Tulangan Pokok

Beton Tulangan Geser / Sengkang Total Berat Total Luas


Atas Tengah Bawah Tulangan luas bekisting Bekisting
No.
Dimensi Luas Selimut Vol. Ø Tul Jml. Berat Berat Ø Tul Jml. Berat Ø Tul Jml. Berat Ø Tul Tump. Lap. Berat (kg) m1 / (1m1) m2 / (1m3)
(cm) (m2) (mm) (/1m3) (mm) (bh) (kg/1m1) (kg/1m3) (mm) (bh) (kg/1m3) (mm) (bh) (kg/1m3) (mm) (cm) (cm) (kg/1m3)

A SLOOF
1 15 x 20 0.03 15.00 33.33 12.00 2.00 0.89 59.16 - - - 12.00 2.00 59.16 6.00 15.00 17.50 29.41 147.74 0.40 13.33
2 15 x 25 0.04 15.00 26.67 12.00 2.00 0.89 47.33 - - - 12.00 2.00 47.33 6.00 15.00 15.00 29.76 124.42 0.50 13.33
3 25 x 30 0.08 20.00 13.33 16.00 3.00 1.58 63.11 13.00 2.00 27.77 16.00 3.00 63.11 8.00 15.00 15.00 36.85 190.85 0.60 8.00
4 20 x 35 0.07 20.00 14.29 12.00 3.00 0.89 38.03 10.00 6.00 52.83 12.00 3.00 38.03 8.00 12.50 15.00 42.52 171.41 0.70 10.00
5 25 x 35 0.09 25.00 11.43 16.00 3.00 1.58 54.09 12.00 4.00 40.57 16.00 3.00 54.09 8.00 12.50 12.50 40.83 189.59 0.70 8.00
6 30 x 40 0.12 25.00 8.33 14.00 4.00 1.21 40.26 12.00 6.00 44.37 14.00 4.00 40.26 8.00 12.50 12.50 35.43 160.33 0.80 6.67

B KOLOM
1 11 x 11 0.01 10.00 82.64 10.00 4.00 0.62 203.74 - - - - - - 6.00 15.00 17.50 45.56 249.29 0.22 18.18
2 13 x 13 0.02 15.00 59.17 12.00 4.00 0.89 210.05 - - - - - - 6.00 15.00 17.50 37.50 247.55 0.26 15.38
3 15 x 15 0.02 15.00 44.44 12.00 4.00 0.89 157.77 - - - - - - 6.00 15.00 17.50 33.06 190.83 0.30 13.33
4 15 x 20 0.03 15.00 33.33 12.00 4.00 0.89 118.33 - - - - - - 6.00 15.00 17.50 29.41 147.74 0.35 11.67
5 20 x 20 0.04 20.00 25.00 13.00 4.00 1.04 104.15 - - - - - - 8.00 15.00 15.00 48.43 152.59 0.80 20.00
6 20 x 40 0.08 20.00 12.50 12.00 6.00 0.89 66.56 - - - - - - 6.00 15.00 15.00 21.32 87.88 0.60 7.50
7 25 x 25 0.06 20.00 16.00 16.00 4.00 1.58 100.97 - - - - - - 8.00 12.50 15.00 42.90 143.87 1.00 16.00
8 25 x 30 0.08 25.00 13.33 14.00 3.00 1.21 48.32 14.00 4.00 64.42 14.00 3.00 48.32 8.00 12.50 15.00 38.96 200.02 1.10 14.67
9 25 x 35 0.09 25.00 11.43 16.00 3.00 1.58 54.09 14.00 6.00 82.83 16.00 3.00 54.09 8.00 12.50 15.00 36.84 227.85 1.20 13.71
10 30 x 40 0.12 25.00 8.33 16.00 4.00 1.58 52.59 12.00 4.00 29.58 16.00 4.00 52.59 8.00 12.50 15.00 31.99 166.75 1.40 11.67
11 40 x 40 0.16 35.00 6.25 16.00 4.00 1.58 39.44 16.00 4.00 39.44 16.00 4.00 39.44 10.00 12.50 15.00 42.58 160.91 1.60 10.00
12 40 x 60 0.24 40.00 4.17 19.00 5.00 2.22 46.35 19.00 8.00 74.16 19.00 5.00 46.35 8.00 10.00 12.50 28.18 195.05 2.00 8.33
13 Dia x 30 0.07 25.00 14.15 16.00 6.00 1.58 133.99 8.00 15.00 34.36 168.35 1.04 14.67
14 50 x 50 0.25 40.00 4.00 22.00 5.00 2.98 59.66 22.00 6.00 71.59 22.00 5.00 59.66 8.00 10.00 12.50 27.12 218.02 2.00 8.00

C BALOK
1 13 x 15 0.02 10.00 51.28 10.00 2.00 0.62 63.21 - - - 10.00 2.00 63.21 6.00 15.00 17.50 36.71 163.13 0.30 15.38
2 13 x 13 0.02 10.00 59.17 10.00 2.00 0.62 72.93 - - - 10.00 2.00 72.93 6.00 15.00 17.50 39.11 184.98 0.26 15.38
2 13 x 15 0.02 10.00 51.28 12.00 2.00 0.89 91.02 - - - 12.00 2.00 91.02 6.00 15.00 17.50 36.71 218.76 0.30 15.38
3 13 x 13 0.02 10.00 59.17 10.00 2.00 0.62 72.93 - - - 10.00 2.00 72.93 6.00 15.00 17.50 39.11 184.98 0.26 15.38
4 15 x 15 0.02 10.00 44.44 12.00 2.00 0.89 78.89 - - - 12.00 2.00 78.89 6.00 15.00 17.50 34.27 192.04 0.30 13.33
5 15 x 20 0.03 15.00 33.33 12.00 2.00 0.89 59.16 10.00 2.00 41.09 12.00 2.00 59.16 8.00 12.50 15.00 61.85 221.27 0.55 18.33
6 15 x 25 0.04 15.00 26.67 12.00 3.00 0.89 71.00 10.00 2.00 32.87 12.00 3.00 71.00 8.00 12.50 15.00 57.24 232.10 0.65 17.33
7 20 x 20 0.04 20.00 25.00 12.00 3.00 0.89 66.56 10.00 2.00 30.82 12.00 3.00 66.56 8.00 12.50 15.00 52.26 216.20 0.60 15.00
8 20 x 30 0.06 20.00 16.67 12.00 3.00 0.89 44.37 12.00 4.00 59.16 12.00 3.00 44.37 8.00 10.00 12.50 54.42 202.33 0.80 13.33
9 15 x 20 0.03 25.00 33.33 12.00 2.00 0.89 59.16 - - - 12.00 2.00 59.16 6.00 15.00 12.50 33.73 152.06 0.40 13.33
10 20 x 30 0.06 25.00 16.67 19.00 3.00 2.22 111.24 - - - 19.00 2.00 74.16 8.00 12.50 12.50 48.47 233.87 0.80 13.33
11 25 x 40 0.10 30.00 10.00 16.00 3.00 1.58 47.33 13.00 2.00 20.83 16.00 3.00 47.33 10.00 12.50 12.50 60.14 175.63 1.05 10.50
12 30 x 50 0.15 30.00 6.67 19.00 7.00 2.22 103.83 13.00 2.00 13.89 19.00 2.00 29.66 10.00 10.00 12.50 55.71 203.09 1.30 8.67
13 40 x 70 0.28 25.00 3.57 22.00 5.00 2.98 53.27 16.00 6.00 33.81 16.00 4.00 22.54 8.00 10.00 12.50 27.79 137.41 1.80 6.43
14 25 x 20 0.05 25.00 20.00 16.00 4.00 1.58 126.22 16.00 2.00 63.11 16.00 4.00 126.22 8.00 10.00 12.50 56.73 372.27 0.45 9.00
Tulangan Pokok Beton Tulangan Lentur
Beton Total Berat Total Luas
Atas Tulangan luas bekisting Bekisting No. Panjang Lebar Tebal Selimut Jarak Ø Tul Berat
No.
Dimensi Luas Vol. Ø Tul Jml. Berat Berat (kg) m1 / (1m1) m2 / (1m3) m1 m1 m1 m1 m1 mm /m1
(cm) (m2) (/1m3) (mm) (bh) (kg/1m1) (kg/1m3)
H FOOT PLATE
D PLAT LANTAI 1 0.80 0.80 0.20 0.03 0.15 0.016 1.58
8.00 0.08 3.54 0.010 23.57 0.62 51.36 102.72 1.00 3.54 2 1.00 1.00 0.30 0.03 0.15 0.014 1.21
10.00 0.10 3.16 0.010 42.16 0.62 82.17 164.35 1.00 3.16 3 1.20 1.20 0.40 0.03 0.15 0.016 1.58
12.00 0.12 2.89 0.010 38.49 0.62 68.48 136.96 1.00 2.89 4 1.50 1.50 0.40 0.04 0.15 0.019 2.22
15.00 0.15 2.58 0.010 34.43 0.62 54.78 109.56 1.00 2.58 5 2.00 1.50 0.50 0.04 0.15 0.019 2.22
12.00 0.12 2.89 0.010 19.25 0.62 34.24 68.48 1.00 2.89
12.00 0.12 2.89 0.008 23.09 0.39 26.30 52.59 - -
10.00 0.15 2.58 0.008 51.64 0.39 52.59 105.18 - -

E PLAT DINDING
8.00 0.08 3.54 0.01 23.57 0.89 73.96 147.91 1.75 6.19
10.00 0.10 3.16 0.01 42.16 0.89 118.33 236.66 1.75 5.53
12.00 0.12 2.89 0.01 38.49 0.89 98.61 197.22 1.75 5.05

Dimensi Luas Vol. Bekisting


No. Keterangan
(cm) (m2) (/1m3) (/1m1) (/1m3)

F SELIMUT BETON KOLOM (BAJA WF)


1 15/30 (1) 0.05 21.04 --> keliling kolom WF 300 0.88 18.52
2 12,5/25 (1) 0.03 30.30 --> keliling kolom WF 250 0.74 22.42

3 10/20 (1) 0.02 47.35 --> keliling kolom WF 200 0.56 26.52
4 15/30 (1/2) 0.02 42.09 --> Sebagian kolom WF 300 0.51 21.46
5 12,5/25 (1/2) 0.02 60.61 --> Sebagian kolom WF 250 0.43 25.76
6 10/20 (1/2) 0.01 94.70 --> Sebagian kolom WF 200 0.34 32.20

G SELIMUT BETON BALOK (BAJA WF)


1 15/30 (1) 0.05 21.04 --> keliling balok WF 300 0.70 14.73
2 12,5/25 (1) 0.02 60.61 --> keliling balok WF 250 0.59 35.76
3 10/20 (1) 0.01 94.70 --> keliling balok WF 200 0.44 41.67
4 15/30 (1/2) 0.02 42.09 --> Sebagian balok WF 300 0.42 17.68
5 12,5/25 (1/2) 0.03 30.30 --> Sebagian balok WF 250 0.35 10.61
6 10/20 (1/2) 0.02 47.35 --> Sebagian balok WF 200 0.28 13.26
Tulangan Lentur Tulangan Susut Total Bekisting
Jumlah Berat Jarak Ø Tul Berat Jumlah Berat Berat Luas Total Luas
Bh /m3 m1 mm /m1 Bh /m3 /m3 /m1 /m3

6.33 148.94 0.15 0.013 1.04 1.11 100.70 249.64 0.640 5.000
7.67 75.59 0.15 0.012 0.89 1.09 56.81 132.40 1.200 4.000
9.00 74.45 0.15 0.013 1.04 1.11 50.07 124.52 1.920 3.333
11.00 78.27 0.15 0.016 1.58 1.13 70.23 148.49 2.400 2.667
14.33 80.67 0.15 0.016 1.58 1.13 58.23 138.90 3.500 2.333
DAFTAR HARGA SATUAN

NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Pekerja
Pekerja Oh 73,500.00
Pekerja tak terlatih Oh 73,500.00
Pekerja semi terlatih Oh 78,400.00
Pekerja terlatih Oh 79,600.00
2 Tukang
Tukang batu Oh 102,500.00
Tukang kayu Oh 102,500.00
Tukang besi Oh 102,500.00
Tukang las Oh 102,500.00
Tukang pelitur Oh 102,500.00
Tukang cat Oh 102,500.00
Tukang pipa PVC Oh 102,500.00
Tukang pipa besi Oh 102,500.00
Tukang listrik Oh 102,500.00
Tukang Kaca Oh 102,500.00
Pengisi bronjong Oh 73,500.00
Penganyam bronjong Oh 102,500.00
Pemecah batu Oh 73,500.00
Pengergaji Oh 73,500.00
3 Kepala tukang Oh 108,500.00
Kepala tukang batu Oh 108,500.00
Kepala tukang kayu Oh 108,500.00
Kepala tukang besi beton Oh 108,500.00
Kepala tukang las Oh 111,500.00
Kepala tukang cat Oh 108,500.00
Kepala pengayam bronjong Oh 108,500.00
Kepala tukang listrik Oh 108,500.00
4 Pekerja ahli
Mandor Oh 115,100.00
Sopir Oh 96,400.00
Pembantu Sopir Oh 73,500.00
Mekanik Oh 105,500.00
Pembantu mekanik Oh 99,500.00
Operator semi terlatih Oh 81,000.00
Operator terlatih Oh 96,000.00
Pembantu operator Oh 84,400.00
Pemasak aspal Oh 73,500.00
NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Batu
Batu belah 15-20 cm m³ 185,000.00
Batu belah 10-15 cm m³ 150,000.00
Batu pecah 5-7 cm m³ 276,100.00
Batu pecah 3-5 cm m³ 347,100.00
Batu pecah 2-3 cm m³ 374,400.00
Batu pecah 1-2 cm m³ 287,000.00
Batu paras m³ 241,300.00
Batu kali alam m³ 215,800.00
2 Kerikil
Kerikil alam 2/3 cm m³ 373,900.00
Kerikil sungai royalti m³ 353,800.00
Kerikil pecah 1/2 cm m³ 361,900.00
Kerikil alam 1 cm m³ 361,900.00
3 Koral beton m³ 201,100.00
4 Agregate
Agregate 2-3 (stone crusher) Kg 274.07
Agregate 1-2 (stone crusher) m³ 425,000.00
Agregate klas B (20% : 80% agg.ksr) m³ 248,000.00
Agregat base kelas A m³ 288,800.00
Agregat base kelas B m³ 282,400.00
Agregat base kelas C m³ 266,000.00
5 Bata
Bata merah klas 1 buah 900.00
Bata merah klas 2 buah 800.00
6 Pasir
Pasir beton Kg 139.29
Pasir pasang m³ 185,000.00
Pasir urug m³ 140,000.00
7 Sirtu m³ 180,000.00
8 Tanah
Tanah urug biasa m³ 85,000.00
Tanah urug pilihan m³ 100,000.00
Tanah liat (Tl) m³ 70,000.00
9 Semen
Semen merah m³ 241,300.00
Semen warna kg 16,800.00
Semen Portland kg 1,400.00 zak (50 kg)
10 Rumput Gebalan m² 26,900.00
11 Kapur
Kapur gamping kg 2,450.00
Kapur biasa Kg 1,000.00
12 List plafon (profil) 4/4 cm m 26,900.00
13 Aspal
Aspal (aspal concrete/ac) kg 20,500.00
Aspal (medium curring/mc) kg 22,000.00
Aspal emulsi kg 19,100.00
14 Filter (abu batu) kg 3,100.00
15 Buton Granular Asphalt (BGA) kg 2,900.00
16 Air liter 75.00
17 Strorox kg 40,300.00
18 HB
NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Sirap kalimantan buah 2,900.00
2 Genteng
Genteng lokal buah 2,800.00
Genteng beton/pres buah 7,200.00
Genteng karang pilang/kodok buah 4,400.00
Genteng pejaten (sudah dicat) buah 3,600.00
Genteng kaca buah 19,200.00
Genteng keramik buah 21,200.00
Genteng PVC (alderon atau setara) m² 170,000.00
Genteng PVC transparan (alderon atau setara) m² 210,000.00
3 Bubungan
Bubungan genteng lokal buah 4,500.00
Bubungan genteng beton buah 7,700.00
Bubungan genteng pejaten buah 4,800.00
Bubungan genteng keramik buah 24,300.00
Bubungan karang pilang/kodok buah 7,000.00
Bubungan metalroof 0,35 mm, p = 90 cm (biasa) buah 41,600.00
Bubungan metalroof 0,35 mm, p = 90 cm (stone) buah 57,700.00
Bubungan metalroof 0,40 mm, p = 90 cm (biasa) buah 52,500.00
Bubungan metalroof 0,40 mm, p = 90 cm (stone) buah 65,000.00
Bubungan asbes gelombang lebar 92 cm buah 39,900.00
Bubungan asbes gelombang lebar 105 cm buah 84,400.00
Bubungan seng spandek 0,30 mm m1 30,000.00
Bubungan seng spandek 0,35 mm m1 35,000.00
Bubungan seng spandek 0,40 mm m1 40,000.00
Bubungan PVC (alderon atau setara) m1 90,000.00
4 Atap metal
Atap metalroof 0,35 mm 80 x 100 cm (biasa) lembar 47,850.00
Atap metalroof 0,35 mm 80 x 100 cm (stone) lembar 90,000.00
Atap metalroof 0,40 mm 80 x 100 cm (biasa) lembar 68,875.00
Atap metalroof 0,40 mm 80 x 100 cm (stone) lembar 116,500.00
5 Asbes
Asbes type genteng (tyluq) lembar 63,600.00
Asbes gelombang 92 x 180 cm lembar 45,000.00
Asbes gelombang 105 x 240 cm lembar 48,000.00
6 Ijuk kg 26,800.00
7 Seng
Seng gelombang besar BJLS 20 lembar 62,900.00
Seng gelombang besar BJLS 25 lembar 79,800.00
Seng gelombang besar BJLS 30 lembar 104,500.00
Seng gelombang kecil BJLS 20 lembar 72,000.00
Seng plat BJLS 20 lebar 90 cm m1 55,000.00
Seng plat BJLS 25 lebar 90 cm m1 75,000.00
Seng plat BJLS 30 lebar 90 cm m1 85,100.00
Seng spandek 0,30 mm lebar 70 cm m2 41,250.00
Seng spandek 0,35 mm lebar 70 cm m2 47,850.00
Seng spandek 0,40 mm lebar 70 cm m2 57,750.00
NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Papan
Papan kayu klas I m³ 8,000,000.00
Papan kayu klas II m³ 6,500,000.00
Papan kayu klas III m³ 4,500,000.00
Papan kayu bekisting m³ 4,500,000.00
2 Balok
Balok Kayu klas I m³ 7,000,000.00
Balok Kayu klas II m³ 5,500,000.00
Balok Kayu klas III m³ 3,500,000.00
Balok Kayu bekisting m³ 3,500,000.00
3 Dolken/perancah dia. 10/400 cm batang 20,000.00
4 Dolken/perancah dia. 20/400 cm batang 50,000.00
5 Schafolding set 1,153,400.00
6 Perancah kayu m³ 2,875,000.00
7 Kalsiplank 20 cm m1 27,500.00

NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Bambu
Bambu dia. 12,5/600 cm batang 26,900.00
Bambu dia. 10/600 cm batang 23,500.00
Bambu dia. 7/600 cm batang 20,200.00
2 Bedek
Bedek kulitan m2 49,000.00
Bedek biasa m2 47,000.00
Bedek pagar m2 38,300.00

NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Lubang angin beton (roster)
Roster beton uk. 10 x 20 cm buah 45,000.00
Roster beton uk. 20 x 20 cm buah 52,500.00
Roster beton uk. 30 x 30 cm buah 57,000.00
2 Buis beton
Buis beton dia. 10 cm m1 60,000.00
Buis beton dia. 20 cm m1 85,000.00
Buis beton dia. 30 cm m1 110,000.00
Buis beton dia. 40 cm m1 150,000.00
Buis beton dia. 60 cm m1 250,000.00
Buis beton dia. 80 cm m1 340,000.00
3 Paving blok
Paving Pres type bata t = 6 cm buah 1,400.00
Paving Pres type bata t = 8 cm buah 1,800.00
Paving Pres type bata t = 10 cm buah 2,400.00
4 Batako 10 x 20 x 40 cm buah 3,500.00
5 Roster keramik buah 70,000.00
NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Tegel
Tegel abu abu uk. 20 x 20 cm buah 2,200.00
Tegel bergaris abu uk. 20 x 20 cm buah 2,850.00
Tegel warna uk. 20 x 20 cm buah 2,200.00
Tegel bergaris warna uk. 20 x 20 cm buah 2,750.00
Tegel traso klas I uk. 30 x 30 cm buah 6,250.00
Tegel traso klas II uk. 30 x 30 cm buah 5,750.00
2 Keramik
Keramik dinding m² 82,000.00
Keramik kw I (motif) m² 79,200.00
Keramik kw II (motif) m² 72,000.00
Keramik kw I (polos) m² 65,400.00
Keramik kw II (polos) m² 63,600.00
Keramik list m' 15,000.00
Granit m² 113,200.00
3 Marmer
Marmer kw I m² 308,700.00
Marmer kw II m² 233,000.00
4 Porselin
Porselin kw I (polos) buah 3,177.00
5 Batu
Batu tempel hitam m² 220,000.00

NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Besi Beton Ulir kg 12,500.00
2 Besi Beton Polos kg 12,500.00
3 Besi Profil kg 18,000.00
4 Besi IWF kg 18,000.00
5 Besi SCH 40 kg 7,500.00
6 Besi Plat kg 22,000.00
7 Pipa Kotak 100 x 100 x 3.2 mm m' 95,700.00
8 Pipa Kotak 50 x 100 x 2.3 mm m' 57,300.00
9 Pipa Kotak 50 x 50 x 2.0 mm m' 28,500.00
10 Pipa Kotak 40 x 40 x 1.6 mm m' 22,000.00
11 Pipa Kotak 20 x 40 x 1.4 mm m' 12,650.00
12 Plat Eser 120 x 240 x 6 mm lembar 1,430,000.00
13 Plat Eser 120 x 240 x 8 mm lembar 1,426,700.00
14 Plat Eser 120 x 240 x 10 mm lembar 2,735,700.00
15 Plat Eser 120 x 240 x 12 mm lembar 3,264,800.00
16 Besi Siku 30 x 30 x 2 mm m' 11,400.00
17 Besi Siku 40 x 40 x 3 mm m' 12,500.00
18 Besi Siku 50 x 50 x 4 mm m' 38,000.00
19 Besi Siku 60 x 60 x 5 mm m' 96,400.00
20 Besi Siku 70 x 70 x 6 mm m' 120,300.00
21 Alluminium Kusen 3" (natural) m' 123,700.00
22 Alluminium Kusen 4" (natural) m' 137,500.00
23 Alluminium Kusen 3" (warna) m' 137,500.00
24 Alluminium Kusen 4" (warna) m' 151,200.00
25 Alluminium Alexindo Tiang Back Mullion m' 70,600.00
26 Alluminium Alexindo Transome CW m' 80,453.00
27 Bracket Mullion Bh 18,000.00
28 Step Nosing Aluminium m' 100,000.00
29 Besi CNP 100 x 50 x 20 x 2,3 mm m' 55,800.00
30 Besi CNP 125 x 50 x 20 x 2,3 mm m' 62,100.00
31 Besi CNP 150 x 50 x 20 x 2,3 mm m' 68,200.00
32 Besi CNP 150 x 65 x 20 x 2,3 mm m' 75,600.00
33 Besi CNP 200 x 75 x 20 x 3,2 mm m' 129,800.00
34 Baja ringan canal C75 m' 17,000.00
35 Reng canal 45 mm m' 9,900.00
36 Baja ringan hollow 40 x 40 mm m' 13,700.00
37 Kawat Ikat Beton kg 22,000.00
38 Kawat Nyamuk Besi m² 24,200.00
39 Kawat Nyamuk Plastik m² 23,900.00
40 Kawat Saringan Pasir m² 30,000.00
41 Kawat harmonika m² 44,000.00
37 Kawat Duri rol 88,000.00
38 Kawat Bronjong 3 mm kg 27,500.00
39 Kawat Bronjong 4 mm kg 33,000.00
40 Kawat 3 mm (gulungan) kg 21,300.00
41 Kawat Las kg 38,500.00
42 Jaring kawat baja dilas kg 23,900.00
43 Besi Angkur Ø 8 mm kg 23,700.00
44 Besi Angkur Ø 22 mm kg 55,000.00
45 Besi strip tebal 5 mm kg 23,900.00
46 Besi strip 2 x 3 mm kg 23,900.00
47 Baja strip (0,2 x 2) cm kg 23,900.00
48 Baja strip kg 23,900.00
49 Plat boundeck 0,75 mm m2 143,000.00
50 Besi list kaca (1 x 1) cm m1 319,400.00
51 Pintu gulung besi m2 732,000.00
52 Pintu lipat baja Folding door besi strip 3 mm m2 760,000.00
53 Rolling door alluminium m2 497,000.00
54 Alumunium strip m1 50,400.00
55 Alumunium voil Lbr 116,300.00
56 Pintu Alumunium m2 150,200.00
57 Profil kaca alluminium m1 62,500.00
58 Jendela nako (rangka + kaca 5 mm) m2 279,500.00
59 Kawat 4 mm (gulungan) kg 21,300.00
60 Pagar BRC 120x240 cm buah 468,500.00
61 Tiang BRC 15"x120 cm buah 109,800.00
62 Knop Tiang BRC 15" buah 10,100.00
63 Pintu BRC 120x100 cm Swing Tunggal buah 676,300.00
64 Mur Baut BRC M8x80 buah 2,600.00
65 Angkur Baut HTB M24 Bh 75,000.00
66 Baut Baja HTB M19 buah 7,500.00
67 Baut Mur Baja M10 Panjang 50 mm Buah 4,500.00
68 Trecker buah 24,700.00
69 Trash rack 1000 x 2000 unit 111,100.00
NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Eternit 100 x 100 Cm lembar 22,500.00
2 Triplek 120x240x 2 mm lembar 62,000.00
3 Triplek 120x240x 3 mm lembar 67,400.00
4 Triplek 120x240x 4 mm lembar 60,950.00
5 Triplek 120x240x 6 mm M2 26,354.17
6 Triplek 120x240x 9 mm lembar 115,000.00
7 Triplek 120x240x 12 mm lembar 161,000.00
8 Triplek 120x240x 15 mm lembar 225,400.00
9 Triplek 120x240x 18 mm lembar 241,500.00
10 Lapisan HPL (Uk.120x240)cm M2 78,263.89
11 Blockboar 120x240x 18 mm lembar 305,000.00
12 Teakblock 120x240x 18 mm lembar 400,000.00
13 Triplek lapis aluminium lembar 108,100.00
14 Calsiboard 120x240x3,5 mm lembar 71,300.00
15 Calsiboard 120x240x6 mm lembar 139,150.00
16 Gypsum board 1200 x 2400 x 6 mm lembar 85,000.00
17 Gypsum board 1200 x 2400 x 9 mm lembar 127,200.00
18 UPVC Plafon M2 170,000.00
19 Polywood 120x240x 3 mm lembar 106,600.00
20 Teakwood 120x240x 3 mm lembar 109,200.00
21 Formika Putih 120 x 240 Cm lembar 147,700.00
22 Formika Warna 120 x 240 Cm lembar 153,800.00
23 Aluminium Composite Panel 4 mm lembar 1,000,000.00
24 Daun Pintu Aluminium Bh 750,000.00
25 List Gypsum Profil m' 34,400.00
26 List Kayu Profil m' 7,600.00
27 List UPVC Profil m' 32,500.00
28 List Kayu Polos m' 5,000.00
29 Lem Kayu kg 23,000.00
30 Lem Vinyl kg 32,700.00
NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
PIPA GI
1 Pipa GI Medium B Ø ½" m1 13,200.00
2 Pipa GI Medium B Ø ¾" m1 17,500.00
3 Pipa GI Medium B Ø 1" m1 21,700.00
4 Pipa GI Medium B Ø 1 ½" m1 32,500.00
5 Pipa GI Medium B Ø 2" m1 42,000.00
6 Pipa GI Medium B Ø 3" m1 64,000.00
7 Pipa GI Medium B Ø 4" m1 83,800.00
8 Pipa GI Medium B Ø 6" m1 -
9 Pipa GI Medium A Ø ½" m1 24,000.00
10 Pipa GI Medium A Ø ¾" m1 36,000.00
11 Pipa GI Medium A Ø 1" m1 36,700.00
12 Pipa GI Medium A Ø 1 ½" m1 81,000.00
13 Pipa GI Medium A Ø 2" m1 101,200.00
14 Pipa GI Medium A Ø 3" m1 166,800.00
15 Pipa GI Medium A Ø 4" m1 242,600.00
16 Pipa GI Medium A Ø 6" m1 370,800.00
PIPA VPC
1 Pipa PVC AW Ø ½" m1 6,000.00
2 Pipa PVC AW Ø ¾" m1 7,500.00
3 Pipa PVC AW Ø 1" m1 9,900.00
4 Pipa PVC AW Ø 1 ½" m1 16,500.00
5 Pipa PVC AW Ø 2" m1 22,800.00
6 Pipa PVC AW Ø 3" m1 42,000.00
7 Pipa PVC AW Ø 4" m1 64,500.00
8 Pipa Drain Air Hujan PVC AW Ø 4" m1 200,000.00
9 Pipa PVC AW Ø 6" m1 130,500.00
10 Pipa PVC AW Ø 8" m1 -
11 Pipa PVC D Ø 1 ½" m1 9,000.00
12 Pipa PVC D Ø 2" m1 12,600.00
13 Pipa PVC D Ø 3" m1 25,200.00
14 Pipa PVC D Ø 4" m1 34,500.00
15 Pipa PVC D Ø 6" m1 69,750.00
16 Pipa PVC D Ø 8" m1 122,700.00
17 Mata gergaji besi Buah 84,200.00
18 Stang gergaji besi Buah 34,900.00
19 Betel besar Buah 21,000.00
20 Betel kecil Buah 10,500.00
21 Bending PIPA Btg 125,000.00
22 Bend Section Ø 370 mm, Tebal 5 mm Buah 2,463,000.00
23 Expantion Join Ø 370 mm Set 272,500.00
NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Kaca Polos 3 mm m² 150,000.00
2 Kaca Polos 5 mm m² 176,000.00
3 Kaca Darkrin 8 mm (panasap) m² 522,500.00
4 Kaca Polos 10 mm m² 409,000.00
5 Kaca tempred 12mm (Diamond) m² 1,400,000.00
6 Kaca Riben Tebal 3 mm m² 160,000.00
7 Kaca Riben Tebal 5 mm m² 187,000.00
8 Kaca Raiben 10 mm m² 646,250.00
9 Kaca Raiben 12 mm m² 687,500.00
10 Kaca Buram 3 mm m² 158,600.00
11 Kaca Buram 5 mm m² 258,750.00
12 Kaca Buram bermotif 3 mm m² 208,700.00
13 Kaca Buram bermotif 5 mm m² 258,800.00
14 Kaca Cermin 5 mm m² 125,200.00
15 Kaca Wire Glass 5 mm m² 250,500.00
16 Kaca Wire Glass 8 mm m² 250,500.00
17 Glass Blok buah 41,750.00
18 Kerangka Nako 5 mm m² 118,200.00
19 Kerangka Es 3 mm m² 125,200.00

NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Ampelas lembar 3,500.00
2 Plamir Kayu kg 22,500.00
3 Plamir Tembok kg 11,150.00
4 Spiritus liter 16,500.00
5 Minyak Cat liter 33,000.00
6 Residu liter 17,900.00
7 Teak Oil liter 32,350.00
8 Melamin lembar 79,150.00
9 Meni Besi kg 33,700.00
10 Meni Kayu kg 29,300.00
11 Cat Kayu Mutu Menengah kg 40,000.00
12 Cat Kayu Mutu Tinggi kg 55,000.00
13 Cat Tembok dasar kg 40,000.00
14 Cat Tembok interior kg 45,000.00
15 Cat Tembok ekserior kg 95,000.00
16 Cat Besi Mutu Menengah kg 50,000.00
17 Cat Besi Mutu Tinggi kg 60,000.00
18 Cat genteng kg 60,000.00
19 Cat termoplastik kg 25,300.00
20 Glass bead kg 20,700.00
21 Kuas bh 7,500.00
22 Tepung Gypsum kg 21,800.00
23 Teer liter 7,850.00
24 Politur liter 42,000.00
25 Cat Marka Jalan Scalato kg 67,050.00
26 Aqua Proff kg 51,000.00
27 Cat Marka Jalan Biasa kg 59,000.00
28 Cairan Pengupas Cat kg 205,100.00
29 Cairan Pengeras Cat (Hardner) kg 186,600.00
30 Roll cat buah 13,800.00
31 Kape buah 5,600.00
32 Sikat Baja buah 18,000.00
33 Vernis Liter 41,000.00
34 Wood Filler kg 25,000.00
35 Soda Api kg 32,000.00
NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN
1 2 3 5 6
1 Kunci pintu mutu menengah buah 126,300.00
2 Kunci pintu mutu Tinggi buah 356,100.00
3 Hendle Pintu Ex. Dorma Buah 225,000.00
4 Yale Kecil buah 90,000.00
5 Yale Besar buah 150,000.00
6 Kuda Terbang Kecil buah 77,600.00
7 Kuda Terbang Besar buah 93,700.00
8 Royal stel 84,700.00
9 Haag Angin Besar stel 8,200.00
10 Haag Angin Kecil stel 6,600.00
11 Hak Angin ( Ramskar Jendela Dekkson AWH SQ 001 ) stel 170,400.00
12 Grendel Besar buah 15,100.00
13 Grendel Kecil buah 11,600.00
14 Engsel Nylon buah 30,000.00
15 Engsel Dekkson buah 27,500.00
16 Engsel H buah 15,000.00
17 Expagnolet buah 20,400.00
18 Kunci Tanam Biasa buah 119,700.00
19 Kunci Tanam Biasa Mutu Menengah buah 199,600.00
20 Kunci Tanam Antik buah 319,400.00
21 Kunci Silinder buah 55,900.00
22 Kunci Slot buah 87,800.00
23 Door Holder buah 47,900.00
24 Door Closer buah 495,000.00
25 Door Stop buah 60,600.00
26 Rel Pintu buah 35,900.00
27 Fitingan pintu kaca set 550,000.00
28 Floorhinges mutu tinggi set 1,050,000.00
29 Handle pintu stainless steel T.60cm bh 450,000.00
30 Kunci pintu aluminium bh 375,000.00
31 Daun Pintu Besi m² 1,190,650.00

NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN


1 2 3 5 6
1 Closet Duduk Keramik buah 1,960,700.00
2 Closet Jongkok Teraso buah 89,500.00
3 Closet Jongkok Porselin buah 209,400.00
4 Wastafel buah 1,450,000.00
5 Urinoir Porselin (kualitas 1) buah 2,265,000.00
6 Saringan Air Besi Stainless buah 266,350.00
7 Saringan Air Besi buah 72,600.00
8 Saringan Air Plastik buah 19,500.00
9 Bak Cuci Piring Teraso buah 304,300.00
10 Bak Cuci Stainless Steel buah 370,300.00
11 Bak Cuci Piring Logam buah 453,100.00
12 Reservoir Air Rangka Baja 1 M3 buah 3,560,000.00
13 Septictank Kapasitas 1 M3 buah 3,203,800.00
14 Septictank Kapasitas 2 M3 buah 4,164,900.00
15 Bak Fiberglass 0,30 M3 buah 275,000.00
16 Bak Fiberglass 1,00 M3 buah 392,050.00
17 Bak Mandi Plastik Kap 0,5 M3 buah 466,700.00
18 Bak Mandi Teraso 50 x 50 x 50 cm buah 410,800.00
19 Bak Mandi Porselin buah 450,000.00
20 Kran Air Dia. 1/2" buah 17,500.00
21 Kran Air Dia. 3/4" buah 20,000.00
22 Floor Drain buah 21,800.00
23 Jet Washer buah 200,000.00
23 Seal Tape buah 3,650.00
33 Sumur Pompa Tangan Terpasang buah 1,277,600.00
NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Paku 1 - 3 cm kg 24,300.00
2 Paku 4 - 6 cm kg 23,400.00
3 Paku 7 - 12 cm kg 22,500.00
4 Paku kait Buah 2,100.00
5 Paku eternit kg 25,000.00
6 Paku seng kg 19,300.00
7 Paku asbes kg 30,400.00
8 Skrup / Piles 1,5 Cm. Doos Kecil 15,000.00
9 Skrup / Piles 2,0 Cm. Doos Kecil 12,800.00
10 Skrup fixer bh 2,500.00
11 Skrup 10,66 mm bh 400.00
12 Dynabol dia 12 x 120 mm bh 5,000.00
13 Paku sumbat Kotak 26,700.00
14 Besi beugel/ baut (utk kuda-kuda) buah 25,000.00
15 Paku skrup 1 - 2,5 cm buah 450.00

NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Titik lampu buah 197,700.00
2 Stop kontak tanam buah 39,000.00
3 Saklar tanam buah 175,000.00
4 Saklar ganda buah 35,200.00
5 Saklar tunggal buah 24,200.00
6 Zekering boxs 1 group buah 326,700.00
7 Zekering boxs 2 group buah 423,500.00
8 Zekering boxs 3 group buah 520,300.00
9 Box skring 2 grup bh 188,800.00
10 Lampu Down Light 4" Philips LED 1 x 18 watt Bh 234,000.00
11 Lampu Down Light 4" Philips LED 1 x 10 watt Bh 150,000.00
12 Tiang utama ( T.Beton 11 Meter ) batang 4,729,000.00
13 Tiang utama ( T.Besi 9 meter ) m³ 2,389,000.00
14 Isolator Tumpu 20 kV buah 306,250.00
15 Isolator Tarik 20 kV buah 437,050.00
16 Konduktor AAAC 70 mm2 m 34,000.00
17 Faktor Pemasangan AAAC 0,035 m 34,000.00
18 Faktor Pemasangan LVTC 0,035 m 59,950.00
19 Trackschoor set 1,048,000.00
20 a. Type A1 set 552,200.00
21 b. Type A3 set 1,280,850.00
22 Cross Arm A1 UNP. 80 set 894,850.00
23 Cross Cut Out UNP. 80 set 894,850.00
24 Distribusi Tie 70 mm2 buah 29,050.00
25 Joint Sleve 70 mm2 buah 67,350.00
26 Penghalang Panjat buah 94,850.00
27 Tanda Kilat buah 69,850.00
28 LVTC 3 x 70 + 50mm2 m 68,750.00
29 Suspension Assembly buah 111,800.00
30 Large Angle Assembly buah 161,600.00
31 Fixed Dead End buah 118,800.00
32 Bundel Assembly buah 70,650.00
33 Tap Connector 70/50 mm2 buah 21,050.00
34 Joint Sleve 70 mm2 buah 67,350.00
35 Arde 5 OHM buah 711,150.00
36 Arde U/5 OHM pasangan luar buah 615,000.00
37 Arde U/3 OHM pasangan luar set 1,186,350.00
38 Trafo 50 kVA / 20 KV (Step Up), 3 Phasa unit 87,346,850.00
39 Fuse Cut Out 20 kV buah 1,262,000.00
40 Lighting Arrester 20 kV buah 1,277,250.00
41 LBS /Sistem interkoneksi + Accesories buah 6,987,750.00
42 Penghalang Panjat buah 94,850.00
43 Tanda Kilat Besar buah 104,850.00
44 Yser Werk U/Trafo 3 Phase, konst. 2 tiang set 2,466,000.00
45 LV Board U/ 2 Jurusan, 3 phase set 11,769,050.00
46 Tap Conector 50 mm2 AL. AL buah 30,500.00
47 Assesoris (perkuatan, las dll) Ls 15,000.00
48 Alat Bantu Set 45,000.00

NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
1 Axytilin Botol 352,400.00
2 Bentonite zak 273,200.00
3 Flux Oil liter 4,400.00
4 Solar liter 6,400.00
5 Kayu bakar m³ 198,000.00
6 Minyak begisting liter 16,500.00
7 Minyak pelumas liter 25,000.00
8 Kerosene liter 3,500.00
9 Filler Kg 1,400.00
10 Oxigen Botol 231,000.00
11 Sambungan Rumah 1" set 2,310,000.00
12 Sambungan Rumah 1/2" set 1,188,000.00
13 Sambungan Rumah 2/4" set 1,650,000.00
14 Wall Paper m² 55,000.00
15 Floor hardener kg 19,800.00
16 Sewa mesin las Jam 30,000.00
17 Sewa mesin potong besi Jam 20,000.00
18 Sewa mesin bor besi Jam 20,000.00
19 Sewa alat Perakitan Baja IWF Jam 1,000,000.00
20 Sewa Scaffolding Unit 60,000.00
21 Mata bor besi buah 25,000.00
22 Listrik Kwh 1,782.00
23 Compressor Jam 90,000.00
24 Dump Truck Jam 120,000.00
25 Alat-alat bantu Set 50,000.00
26 Ramset buah 16,500.00
27 Sealant Tube 50,000.00
28 Rubber Setting Block M1 18,000.00
29 Venetions blinds dan vertical blinds (tirai) m² 165,000.00

NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
INSTALASI KWH PLN
1 Biaya Penyambungan (BP) PLN Daya 30.000 VA Ls 36,000,000.00
2 Biaya Uang Jaminan Langanan (UJL) Ls 2,352,000.00
3 Biaya Pemeriksaan Instalasi Listrik Tegangan Rendah Ls 1,320,000.00
4 Jasa Supervisi Instalasi Listrik Ls 1,500,000.00
5 Gambar Instalasi Listrik Ls 1,000,000.00
6 Biaya Uji Coba & Comisioning Ls 1,000,000.00
7 Kabel daya NYFGBY 4x95 mm2 M1 558,000.00
8 Kabel daya NYFGBY 4x95 mm2 M1 558,000.00
NO. URAIAN SATUAN HARGA (Rp.) KETERANGAN

1 2 3 5 6
MANAJEMEN KESEHATAN DAN KESELAMATAN KERJA
1 Penyiapan RKK, terdiri dari :
Pembuatan dokumen Rencana Keselamatan Konstruksi
Set 750,000.00
Pembuatan prosedur dan instruksi kerja Set 500,000.00
Penyiapan formulir Set 500,000.00
2 Sosialisasi, Promosi dan pelatihan terdiri dari :
Pengarahan K3 (Safety Briefeng) Bh 200,000.00
Spanduk (Banner) Bh 150,000.00
Poster Bh 150,000.00
3 Alat Pelindung Diri dan Pelindung Kerja, terdiri dari :
Topi pelindung Bh 125,000.00
Pelindung mata Psg 50,000.00
Pelindung pernafasan dan mulut (masker) Bh 50,000.00
Sarung tangan Psg 30,000.00
Sepatu keselamatan Psg 130,000.00
Rompi keselamatan Bh 50,000.00
4 Asuransi dan Perizinan : Keg 1,000,000.00
5 Fasilitas Sarana Kesehatan :
Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat luk Unit 750,000.00
6 Rambu - Rambu :
Rambu-Rambu proyek Bh 100,000.00
Jalur evakuasi Bh 100,000.00
7 Konsultasi dengan Ahli terkait Keselamatan Konstruksi Ls 1,000,000.00
8 Lain - Lain Terkait Pengendalian Resiko K3 :
Alat pemadam api ringan Bh 1,000,000.00
Bendera K3, uk. 1350 x 900 mm Bh 50,000.00
9 Protokol Pencegahan COVID-19 :
Pembentukan Satgas Covid-19 OB -
Pencuci Tangan (Peralatan, Air dan sabun ) Set 350,000.00
Handsatizer Botol 500ml Bh 50,000.00
Thermometer Gun Bh 150,000.00
Masker Kain Unit 15,000.00
DAFTAR ANALISA HARGA SATUAN
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A.2.2.1.1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 m ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.400 73,500.00 29,400.00
2 Tukang kayu L.02 Oh 0.200 102,500.00 20,500.00
3 Kepala tukang L.03 Oh 0.020 108,500.00 2,170.00
4 Mandor L.04 Oh 0.020 115,100.00 2,302.00
JUMLAH TENAGA KERJA 54,372.00
B BAHAN
1 Dolken/perancah dia. 10/400 cm batang 1.250 20,000.00 25,000.00
2 Semen Portland kg 5.000 1,400.00 7,000.00
3 Pasir pasang m³ 0.005 185,000.00 925.00
4 Agregate 2-3 (stone crusher) Kg 0.009 274.07 2.47
5 Balok Kayu klas II m³ 0.072 5,500,000.00 396,000.00
6 Paku 7 - 12 cm kg 0.060 22,500.00 1,350.00
7 Residu liter 0.400 17,900.00 7,160.00
JUMLAH HARGA BAHAN 437,437.47
C PERALATAN
1
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 491,809.47
E Overhead & Profit 10% x D 49,180.95
F HARGA SATUAN PEKERJAAN (D+E) 540,990.41

A.2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 m ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.200 73,500.00 14,700.00
2 Tukang kayu L.02 Oh 0.400 102,500.00 41,000.00
3 Kepala tukang L.03 Oh 0.020 108,500.00 2,170.00
4 Mandor L.04 Oh 0.020 115,100.00 2,302.00
JUMLAH TENAGA KERJA 60,172.00
B BAHAN
1 Dolken/perancah dia. 10/400 cm batang 1.250 20,000.00 25,000.00
2 Semen Portland kg 2.500 1,400.00 3,500.00
3 Seng gelombang besar BJLS 25 lembar 1.200 79,800.00 95,760.00
4 Pasir beton Kg 0.005 139.29 0.70
5 Koral beton m³ 0.090 201,100.00 18,099.00
6 Balok Kayu klas II m³ 0.072 5,500,000.00 396,000.00
7 Paku 1 - 3 cm kg 0.060 24,300.00 1,458.00
8 Meni Besi kg 0.450 33,700.00 15,165.00
JUMLAH HARGA BAHAN 554,982.70
C PERALATAN
1
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 25,000.00
E Overhead & Profit 10% x D 2,500.00
F HARGA SATUAN PEKERJAAN (D+E) 27,500.00

A.2.2.1.3 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 m ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.200 73,500.00 14,700.00
2 Tukang kayu L.02 Oh 0.300 102,500.00 30,750.00
3 Kepala tukang L.03 Oh 0.020 108,500.00 2,170.00
4 Mandor L.04 Oh 0.020 115,100.00 2,302.00
JUMLAH TENAGA KERJA 49,922.00
B BAHAN
1 Dolken/perancah dia. 10/400 cm batang 1.000 20,000.00 20,000.00
2 Semen Portland kg 2.000 1,400.00 2,800.00
3 Kawat Duri rol 25.000 88,000.00 2,200,000.00
4 Pasir beton Kg 0.005 139.29 0.70
5 Koral beton m³ 0.009 201,100.00 1,809.90
6 Paku 4 - 6 cm kg 0.060 23,400.00 1,404.00
JUMLAH HARGA BAHAN 2,226,014.60
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 2,275,936.60
E Overhead & Profit 10% x D 227,593.66
F HARGA SATUAN PEKERJAAN (D+E) 2,503,530.26

A.2.2.1.4 Pengukuran dan pemasangan 1 m1 Bouwplank ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.100 73,500.00 7,350.00
2 Tukang kayu L.02 Oh 0.100 102,500.00 10,250.00
3 Kepala tukang L.03 Oh 0.010 108,500.00 1,085.00
4 Mandor L.04 Oh 0.005 115,100.00 575.50
JUMLAH TENAGA KERJA 19,260.50
B BAHAN
1 Balok Kayu klas II m³ 0.012 5,500,000.00 66,000.00
2 Paku 7 - 12 cm kg 0.020 22,500.00 450.00
3 Papan kayu klas II m³ 0.007 6,500,000.00 45,500.00
JUMLAH HARGA BAHAN 111,950.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 131,210.50
E Overhead & Profit 10% x D 13,121.05
F HARGA SATUAN PEKERJAAN (D+E) 144,331.55

A.2.2.1.5 Pembuatan 1 m2 kantor sementara lantai plesteran ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.667 73,500.00 49,000.00
2 Tukang kayu L.02 Oh 0.667 102,500.00 68,333.33
3 Tukang batu L.02 Oh 0.333 102,500.00 34,166.67
4 Kepala tukang L.03 Oh 0.100 108,500.00 10,850.00
5 Mandor L.04 Oh 0.017 115,100.00 1,918.33
JUMLAH TENAGA KERJA 164,268.33
B BAHAN
1 Dolken/perancah dia. 10/400 cm batang 0.417 20,000.00 8,333.33
2 Balok Kayu klas II m³ 0.043 5,500,000.00 238,333.33
3 Paku 4 - 6 cm kg 0.027 23,400.00 624.00
4 Baja strip kg 3.667 23,900.00 87,633.33
5 Semen Portland kg 11.667 1,400.00 16,333.33
6 Pasir pasang m³ 0.050 185,000.00 9,250.00
7 Pasir beton Kg 0.033 139.29 4.64
8 Koral beton m³ 0.050 201,100.00 10,055.00
9 Bata merah klas 1 buah 10.000 900.00 9,000.00
10 Seng plat BJLS 25 lebar 90 cm m1 0.083 75,000.00 6,250.00
11 Kerangka Nako 5 mm m² 0.067 118,200.00 7,880.00
12 Kaca Polos 3 mm m² 0.027 150,000.00 4,000.00
13 Kunci pintu mutu menengah buah 0.050 126,300.00 6,315.00
14 Triplek 120x240x 6 mm M2 0.020 26,354.17 527.08
JUMLAH HARGA BAHAN 404,539.06
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 568,807.39
E Overhead & Profit 10% x D 56,880.74
F HARGA SATUAN PEKERJAAN (D+E) 625,688.13

A.2.2.1.6 Pembuatan 1 m2 rumah jaga (konstruksi kayu) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.000 73,500.00 73,500.00
2 Tukang kayu L.02 Oh 1.500 102,500.00 153,750.00
3 Kepala tukang L.03 Oh 0.150 108,500.00 16,275.00
4 Mandor L.04 Oh 0.050 115,100.00 5,755.00
JUMLAH TENAGA KERJA 249,280.00
B BAHAN
1 Dolken/perancah dia. 10/400 cm batang 3.000 20,000.00 60,000.00
2 Balok Kayu klas II m³ 0.276 5,500,000.00 1,518,000.00
3 Paku 4 - 6 cm kg 0.700 23,400.00 16,380.00
4 Seng gelombang besar BJLS 30 lembar 1.500 104,500.00 156,750.00
JUMLAH HARGA BAHAN 1,751,130.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 2,000,410.00
E Overhead & Profit 10% x D 200,041.00
F HARGA SATUAN PEKERJAAN (D+E) 2,200,451.00

A.2.2.1.7 Pembuatan 1 m2 gudang semen dan peralatan ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.000 73,500.00 73,500.00
2 Tukang kayu L.02 Oh 2.000 102,500.00 205,000.00
3 Kepala tukang L.03 Oh 0.200 108,500.00 21,700.00
4 Mandor L.04 Oh 0.050 115,100.00 5,755.00
JUMLAH TENAGA KERJA 305,955.00
B BAHAN
1 Dolken/perancah dia. 10/400 cm batang 1.700 20,000.00 34,000.00
2 Balok Kayu klas II m³ 0.210 5,500,000.00 1,155,000.00
3 Paku 4 - 6 cm kg 0.300 23,400.00 7,020.00
4 Semen Portland kg 10.500 1,400.00 14,700.00
5 Pasir beton Kg 0.030 139.29 4.18
6 Koral beton m³ 0.050 201,100.00 10,055.00
7 Seng gelombang besar BJLS 30 lembar 1.500 104,500.00 156,750.00
8 Seng plat BJLS 25 lebar 90 cm m1 0.250 75,000.00 18,750.00
JUMLAH HARGA BAHAN 1,396,279.18
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,702,234.18
E Overhead & Profit 10% x D 170,223.42
F HARGA SATUAN PEKERJAAN (D+E) 1,872,457.60

A.2.2.1.8 Pembuatan 1 m2 bedeng pekerja ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.000 73,500.00 73,500.00
2 Tukang kayu L.02 Oh 2.000 102,500.00 205,000.00
3 Kepala tukang L.03 Oh 0.200 108,500.00 21,700.00
4 Mandor L.04 Oh 0.050 115,100.00 5,755.00
JUMLAH TENAGA KERJA 305,955.00
B BAHAN
1 Dolken/perancah dia. 10/400 cm batang 1.250 20,000.00 25,000.00
2 Balok Kayu klas II m³ 0.186 5,500,000.00 1,023,000.00
3 Paku 4 - 6 cm kg 0.300 23,400.00 7,020.00
4 Semen Portland kg 18.000 1,400.00 25,200.00
5 Pasir beton Kg 0.030 139.29 4.18
6 Koral beton m³ 0.050 201,100.00 10,055.00
7 Seng gelombang besar BJLS 30 lembar 1.500 104,500.00 156,750.00
8 Triplek 120x240x 4 mm lembar 1.350 60,950.00 82,282.50
JUMLAH HARGA BAHAN 1,329,311.68
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,635,266.68
E Overhead & Profit 10% x D 163,526.67
F HARGA SATUAN PEKERJAAN (D+E) 1,798,793.35

