0% found this document useful (0 votes)
35 views6 pages

Evaluation - Metro Driving School Management System

This document provides an evaluation of a group project. It assesses the project proposal, implementation, report and presentation, and teamwork. The project involved developing a management system for a driving school using data structures like linked lists and queues. The proposal and implementation were evaluated based on criteria like defined tasks, data structures used, and processing of data. The report and presentation were assessed on delivery of ideas, written communication, and responding to questions. Peer evaluations rated each member on equal work distribution and cooperation. Overall the group was found to have completed the required tasks and worked well together on the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views6 pages

Evaluation - Metro Driving School Management System

This document provides an evaluation of a group project. It assesses the project proposal, implementation, report and presentation, and teamwork. The project involved developing a management system for a driving school using data structures like linked lists and queues. The proposal and implementation were evaluated based on criteria like defined tasks, data structures used, and processing of data. The report and presentation were assessed on delivery of ideas, written communication, and responding to questions. Peer evaluations rated each member on equal work distribution and cooperation. Overall the group was found to have completed the required tasks and worked well together on the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

GROUP PROJECT’S EVALUATION (Final Calculated Marks : 20%)

[SECTION A]

Project Title: METRO DRIVING SCHOOL MANAGEMENT SYSTEM / T5CS1103B

Project’s proposal (10%)


0 1 2
Tasks Weight Total

The class propose Lack in some area, Well defined, can 5 /10
could not be can be improved be easily
Object’s class
implemented and but relevant. implemented and
not relevant relevant.
Not achievable or Achievable but level Achievable and 5 /10
Processing 1 below expectation. of complexity is acceptable level of
below expectation. complexity.
Not achievable or Achievable but level Achievable and 5 /10
Processing 2 below expectation. of complexity is acceptable level of
below expectation. complexity.
Not achievable or Achievable but level Achievable and 5 /10
Processing 3 below expectation. of complexity is acceptable level of
below expectation. complexity.
Not achievable or Achievable but level Achievable and 5 /10
Processing 4 below expectation. of complexity is acceptable level of
below expectation. complexity.
Not achievable or Achievable but level Achievable and 5 /10
Processing 5 below expectation. of complexity is acceptable level of
below expectation. complexity.
less than 10 records less than 20 records Sufficient with more 5 /10
Data in input file
than 20 records

TOTAL (70)

Oct 2022 – Mar 2023


[SECTION B]

Project Title: METRO DRIVING SCHOOL MANAGEMENT SYSTEM / T5CS1103B

Project’s implementation (60%)


0 1 2
Exist Weight Total
Tasks
not exist Incorrect/ Complete
incomplete
Linked List 3 /6
Class definition
class
2 /4
Queue Class definition
2 /4
Object Class Class definition

Data Structure 2 /4
object’s declaration
Data insertion into 2 /4
the data structure
involved
3 /6
Processing 1

Main Class 1 3 /6
Processing 2
(Linked List)
3 /6
Processing 3

3 /6
Processing 4

3 /6
Processing 5

Data Structure 2 /4
object’s declaration
Data insertion into 2 /4
the data structure
involved
3 /6
Processing 1

Main Class 2 3 /6
(Queue) Processing 2

3 /6
Processing 3

3 /6
Processing 4

Processing 5 3 /6

Oct 2022 – Mar 2023


1 2 3
Tasks Poor Executed Weight Total
Moderate
perfectly
Overall execution – program run 2 /6
smoothly
3 /6
Logic on data structure

2 /4
Data Casting ability

0 1 2 3
None of Poor Able to
All
Tasks the problem- solve Weight Total
problems
problem solving some
Solved
Solved skills problem
3 /9
Problem Solving

TOTAL (115)

Oct 2022 – Mar 2023


[SECTION C]

Project Title: METRO DRIVING SCHOOL MANAGEMENT SYSTEM / T5CS1103B

Report and Presentation (30%)


1 2 3
Tasks Weight Total
Poor Moderate Very Good
Clear delivery of 3 /9
ideas (content)
Confident and 2 /6
articulate delivery
Verbal
of ideas
Communication
(Communicative
(Individual)
ability)
Understand and 2 /6
respond to
questions
Clarity and 2 /6
accuracy written
academic
discourse
(Content)
Coherently written 3 /9
Written
academic
Communication
discourse
(report)
(Communicative
ability)
Systematically 3 /9
written academic
discourse
(Technicality)

TOTAL (45)

Oct 2022 – Mar 2023


[SECTION D]

Project Title: METRO DRIVING SCHOOL MANAGEMENT SYSTEM

Peer 1: MUHAMMAD SYAZWAN SYAHMI BIN MAT ZAIDI / T5CS1103B

Peer 2: SYAFIQ DANIAL BIN MOHAMAD HUSNI / T5CS1103B

Peer 3: MUHAMMAD HAZIQ BIN MOHD SAIDI / T5CS1103B

Peer 4: MUHAMMAD ASYRAF BIN KAMARUZAMAN /T5CS1103B

Teamwork (Peer evaluation)

Goal 1 point 2 points 3 points 4 points Peer Peer Peer Peer


1 2 3 4
Equal work Did little or no Did almost as Did an equal Did a full
work much work as share of work share of work 4/4 4/4 4/4 4/4
others or more
Cooperation Did not Could be Work Took an
cooperate persuaded to agreeably with initiative to get
4/4 4/4 4/4 4/4
cooperate others the group
organized
Participation Not Listen to others Participated in Provided
participated in but made few discussions many ideas
discussions suggestions and made 4/4 4/4 4/4 4/4
and made no some
suggestion. suggestions
Support Took little Seemed pre- Offered Assisted other
interest in the occupied with encouragemen partners
4/4 4/4 4/4 4/4
project other projects t to other
partners
Communication Never Rarely Usually shares Clearly
expressed expressed ideas communicated 4/4 4/4 4/4 /4
ideas ideas ideas

TOTAL (20) 20/20 20/20 20/20 20/20

Oct 2022 – Mar 2023


[SECTION E]

Project Title: METRO DRIVING SCHOOL MANAGEMENT SYSTEM /

Team member 1: MUHAMMAD SYAZWAN SYAHMI BIN MAT ZAIDI / T5CS1103B

Evaluation Total Marks Percentage counted Marks calculated


Proposal 70 10%
Project’s implementation 115 60%
Report and presentation 45 20%
Teamwork 20 10%
Total /100

Team member 2: SYAFIQ DANIAL BIN MOHAMAD HUSNI / T5CS1103B

Evaluation Total Marks Percentage counted Marks calculated


Proposal 70 10%
Project’s implementation 115 60%
Report and presentation 45 20%
Teamwork 20 10%
Total /100

Team member 3: MUHAMMAD HAZIQ BIN MOHD SAIDI / T5CS1103B

Evaluation Total Marks Percentage counted Marks calculated


Proposal 70 10%
Project’s implementation 115 60%
Report and presentation 45 20%
Teamwork 20 10%
Total /100

Team member 4: MUHAMMAD ASYRAF BIN KAMARUZAMAN /T5CS1103B

Evaluation Total Marks Percentage counted Marks calculated


Proposal 70 10%
Project’s implementation 115 60%
Report and presentation 45 20%
Teamwork 20 10%
Total /100

Oct 2022 – Mar 2023

You might also like