Drainage Consumption Statement

This document provides details of the rehabilitation and construction of essential drainage networks in command areas of zones 11-13 and zones 1-10 of the LMC CAD Bundi. It includes 20 items of work such as clearing and excavation, stone masonry, concrete works, shuttering, reinforcement, pipe laying etc. The quantities and specifications of each item are listed along with the estimated requirements of sand, aggregate and rubble stones. The total estimated quantities of sand required is 766.89 cubic meters, aggregate is 1520.27 cubic meters and rubble stones is 17.77 cubic meters.

Uploaded by

naresh kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views4 pages

Drainage Consumption Statement

This document provides details of the rehabilitation and construction of essential drainage networks in command areas of zones 11-13 and zones 1-10 of the LMC CAD Bundi. It includes 20 items of work such as clearing and excavation, stone masonry, concrete works, shuttering, reinforcement, pipe laying etc. The quantities and specifications of each item are listed along with the estimated requirements of sand, aggregate and rubble stones. The total estimated quantities of sand required is 766.89 cubic meters, aggregate is 1520.27 cubic meters and rubble stones is 17.77 cubic meters.

Uploaded by

naresh kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Name of work-Rehabilitation and construction of essential drainage network in Command

area of zone 11 to 13 LMC CAD Bundi


Agency - M/S Saran buildwell Bikaner
Est No. CE/13 OF 2022-23

Agg. RR Stones
S.No. Item Qty. Unit Sand (Cum)
(Cum) (Cum)

Cutting & clearance of jungle, bushes, shrubs


Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in
1
dry/moist/slushy conditions including disposal as per 1220942.23 Sqm. 0 0 0
instructions of the Engineer-in-charge. Cost of wood has
been deducted from rates and thus will be property of
contractor after cutting. (b)Thick

Excavation including loading, unloading, disposal and


dressing of excavated earth within initial lead of 50m and lift
2 up to 1.5 m in dry or moist including dressing of excavated 636962.05 Cum. 0 0 0
area dewatering wherever required complete in all respect
in Soft/Loose soil.

Excavation including loading, unloading, disposal and


dressing of excavated earth within initial lead of 50m and lift
3 up to 1.5 m in dry or moist including dressing of excavated 1965.41 Cum. 0 0 0
area dewatering wherever required complete in all respect
in Hard /Dense soil..

Random rubble stone masonry (using R.R. stone where 75%


stones to be not less than 15 cm in size in any direction and
4 weighting not less than 23 kg) for foundation including all 16.15 Cum. 6.91 0 17.77
leads of all construction materials including curing etc.
complete. in cement sand mortar 1:6.

Plaster in cement sand mortar 1:4 including racking of joints,


5 smooth finishing & curing etc. complete including all leads of 178.08 Sqm. 2.85 0 0
all construction materials complete of thickness : 12 mm

Providing and laying Cement concrete coping in (1:2:4) with


maximum size of crusher broken aggregate up to 20 mm
6
including shuttering etc. with all leads of material complete 25.92 Sqm. 11.66 23.33 0
in all respect in thickness of 50 mm.

Removal of slit/soil/earth, sand, pebbles, 'Malba', debris,


rubbish, stone pebbles & obstruction deposited in canal bed
up to design line grade and sections having design due to
erosion/scour/slips in canal banks/silting with or without
bushes and weeds etc. in dry or moist condition from canal
7
bed including dewatering, loading unloading and disposal at 770 Sqm. 0 0 0
suitable place as directed by Engineer in charge with initial
lead of 50m. and lift upto 1.5 m with proper dressing on
canal bed complete in all respect. For depth above 15 cms
but upto 30cms ( Unlined Section)

Providing and Laying in position of Cement concrete Nominal


mix (1:3:6) including leads of all construction materials,
curing, compaction and finishing with rendering in cement
8 sand mortar 1:3 (1 cement : 3 coarse sand) and making good 60.32 cum 28.35 56.7 0
the joints excluding the cost of centering, shuttering and
reinforcement. Well graded crusher broken stone aggregate
of maximum size upto 20 mm
Providing and Laying in position of Cement concrete Nominal
mix (1:2:4) including leads of all construction materials,
curing, compaction and finishing with rendering in cement
9 sand mortar 1:3 (1 cement : 3 coarse sand) and making good 375.24 cum 165.86 337.72 0
the joints excluding the cost of centering, shuttering and
reinforcement. Well graded crusher broken stone aggregate
of maximum size upto 20 mm

