2nd Quarter

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Republic of the Philippines

Department of Education
Region XI
Division of Davao City
CABANTIAN NATIONAL HIGH SCHOOL
School ID: 304346

INDIVIDUAL LEARNING MONITORING PLAN


SECOND QUARTER

Learner’s Name: KHRRYSTIAN MARQ D. ALVARADO


Grade Level: Grade 10-Quezon
Learner’s
Learning Learner’s Intervention Monitoring Status
Area Needs Strategies Provided Date Insignificant Significant Mastery
Progress Progress
Provide easiest and February 8,
Calculation of simplest steps in 2022 There was an
T.L.E. – different methods calculating the pipe and The learner got increase of 10
Plumbing of measuring pipe tube. only 5 correct correct answers/ The learner got
10 and tube as well as answer/ responses responses from 15 out of 20 item
the steps on how to More out of 20 item the previous Assessment Test
get the fitting examples/exercises on February 15, Assessment Test. score of 5 in a 20
allowance. the problems in 2022 item Assessment
calculating the pipe and Test.
tube.
Intervention Learner is not making significant progress in a timely manner. Intervention strategies need to be revised.
Status √ Learner is making significant progress. Continue with the learning plan.
Learner has reached mastery of the competencies in learning plan.

Prepared by: Noted by: Checked by:

JOEVIN B. TOTESORA, MAEM ROBIN C. BAJA, MED-EM LIBERTY L. RASGO-ARELLANO, EdD.


Teacher II SUBJECT COORDINATOR/Teacher III Principal III

You might also like