A.2.2.1.9 Pembersihan 1 m2 lapangan dan perataan ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.100 73,500.00 7,350.00
2 Mandor L.04 Oh 0.050 115,100.00 5,755.00
JUMLAH TENAGA KERJA 13,105.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 13,105.00
E Overhead & Profit 10% x D 1,310.50
F HARGA SATUAN PEKERJAAN (D+E) 14,415.50

A.2.2.1.10 Pembuatan 1 m2 steger/perancah dari bambu ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.000 73,500.00 73,500.00
2 Tukang kayu L.02 Oh 2.000 102,500.00 205,000.00
3 Kepala tukang L.03 Oh 0.200 108,500.00 21,700.00
4 Mandor L.04 Oh 0.050 115,100.00 5,755.00
JUMLAH TENAGA KERJA 305,955.00
B BAHAN
1 Bambu dia. 12,5/600 cm batang 1.250 26,900.00 33,625.00
2 Ijuk kg 0.186 26,800.00 4,984.80
JUMLAH HARGA BAHAN 38,609.80
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 344,564.80
E Overhead & Profit 10% x D 34,456.48
F HARGA SATUAN PEKERJAAN (D+E) 379,021.28

A.2.2.1.11 Pembuatan 1 buah kotak adukan ukuran 40cm x 50cm x 25cm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Tukang kayu L.02 Oh 0.300 102,500.00 30,750.00
2 Kepala tukang L.03 Oh 0.030 108,500.00 3,255.00
JUMLAH TENAGA KERJA 34,005.00
B BAHAN
1 Papan kayu klas II m³ 0.036 6,500,000.00 234,000.00
2 Balok Kayu klas II m³ 5,500,000.00 -
3 Paku 4 - 6 cm kg 0.080 23,400.00 1,872.00
JUMLAH HARGA BAHAN 235,872.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 269,877.00
E Overhead & Profit 10% x D 26,987.70
F HARGA SATUAN PEKERJAAN (D+E) 296,864.70

A.2.2.1.12 Pembuatan 1 m2 jalan sementara ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.000 73,500.00 73,500.00
2 Mandor L.04 Oh 0.005 115,100.00 575.50
JUMLAH TENAGA KERJA 74,075.50
B BAHAN
1 Batu belah 15-20 cm m³ 0.150 185,000.00 27,750.00
2 Batu pecah 5-7 cm m³ 0.090 276,100.00 24,849.00
3 Pasir pasang m³ 0.010 185,000.00 1,850.00
JUMLAH HARGA BAHAN 54,449.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 128,524.50
E Overhead & Profit 10% x D 12,852.45
F HARGA SATUAN PEKERJAAN (D+E) 141,376.95

A.2.2.1.13 Pembongkaran 1 m3 beton bertulang ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 13.334 73,500.00 980,049.00
2 Mandor L.04 Oh 0.666 115,100.00 76,656.60
JUMLAH TENAGA KERJA 1,056,705.60
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
1 Alat Bantu set 1.000 45,000.00 45,000.00
JUMLAH HARGA ALAT 45,000.00
D Jumlah (A+B+C) 1,101,705.60
E Overhead & Profit 10% x D 110,170.56
F HARGA SATUAN PEKERJAAN (D+E) 1,211,876.16

A.2.2.1.14 Pembongkaran 1 m3 dinding tembok bata ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 6.667 73,500.00 490,024.50
2 Mandor L.04 Oh 0.333 115,100.00 38,328.30
JUMLAH TENAGA KERJA 528,352.80
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
1 Alat Bantu set 1.000 45,000.00 45,000.00
JUMLAH HARGA ALAT 45,000.00
D Jumlah (A+B+C) 573,352.80
E Overhead & Profit 10% x D 57,335.28
F HARGA SATUAN PEKERJAAN (D+E) 630,688.08

A.2.2.1.14a Pembongkaran 1 m3 dinding tembok bata lantai 2 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 10.001 73,500.00 735,036.75
2 Mandor L.04 Oh 0.500 115,100.00 57,492.45
JUMLAH TENAGA KERJA 792,529.20
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
1 Alat Bantu set 2.000 45,000.00 90,000.00
JUMLAH HARGA ALAT 90,000.00
D Jumlah (A+B+C) 882,529.20
E Overhead & Profit 10% x D 88,252.92
F HARGA SATUAN PEKERJAAN (D+E) 970,782.12

A.2.2.1.15 Pembongkaran 1 m2 lantai ubin / keramik ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.333 73,500.00 24,501.23
2 Mandor L.04 Oh 0.333 115,100.00 38,328.30
JUMLAH TENAGA KERJA 62,829.53
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
1 Alat Bantu set 1.000 45,000.00 45,000.00
JUMLAH HARGA ALAT 45,000.00
D Jumlah (A+B+C) 107,829.53
E Overhead & Profit 10% x D 10,782.95
F HARGA SATUAN PEKERJAAN (D+E) 118,612.48

A.2.2.1.16 Pembongkaran 1 m3 kusen kayu ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 8.000 73,500.00 588,029.40
2 Mandor L.04 Oh 0.400 115,100.00 45,993.96
JUMLAH TENAGA KERJA 634,023.36
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 634,023.36
E Overhead & Profit 10% x D 63,402.34
F HARGA SATUAN PEKERJAAN (D+E) 697,425.70

A.2.2.1.17 Pengupasan 1 m2 pleseteran ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.267 73,500.00 19,600.98
2 Mandor L.04 Oh 0.333 115,100.00 38,328.30
JUMLAH TENAGA KERJA 57,929.28
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 57,929.28
E Overhead & Profit 10% x D 5,792.93
F HARGA SATUAN PEKERJAAN (D+E) 63,722.21

A.2.2.1.18 Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.042 73,500.00 3,087.00
2 Tukang kayu L.02 Oh 0.004 102,500.00 410.00
3 Kepala tukang L.03 Oh 0.002 108,500.00 217.00
4 Mandor L.04 Oh 0.042 115,100.00 4,834.20
JUMLAH TENAGA KERJA 8,548.20
B BAHAN
1 Kawat Nyamuk Besi m² 0.050 24,200.00 1,210.00
JUMLAH HARGA BAHAN 1,210.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 9,758.20
E Overhead & Profit 10% x D 975.82
F HARGA SATUAN PEKERJAAN (D+E) 10,734.02

A.1.5.1 HARGA SATUAN PEKERJAAN TANAH


A.1.5.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.750 73,500.00 55,125.00
2 Mandor L.04 Oh 0.025 115,100.00 2,877.50
JUMLAH TENAGA KERJA 58,002.50
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 58,002.50
E Overhead & Profit 10% x D 5,800.25
F HARGA SATUAN PEKERJAAN (D+E) 63,802.75

A.1.5.1.2 Penggalian 1 m3 tanah biasa sedalam 2 m ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.900 73,500.00 66,150.00
2 Mandor L.04 Oh 0.045 115,100.00 5,179.50
JUMLAH TENAGA KERJA 71,329.50
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 71,329.50
E Overhead & Profit 10% x D 7,132.95
F HARGA SATUAN PEKERJAAN (D+E) 78,462.45

A.1.5.1.3 Penggalian 1 m3 tanah biasa sedalam 3 m ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.050 73,500.00 77,175.00
2 Mandor L.04 Oh 0.067 115,100.00 7,711.70
JUMLAH TENAGA KERJA 84,886.70
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 84,886.70
E Overhead & Profit 10% x D 8,488.67
F HARGA SATUAN PEKERJAAN (D+E) 93,375.37
A.1.5.1.9 Pengurugan kembali 1 m3 galian tanah ###
Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien PEKERJAAN galian

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.500 73,500.00 36,750.00
2 Mandor L.04 Oh 0.050 115,100.00 5,755.00
JUMLAH TENAGA KERJA 42,505.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 42,505.00
E Overhead & Profit 10% x D 4,250.50
F HARGA SATUAN PEKERJAAN (D+E) 46,755.50

A.1.5.1.10 Pemadatan tanah 1 m3 tanah (per 20 cm) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.500 73,500.00 36,750.00
2 Mandor L.04 Oh 0.050 115,100.00 5,755.00
JUMLAH TENAGA KERJA 42,505.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 42,505.00
E Overhead & Profit 10% x D 4,250.50
F HARGA SATUAN PEKERJAAN (D+E) 46,755.50

A.1.5.1.11 Pengurugan 1 m3 dengan pasir urug ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.300 73,500.00 22,050.00
2 Mandor L.04 Oh 0.010 115,100.00 1,151.00
JUMLAH TENAGA KERJA 23,201.00
B BAHAN
1 Pasir urug 1.200 140,000.00 168,000.00
JUMLAH HARGA BAHAN 168,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 191,201.00
E Overhead & Profit 10% x D 19,120.10
F HARGA SATUAN PEKERJAAN (D+E) 210,321.10

A.1.5.1.14 Pengurugan 1 m3 sirtu padat ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Mandor L.04 Oh 0.025 115,100.00 2,877.50
JUMLAH TENAGA KERJA 21,252.50
B BAHAN
1 Sirtu m³ 1.200 180,000.00 216,000.00
JUMLAH HARGA BAHAN 216,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 237,252.50
E Overhead & Profit 10% x D 23,725.25
F HARGA SATUAN PEKERJAAN (D+E) 260,977.75

A.1.5.1.15 Pengurugan 1 m3 dengan tanah urug ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.300 73,500.00 22,050.00
2 Mandor L.04 Oh 0.010 115,100.00 1,151.00
JUMLAH TENAGA KERJA 23,201.00
B BAHAN
1 Tanah urug pilihan m³ 1.200 100,000.00 120,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 143,201.00
E Overhead & Profit 10% x D 14,320.10
F HARGA SATUAN PEKERJAAN (D+E) 157,521.10

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.1 Pemasangan 1 m3 pondasi batu belah campuran 1 Pc : 3 Ps ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.500 73,500.00 110,250.00
2 Tukang batu L.02 Oh 0.750 102,500.00 76,875.00
3 Kepala tukang L.03 Oh 0.075 108,500.00 8,137.50
4 Mandor L.04 Oh 0.075 115,100.00 8,632.50
JUMLAH TENAGA KERJA 203,895.00
B BAHAN
1 Batu belah 15-20 cm m³ 1.200 185,000.00 222,000.00
2 Semen Portland kg 202.000 1,400.00 282,800.00
3 Pasir pasang m³ 0.485 185,000.00 89,725.00
JUMLAH HARGA BAHAN 594,525.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 798,420.00
E Overhead & Profit 10% x D 79,842.00
F HARGA SATUAN PEKERJAAN (D+E) 878,262.00

A.3.2.1.2 Pemasangan 1 m3 pondasi batu belah campuran 1 Pc : 4 Ps ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.500 73,500.00 110,250.00
2 Tukang batu L.02 Oh 0.750 102,500.00 76,875.00
3 Kepala tukang L.03 Oh 0.075 108,500.00 8,137.50
4 Mandor L.04 Oh 0.075 115,100.00 8,632.50
JUMLAH TENAGA KERJA 203,895.00
B BAHAN
1 Batu belah 15-20 cm m³ 1.200 185,000.00 222,000.00
2 Semen Portland kg 163.000 1,400.00 228,200.00
3 Pasir pasang m³ 0.520 185,000.00 96,200.00
JUMLAH HARGA BAHAN 546,400.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 750,295.00
E Overhead & Profit 10% x D 75,029.50
F HARGA SATUAN PEKERJAAN (D+E) 825,324.50

A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1 Pc : 5 Ps ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.500 73,500.00 110,250.00
2 Tukang batu L.02 Oh 0.750 102,500.00 76,875.00
3 Kepala tukang L.03 Oh 0.075 108,500.00 8,137.50
4 Mandor L.04 Oh 0.075 115,100.00 8,632.50
JUMLAH TENAGA KERJA 203,895.00
B BAHAN
1 Batu belah 15-20 cm m³ 1.200 185,000.00 222,000.00
2 Semen Portland kg 136.000 1,400.00 190,400.00
3 Pasir pasang m³ 0.544 185,000.00 100,640.00
JUMLAH HARGA BAHAN 513,040.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 716,935.00
E Overhead & Profit 10% x D 71,693.50
F HARGA SATUAN PEKERJAAN (D+E) 788,628.50
A.3.2.1.9 Pemasangan 1 m3 batu kosong (anstamping) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.780 73,500.00 57,330.00
2 Tukang batu L.02 Oh 0.390 102,500.00 39,975.00
3 Kepala tukang L.03 Oh 0.039 108,500.00 4,231.50
4 Mandor L.04 Oh 0.039 115,100.00 4,488.90
JUMLAH TENAGA KERJA 106,025.40
B BAHAN
1 Batu belah 15-20 cm m³ 1.200 185,000.00 222,000.00
2 Pasir urug m³ 0.432 140,000.00 60,480.00
JUMLAH HARGA BAHAN 282,480.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 388,505.40
E Overhead & Profit 10% x D 38,850.54
F HARGA SATUAN PEKERJAAN (D+E) 427,355.94

