Data Sheet For Loading Arm
Data Sheet For Loading Arm
Data Sheet For Loading Arm
:A10601
CONTRACT NO.:KDC0939001
DATA SHEET
FOR
大林儲運中心 2 座各 3 萬公秉乙烯/丙烯冷凍槽及其附屬設施新建統包工程
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 1 OF 15
PIPING DESIGN
ARM DESIGN DETAILS (TABLE 1 OF OCIMF)
Berth Arm Dia.(inch) Cargo to be Design Press. Design Material
Arm No. Description NOTES
No. (Note 7) transferred (kg/cm2G) Temp.(℃) (Note 1)
Cryogenic Propylene L: 12” (Min.) Cryogenic 304 S.S +
S#10 L-3103 17.5 / F.V 70 / -50 (Note 15)
Unloading Arm V: --- Propylene 1.0mm (C.A.)
Cryogenic Propylene L: --- Cryogenic 304 S.S + (Note 2)
S#10 L-3104 17.5 / F.V 70 / -50
Vapor Return Arm V: 10” (Min.) Propylene Vapor 1.0mm (C.A.) (Note 15)
Cryogenic Ethylene L: 12” (Min.) Cryogenic 304 S.S +
S#11 L-3112 17.5 / F.V 70 / -107 (Note 15)
Loading/Unloading Arm V: --- Ethylene 1.0mm (C.A.)
Cryogenic Ethylene L: --- Cryogenic 304 S.S + (Note 2)
S#11 L-3113 17.5 /F.V. 70 / -107
Vapor Return Arm V: 10” (Min.) Ethylene Vapor 1.0mm (C.A.) (Note 15)
NOTES:
1. Corrosion allowance shall be 1.0 mm
2. L-3104 & L-3113 will be used as vapor return arm.
3. ERS valves shall be full bored.
4. The loading/unloading arms are to be designed to permit reverse flow.
5. Each loading arm should be provided with an accumulator for emergency release coupling (ERC).
6. During full capacity unloading, each unloading arm should be designed so that there shall be no vibration and and
without cavitation vibration.
7. Vendor to confirm the arm diameter.
8. Pressure drop vs. flowrate should be provided by vendor.
9. FV (Full Vacuum) requirement to be reviewed by Vendor.
10. Hydraulic Quick Connect/ Disconnect Couplers (QC/DC) & manual device disconnect for fault condition to be
provided.
11. Emergency Release System (ERS) to be provided.
12. Two speed maneuvering is required.
13. Local and wireless remote control to be supplied for arm operation.
14. Hydraulic Power Unit(HPU) to be supplied for arm hydraulic operation, one(1) HPU with integrated capacity of
loading arms shall be provided for each berth.
15. The painting coating required for L-3103/ L-3104/ L-3112/ L-3113 must be able to withstand the design
temperature, and the painting coating shall not fall off.
NOTES:
1. Actual pressure drop, pressure drop versus flow rate shall be specification by vendor.
2. Vapor Recovery Arm shall be capable of handling variety of vapors of different quality and molecular weight.
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 2 OF 15
PIPING DESIGN
3. 25% margin for design flowrate to be considered for vapor growth consideration
4. The operation pressure corresponds to the pressure at ship vessel.
5. Flowrate to be confirmed during DDE according to piping routing and ship info.
6. L-3104 (vapor arm) shall have unloading propylene liquid function as per CPC request. The unloading flowrate to be
specified by vendor according to actual selected size of vapor arm.
7. L-3113 (vapor arm) shall have loading and unloading ethylene liquid function as per CPC request. The loading and
unloading flowrate to be specified by vendor according to actual selected size of vapor arm.
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 3 OF 15
PIPING DESIGN
MANIFOLD DETAILS (TABLE 5 OF OCIMF)
3
1 Carrier size (m )
2 Product Propylene(L) Propylene(V) Ethylene(L) Ethylene(V)
3 Nominal pipe size (inch) 12 10 12 10
4 Flange rating (ASME rating) ANSI 150#RF ANSI 150#RF ANSI 150#RF ANSI 150#RF
5 Wall thickness / material 304 S.S 304 S.S 304 S.S 304 S.S
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 4 OF 15
PIPING DESIGN
ENVIRONMENTAL DATA (TABLE 10 OF OCIMF)
Design Wind Velocities (Baseic 3 seconds gust wind speed)
-Stored (m/s) 70
-Maneuvering / Connected (m/s) 25
-Hydrostatic Test / Maintenance (m/s)
Earthquake loads (EL) to be considered while arm in stored
and connected attitude
- Seismic Zone Factor (Z) 0.33
- Site Coefficient for Soil Characteristics (S)
- Importance Factor (I)
Ambient Temperature
- Minimum (℃) 5.6
- Maximum (℃) 36.7
2
Solar Radiation (W/m )
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 5 OF 15
PIPING DESIGN
SPECIFIC REQUIREMENTS (TABLE 11 OF OCIMF) (Contd)
Drives
- Slewing ( V ) Hydraulic / ( ) Manual
- Inboard ( V ) Hydraulic / ( ) Manual
- Outboard ( V ) Hydraulic / ( ) Manual
Control System
- Jetty Head Common Consol for all MLA central ( V ) Yes / ( ) No
- Portable (Radio Remote Control) ( V ) Yes / ( ) No
Vacuum Breaker ( ) Yes / (V ) No
Cargo Purging System
- Riser(for Drain) ( V ) Yes / ( ) No
Apex(by Nitrogen) (V ) Yes / ( ) No
- Manifold(for Drain) ( V ) Yes / ( ) No
Ladders and Platforms ( V ) Yes / ( ) No
Foundation Bolts
- Specified by Vendor ( V ) Yes / ( ) No
- Supplied by Vendor ( V ) Yes / ( ) No
Base plate Template Supplied by Vendor ( V ) Yes / ( ) No
Standby Electro-Hydraulic Pump (V ) Yes / ( ) No
Manual Hydraulic Pump (V ) Yes / ( ) No
- Swivel Purging (drying system) ( V ) Yes / ( ) No
- Support Jack ( V ) Yes / ( ) No
- Storm lock ( V ) Yes / ( ) No
- Earthing lug and earth bounding to jump over swivels ( V ) Yes / ( ) No
Electrical Insulation flange ( V ) Yes / ( ) No
Blind flange to be placed on the coupler ( V ) Yes / ( ) No
Lubrication ( ) Yes / ( ) No by Vendor
- Grease ( ) Yes / ( ) No by Vendor
- Cartridge ( ) Yes / ( ) No by Vendor
- Local ( ) Yes / ( ) No by Vendor
- Central ( ) Yes / ( ) No by Vendor
- Other
Flushing connection ( ) Yes / ( ) No by Vendor
- Size by Vendor
- Flange by Vendor
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 6 OF 15
PIPING DESIGN
Material of construction (Contd):
NOTES:
1. Ethylene marine loading/unloading arms shall be separate support structure type, propylene marine loading/unloading
arms can be separate support structure or self-supporting type.
2. Ladders and platform shall be provided for access to the trunnion and apex swivel.
3. QC/ DC couplers (hydraulic) provide mechanical locking arrangement.
4. Liquid and vapour inlet connections shall be suitable for connection to the tanker mainifolds with various flange types ..
5. Lifting lugs shall be provided.
Permitting the greasing from inspection platforms on the arm
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 7 OF 15
PIPING DESIGN
ENVELOPE DETAILS FOR ARMS WITH ERS (TABLE 13 OF OCIMF) (REFER TO FIGURE 4)(NOTE
1、NOTE 2)
Arm No. #S10/L-3103/3104,#S11/L-3112/3113
A Pre-alarm required (m) ( V ) Yes / ( ) No
B Pre-alarm (luffing) (m) by Vendor
C 1st stage alarm (luffing) (m) by Vendor
D 2nd stage alarm (luffing) (m) by Vendor
E Maximum reach (luffing) (m) by Vendor
F Bottom limit operating envelope to chart datum (m) by Vendor
G Top limit operating envelope to chart datum (m) by Vendor
H Maximum slew right , (surge) See Table 4 (m) by Vendor
I Maximum slew left , (surge) See Table 4 (m) by Vendor
J 2nd stage alarm slew right (m) by Vendor
K 2nd stage alarm slew left (m) by Vendor
L 1st stage alarm slew right (m) by Vendor
M 1st stage alarm slew left (m) by Vendor
N Pre-alarm slew right (m) by Vendor
O Pre-alarm slew left (m) by Vendor
P Maximum Drift velocity (surge direction) (m/s) by Vendor
Q Maximum Drift velocity (sway direction) (m/s) by Vendor
NOTES:
1. Loading arm shall cover full working envelope area.
2. Vendor to note that the limit of pre-alarm, 1st alarm, 2nd alarm shall be within the complete working
envelope.
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 8 OF 15
PIPING DESIGN
REMOTE CONTROL REQUIREMENT (TABLE 15 OF OCIMF)
A Loading arm manoeuvring controls ( V ) Yes / ( ) No
B Two speed manoeuvring selection ( V ) Yes / ( ) No
C QC/DC operation ( V ) Yes / ( ) No
D Arm selector switch ( V ) Yes / ( ) No
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 9 OF 15
PIPING DESIGN
FIGURE 1 SHIP DETAILS (REFER TO TABLE 3)
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 10 OF 15
PIPING DESIGN
FIGURE 2 SHIP MOTIONS (REFER TO TABLE 4)
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 11 OF 15
PIPING DESIGN
FIGURE 3 BREATH DETAILS (REFER TO TABLE 6)
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 12 OF 15
PIPING DESIGN
FIGURE 4 REFERENCE ENVELOPE (WITH ERS) (REFER TO TABLE 13)
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 13 OF 15
PIPING DESIGN
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 14 OF 15
PIPING DESIGN
DS02-0000-003
DATASHEET
CPC Corporation,
TAIWAN FOR PP
PAGE
MARINE LOADING/UNLOADING ARMS 15 OF 15
PIPING DESIGN