0% found this document useful (0 votes)
39 views3 pages

WPR Abis

Uploaded by

Romantic Chicken
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views3 pages

WPR Abis

Uploaded by

Romantic Chicken
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Weekly Progress Report

weekly progress report # : date:

contractor construction package #


3FJ CONSTRUCTION

highlights of events and activities (A chronological tabulation of construction related matters)

design issues, field problems encountered/solutions and recommendations, if any


(A brief and complete description of deviations noted from the plans and specifications due to field conditions and/or directives issued by
the Owner and Consultants, including its effect to the overall project schedule )
Weekly Progress Report

accomplishment reports (Includes Activity Report – Works Accomplished and In Progress. Attach Cumulative Accomplishment Report)

works accomplished (Summary of items accomplished)


Item of Work Percent Accomplishment Todate

works in progress (Summary of construction activities)


Item of Work Percent Accomplishment Todate

owner furnished materials/equipment delivered within the week, if any


Weekly Progress Report

manpower and equipment

Provide a detailed list of manpower and equipment resources. The Trade field refers to type of manpower, i.e. Carpenter, Electrician, etc.
The Classification field refers to qualifications, i.e. Foreman, Helper, etc.

Quantity Trade Classification Quantity Equipment

Manpower Units : Manhours  Mandays  Equipment Units : Days  Mandays

visitors at site, if any (State Purpose)

additional information/queries

Remarks

1. This form must be accomplished by all Contractors and submitted to Client every ________ morning/afternoon, to cover progress of
work for the previous week.
2. Attach a copy of the Weather Condition Chart

_____________________________________ _________________________________ ____________________________


prepared by: checked by: noted by: