CONSTRUCTION AND COMPLETION OF PACKAGE GS01 - GUIDEWAY, STATIONS,

LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM PARK AND RIDE, ANCILLARY BUILDINGS
BANDAR UTAMA TO JOHAN SETIA AND OTHER ASSOCIATED WORKS

SECTION 7 - BILLS OF QUANTITIES

Subject: Supply of Long Span Parapet

Item No. Code No. Description Unit Qty. Rate Amount

A Supply of Long Span Parapet


Supply of Long Span Parapet as refer to the drawing attached No. 440.00

-Each precast segment = 1m width

Site preparation, storage and land rental offsite and delivery precast Sum
parapet to site 1.00

Casting Duration : 10 weeks

Note: all cast-In item shall be supply and install by the sub-contractor

Drawings
KVLRT3-MRCBGK-GS01-EC-GDY-LS-RFD-150166-WW00
KVLRT3-MRCBGK-GS01-EC-GDY-LS-CCO-150118-WW01

Total Amount (RM)

Material Supply Rate

1 Rebar
1.1 Rebar size (<T12,T40) = RM 2,550/ton
1.2 Rebar size (>T16) = RM2,450/ton

2 Concrete G40N = RM 228/m3


CONSTRUCTION AND COMPLETION OF
LIGHT RAIL TRANSIT LINE 3 (LRT3) FROM
BANDAR UTAMA TO JOHAN SETIA
BILL OF QUANTITIES

Subject: Installation of Precast Parapet And Parapet Stitch Casting for Long Span

Item No. Code No. Description Unit Qty. Rate Amount

Installation of Precast Parapet And Parapet Stitch Casting for Long


A
Span

Installation of precast parapet complete with in-situ stitching and No 230 -


all necessary parapet temporary support works as refer to
drawings attached

- Each precast parapet segment = 1.99 m length with 10mm gap

Refer to drawings :
- KVLRT3-MRCBGK-GS01-EC-GDY-SPS-LOD-000008_H01
- KVLRT3-MRCBGK-GS01-EC-GDY-LS-CCO-150118_WW01
- KVLRT3-MRCBGK-GS01-EC-GDY-LS-CSQ-150111_WW01
- KVLRT3-MRCBGK-GS01-EC-GDY-LS-RFD-150166_WW01
- KVLRT3-MCB-GS01-EC-GDY-SPS-DTL-000018_H01
- KVLRT3-MCB-GS01-EC-GDY-SPS-DTL-000019_H00
- KVLRT3-MCB-GS01-EC-GDY-SPS-GA-000007_H01
- KVLRT3-MCB-GS01-EC-GDY-SPS-GA-000008_H01

Total Amount (RM) -