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.1 Pembuatan 1 m3 beton mutu f’ = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 c
###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.650 73,500.00 121,275.00
2 Tukang batu L.02 Oh 0.275 102,500.00 28,187.50
3 Kepala tukang L.03 Oh 0.028 108,500.00 3,038.00
4 Mandor L.04 Oh 0.083 115,100.00 9,553.30
JUMLAH TENAGA KERJA 162,053.80
B BAHAN
1 Semen Portland kg 247.000 1,400.00 345,800.00
2 Pasir beton Kg 869.000 139.29 121,039.29
3 Agregate 2-3 (stone crusher) Kg 999.000 274.07 273,800.00
4 Air liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 756,764.29
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 918,818.09
E Overhead & Profit 10% x D 91,881.81
F HARGA SATUAN PEKERJAAN (D+E) 1,010,699.89

A.4.1.1.2 Pembuatan 1 m3 beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 c
###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.650 73,500.00 121,275.00
2 Tukang batu L.02 Oh 0.275 102,500.00 28,187.50
3 Kepala tukang L.03 Oh 0.028 108,500.00 3,038.00
4 Mandor L.04 Oh 0.083 115,100.00 9,553.30
JUMLAH TENAGA KERJA 162,053.80
B BAHAN
1 Semen Portland kg 276.000 1,400.00 386,400.00
2 Pasir beton Kg 828.000 139.29 115,328.57
3 Agregate 2-3 (stone crusher) Kg 1,012.000 274.07 277,362.96
4 Air liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 795,216.53
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 957,270.33
E Overhead & Profit 10% x D 95,727.03
F HARGA SATUAN PEKERJAAN (D+E) 1,052,997.37

A.4.1.1.3 Pembuatan 1 m3 beton mutu f’ = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 ###
c

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.650 73,500.00 121,275.00
2 Tukang batu L.02 Oh 0.275 102,500.00 28,187.50
3 Kepala tukang L.03 Oh 0.028 108,500.00 3,038.00
4 Mandor L.04 Oh 0.083 115,100.00 9,553.30
JUMLAH TENAGA KERJA 162,053.80
B BAHAN
1 Semen Portland kg 299.000 1,400.00 418,600.00
2 Pasir beton Kg 799.000 139.29 111,289.29
3 Agregate 2-3 (stone crusher) Kg 1,017.000 274.07 278,733.33
4 Air liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 824,747.62
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 986,801.42
E Overhead & Profit 10% x D 98,680.14
F HARGA SATUAN PEKERJAAN (D+E) 1,085,481.56
CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %
A.4.1.1.4 Pembuatan 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.200 73,500.00 88,200.00
2 Tukang batu L.02 Oh 0.200 102,500.00 20,500.00
3 Kepala tukang L.03 Oh 0.020 108,500.00 2,170.00
4 Mandor L.04 Oh 0.060 115,100.00 6,906.00
JUMLAH TENAGA KERJA 117,776.00
B BAHAN
1 Semen Portland kg 230.000 1,400.00 322,000.00
2 Pasir beton Kg 893.000 139.29 124,382.14
3 Agregate 2-3 (stone crusher) Kg 1,027.000 274.07 281,474.07
4 Air liter 200.000 75.00 15,000.00
JUMLAH HARGA BAHAN 742,856.22
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 860,632.22
E Overhead & Profit 10% x D 86,063.22
F HARGA SATUAN PEKERJAAN (D+E) 946,695.44

A.4.1.1.5a Pembuatan 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 c
###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.650 73,500.00 121,275.00
2 Tukang batu L.02 Oh 0.275 102,500.00 28,187.50
3 Kepala tukang L.03 Oh 0.028 108,500.00 3,038.00
4 Mandor L.04 Oh 0.083 115,100.00 9,553.30
JUMLAH TENAGA KERJA 162,053.80
B BAHAN
1 Semen Portland kg 326.000 1,400.00 456,400.00
2 Pasir beton Kg 760.000 139.29 105,857.14
3 Agregate 2-3 (stone crusher) Kg 1,029.000 274.07 282,022.22
4 Air liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 860,404.37
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,022,458.17
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 1,022,458.17
A.4.1.1.5b Pembuatan 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 (overhead)
c
###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.650 73,500.00 121,275.00
2 Tukang batu L.02 Oh 0.275 102,500.00 28,187.50
3 Kepala tukang L.03 Oh 0.028 108,500.00 3,038.00
4 Mandor L.04 Oh 0.083 115,100.00 9,553.30
JUMLAH TENAGA KERJA 162,053.80
B BAHAN
1 Semen Portland kg 326.000 1,400.00 456,400.00
2 Pasir beton Kg 760.000 139.29 105,857.14
3 Agregate 2-3 (stone crusher) Kg 1,029.000 274.07 282,022.22
4 Air liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 860,404.37
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,022,458.17
E Overhead & Profit 10% x D 102,245.82
F HARGA SATUAN PEKERJAAN (D+E) 1,124,703.98

A.4.1.1.6 Pembuatan 1 m3 beton mutu f’ = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 c
###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.650 73,500.00 121,275.00
2 Tukang batu L.02 Oh 0.275 102,500.00 28,187.50
3 Kepala tukang L.03 Oh 0.028 108,500.00 3,038.00
4 Mandor L.04 Oh 0.083 115,100.00 9,553.30
JUMLAH TENAGA KERJA 162,053.80
B BAHAN
1 Semen Portland kg 352.000 1,400.00 492,800.00
2 Pasir beton Kg 731.000 139.29 101,817.86
3 Agregate 2-3 (stone crusher) Kg 1,031.000 274.07 282,570.37
4 Air liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 893,313.23
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,055,367.03
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 1,055,367.03

A.4.1.1.7 Pembuatan 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 c ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.650 73,500.00 121,275.00
2 Tukang batu L.02 Oh 0.275 102,500.00 28,187.50
3 Kepala tukang L.03 Oh 0.028 108,500.00 3,038.00
4 Mandor L.04 Oh 0.083 115,100.00 9,553.30
JUMLAH TENAGA KERJA 162,053.80
B BAHAN
1 Semen Portland kg 371.000 1,400.00 519,400.00
2 Pasir beton Kg 698.000 139.29 97,221.43
3 Agregate 2-3 (stone crusher) Kg 1,047.000 274.07 286,955.56
4 Air liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 919,701.98
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,081,755.78
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 1,081,755.78
A.4.1.1.8 Pembuatan 1 m3 beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 c ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.650 73,500.00 121,275.00
2 Tukang batu L.02 Oh 0.275 102,500.00 28,187.50
3 Kepala tukang L.03 Oh 0.028 108,500.00 3,038.00
4 Mandor L.04 Oh 0.083 115,100.00 9,553.30
JUMLAH TENAGA KERJA 162,053.80
B BAHAN
1 Semen Portland kg 384.000 1,400.00 537,600.00
2 Pasir beton Kg 692.000 139.29 96,385.71
3 Agregate 2-3 (stone crusher) Kg 1,039.000 274.07 284,762.96
4 Air liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 934,873.68
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,096,927.48
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 1,096,927.48

A.4.1.1.9 Pembuatan 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 c ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.650 73,500.00 121,275.00
2 Tukang batu L.02 Oh 0.275 102,500.00 28,187.50
3 Kepala tukang L.03 Oh 0.028 108,500.00 3,038.00
4 Mandor L.04 Oh 0.083 115,100.00 9,553.30
JUMLAH TENAGA KERJA 162,053.80
B BAHAN
1 Semen Portland kg 406.000 1,400.00 568,400.00
2 Pasir beton Kg 684.000 139.29 95,271.43
3 Agregate 2-3 (stone crusher) Kg 1,026.000 274.07 281,200.00
4 Air liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 960,996.43
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,123,050.23
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 1,123,050.23

A.4.1.1.10 Pembuatan 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.650 73,500.00 121,275.00
2 Tukang batu L.02 Oh 0.275 102,500.00 28,187.50
3 Kepala tukang L.03 Oh 0.028 108,500.00 3,038.00
4 Mandor L.04 Oh 0.083 115,100.00 9,553.30
JUMLAH TENAGA KERJA 162,053.80
B BAHAN
1 Semen Portland kg 413.000 1,400.00 578,200.00
2 Pasir beton Kg 681.000 139.29 94,853.57
3 Agregate 2-3 (stone crusher) Kg 1,021.000 274.07 279,829.63
4 Air liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 969,008.20
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,131,062.00
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 1,131,062.00

A.4.1.1.11 Pembuatan 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 2.100 73,500.00 154,350.00
2 Tukang batu L.02 Oh 0.350 102,500.00 35,875.00
3 Kepala tukang L.03 Oh 0.035 108,500.00 3,797.50
4 Mandor L.04 Oh 0.105 115,100.00 12,085.50
JUMLAH TENAGA KERJA 206,108.00
B BAHAN
1 Semen Portland kg 439.000 1,400.00 614,600.00
2 Pasir beton Kg 670.000 139.29 93,321.43
3 Agregate 2-3 (stone crusher) Kg 1,006.000 274.07 275,718.52
4 Air liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 999,764.95
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,205,872.95
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 1,205,872.95

A.4.1.1.12 Pembuatan 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 2.100 73,500.00 154,350.00
2 Tukang batu L.02 Oh 0.350 102,500.00 35,875.00
3 Kepala tukang L.03 Oh 0.035 108,500.00 3,797.50
4 Mandor L.04 Oh 0.105 115,100.00 12,085.50
JUMLAH TENAGA KERJA 206,108.00
B BAHAN
1 Semen Portland kg 448.000 1,400.00 627,200.00
2 Pasir beton Kg 667.000 139.29 92,903.57
3 Agregate 2-3 (stone crusher) Kg 1,000.000 274.07 274,074.07
4 Air liter 215.000 75.00 16,125.00
JUMLAH HARGA BAHAN 1,010,302.65
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,216,410.65
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 1,216,410.65

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.070 73,500.00 5,145.00
2 Tukang besi L.02 Oh 0.070 102,500.00 7,175.00
3 Kepala tukang L.03 Oh 0.007 108,500.00 759.50
4 Mandor L.04 Oh 0.004 115,100.00 460.40
JUMLAH TENAGA KERJA 13,539.90
B BAHAN
1 Besi Beton Polos kg 10.500 12,500.00 131,250.00
2 Kawat Ikat Beton kg 0.150 22,000.00 3,300.00
JUMLAH HARGA BAHAN 134,550.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 148,089.90
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 148,089.90

A.A4.1.1.17 Pembesian 1 kg dengan besi polos atau besi ulir ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.007 73,500.00 514.50
2 Tukang besi L.02 Oh 0.007 102,500.00 717.50
3 Kepala tukang L.03 Oh 0.001 108,500.00 75.95
4 Mandor L.04 Oh 0.000 115,100.00 46.04
JUMLAH TENAGA KERJA 1,353.99
B BAHAN
1 Besi Beton Polos kg 1.050 12,500.00 13,125.00
2 Kawat Ikat Beton kg 0.015 22,000.00 330.00
JUMLAH HARGA BAHAN 13,455.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 14,808.99
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 14,808.99

A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.520 73,500.00 38,220.00
2 Tukang kayu L.02 Oh 0.260 102,500.00 26,650.00
3 Kepala tukang L.03 Oh 0.026 108,500.00 2,821.00
4 Mandor L.04 Oh 0.026 115,100.00 2,992.60
JUMLAH TENAGA KERJA 70,683.60
B BAHAN
1 Papan kayu bekisting m³ 0.040 4,500,000.00 180,000.00
2 Paku 4 - 6 cm kg 0.300 23,400.00 7,020.00
3 Minyak begisting liter 0.100 16,500.00 1,650.00
JUMLAH HARGA BAHAN 188,670.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 259,353.60
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 259,353.60
A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.520 73,500.00 38,220.00
2 Tukang kayu L.02 Oh 0.260 102,500.00 26,650.00
3 Kepala tukang L.03 Oh 0.026 108,500.00 2,821.00
4 Mandor L.04 Oh 0.026 115,100.00 2,992.60
JUMLAH TENAGA KERJA 70,683.60
B BAHAN
1 Papan kayu bekisting m³ 0.045 4,500,000.00 202,500.00
2 Paku 4 - 6 cm kg 0.300 23,400.00 7,020.00
3 Minyak begisting liter 0.100 16,500.00 1,650.00
JUMLAH HARGA BAHAN 211,170.00
PEMAKAIAN BEKISTING 3x B 70,390.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 141,073.60
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 141,073.60

A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.660 73,500.00 48,510.00
2 Tukang kayu L.02 Oh 0.330 102,500.00 33,825.00
3 Kepala tukang L.03 Oh 0.033 108,500.00 3,580.50
4 Mandor L.04 Oh 0.033 115,100.00 3,798.30
JUMLAH TENAGA KERJA 89,713.80
B BAHAN
1 Paku 7 - 12 cm kg 0.400 22,500.00 9,000.00
2 Minyak begisting liter 0.200 16,500.00 3,300.00
3 Balok Kayu klas III m³ 0.015 3,500,000.00 52,500.00
4 Triplek 120x240x 9 mm lembar 0.350 115,000.00 40,250.00
5 Dolken/perancah dia. 10/400 cm batang 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 125,050.00
PEMAKAIAN BEKISTING 3x B 41,683.33
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 131,397.13
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 131,397.13

