The document provides a schedule of loads and circuit computations for an electrical system design project. It details the loads, circuit requirements, service entrance computations, and proposed service equipment for a residential unit.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views6 pages

Ee24 Diche

The document provides a schedule of loads and circuit computations for an electrical system design project. It details the loads, circuit requirements, service entrance computations, and proposed service equipment for a residential unit.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

MAPUA UNIVERSITY

SCHOOL OF ELECTRICAL, ELECTRONICS, AND COMPUTER


ENGINEERING
ELECTRICAL ENGINEERING DEPARTMENT

EE24 / E13
ELECTRICAL SYSTEMS DESIGN
PROJECT

NAME: DICHE, TIMOTHY JOHN C.


DATE SUBMITTED: OCTOBER 23, 2019

RATING:
SCHEDULE OF LOADS

CIRCUIT LOAD PCS WATTS VOLTAGE CURRENT PROTECTION WIRE CONDUIT

1 Lighting 7 4080 230 17.74 20 2.0mm2 15mm dia.

2 Lighting 7 4080 230 17.74 20 2.0mm2 15mm dia.

3 .Laundry 1 1500 230 6.52 20 2.0mm2 15mm dia.

4 Kitchen 4 1500 230 6.52 20 2.0mm2 15mm dia.

5 8kW E.R. 1 6400 230 27.83 30 5.5mm2 20mm dia.

6 Small 7 1500 230 6.52 20 2.0mm2 15mm dia.


Appliance
7 ¾ HP ACU 1 1984.90 230 8.63 20 2.0mm2 15mm dia.

8 Lighting 9 4080 230 17.74 20 2.0mm2 15mm dia.

9 Small 11 1500 230 6.52 20 2.0mm2 15mm dia.


Appliance
10 1HP ACU 1 2300 230 10 25 2.0mm2 15mm dia.

11 1/2HP 1 1409.9 230 6.13 20 2.0mm2 15mm dia.


ACU
12 1/2HP 1 1409.9 230 6.13 20 2.0mm2 15mm dia.
ACU
13 Spare 1 1200 230 5.22 20 2.0mm2 15mm dia.

14 Spare 1 1200 230 5.22 20 2.0mm2 15mm dia.


BRANCH CIRCUIT COMPUTATIONS
1. General Lighting Load. (Branch Circuit 1, 2, and 8)
Residential Unit @ 170sqm
Load = 170sqm x 24V-A/sqm = 4080V-A
Load Current = 4080V-A / 230V = 17.74A

• Use six (6) 2.0mm2 THW Copper Wire


• Use 15mm dia. Rigid PVC Conduit
• Provide three (3) 20A branch circuit
2. Small Appliance Load. (Branch Circuit 6, and 9)
Load = 1500V-A
Load Current = 1500V-A / 230V = 6.52A

• Use four (4) 2.0mm2 THW Copper Wire


• Use 15mm dia. Rigid PVC Conduit
• Provide two (2) 20A branch circuit
3. Laundry Circuit Load. (Branch Circuit 3)
Load = 1500V-A
Load Current = 1500V-A / 230V= 6.52A

• Use two (2) 2.0mm2 THW Copper Wire


• Use 15mm dia. Rigid PVC Conduit
• Provide one (1) 20A branch circuit
4. Kitchen Circuit and Garage Load. (Branch Circuit 4)
Load = 1500V-A
Load Current = 1500V-A / 230V= 6.52A

• Use one (1) 2.0mm2 THW Copper Wire


• Use 15mm dia. Rigid PVC Conduit
• Provide one (1) 20A branch circuit
5. 8 KW Electric Range. (Branch Circuit 5)
Maximum Demand = 80% x 8000W = 6400V-A
Load Current = 6400V-A / 230V = 27.83A

• Use two (2) 5.5mm2 THW Copper Wire


• Use 20mm dia. Rigid PVC Conduit
• Use one (1) 30A branch circuit.
6. ½ HP Air-Conditioning Unit. (Branch Circuit 11 and 12)
Motor full-load current = 4.9A
Load Current; Ampacity of Wire = 125% x 4.9A = 6.13A

• Use four (4) 2.0mm2 THW Copper Wire


• 15mm dia. Rigid PVC Conduit
Maximum inverse time rating of the breaker = 250%
Rating of branch circuit protective device = 250% x 4.9A = 12.25A

• Provide two (2) 20A branch circuit for 0.5HP ACU


7. ¾ HP Air-Conditioning Unit. (Branch Circuit 7)
Motor full-load current = 6.9A
Load Current; Ampacity of Wire = 125% x 6.9A = 8.63A

• Use two (2) 2.0mm2 THW Copper Wire


• 15mm dia. Rigid PVC Conduit
Maximum inverse time rating of the breaker = 250%
Rating of branch circuit protective device = 250% x 6.9A = 17.25A

• Provide one (1) 20A branch circuit for 0.75HP ACU


8. 1 HP Air-Conditioning Unit. (Branch Circuit 10)
Motor full-load current = 8A
Load Current; Ampacity of Wire = 125% x 8A = 10A

• Use two (2) 2.0mm2 THW Copper Wire


• 15mm dia. Rigid PVC Conduit
Maximum inverse time rating of the breaker = 250%
Rating of branch circuit protective device = 250% x 8A = 20A

• Provide one (1) 25A branch circuit for 1HP ACU


9. Spare. (Branch Circuit 13 and 14)
Wattage: 1200W
Load Current = 1200W / 230V = 5.22A

• Use two (2) 2.0mm2 THW Copper Wire


• 15mm dia. Rigid PVC Conduit
• Provide one (1) 20A branch circuit for 1HP ACU
SERVICE ENTRANCE COMPUTATION

1. Air-Conditioning Unit Load. Computation at 100% demand factor


(2) – 0.5HP ACU, (1) 0.75HP ACU, (1) 1HP ACU
(4.9 + 4.9 + 6.9 + 8)A x 230V = 5681W

2. General Lighting Load and General Use Receptacle. Computed at 100% demand factor
170 sqm x 24V-A/sqm = 4080W

3. Cooking Load
8kW Electric Range. Demand rating 8000W x 80% = 6400W

4. Other Loads:
Two (2) Small appliance branch circuit at 1500V-A/circuit = 2 x 1500V-A = 3000 W
Kitchen and Garage Load at 1500V-A/circuit = 1 x 1500V-A = 1500W
Laundry Load at 1500V-A/circuit = 1 x 1500V-A = 1500W
Other Loads total = 6000w
Application of Demand Factor 6000W x 40% = 2400W

Total Net Computed Load = (5681 + 4080 + 6400 + 2400)W = 18,561W


Circuit Requirement: Twelve (12) 20A 2-wire branch circuit
One (1) 25A 2-wire branch circuit
One (1) 30A 2-wire branch circuit
Service Entrance Conductors: [18,561+25%(8 x 230)]/230 = 82.7A

• Use two (2) 22mm2 THW Copper Wire


Service Equipment:
A. Maximum Current Rating of Protective Device
1. Non-Time Delay Fuse
[(2 x 4.9 x 230) + (6.9 x 230) + 300%(8 x 230) + 4080 + 6400 + 2400]/230 = 96.7A
2. Inverse-Time Circuit Breaker
[(2 x 4.9 x 230) + (6.9 x 230) + 250%(8 x 230) + 4080 + 6400 + 2400]/230 = 92.7A

B. Service Equipment Rating in case of underground service


1. Use one (1) 125A, 2PST, 250V safety switch with two 100A renewable fuses
2. Use one (1) 100AT, 2 pole, 240V, molded circuit breaker