special Edition, compiled by EMBRAER Fleet Technical Center (EFTC), brings
information concerning the efficacy of some important Service Bulletins issued by
EMBRAER for the E-Jets Fleet.
In this E-Jets NEWS Special Edition, you will find relevant information that are currently
available to improve aircraft utilization. Main contributors have been identified and,
consequently, SBs that may allow your airline to further reduce flight interruption rate have
been defined.
Should you need further information to support you, please feel free to contact your local
EMBRAER representative.
E-JETS NEWS
E-mail: [email protected]
PROPRIETARY NOTICE
The articles published in E-JETS NEWS are for information only and are an EMBRAER S/A
property. This newsletter must not be reproduced or distributed in whole or in part to a third
party without EMBRAER’s written consent. Also, no article published should be considered
authority-approved data, unless specifically stated.
Page 2
SB Efficacy
October 2007 Special Edition
Index
ASSUMPTIONS AND LIMITATIONS ............................................................................ 5
SB170-21-0028 / SB190-21-0015 IMPROVEMENTS TO THE PACK OUTLET
DUCTS.................................................................................................................................. 6
SB170-21-0029 / SB190-21-0016 AIR MANAGEMENT SYSTEMS CONTROLLER
PROCESSOR BOARD – INCORPORATION OF NEW OPS SOFTWARE (BLACK
LABEL 8.0) .......................................................................................................................... 7
SB190-21-0014 IMPROVEMENT IN CABIN TEMPERATURE................................... 8
SB170-25-0062 / SB190-25-0034 FWD AND AFT LAVATORIES - REPLACEMENT
OF FAUCETS ...................................................................................................................... 9
SB170-27-0024 / SB190-27-0007 INSTALLATION OF NEW MULTIFUNCTION-
SPOILER POWER-CONTROL UNIT PN 414800-1009............................................... 10
SB170-27-0033 / 190-27-0014 REPLACEMENT OF THE SLAT HARNESSES ........ 11
SB190-27-0010 RE-GREASING OF THE FLAP ACTUATORS OUTPUT SEALS
AND BEARINGS............................................................................................................... 12
SB170-29-0017 / SB190-29-0013 HYDRAULIC SYSTEM RESERVOIRS
REPLACEMENT .............................................................................................................. 13
SB170-29-0011 / SB190-29-0007 REPLACEMENT OF THE ENGINE DRIVEN
PUMP (EDP) FROM PN 51164 OR PN 51164-01 OR PN 51164-02 TO PN 51164-03 14
SB170-29-0018 / SB190-29-0014 REPLACEMENT OF THE ENGINE DRIVEN
PUMP (EDP) FROM PN 51164 OR PN 51164-01 OR PN 51164-02 TO PN 51164-04 14
SB170-32-0021 / SB190-32-0003 MAIN LANDING GEAR - SHIMMY DAMPER
REPLACEMENT .............................................................................................................. 15
SB170-32-0025 / SB190-32-0011 MODIFICATION FOR NOSE WHEEL STEERING
CONTROL MODULE (NWSCM) PN 1855A0000-03 TO PN 1855A0000-03
AMENDMENT A .............................................................................................................. 16
SB170-32-0027 / SB190-32-0013 REPLACEMENT OF LANDING GEAR CONTROL
LEVER (LGCL) UNIT BY NEW PN 9037B0001-04 ..................................................... 17
SB170-32-0032 / SB190-32-0018 EMERGENCY PARKING / BRAKE VALVE
(EPBV) REPLACEMENT................................................................................................ 18
SB 190-32-0017 (FLUSHING PROCEDURE FOR BRAKE SYSTEM), SB 190-32-
0019 (SHUTOFF VALVE IMPROVEMENT) AND SB 190-32-0020 (BRAKE
CONTROL VALVE REPLACEMENT)......................................................................... 19
SB170-34-0014 NEW NETWORK INTERFACE MODULE PN 7517964-917
INSTALLATION............................................................................................................... 20
SB170-34-0018 / SB190-34-0008 NEW AIR DATA SMARTPROBE 2015G2H2H-8.. 21
SB170-36-0005 FAN AIR MODULATION VALVE IMPROVEMENTS.................... 22
SB170-36-0007 / SB190-36-0002 PROVISIONS FOR NEW BLEED OVERPRESS
LOGIC................................................................................................................................ 23
SB170-36-0013 / SB190-36-0009 INSTALLATION OF NEW BLEED
OVERPRESSURE SWITCH LOGIC ............................................................................. 23
Page 3
SB Efficacy
October 2007 Special Edition
Page 4
SB Efficacy
October 2007 Special Edition
For this E-Jets NEWS Special Edition, which covers SB Efficacy analysis (interruption rate),
the following were considered:
• Systems that can be placed on MEL (Minimum Equipment List) may affect rate
analysis.