A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.660 73,500.00 48,510.00
2 Tukang kayu L.02 Oh 0.330 102,500.00 33,825.00
3 Kepala tukang L.03 Oh 0.033 108,500.00 3,580.50
4 Mandor L.04 Oh 0.033 115,100.00 3,798.30
JUMLAH TENAGA KERJA 89,713.80
B BAHAN
1 Paku 7 - 12 cm kg 0.400 22,500.00 9,000.00
2 Minyak begisting liter 0.200 16,500.00 3,300.00
3 Balok Kayu klas III m³ 0.018 3,500,000.00 63,000.00
4 Triplek 120x240x 9 mm lembar 0.350 115,000.00 40,250.00
5 Dolken/perancah dia. 10/400 cm batang 2.000 20,000.00 40,000.00
JUMLAH HARGA BAHAN 155,550.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 245,263.80
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 245,263.80
A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.660 73,500.00 48,510.00
2 Tukang kayu L.02 Oh 0.330 102,500.00 33,825.00
3 Kepala tukang L.03 Oh 0.033 108,500.00 3,580.50
4 Mandor L.04 Oh 0.033 115,100.00 3,798.30
JUMLAH TENAGA KERJA 89,713.80
B BAHAN
1 Paku 7 - 12 cm kg 0.400 22,500.00 9,000.00
2 Minyak begisting liter 0.200 16,500.00 3,300.00
3 Balok Kayu klas III m³ 0.015 3,500,000.00 52,500.00
4 Triplek 120x240x 9 mm lembar 0.350 115,000.00 40,250.00
5 Dolken/perancah dia. 10/400 cm batang 5.000 20,000.00 100,000.00
JUMLAH HARGA BAHAN 205,050.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 294,763.80
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 294,763.80

A.4.1.1.25 Pemasangan 1 m2 boundeck untuk lantai ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.400 73,500.00 29,400.00
2 Tukang kayu L.02 Oh 0.200 102,500.00 20,500.00
3 Kepala tukang L.03 Oh 0.020 108,500.00 2,170.00
4 Mandor L.04 Oh 0.020 115,100.00 2,302.00
JUMLAH TENAGA KERJA 54,372.00
B BAHAN
1 Plat boundeck 0,75 mm m2 1.050 143,000.00 150,150.00
2 Paku 7 - 12 cm kg 0.100 22,500.00 2,250.00
3 Balok Kayu klas III m³ 0.010 3,500,000.00 35,000.00
4 Dolken/perancah dia. 10/400 cm batang 3.000 20,000.00 60,000.00
JUMLAH HARGA BAHAN 247,400.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 301,772.00
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 301,772.00

A.4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.660 73,500.00 48,510.00
2 Tukang kayu L.02 Oh 0.330 102,500.00 33,825.00
3 Kepala tukang L.03 Oh 0.033 108,500.00 3,580.50
4 Mandor L.04 Oh 0.033 115,100.00 3,798.30
JUMLAH TENAGA KERJA 89,713.80
B BAHAN
1 Papan kayu bekisting m³ 0.020 4,500,000.00 90,000.00
2 Paku 7 - 12 cm kg 0.400 22,500.00 9,000.00
3 Minyak begisting liter 0.150 16,500.00 2,475.00
4 Balok Kayu klas III m³ 0.020 3,500,000.00 70,000.00
5 Triplek 120x240x 9 mm lembar 0.400 115,000.00 46,000.00
6 Dolken/perancah dia. 10/400 cm batang 5.000 20,000.00 100,000.00
JUMLAH HARGA BAHAN 317,475.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 407,188.80
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 407,188.80

B.21.a Pemasangan 1 M2 Begisiting Untuk Permukaan Beton Biasa Multiplek 9 mm ata 18 mm ###
(Analasisa SDA)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.660 73,500.00 48,510.00
2 Tukang kayu L.02 Oh 0.330 102,500.00 33,825.00
3 Kepala tukang L.03 Oh 0.033 108,500.00 3,580.50
4 Mandor L.04 Oh 0.033 115,100.00 3,798.30
JUMLAH TENAGA KERJA 89,713.80
B BAHAN
1 Triplek 120x240x 9 mm lembar 0.200 115,000.00 23,000.00
2 Balok Kayu klas III m³ 0.015 3,500,000.00 52,500.00
3 Paku 7 - 12 cm kg 0.250 22,500.00 5,625.00
4 Minyak begisting liter 0.200 16,500.00 3,300.00
JUMLAH HARGA BAHAN 84,425.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 174,138.80
E Overhead & Profit 10% x D 17,413.88
F HARGA SATUAN PEKERJAAN (D+E) 191,552.68

B.35. Bongkar 1 M2 Begisting Secara Biasa ( Analisa SDA ) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.025 73,500.00 1,837.50
2 Tukang kayu L.02 Oh 0.003 102,500.00 256.25
3
4
JUMLAH TENAGA KERJA 2,093.75
B BAHAN

JUMLAH HARGA BAHAN -


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 2,093.75
E Overhead & Profit 10% x D 209.38
F HARGA SATUAN PEKERJAAN (D+E) 2,303.13
A.A.4.1.1.27a Pemasangan 1 m3 beton bertulang (sloof 15/20) ###
Beton mutu f’ = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 14,5 MPa (K 175) M3 1.000 1,022,458.17 1,022,458.17


Pembesiaan dengan besi polos Kg 147.737 14,808.99 2,187,829.90
Begesting M2 13.333 141,073.60 1,880,981.33

Jumlah 5,091,269.40
Overhead & Profit 10% x Jumlah 509,126.94
HARGA SATUAN PEKERJAAN 5,600,396.34

A.A.4.1.1.28 Pemasangan 1 m3 beton bertulang (sloof 25/30) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 190.846 14,808.99 2,826,237.96
Begesting M2 8.000 141,073.60 1,128,588.80

Jumlah 5,051,754.24
Overhead & Profit 10% x Jumlah 505,175.42
HARGA SATUAN PEKERJAAN 5,556,929.67

A.A.4.1.1.29 Pemasangan 1 m3 beton bertulang (sloof 25/35) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 189.588 14,808.99 2,807,612.15
Begesting M2 8.000 141,073.60 1,128,588.80

Jumlah 5,033,128.42
Overhead & Profit 10% x Jumlah 503,312.84
HARGA SATUAN PEKERJAAN 5,536,441.27

A.A.4.1.1.32 Pemasangan 1 m3 beton bertulang (kolom 13/13) ###


Beton mutu f’ = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 14,5 MPa (K 175) M3 1.000 1,022,458.17 1,022,458.17


Pembesiaan dengan besi polos Kg 247.549 14,808.99 3,665,945.53
Begesting M2 15.385 131,397.13 2,021,494.36

Jumlah 6,709,898.05
Overhead & Profit 10% x Jumlah 670,989.81
HARGA SATUAN PEKERJAAN 7,380,887.86

A.A.4.1.1.33a Pemasangan 1 m3 beton bertulang (kolom 15/15) ###


Beton mutu f’ = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 14,5 MPa (K 175) M3 1.000 1,022,458.17 1,022,458.17


Pembesiaan dengan besi polos Kg 190.832 14,808.99 2,826,026.55
Begesting M2 13.333 131,397.13 1,751,961.78

Jumlah 5,600,446.49
Overhead & Profit 10% x Jumlah 560,044.65
HARGA SATUAN PEKERJAAN 6,160,491.14
A.A.4.1.1.34 Pemasangan 1 m3 beton bertulang (kolom 20/20) ###
beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 152.587 14,808.99 2,259,655.54
Begesting M2 20.000 131,397.13 2,627,942.67

Jumlah 5,984,525.69
Overhead & Profit 10% x Jumlah 598,452.57
HARGA SATUAN PEKERJAAN 6,582,978.25

A.A.4.1.1.34a Pemasangan 1 m3 beton bertulang (kolom 20/40) ###


beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 19,3 MPa (K 225) M3 1.000 1,081,755.78 1,081,755.78


Pembesiaan dengan besi polos Kg 87.879 14,808.99 1,301,394.21
Begesting M2 7.500 131,397.13 985,478.50

Jumlah 3,368,628.49
Overhead & Profit 10% x Jumlah 336,862.85
HARGA SATUAN PEKERJAAN 3,705,491.34

A.A.4.1.1.35a Pemasangan 1 m3 beton bertulang (kolom 25/25) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 143.874 14,808.99 2,130,623.41
Begesting M2 16.000 131,397.13 2,102,354.13

Jumlah 5,329,905.02
Overhead & Profit 10% x Jumlah 532,990.50
HARGA SATUAN PEKERJAAN 5,862,895.52

A.A.4.1.1.35b Pemasangan 1 m3 beton bertulang (kolom 25/30) ###


beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 19,3 MPa (K 225) M3 1.000 1,081,755.78 1,081,755.78


Pembesiaan dengan besi polos Kg 200.023 14,808.99 2,962,143.11
Begesting M2 14.667 131,397.13 1,927,157.96

Jumlah 5,971,056.85
Overhead & Profit 10% x Jumlah 597,105.68
HARGA SATUAN PEKERJAAN 6,568,162.53

A.A.4.1.1.35c Pemasangan 1 m3 beton bertulang (kolom 25/35) ###


beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 19,3 MPa (K 225) M3 1.000 1,081,755.78 1,081,755.78


Pembesiaan dengan besi polos Kg 227.853 14,808.99 3,374,276.11
Begesting M2 13.714 131,397.13 1,802,017.83

Jumlah 6,258,049.73
Overhead & Profit 10% x Jumlah 625,804.97
HARGA SATUAN PEKERJAAN 6,883,854.70
A.A.4.1.1.36a Pemasangan 1 m3 beton bertulang (kolom 30/40) ###
beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 166.751 14,808.99 2,469,415.73
Begesting M2 11.667 131,397.13 1,532,966.56

Jumlah 5,099,309.76
Overhead & Profit 10% x Jumlah 509,930.98
HARGA SATUAN PEKERJAAN 5,609,240.74

A.A.4.1.1.36b Pemasangan 1 m3 beton bertulang (kolom 40/40) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 160.910 14,808.99 2,382,911.13
Begesting M2 10.000 131,397.13 1,313,971.33

Jumlah 4,793,809.94
Overhead & Profit 10% x Jumlah 479,380.99
HARGA SATUAN PEKERJAAN 5,273,190.94

A.A.4.1.1.36c Pemasangan 1 m3 beton bertulang (kolom 40/60) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 195.048 14,808.99 2,888,460.30
Begesting M2 8.333 131,397.13 1,094,976.11

Jumlah 5,080,363.89
Overhead & Profit 10% x Jumlah 508,036.39
HARGA SATUAN PEKERJAAN 5,588,400.27

A.A.4.1.1.36d Pemasangan 1 m3 beton bertulang (kolom Ø 30) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 168.350 14,808.99 2,493,090.85
Begesting M2 14.667 131,397.13 1,927,157.96

Jumlah 5,517,176.29
Overhead & Profit 10% x Jumlah 551,717.63
HARGA SATUAN PEKERJAAN 6,068,893.92

A.A.4.1.1.37 Pemasangan 1 m3 beton bertulang (kolom 50/50) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 218.021 14,808.99 3,228,664.18
Begesting M2 8.000 131,397.13 1,051,177.07

Jumlah 5,376,768.73
Overhead & Profit 10% x Jumlah 537,676.87
HARGA SATUAN PEKERJAAN 5,914,445.60
A.A.4.1.1.38 Pemasangan 1 m3 beton bertulang (ring balok 13/15) ###
Beton mutu f’ = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 14,5 MPa (K 175) M3 1.000 1,022,458.17 1,022,458.17


Pembesiaan dengan besi polos Kg 218.757 14,808.99 3,239,576.18
Begesting M2 15.385 245,263.80 3,773,289.23

Jumlah 8,035,323.57
Overhead & Profit 10% x Jumlah 803,532.36
HARGA SATUAN PEKERJAAN 8,838,855.93

A.A.4.1.1.42a Pemasangan 1 m3 beton bertulang (balok 15/20) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 152.062 14,808.99 2,251,886.34
Begesting M2 13.333 245,263.80 3,270,184.00

Jumlah 6,618,997.82
Overhead & Profit 10% x Jumlah 661,899.78
HARGA SATUAN PEKERJAAN 7,280,897.60

A.A.4.1.1.42b Pemasangan 1 m3 beton bertulang (balok 20/30) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 233.872 14,808.99 3,463,414.62
Begesting M2 13.333 245,263.80 3,270,184.00

Jumlah 7,830,526.09
Overhead & Profit 10% x Jumlah 783,052.61
HARGA SATUAN PEKERJAAN 8,613,578.70

A.A.4.1.1.42c Pemasangan 1 m3 beton bertulang (balok 25/40) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 175.633 14,808.99 2,600,949.92
Begesting M2 10.500 245,263.80 2,575,269.90

Jumlah 6,273,147.29
Overhead & Profit 10% x Jumlah 627,314.73
HARGA SATUAN PEKERJAAN 6,900,462.02

A.A.4.1.1.42d Pemasangan 1 m3 beton bertulang (balok 30/50) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 203.087 14,808.99 3,007,517.57
Begesting M2 8.667 245,263.80 2,125,619.60

Jumlah 6,230,064.65
Overhead & Profit 10% x Jumlah 623,006.46
HARGA SATUAN PEKERJAAN 6,853,071.11
A.A.4.1.1.43 Pemasangan 1 m3 beton bertulang (plat 8 cm) ###
beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 102.717 14,808.99 1,521,130.09
Begesting M2 3.536 294,763.80 1,042,147.41

Jumlah 3,660,204.98
Overhead & Profit 10% x Jumlah 366,020.50
HARGA SATUAN PEKERJAAN 4,026,225.47

A.A.4.1.1.44 Pemasangan 1 m3 beton bertulang (plat 10 cm) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 164.347 14,808.99 2,433,808.14
Begesting M2 3.162 294,763.80 932,124.98

