Known as UAP-IAPOA DOC 210: ARCHITECT’S GUIDELINES FOR STANDARDS OF PROFESSIONAL PRACTICE (SPP) COMPLIANCES – METHODS OF COMPENSATION &
SCHEDULE OF FEES (replacing the 1979 UAP DOC 208-b)
1. Percentage Based Fee • One of the most common; Percentage amount, based on type of project.
• Percentage based on Project • Fair to both client & architect.
Construction Cost (PCC) • In DADS arrangement, Architect is entitled to 60% of corresponding DAEDS professional fee.
• Unit Cost Method • Fee is based on cost per square meter of project.
• Value-based Pricing/Percentage • Fee is based on revenue/profitability outcome of services. (ex. Sales in retail facilities, leasing in housing or
of Gross Rentals commercial space.)
• Architect goes beyond upkeep functions & innovates schemes to maximize occupancy.
2. Lump Sum of Fixed Fee • When the scope of services required can clearly & fully defines from beginning; used for government projects.
May be computed in two ways:
- Percentage of the PCC
- Individual elements of the cost outlines + reasonable margin for profit
3. Time Basis Useful when services are difficult to determine in advance, if they are interim of often short in duration. Often used for:
- Services not well define, predesign services, Rendering expert testimony, Consultancy
• MDPE – Multiple of Direct For non-creative work only. (i.e. not design services)
personal expenses
• Professional fee + expenses Used when there is continuing relationship on series of projects.
• Per diem, honorarium + For request that require Architect’s personal time. (project related trips, conference, ocular inspection.)
reimbursable exps
• Salary cost x Multiplier + direct Based on total basic salaries of all PCAs & staff multiplied by factor from 3.0 + reimbursable.
cost or reimbursable exps
• Per diem or hourly basis Involving intermittent personal services, such consultancy services.
• Retainer
When consulting architect is to be required at intervals over period of time. Frequently, annual basis.
4. Mixed Methods Assortment of compensation methods.
MANNER OF PAYMENT
PHASE/STAGE PAYMENT UPON SUBMISSION ACCUMULATED AMOUNT
MOBILIZATION 5% of PF 5%*
SCHEMATIC DESIGN (payment: not more than 15 days after submission) 15% of PF 20%**
DESIGN DEVELOPMENT (payment: not more than 15 days after submission) 20% of PF 40%**
CONTACT DOCUMENT (payment: not more than 15 days after submission) 50% of PF 90%**
BIDDING/NEGOTIATION Adjust fee to be equal to 90 % of RFP, based 90%***
on winning bid.
CONSTRUCTION PHASE 10 % of PF 100%****
Note: When suspension of construction exceeds a period of 6 months, fee of (5% civil liability; 5% periodic construction
remaining works (periodic construction supervision) shall be doubled. supervision)
PHYSICAL PLANNING
RPF = ₱50,000/hectare for first 5 has.; however, fee shall increase 20-30% if land is steep terrain.
AREA RPF AMOUNT
First 5 Has or less (1ha:10,000 sqm) ₱5.00 per sqm. ₱250,000
5-10 Ha ₱4.00 per sqm. ₱250,000 + ₱40,000 per ha (in excess of 5 ha)
10-50 Ha ₱3.00 per sqm. ₱450,000 + ₱30,000 per ha (in excess of 10 ha)
50 Ha and above ₱1.50 per sqm. ₱1,650,000 + ₱15,000 per ha (in excess of 50 ha)
MANNER OF PAYMENT
PHASE/STAGE ACCUMULATED AMOUNT
Framework Dev. Plan (FRDP) 30 % OF RPF
Conceptual Master Dev. Plan (CMDP) 30 % OF RPF
Prelim. Master Dev. Plan (PMDP) 20 % OF RPF
Detailed Master Dev. Plan (DMDP) 20 % OF RPF
6. POST-CONSTRUCTION SERVICE (SPP. RPF = value pricing 4-6% OF GROSS RENTALS • Value pricing/ % of Gross rentals
DOC. 205) • Monthly Salary/fee
• Retainer + reimbursable expenses
• Professional fee + Expenses
• MDPE
7. COMPREHENSIVE ARCHITECTURAL RPF = 2-5% OF PCC • Percentage of PCC
SERVICE (SPP. DOC. 206) If PM performs regular design, he is compensated in SPP • Professional fee + Expenses
• Lump Sum/Fixed fee
DOC 202.
• MDPE
8. DESIGN-BUILD SERVICES RPF = 7% OF PCC (by Administration) *exclusive of architect’s • Percentage of PCC
Note: Architect does not advance any fee on Regular Design services. • Professional fee + Expenses
money for payment of expenditures. RFP = 10% OF PCC (Guaranteed Maximum Cost) *exclusive • Lump Sum/Fixed fee
Client pay for all cost of all permits, of architect’s fee on Regular Design services. • Per diem, Honorarium + reimbursable expenses
• MDPE
licenses & incidentals.
• Mixed Method of Compensation
Built in the Guaranteed Maximum Cost
9. ARCHITECTURAL DESIGN
COMPETITIONS
10. PROFESSIONAL ARCH’RAL Depend on type of services to be rendered. • Per diem or Hourly Basis
CONSULTING SERVICES No disparity in compensation between FCPA’s and their • Retainer
• Salary cost x multiplier + direct cost or reimbursable
FC.
• Fixed/Lump Sum
• Percentage of Total Project Cost