• In some cases, where the solution is the same adopted for both EMBRAER
170/190, PRE/POST mod rate evaluations for both fleets are considered.
• Graphs shown are related to most representative failure modes (EFTC Codes).
• The total number of aircraft with SB incorporated includes, besides the aircraft that
accomplished the solution in the field, delivered aircraft with solution factory-
incorporated, thus Post-Mod analysis may show events before SB Released Date.
Page 5
SB Efficacy
October 2007 Special Edition
0.09
SB Released
0.08
0.07
Rate per 1000 FH
0.06
0.05
0.04
0.03
0.02
0.01
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.18 SB Released
0.16
0.14
Rate per 1000 FH
0.12
0.10
0.08
0.06
0.04
0.02
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 6
SB Efficacy
October 2007 Special Edition
Analysis: SB performance is within expected numbers. In the EMBRAER 170 Fleet, there
was one reported event as soon as the solution was released which increased the rate (few
Flight Hours available from aircraft that flew with solution installed).
0.80 SB Released
0.70
0.60
Rate per 1000 FH
0.50
0.40
0.30
0.20
0.10
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.60
0.50
Rate per 1000 FH
0.40
0.30
0.20
0.10
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 7
SB Efficacy
October 2007 Special Edition
Analysis: SB performance is within expected numbers. The only EMBRAER 190 event was
due to the Pack by-pass valve, which will be addressed in April/08 by the introduction of a
new valve PN.
0.16 SB Released
0.14
0.12
Rate per 1000 FH
0.10
0.08
0.06
0.04
0.02
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.16
SB Released
0.14
0.12
Rate per 1000 FH
0.10
0.08
0.06
0.04
0.02
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 8
SB Efficacy
October 2007 Special Edition
0.25 SB Released
0.20
Rate per 1000 FH
0.15
0.10
0.05
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 9
SB Efficacy
October 2007 Special Edition
0.40
SB Released
0.35
0.30
Rate per 1000 FH
0.25
0.20
0.15
0.10
0.05
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.40 SB Released
0.35
0.30
Rate per 1000 FH
0.25
0.20
0.15
0.10
0.05
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 10
SB Efficacy
October 2007 Special Edition
Analysis: SB performance is within expected numbers. The first production aircraft delivered
with the new Slat Harness was in March 2007.
0.12
0.10
0.08
0.06
0.04
0.02
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 11
SB Efficacy
October 2007 Special Edition
Analysis: SB performance is within expected numbers. The SB Efficacy for this SB shall be
evaluated through a sampling program inspection at 2000/ 4000/ 8000/ 16000 hours with re-
lubricated flap actuators. There was only a Post-Mod event reported to EMBRAER, which is
being followed at supplier to identify the root cause (component tear-down).
0.50 SB Released
0.45
0.40
0.35
Rate per 1000 FH
0.30
0.25
0.20
0.15
0.10
0.05
-0.01
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 12
SB Efficacy
October 2007 Special Edition
0.14 SB Released
0.12
0.10
Rate per 1000 FH
0.08
0.06
0.04
0.02
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.70 SB Released
0.60
0.50
Rate per 1000 FH
0.40
0.30
0.20
0.10
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 13
SB Efficacy
October 2007 Special Edition
Analysis: Although the numbers show a decrease in the failure rate for aircraft flying with
EDP -03, it has still been registered cases of leakage through this version of pump.
Investigation is ongoing to determine the root cause.
0.30
SB Released
0.25
Rate per 1000 FH
0.20
0.15
0.10
0.05
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.16 SB Released
0.14
0.12
Rate per 1000 FH
0.10
0.08
0.06
0.04
0.02
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 14
SB Efficacy
October 2007 Special Edition
0.08
0.07
0.06
Rate per 1000 FH
0.05
0.04
0.03
0.02
0.01
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 15
SB Efficacy
October 2007 Special Edition
Analysis: SB performance is within expected numbers. The root cause (STEER FAIL on
touch down) addressed in the module PN -03A was solved as shown in the graphs below.
