Estimate of Slab Culvert in Excelxlsx PDF Free
Estimate of Slab Culvert in Excelxlsx PDF Free
Estimate of Slab Culvert in Excelxlsx PDF Free
WASEEM RAJA
D ESTIM
TOP PLAN
www.TheCivilEngin
S# Descrip
Note: Red Color
Text are Input Text 1 Excavation
70
40 400
Brick Flat Solin
30 2
Culvert
PCC in Founda
3
(1:3:6)
B C
120 150
15 480 15
B/W in Cement
70 40 Abutment 4
(1:4)
Wing Wall
Wing Wall
120
A
5 RCC Slab (1:2:
HALF SECTIONAL PLAN
Cement Conc.
6
wearing coat
500 cm
20
30
20 mm Ø 25 cm c/c Earth Slope
:1
100 160
1
cm
150
BL cm G.L
120
30cm
cm
P.C.C 30cm P.C.C 30
120 cm 70 cm Stone Pitching
20
150
10 mm Ø 25 cm c/c
Distribution Bars
100 40
BL Bed Level
30
70 30
SECTION CBEF
ESTIMATE OF SLAB CULVERT
Length Breadth Height Quantity
vilEngineering.com
Description Nos Remarks
m m m m3
Excavation Upto G.L
Abutment 2 5.10 0.70 0.60 4.28 m3
Wing wall 4 1.20 0.70 0.60 2.02 m3
Total 6.30 m3
PCC in Foundation
(1:3:6)
Abutment 2 5.10 0.70 0.30 2.14 m3
Wing wall 4 1.20 0.70 0.30 1.01 m3
Total 3.15 m3
Upto G.L
Dry Stone pitching b/w
1 4.80 1.50 0.30 2.16 m3
two abutments
Plaster F&B = L x H
Plaster Sides = B x H
Plaster Top = L x B
F E LECTURED BY: Engr. WASEEM RAJA
D ESTIM
TOP PLAN
S# Descrip
www.TheCivilEngineering.com 1
70
40 400
30 2
3
B C
120 150
15 480 15
70 40 Abutment 4
Wing Wall
Wing Wall
120
A
5
HALF SECTIONAL PLAN
6
500 cm
15 7
90
10 mm Ø 25 cm c/c
10 cm Conc. wearing course
8
10 20 mm Ø 50 cm c/c
20
30
20 mm Ø 25 cm c/c Earth Slope
:1
100 160
1
cm
150
BL cm G.L
120
30cm
cm
P.C.C 30cm P.C.C 30
120 cm 70 cm Stone Pitching
20
150
10 mm Ø 25 cm c/c
Distribution Bars
100 40
BL Bed Level
30
70 30
SECTION CBEF
ESTIMATE OF SLAB CULVERT
Length Breadth Height Quantity
Description Nos Remarks
m m m m3
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
-----
Plaster F&B = L x H
Plaster Sides = B x H
Plaster Top = L x B