The document outlines materials, quantities, and costs for various construction items for a building project. It includes items for earthworks, concrete works, masonry, finishes, doors and windows, metal works, roofing, electrical works, plumbing, and safety requirements. Specifically, it details reinforcing steel, structural concrete, CHB blocks, plastering, tiles, doors, aluminum works, painted metal sheeting, roof accessories, ceiling works, drainage, plumbing fixtures, electrical conduits and panels, air conditioning, and safety signboards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views2 pages

Estimate

The document outlines materials, quantities, and costs for various construction items for a building project. It includes items for earthworks, concrete works, masonry, finishes, doors and windows, metal works, roofing, electrical works, plumbing, and safety requirements. Specifically, it details reinforcing steel, structural concrete, CHB blocks, plastering, tiles, doors, aluminum works, painted metal sheeting, roof accessories, ceiling works, drainage, plumbing fixtures, electrical conduits and panels, air conditioning, and safety signboards.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

101(1) Removal of Structures and Obstructi l.s. 1.

00
804 (1) a Embakment from Structure Excavati cu.m. 49.00
804 (1) b Embankment from Common Borrow cu.m. 24.00
804 (4) Gravel fill cu.m. 11.00
PLAIN AND REINFORCED CONCRETE WORK
PART B
902 (1) b Reinforcing Steel (Deformed), Grade kg. 3,383.00
900 (1) c2Structural Concrete for Footing Ti cu.m. 44.00
900 (1) c1Structural Concrete (Class A, 28 day cu.m. 16.04
903(1) Formworks and Falseworks l.s. 1.00
PART C FINISHINGS AND OTHER CIVIL WORKS
1046 (2) a1CHB Non Load Bearing (including Re sq.m. 75.00
1046 (2) a2CHB Non Load Bearing (including Re sq.m. 45.00
1021 (1) aPlain Cement Finish with Floor Hard sq.m. 31.41
1027 (1) Cement Plaster Finish sq.m. 195.00
1018 (1) Glazed Tiles and Trims sq.m 130.74
1018 (2) Unglazed Tiles sq.m 10.44
1010 (1) Frames Jambs, Sills, Head, Transom set. 11.00
1010 (2) aDoors Flush sq.m. 6.72
1010 (2) bDoors Wood Panel sq.m. 8.00
1004 (2) Finishing Hardware l.s. 1.00
1007 (1) Aluminum Glass Door (Sliding Type sq.m. 3.00
1036(1)aPolycarbonate Sheets l.m 119.00
1039(1) Aluminum Cladding sq.m. 126.00
1008 (1) dAluminum Glass Windows Fixed Typ sq.m. 3.00
1047 (1) Structural Steel l.s. 1.00
1047 (5) Metal Structure Accessories Steel Pl kg. 101.00
1047 (3)aMetal Structure Accessories (Bolts) each 48.00
1047 (2) bStructural Steel Trusses kg. 1,546.00
1047 (2) cStructural Steel Purlins kg. 2,259.00
1047(3)bMetal Structure Accessories (Sagrod kg 25.00
1047 (4) Metal Structure Accessories Cross B kg. 49.00
1047 (3) cMetal Structure Accessories Turnbuc pcs. 12.00
1038 (1) Reflective Insulation sq.m 2,056.00
1045(1) Perforated Aluminum Ceiling Panels sq.m 123.00
1014 (1) b2Prepainted Metal Sheets above 0.4 sq.m. 2,056.00
1013 (2) bFabricated Metal Roofing Accessory m. 114.00
1013 (2) cFabricated Metal Roofing Accessory m. 98.00
1003 (1) a1Ceiling 4.5 mm Metal Frame Fiber sq.m. 329.00
1001(5)aCatch Basin,CHB ea 16.00
1032 (1) aPainting works (Masonry Painting) sq.m 3,145.00
1032 (1) bPainting works (Wood Painting) sq.m 19.00
1032 (1) cPainting works (Metal Painting) sq.m 1,208.00
1001 (8) Sewer Line Works l.s. 1.00
1001 (9) Storm Drainage and Downspout l.s. 1.00
1002 (4) Plumbing Fixtures ls. 1.00
1002 (24) Cold Water Lines l.s. 1.00
1001 (11) Septic Vault Concrete/CHB l.s. 1.00
1100 (19)Conduits, Boxes & Fittings l.s. 1.00
1101 (18)Wires and Wiring Devices l.s. 1.00
1102 (1) Panelboard with Main & Branch Bre l.s. 1.00
1103 (1) Lighting Fixtures and Lamps l.s. 1.00
1200 (1) Mechanical Works - Airconditioning l.s. 1.00
PART II OTHER GENERAL REQUIREMENT
B.5 Project Billboard / Signboard each 2.00
B.7 (1) Occupational Safety and Health Pro month 7.00