Cleaning and Cement Lining
Cleaning and Cement Lining
Cleaning and Cement Lining
GENERAL
The work under this section consists of the cleaning and cement
mortar lining of existing cast iron water mains in place within
the limits specified on the contract drawings.
All work done under this section shall be done in accordance with
AWWA Specification C602-83 unless otherwise stated herein.
All materials used for the cleaning and cement lining work shall
conform to all applicable AWWA Standards unless specifically
altered in these specifications.
CONSTRUCTION METHODS
C10-1
re-use any undamaged pipe.
e. At openings in sections under pressure or in service,
the Contractor shall install adequate blocking to
prevent movement during the time the pipe is open.
Cleaning
C10-2
Cement Mortar Lining
C10-3
"blowing-back" with air pressure (maximum 20 psi)or
excavation, opening and reaming where there operation is
impaired by the cleaning and lining operation.
c. In the event that the "blowing-back" method is used (see
b above), the air source shall be regulated to deliver a
maximum of 20 psi. Such regulation of the pressure
shall be visible on a gauge at all times.
The Commission shall view the tape within 48 hours of receipt and
make a determination as to activating the water pipe.
C10-4
Videotapes which are taken when there is water in the pipe are
not acceptable. The Contractor must revideo the pipe when it is
completely free of water.
Chlorination
Obstructions
C10-5
Nominal Pipe Guaranteed Coefficient "C"
Diameter Hazen-Williams Formula
C10-6
MEASUREMENT AND PAYMENT
The unit price paid for this item shall be full compensation for
all work and/or delays which may occur due to being ordered to
clean the main without the use of water.
The unit price for this item is set at $1.00 (one dollar) per
linear foot.
Item C10-6 Clean and Cement Line 6 inch pipe Linear foot
Item C10-8 Clean and Cement Line 8 inch pipe Linear foot
Item C10-10 Clean and Cement Line 10 inch pipe Linear foot
Item C10-12 Clean and Cement Line 12 inch pipe Linear foot
Item C10-16 Clean and Cement Line 16 inch pipe Linear foot
C10-7
The unit price paid for Cleaning and Cement Lining of water mains
shall be full compensation for cutting and disposal of pavement,
trench excavation, sheeting and bracing as required, dewatering,
placing and compacting backfill material, removal and disposal of
any existing water main or fittings shown on the plans, removal
and delivery to BWSC storage yard of any valves or appurtenances
shown on the plans, furnishing and laying new ductile iron pipe
to replace existing pipe damaged by the Contractor, cutting
existing water mains for access to clean and cement line, all
labor, equipment and materials necessary to clean and cement line
the existing pipe, disinfection and testing, all couplings which
may be needed and all other work necessary to clean and cement
line the water pipe which are not paid for under other items.
The unit price shall constitute full compensation for all labor,
tools, equipment, videotape, and related work necessary to
satisfactorily inspect the cement lined pipe.
4/02
C10-8