25 Critical Path Matrix
25 Critical Path Matrix
Technical Document
Version 0 – June 2019
R AFFLES \ ORIENT EXPRESS \ BANYAN TREE \ DEL ANO \ SOFITEL LEGEND \ FAIRMONT \ SL S \ SO \ SOFITEL \ THE ORIGINAL S
RIXOS \ MANTIS \ MGALLERY \ 21C \ ART SERIES \ MONDRIAN \ PULLMAN \ SWISSÔTEL \ ANGSANA \ 2 5HOURS HOTEL S
H Y D E \ M ÖV EN P I C K \ G R A N D M ER C U R E \ P EP P ER S \ T H E S EB EL \ M A N T R A \ N OVOT EL \ M ER C U R E \ A DAG I O
MAMA SHELTER \ TRIBE \ BRE AKFREE \ IBIS \ IBIS S T YLES \ IBIS BUDGE T \ JO& JOE \ HOTELF 1
Critical Path Matrix | Technical Document
Proposed
Days
Opening
Task Owner Category Task to Complete Before Week Date Done Status
Date dd/
Opening
mm/yy
Hotel Opening & MDF, PBX Room, Main Communications Room, &
D&TS (Corp) 100
Handover Admin area IDF’s
Hotel Opening –
D&TS (Corp) PBX operating and servicing Admin areas 100
Heart of House
Hotel Opening –
D&TS (Corp) Engineering Department and Stores 90
Heart of House
Hotel Opening – The Security Office / CCTV Room and all areas
D&TS (Corp) 90
Heart of House surrounding the colleague entrance.
Hotel Opening –
D&TS (Corp) All Service Elevators 90
Heart of House
Proposed
Days
Opening
Task Owner Category Task to Complete Before Week Date Done Status
Date dd/
Opening
mm/yy
Hotel Opening –
D&TS (Corp) Main Kitchen Preparation Areas - Meat, Fish, Veg 60
Heart of House
Hotel Opening –
D&TS (Corp) Satellite Kitchens for Specialty Restaurants 60
Heart of House
Hotel Opening –
D&TS (Corp) Bakery & Pastry including storage and refrigeration 60
Heart of House
Hotel Opening –
D&TS (Corp) Room Service - Holding & Set Up 60
Heart of House
Hotel Opening – All Food & Beverage related storage areas. This
D&TS (Corp) 60
Heart of House includes both refrigerated and dry storage areas.
Hotel Opening –
D&TS (Corp) Uniform Distribution Room 60
Heart of House
Hotel Opening –
D&TS (Corp) Colleague Dining / Canteen / Break Room 40
Heart of House
Hotel Opening –
D&TS (Corp) All other storage areas for the hotel. 40
Heart of House
Proposed
Days
Opening
Task Owner Category Task to Complete Before Week Date Done Status
Date dd/
Opening
mm/yy
Proposed
Days
Opening
Task Owner Category Task to Complete Before Week Date Done Status
Date dd/
Opening
mm/yy
Hotel Opening –
D&TS (Corp) The Health Club, Pool and Spa facilities. 20
Spa & Fitness
Hotel Opening –
D&TS (Corp) Treatment Rooms - Snagged & Complete 30
Spa & Fitness
Hotel Opening –
D&TS (Corp) Treatment Rooms - OS&E Installed 30
Spa & Fitness
Hotel Opening –
D&TS (Corp) Fitness Equipment OS&E Installed 20
Spa & Fitness
Hotel Opening –
D&TS (Corp) Swimming Pool Plant Tested & Commissioned 30
Pool areas
Proposed
Days
Opening
Task Owner Category Task to Complete Before Week Date Done Status
Date dd/
Opening
mm/yy
Hotel Opening –
D&TS (Corp) All guest elevators and escalators. 20
Public areas
Hotel Opening –
D&TS (Corp) ATM Machine installed and operational 10
Public areas
Hotel Opening –
D&TS (Corp) VIP / Bridal Suites including OS&E 20
Public areas
Hotel Opening
D&TS (Corp) - Banquet & Banquet & Meeting Room Stores 30
Meeting
Hotel Opening
Banquet & Meeting Room AV / Lighting Testing &
D&TS (Corp) - Banquet & 30
Commissioning
Meeting
Hotel Opening
D&TS (Corp) - Banquet & Banquet & Meeting Room OS&E 20
Meeting
Hotel Opening & All signage work completed including interior and
D&TS (Corp) 20
Engineering exterior locations.
Proposed
Days
Opening
Task Owner Category Task to Complete Before Week Date Done Status
Date dd/
Opening
mm/yy
Hotel Opening & All Local Authority approvals received; Civil Defence,
D&TS (Corp) 60
Engineering Police, EHS, Local Municipality
Hotel Opening & All Local Utility approvals received; Gas, Electric,
D&TS (Corp) 60
Engineering Water, Waste, Telecoms, GSM
Hotel Opening & All exterior landscaping and irrigation work completed
D&TS (Corp) 30
Engineering including any pools / terrace level landscaping.
Hotel Opening & Tank cleaning and microbiology test for the tank
D&TS (Corp) 20
Engineering water and Kitchen water
Hotel Opening & S/pool shock chlorination and microbiology test for
D&TS (Corp) 20
Engineering the pool water
Hotel Opening & Handover of 50% Car parking for colleague parking
D&TS (Corp) 40
Engineering initially and 100% before the opening
Proposed
Days
Opening
Task Owner Category Task to Complete Before Week Date Done Status
Date dd/
Opening
mm/yy
Hotel Opening & Handover of the public area and guest area keys
D&TS (Corp) 20
Engineering including the MK and GMK to the security
Hotel Opening & Valid Third Party inspection certificates for Elevator,
D&TS (Corp) 30
Engineering Pressure tanks, Sky hooks etc.
Hotel Opening & Initial Pest and termite control before the opening
D&TS (Corp) 30
Engineering of the hotel
Hotel Opening & Testing of the panic alarm system for the
D&TS (Corp) 20
Engineering handicapped toilets
Hotel Opening & Testing of the kitchen cooking gas leak detection
D&TS (Corp) 30
Engineering system before the trials
MEP COMMISSIONING
OK CONSULTANT PROJECT
MANAGEMENT INSPECTIONS
REMEDY OF DEFECTS
FRHI TAKE-OVER
HOTEL OPENING