BPC Risk Assesment Green
BPC Risk Assesment Green
BPC Risk Assesment Green
In the box below tick any of the hazards that you may come into contact with while
recording your production, if the hazard is not on the list please tick other.
HAZARD CHECKLIST
NUMBER HAZARD TICK
1 Trip hazards /
2 Proximity to water /
3 Risk of fire
4 Live electrical equipment
5 Vehicles / modes of transport
6 Machinery proximity
7 Weather conditions /
8 Members of public at location /
9 Access to location
10 Props
11 First Aid medical requirements
12 Falling objects
13 Working at height / Working near a drop
14 Others (Please specify)
Below you must detail the hazard number from the check list, identify where the hazard is
coming from and detail how you will limit the risk of the hazards you have identified.
HAZARD HAZARD DETAILS HOW WILL YOU LIMIT THE
NUMBER RISKS
1 There can be trip hazards at this location since I will limit the risk by
it is a park therefore there’s lots of trees which staying away from large
Trip can have falling sticks or other objects. They trees and I will go when
hazards can also damage equipment especially if large there is wind as that can
sticks fall on the camera. cause more risk of falling
objects.
2 There is a water fountain in the middle of the I will be careful and stand
park. Strong winds or being too close to water away from the water. I will
Proximity can damage equipment. This is because the also avoid going when there
to water cameras are not waterproof. There is also a is strong winds in order to
chance of be getting cold or wet especially if avoid me or the equipment
I’m filming in the late evening when it is getting splashed on.
colder.
3 Since this location is outside, there may be I will limit the risks of
Weather strong winds, rain, hail or lightning. This can weather conditions by
conditions cause injury if the weather conditions are checking the weather prior
strong. The equipment may be damaged if it to going. I will also wear
rans since its not waterproof and I can be waterproof clothes and I
injured or pushed over by strong winds. Strong will put equipment away if
winds may also cause the camera to be the weather starts to get
smashed or damaged by small objects which bad.
are being blowed around in the wind.
4 Members of the public may cause risk since I will avoid going near
Members they may not like me filming. There are also members of the public but
of the lots of pubs near by therefore this location if I’m confronted, I will talk
public may be busy, especially at the later hours. to them in a polite manor
Equipment may be damaged or stolen or and ty my best to resolve
people may get angry if I’m filming. the situation. Is I’m
suspicious of risk, I will go
away and return at a later
date or film at a different
part of the location.
Below you must sign off that you accept the risks and will adhere to safe working practice.
REVISED OCTOBER 2019
BPC MEDIA – RISK ASSESMENT FORM
On some assignments staff with need to sign your risk assessment for you to hire out kit.
STUDENT NAME: Rufus Aylward- STUDENT Rufus
(PRINT) carter SIGNATURE:
STAFF NAME: STAFF SIGNATURE:
(PRINT)