0.04
0.03
Rate per 1000 FH
0.03
0.02
0.02
0.01
0.01
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.06
0.05
Rate per 1000 FH
0.04
0.03
0.02
0.01
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 16
SB Efficacy
October 2007 Special Edition
0.04
SB Released
0.04
0.03
Rate per 1000 FH
0.03
0.02
0.02
0.01
0.01
0.00
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.07
SB Released
0.06
0.05
Rate per 1000 FH
0.04
0.03
0.02
0.01
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.10
0.09
SB Released
0.08
0.07
Rate per 1000 FH
0.06
0.05
0.04
0.03
0.02
0.01
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 18
SB Efficacy
October 2007 Special Edition
Analysis: Data received considers that the mentioned SBs were incorporated together and,
although the data shows an improvement, data received in August showed an increase on
POST MOD events. However an improvement on the brake bleed procedure has shown that
the repeats were considerably reduced. Additionally SB 190-32-0019 removes a filter
downstream the SOV which reduces the contamination inside the valve. EMBRAER is
analyzing the root cause for Brake Faults reports and these SB are not the final solution.
2.00
Rate per 1000 FH
1.50
1.00
0.50
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 19
SB Efficacy
October 2007 Special Edition
0.25
0.20
Rate per 1000 FH
0.15
0.10
0.05
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 20
SB Efficacy
October 2007 Special Edition
0.16 SB Released
0.14
0.12
Rate per 1000 FH
0.10
0.08
0.06
0.04
0.02
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.40 SB Released
0.35
0.30
Rate per 1000 FH
0.25
0.20
0.15
0.10
0.05
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 21
SB Efficacy
October 2007 Special Edition
Analysis: SB performance is within expected numbers. Part of the BLD_0005 FAV Failure
Performance will be solved with the New Fan Air Valve PN 1002166-5 (170) and 1007086-4
(190), which will be available April 2008. BLD_0012 Bleed Fail CAS message performance
Code will be solved with the new -04 Bleed Valve (Complete testing on -4 configuration:
September, 2008. Field and production plans to be informed upon valve configuration
definition).
0.06
0.05
Rate per 1000 FH
0.04
0.03
0.02
0.01
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.40
0.35
0.30
Rate per 1000 FH
0.25
0.20
0.15
0.10
0.05
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 22
SB Efficacy
October 2007 Special Edition
0.14
Rate per 1000 FH
0.12
0.10
0.08
0.06
0.04
0.02
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.35
SB Released SB Released
0.30
0.25
Rate per 1000 FH
0.20
0.15
0.10
0.05
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 23
SB Efficacy
October 2007 Special Edition
Analysis: The current valve (-03) still presents wearing related issues mainly on NAPRSOV
position. The new bleed valve -04, which will address the main issues identified in the
current configuration, still not available. Complete testing on -4 configuration expected for
September, 2008. Field and production plans to be informed upon valve configuration
definition. EMBRAER recommends the installation on -03 Mod L6 for the EMBRAER 190
Fleet (October 2007).
Bleed Issues
0.40 SB Released
0.35
0.30
Rate per 1000 FH
0.25
0.20
0.15
0.10
0.05
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Bleed Issues
SB Released
0.80
0.70
0.60
Rate per 1000 FH
0.50
0.40
0.30
0.20
0.10
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 24
SB Efficacy
October 2007 Special Edition
Number of Aircraft with SB Incorporated (Released date and does not consider AIPC
replacement):
0.08 SB Released
0.07
0.06
Rate per 1000 FH
0.05
0.04
0.03
0.02
0.01
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.05
SB Released
0.04
Rate per 1000 FH
0.03
0.02
0.01
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 25
SB Efficacy
October 2007 Special Edition
Analysis: SB performance is within expected numbers. The new flow diverter replacement is
recommended to be installed with new Waste Tank Sensor
0.10 SB Released
0.09
0.08
0.07
Rate per 1000 FH
0.06
0.05
0.04
0.03
0.02
0.01
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 26
SB Efficacy
October 2007 Special Edition
0.16
0.14
0.12
Rate per 1000 FH
0.10
0.08
0.06
0.04
0.02
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
0.25
0.20
Rate per 1000 FH
0.15
0.10
0.05
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 27
SB Efficacy
October 2007 Special Edition
Concerning the APU Fail Code APU_0023 – APU Exciter Box Fault / Fail Performance,
based on 170 WWF data, SB performance is within expected numbers
0.14
0.12
0.10
Rate per 1000 FH
0.08
0.06
0.04
0.02
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 28
SB Efficacy
October 2007 Special Edition
0.60 SB Released
0.50
Rate per 1000 FH
0.40
0.30
0.20
0.10
0.00
9/1/2006 10/1/2006 11/1/2006 12/1/2006 1/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007
Month
PRE Rate per 1000 FH PRE Rate AVERAGE POS Rate per 1000 FH POS Rate AVERAGE
Page 29