Providing and Laying in position of Cement concrete Design


mix M-20 including leads of all construction materials,
plasticizers (if required), curing, compaction and finishing
with rendering in cement sand mortar 1:3 ( 1 cement : 3
10 coarse sand) and making good the joints excluding the cost 1151.91 cum 518.36 1036.72 0
of centering, shuttering and reinforcement. Well graded
crusher broken stone aggregate of maximum size upto(For
mix design Cement content considered 400 kg/ cum of
concrete) 20 mm aggregate

Providing and Laying in position of Cement concrete Design


mix M-25 including leads of all construction materials,
plasticizers (if required), curing, compaction and finishing
with rendering in cement sand mortar 1:3 ( 1 cement : 3
11 coarse sand) and making good the joints excluding the cost 70 cum 32.9 65.8 0
of centering, shuttering and reinforcement. Well graded
crusher broken stone aggregate of maximum size upto(For
mix design Cement content considered 420 kg/ cum of
concrete) 20 mm

Centering and shuttering for slab, beam, lintels, columns


12 through with or without caps and base including propering 1629.3 sqm 0 0 0
and remove.

Side shuttering including propping etc. complete (to achieve


finish F 2 for : for Block joints of foundation ,stilling
13 394.24 sqm 0 0 0
basins,buckets,aprons,etc. (Non suspended horizontally laid
mass concrete)

Supplying of M.S. reionforcement including labour charges


for bending binding and placing in position all reinforcement
14 11599.48 kg 0 0 0
as per drawingincluding cost of binding wire and all leads
and lifts using.Tor or ribbed bars(IS :1786-1985)

Extra labour charges for obstruction in laying & placing the


reinforced cement concrete due to reinforcement in
15 foundation, rafts, beams, columns bases, stilling 126.16 cum 0 0 0
basin ,buckets,aprons,etc (non suspended horizontally laid
mass concrete)

Providing bitumen joint filter sheet confirming to IS: 1838-


16 20.4 sqm 0 0 0
1983, 20mm thick

Providing, laying and fixing in position RCC spun or hume


pipe with collars (ISI 458-2003) in required size packed in
17 gasket for hume or spun yarn & neatly finished with rich
grout of cement mortar 1:3 perfectly air tight including
testing of joints.
A) 1000 mm dia. 225 RM 0 0 0

Filling in plinth with locally available river shingle under


floors including watering , ramming , consolidating and
18 dressing complete including cost of shingle, and loading
and un-loading wherever required with cost
ofdewatering wherever required, complete in all respect

762.75 cum 0 0 0

19
Carriage of bats ballast, kankar, sand, Bajri, Stone, Grit, 459.45 cum 0 0 0
Murram, Soling Stones for road, water, Godd earth.

20
Compaction of earth or highly weathered strata by manually 92.25 cum 0 0 0
or plain roller. (Density 90% of proctor)
Total 766.89 1520.27 17.77
Name of work-Rehabilitation and construction of essential drainage network in Command
area of zone 1 to 10 LMC CAD Bundi & Talera
Agency - M/S Saran buildwell Bikaner
Est No.

Agg. RR Stones
S.No. Item Qty. Unit Sand (Cum)
(Cum) (Cum)

Cutting & clearance of jungle, bushes, shrubs


Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in
dry/moist/slushy conditions including disposal as per
1 1805407.01 Sqm. 0 0 0
instructions of the Engineer-in-charge. Cost of wood has
been deducted from rates and thus will be property of
contractor after cutting. (b)Thick

Excavation including loading, unloading, disposal and


dressing of excavated earth within initial lead of 50m and lift
2 up to 1.5 m in dry or moist including dressing of excavated 662609.12 Cum. 0 0 0
area dewatering wherever required complete in all respect
in Soft/Loose soil.

Excavation including loading, unloading, disposal and


dressing of excavated earth within initial lead of 50m and lift
3 up to 1.5 m in dry or moist including dressing of excavated 2209.18 Cum. 0 0 0
area dewatering wherever required complete in all respect
in Hard /Dense soil..

Random rubble stone masonry (using R.R. stone where 75%


stones to be not less than 15 cm in size in any direction and
4 weighting not less than 23 kg) for foundation including all 39.13 Cum. 16.75 0 43.04
leads of all construction materials including curing etc.
complete. in cement sand mortar 1:6.

Plaster in cement sand mortar 1:4 including racking of joints,


5 smooth finishing & curing etc. complete including all leads of 563.4 Sqm. 9.01 0 0
all construction materials complete of thickness : 12 mm

Providing and laying Cement concrete coping in (1:2:4) with


6
maximum size of crusher broken aggregate up to 20 mm 65.22 Sqm. 1.47 2.93 0
including shuttering etc. with all leads of material complete
in all respect in thickness of 50 mm.

