DRM PROP.4. System Map1-Model
DRM PROP.4. System Map1-Model
Y)
SN
via
8 . 452 9 5 .)
29 .3 ),
D A)( 293 NY
aA SN
Y ia S
LEGEND:- 2 1 vi ) ( via . 0 0,v
2. 5 78 290
IK)
(38 87.5 DA),(
(M A3
ia A
1.PROPOSED WORKS SHOWN IN RED A
UI a AD , v AT
N I K (V i .8 5 ia T
MA K Z U)
) ( 390ATA) .500 v
2.PROPOSED PLANT SHOWN IN MAGENTA I( D a T 265 .125
NK (KN , vi P) 260
KU RA 1.00 BIR
A ND (27 PUR( M H) 901
K AJ (G 53.
IR AR R IA TP)2 ) 34
B MH
A D TA 411 2.4
GA R(A (TA 46. ) 24
Y A PU R JN. 1 J R )2 V DP 22
RAJ IT G A .4 5 (S L (G 5.0
KHA AD NA 249 ARI P.H B) 23
RSW TA JH UR
TA GA INDP NI (A
S
(RK AN S A L
B
SN) O
BIRBANS(BRBS) P.H. GO ANB
AS
269.213
CHAKRADHARPUR
(CKP)311.852
PANDRASALI (PRSL)303.390 (UP)
305.085 (DN)
CHAIBASA(CBSA)311.856(UP)
313.551(DN)
SINGHPOKHARIA (SIPA)319.180(UP)
320.875 (DN) BAHALDA RD.. (BDO)291.416
D)
0.93
D)
JM
KAL 0 KENDPOSI(KNPS)346.142 (UP) RAIRANGPUR(R
OM
(B
X)
TO
KAN UNG RP)314.029
(G
.
BA
347.837 (DN)
JN
A
(N
SBA (KLG NG
R AJGA H AL(K )426 UA
RIP
DA
DI
SON .336 G OS
AKH NGP XN)4
UN
JAMKHANI SIDING
KULDIHA(KIJ)322.665 I
M
AN( UR(G 33.33 MALUKA(MLKA)356.354 (UP)
JA
(20KM F/ SARDEGA STN.) SAG SXN
AM
RA(S )450 P)44 3
RA
(WITHIN 3 YEARS PROJECT)
OGR .091 2.761 BONDAMUNDA (BNDM) 358.049 (DN) GORUMAHISANI-BANGRIPOSI
NO
GAR
BA
TAN POS )P.H DU (3 TO 5 YEARS PROJECT)
GAR H(G .456.6 BOL BADAMPAHAR(BMPR)
PH)4 83 ME CHHANUA P.H.(CHNU)329.134
MUN 61.33 TR ANIK 338.561
D
469.1A(TGM 3 A HAD
30 )P.H TO AN(
. MBR BYX
JHARSUGUDA TO SARDEGA ( SAIL ) TATANAGAR TO BANSPANI
)
SARDEGA
DOUBLING
DOUBLING (WITHIN 1 YEARS
(3 TO 5 YEARS PROJECT)
559.764 PROJECT)
BAM
RA(B
BARPALI MB) CHANDIPOSI (CPE)437.286
477.5 BADAMPAHAR TO BANSPANI
552.023 IN
27 (3 TO 5 YEARS PROJECT)
LAIKERA B DHA PATASAHI (PSJ)444.975
542.82 CA RUA
D
OBAHAL CK6 487.1 IHI (DIH 452.803
KECH53 1.553 O BAG 93 )
BL 12.14 D
MALIDIHI 5 EHI
(BEH
519.983 PAN
P )493
.3
DHU A 73
TRA LI(PNPL
(DTV )
) 505 P.H.499
BARSUAN -KOIRA- RANGRA
(S.E.C
. RLY JHAR .445 .594 (WITHIN 3 YEARS PROJECT)
.)
IB (JSGSUGUD BARSUAN (BXF)
)514.2 A JN
JHARS 44 BIMLAGARGH TO TALCHER
(3 TO 5 YEARS PROJECT)
UGUD CHAKRADHARPUR DIVISION
R
A ROA
HE
D(E.C
o.Rly)
TO TALC
BARSUAN TO NAYAGARH
(3 TO 5 YEARS PROJECT)
SYSTEM MAP
DRM(Engg) CORRECTED AS ON 31.03.2022
S.E RLY/CKP NOT TO SCALE