SAIC-S-4015 Rev 7

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

SAUDI ARAMCO ID/PID - 18-MAY-05 REV 0 (Standards Cutoff - March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

Final Inspection of Sanitary Sewage Lift Station SAIC-S-4015 30-Apr-13 PLUMB-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Verify that all the quality record documents are available at the GI 2.710
A1
construction site Para 4.1.1.6

GI 2.710
A2 Verify that all the quality record documents are complete
Para 4.1.1.6

Verify that all the Quality Record documents such as applicable


certifications have been reviewed and checked. GI 2.710
A3
Note: Randomly check for all the applicable signatures in various test Para 4.1.1.6
forms, certificates, etc

All non-conformance reports and worksheets shall have been resolved to


GI 2.710
A4 the satisfaction of Inspection Department or entered on the MCC
Para 4.1.1.4
Exception Item List and classified as a “No”item.

Verify that all Operation and Maintenance (O&M) manuals have been
submitted to the Proponent for review four (4) weeks prior to Mechanical
GI 2.710
A5 Completion (MC).
Para 4.1.1.7
Note: Process O&M manuals for facilities must be approved by the
Proponent before mechanical completion.

Color coding of utility piping, installed above ground or below ground shall SAES-S-070
A6
be in accordance with SAES-A-104 and SAES-B-067. Para 4.4

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-S-070 - Installtion of Utility Piping Systems, 5 December 2012

2-GI 2.710 - Mechanical Completion and Performance Acceptance of Facilities, 03/15/2010


Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 2
BER

ACTOR

PLANT NO.

MCC NO.

TRAVEL TIME
USE ONLY
WORK PERMIT REQUIRED?

RE-INSP DATE

Work Verified

Work Verified

Work Verified

= YES N = NO F = FAILED

Page 2 of 2