Removal of slit/soil/earth, sand, pebbles, 'Malba', debris,


rubbish, stone pebbles & obstruction deposited in canal bed
up to design line grade and sections having design due to
erosion/scour/slips in canal banks/silting with or without
7
bushes and weeds etc. in dry or moist condition from canal 885 Sqm. 0 0 0
bed including dewatering, loading unloading and disposal at
suitable place as directed by Engineer in charge with initial
lead of 50m. and lift upto 1.5 m with proper dressing on
canal bed complete in all respect. For depth above 15 cms
but upto 30cms ( Unlined Section)

Providing and Laying in position of Cement concrete Nominal


mix (1:3:6) including leads of all construction materials,
curing, compaction and finishing with rendering in cement
8 sand mortar 1:3 (1 cement : 3 coarse sand) and making good 75.4 cum 35.44 70.88 0
the joints excluding the cost of centering, shuttering and
reinforcement. Well graded crusher broken stone aggregate
of maximum size upto 20 mm

Providing and Laying in position of Cement concrete Nominal


mix (1:2:4) including leads of all construction materials,
curing, compaction and finishing with rendering in cement
9 sand mortar 1:3 (1 cement : 3 coarse sand) and making good 469.05 cum 211.07 422.15 0
the joints excluding the cost of centering, shuttering and
reinforcement. Well graded crusher broken stone aggregate
of maximum size upto 20 mm
Providing and Laying in position of Cement concrete Design
mix M-20 including leads of all construction materials,
plasticizers (if required), curing, compaction and finishing
with rendering in cement sand mortar 1:3 ( 1 cement : 3
10 coarse sand) and making good the joints excluding the cost 1239 cum 532.77 1053.15 0
of centering, shuttering and reinforcement. Well graded
crusher broken stone aggregate of maximum size upto(For
mix design Cement content considered 400 kg/ cum of
concrete) 20 mm aggregate

Providing and Laying in position of Cement concrete Design


mix M-25 including leads of all construction materials,
plasticizers (if required), curing, compaction and finishing
with rendering in cement sand mortar 1:3 ( 1 cement : 3
11 coarse sand) and making good the joints excluding the cost 87.5 cum 35 70 0
of centering, shuttering and reinforcement. Well graded
crusher broken stone aggregate of maximum size upto(For
mix design Cement content considered 420 kg/ cum of
concrete) 20 mm

Centering and shuttering for slab, beam, lintels, columns


12 through with or without caps and base including propering 1754.64 sqm 0 0 0
and remove.

Side shuttering including propping etc. complete (to achieve


finish F 2 for : for Block joints of foundation ,stilling
13 492.8 sqm 0 0 0
basins,buckets,aprons,etc. (Non suspended horizontally laid
mass concrete)

Supplying of M.S. reionforcement including labour charges


for bending binding and placing in position all reinforcement
14 14499.35 kg 0 0 0
as per drawingincluding cost of binding wire and all leads
and lifts using.Tor or ribbed bars(IS :1786-1985)

Extra labour charges for obstruction in laying & placing the


reinforced cement concrete due to reinforcement in
15 foundation, rafts, beams, columns bases, stilling 157.7 cum 0 0 0
basin ,buckets,aprons,etc (non suspended horizontally laid
mass concrete)

Providing bitumen joint filter sheet confirming to IS: 1838-


16 25.5 sqm 0 0 0
1983, 20mm thick

Providing, laying and fixing in position RCC spun or hume


pipe with collars (ISI 458-2003) in required size packed in
17 gasket for hume or spun yarn & neatly finished with rich 0 0 0
grout of cement mortar 1:3 perfectly air tight including
testing of joints.
A) 1000 mm dia. 240 RM 0 0 0

Filling in plinth with locally available river shingle under


floors including watering , ramming , consolidating and
18 dressing complete including cost of shingle, and loading 0 0 0
and un-loading wherever required with cost
ofdewatering wherever required, complete in all respect

813.6 cum 0 0 0

19
Carriage of bats ballast, kankar, sand, Bajri, Stone, Grit, 490.08 cum 0 0 0
Murram, Soling Stones for road, water, Godd earth.

20
Compaction of earth or highly weathered strata by manually 98.4 cum 0 0 0
or plain roller. (Density 90% of proctor)
Total 841.51 1619.11 43.04