Jumlah 4,462,860.60
Overhead & Profit 10% x Jumlah 446,286.06
HARGA SATUAN PEKERJAAN 4,909,146.66

A.A.4.1.1.45 Pemasangan 1 m3 beton bertulang (plat 12 cm) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 136.956 14,808.99 2,028,173.45
Begesting M2 2.887 294,763.80 850,909.80

Jumlah 3,976,010.73
Overhead & Profit 10% x Jumlah 397,601.07
HARGA SATUAN PEKERJAAN 4,373,611.80

A.A.4.1.1.45.a Pemasangan 1 m3 beton bertulang (plat 15 cm) ###


beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos Kg 109.564 14,808.99 1,622,538.76
Begesting M2 2.582 294,763.80 761,076.86

Jumlah 3,480,543.10
Overhead & Profit 10% x Jumlah 348,054.31
HARGA SATUAN PEKERJAAN 3,828,597.41

A.A.4.1.1.45.b Pemasangan 1 m3 beton wiremes 8 mm (plat lantai 12 cm) ###


Beton mutu f’ = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 14,5 MPa (K 175) M3 1.000 1,022,458.17 1,022,458.17


Pembesiaan dengan besi polos Kg 52.591 14,808.99 778,818.61
Begesting M2 - 294,763.80 -

Jumlah 1,801,276.77
Overhead & Profit 10% x Jumlah 180,127.68
HARGA SATUAN PEKERJAAN 1,981,404.45
A.A.4.1.1.48a Pemasangan 1 m3 pondasi beton bertulang (foot plat 80 x 80 X 20 cm) ###
beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos dan ulir Kg 249.636 14,808.99 3,696,851.18
Begesting M2 5.000 259,353.60 1,296,768.00

Jumlah 6,090,546.66
Overhead & Profit 10% x Jumlah 609,054.67
HARGA SATUAN PEKERJAAN 6,699,601.32

A.A.4.1.1.48b Pemasangan 1 m3 pondasi beton bertulang (foot plat 100 x 100 X 25 cm) ###
beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos dan ulir Kg 132.399 14,808.99 1,960,692.07
Begesting M2 4.000 259,353.60 1,037,414.40

Jumlah 4,095,033.94
Overhead & Profit 10% x Jumlah 409,503.39
HARGA SATUAN PEKERJAAN 4,504,537.34

A.A.4.1.1.48c Pemasangan 1 m3 pondasi beton bertulang (foot plat 120 x 120 X 40 cm) ###
beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos dan ulir Kg 124.519 14,808.99 1,844,004.21
Begesting M2 3.333 259,353.60 864,512.00

Jumlah 3,805,443.69
Overhead & Profit 10% x Jumlah 380,544.37
HARGA SATUAN PEKERJAAN 4,185,988.06

A.A.4.1.1.48d Pemasangan 1 m3 pondasi beton bertulang (foot plat 150 x 150 X 40 cm) ###
beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos dan ulir Kg 148.491 14,808.99 2,199,008.53
Begesting M2 2.667 259,353.60 691,609.60

Jumlah 3,987,545.61
Overhead & Profit 10% x Jumlah 398,754.56
HARGA SATUAN PEKERJAAN 4,386,300.17

A.A.4.1.1.48e Pemasangan 1 m3 pondasi beton bertulang (foot plat 200 x 250 X 50 cm) ###
beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Beton mutu f’ = 21,7 MPa (K 250) M3 1.000 1,096,927.48 1,096,927.48


Pembesiaan dengan besi polos dan ulir Kg 138.897 14,808.99 2,056,917.54
Begesting M2 2.333 259,353.60 605,158.40

Jumlah 3,759,003.42
Overhead & Profit 10% x Jumlah 375,900.34
HARGA SATUAN PEKERJAAN 4,134,903.76
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1 Pemasangan 1 kg besi profil ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.060 73,500.00 4,410.00
2 Tukang las L.03 Oh 0.060 102,500.00 6,150.00
3 Kepala tukang L.03 Oh 0.006 108,500.00 651.00
4 Mandor L.04 Oh 0.003 115,100.00 345.30
JUMLAH TENAGA KERJA 11,556.30
B BAHAN
1 Besi Profil kg 1.150 18,000.00 20,700.00
JUMLAH HARGA BAHAN 20,700.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 32,256.30
E Overhead & Profit 10% x D 3,225.63
F HARGA SATUAN PEKERJAAN (D+E) 35,481.93

A.4.2.1.2a Pemasangan 1 kg besi SCH 40 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.060 73,500.00 4,410.00
2 Mandor L.03 Oh 0.060 115,100.00 6,906.00
3 Kepala tukang L.03 Oh 0.006 108,500.00 651.00
4 Mandor L.04 Oh 0.003 115,100.00 345.30
JUMLAH TENAGA KERJA 12,312.30
B BAHAN
1 Besi SCH 40 kg 1.150 7,500.00 8,625.00
JUMLAH HARGA BAHAN 8,625.00
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 21,537.30
E Overhead & Profit 10% x D 2,153.73
F HARGA SATUAN PEKERJAAN (D+E) 23,691.03

A.4.2.1.2b Pemasangan 1 m1 rangka pipa GI dia. 1 inchi (medium B) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.063 73,500.00 4,630.50
2 Tukang besi L.03 Oh 0.031 102,500.00 3,177.50
3 Tukang las L.03 Oh 0.031 102,500.00 3,177.50
4 Kepala tukang L.03 Oh 0.003 108,500.00 336.35
5 Mandor L.04 Oh 0.003 115,100.00 368.32
JUMLAH TENAGA KERJA 11,690.17
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa GI Medium B Ø 1" m1 1.100 21,700.00 23,870.00
JUMLAH HARGA BAHAN 26,295.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 38,585.67
E Overhead & Profit 10% x D 3,858.57
F HARGA SATUAN PEKERJAAN (D+E) 42,444.24

A.4.2.1.3a Pemasangan 1 m1 rangka pipa GI dia. 1,5 inchi (medium A) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.063 73,500.00 4,630.50
2 Tukang besi L.03 Oh 0.031 102,500.00 3,177.50
3 Tukang las L.03 Oh 0.031 102,500.00 3,177.50
4 Kepala tukang L.03 Oh 0.003 108,500.00 336.35
5 Mandor L.04 Oh 0.003 115,100.00 368.32
JUMLAH TENAGA KERJA 11,690.17
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa GI Medium A Ø 1 ½" m1 1.100 81,000.00 89,100.00
JUMLAH HARGA BAHAN 91,525.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 103,815.67
E Overhead & Profit 10% x D 10,381.57
F HARGA SATUAN PEKERJAAN (D+E) 114,197.24

A.4.2.1.3b Pemasangan 1 m1 rangka pipa GI dia. 1.5 inchi (medium B) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.063 73,500.00 4,630.50
2 Tukang besi L.03 Oh 0.031 102,500.00 3,177.50
3 Tukang las L.03 Oh 0.031 102,500.00 3,177.50
4 Kepala tukang L.03 Oh 0.003 108,500.00 336.35
5 Mandor L.04 Oh 0.003 115,100.00 368.32
JUMLAH TENAGA KERJA 11,690.17
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa GI Medium B Ø 1 ½" m1 1.100 32,500.00 35,750.00
JUMLAH HARGA BAHAN 38,175.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 50,465.67
E Overhead & Profit 10% x D 5,046.57
F HARGA SATUAN PEKERJAAN (D+E) 55,512.24

A.4.2.1.4a Pemasangan 1 m1 rangka pipa GI dia. 2 inchi (medium A) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.063 73,500.00 4,630.50
2 Tukang besi L.03 Oh 0.031 102,500.00 3,177.50
3 Tukang las L.03 Oh 0.031 102,500.00 3,177.50
4 Kepala tukang L.03 Oh 0.003 108,500.00 336.35
5 Mandor L.04 Oh 0.003 115,100.00 368.32
JUMLAH TENAGA KERJA 11,690.17
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa GI Medium A Ø 2" m1 1.100 101,200.00 111,320.00
JUMLAH HARGA BAHAN 113,745.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 126,035.67
E Overhead & Profit 10% x D 12,603.57
F HARGA SATUAN PEKERJAAN (D+E) 138,639.24

A.4.2.1.4b Pemasangan 1 m1 rangka pipa GI dia. 2 inchi (medium B) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.063 73,500.00 4,630.50
2 Tukang besi L.03 Oh 0.031 102,500.00 3,177.50
3 Tukang las L.03 Oh 0.031 102,500.00 3,177.50
4 Kepala tukang L.03 Oh 0.003 108,500.00 336.35
5 Mandor L.04 Oh 0.003 115,100.00 368.32
JUMLAH TENAGA KERJA 11,690.17
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa GI Medium B Ø 2" m1 1.100 42,000.00 46,200.00
JUMLAH HARGA BAHAN 48,625.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 60,915.67
E Overhead & Profit 10% x D 6,091.57
F HARGA SATUAN PEKERJAAN (D+E) 67,007.24
A.4.2.1.5a Pemasangan 1 m1 rangka pipa GI dia. 3 inchi (medium A) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.063 73,500.00 4,630.50
2 Tukang besi L.03 Oh 0.031 102,500.00 3,177.50
3 Tukang las L.03 Oh 0.031 102,500.00 3,177.50
4 Kepala tukang L.03 Oh 0.003 108,500.00 336.35
5 Mandor L.04 Oh 0.003 115,100.00 368.32
JUMLAH TENAGA KERJA 11,690.17
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa GI Medium A Ø 3" m1 1.100 166,800.00 183,480.00
JUMLAH HARGA BAHAN 185,905.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 198,195.67
E Overhead & Profit 10% x D 19,819.57
F HARGA SATUAN PEKERJAAN (D+E) 218,015.24

A.4.2.1.5b Pemasangan 1 m1 rangka pipa GI dia. 3 inchi (medium B) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.063 73,500.00 4,630.50
2 Tukang besi L.03 Oh 0.031 102,500.00 3,177.50
3 Tukang las L.03 Oh 0.031 102,500.00 3,177.50
4 Kepala tukang L.03 Oh 0.003 108,500.00 336.35
5 Mandor L.04 Oh 0.003 115,100.00 368.32
JUMLAH TENAGA KERJA 11,690.17
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa GI Medium B Ø 3" m1 1.100 64,000.00 70,400.00
JUMLAH HARGA BAHAN 72,825.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 85,115.67
E Overhead & Profit 10% x D 8,511.57
F HARGA SATUAN PEKERJAAN (D+E) 93,627.24

A.4.2.1.6a Pemasangan 1 m1 rangka pipa GI dia. 4 inchi (medium A) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.063 73,500.00 4,630.50
2 Tukang besi L.03 Oh 0.031 102,500.00 3,177.50
3 Tukang las L.03 Oh 0.031 102,500.00 3,177.50
4 Kepala tukang L.03 Oh 0.003 108,500.00 336.35
5 Mandor L.04 Oh 0.003 115,100.00 368.32
JUMLAH TENAGA KERJA 11,690.17
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa GI Medium A Ø 4" m1 1.100 242,600.00 266,860.00
JUMLAH HARGA BAHAN 269,285.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 281,575.67
E Overhead & Profit 10% x D 28,157.57
F HARGA SATUAN PEKERJAAN (D+E) 309,733.24

A.4.2.1.6b Pemasangan 1 m1 rangka pipa GI dia. 4 inchi (medium B) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.063 73,500.00 4,630.50
2 Tukang besi L.03 Oh 0.031 102,500.00 3,177.50
3 Tukang las L.03 Oh 0.031 102,500.00 3,177.50
4 Kepala tukang L.03 Oh 0.003 108,500.00 336.35
5 Mandor L.04 Oh 0.003 115,100.00 368.32
JUMLAH TENAGA KERJA 11,690.17
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa GI Medium B Ø 4" m1 1.100 83,800.00 92,180.00
JUMLAH HARGA BAHAN 94,605.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 106,895.67
E Overhead & Profit 10% x D 10,689.57
F HARGA SATUAN PEKERJAAN (D+E) 117,585.24

A.4.2.1.7 Pemasangan 1 m1 rangka pipa GI dia. 6 inchi (medium A) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.063 73,500.00 4,630.50
2 Tukang besi L.03 Oh 0.031 102,500.00 3,177.50
3 Tukang las L.03 Oh 0.031 102,500.00 3,177.50
4 Kepala tukang L.03 Oh 0.003 108,500.00 336.35
5 Mandor L.04 Oh 0.003 115,100.00 368.32
JUMLAH TENAGA KERJA 11,690.17
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa GI Medium A Ø 6" m1 1.100 370,800.00 407,880.00
JUMLAH HARGA BAHAN 410,305.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 422,595.67
E Overhead & Profit 10% x D 42,259.57
F HARGA SATUAN PEKERJAAN (D+E) 464,855.24

A.4.2.1.8 Pemasangan 1 kg trakstang besi beton ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.010 73,500.00 735.00
2 Tukang besi L.03 Oh 0.010 102,500.00 1,025.00
3 Tukang las L.03 Oh 0.010 102,500.00 1,025.00
4 Kepala tukang L.03 Oh 0.001 108,500.00 108.50
5 Mandor L.04 Oh 0.001 115,100.00 57.55
JUMLAH TENAGA KERJA 2,951.05
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Besi Beton Polos kg 1.100 12,500.00 13,750.00
3 Trecker buah 0.100 24,700.00 2,470.00
JUMLAH HARGA BAHAN 18,645.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 22,196.55
E Overhead & Profit 10% x D 2,219.66
F HARGA SATUAN PEKERJAAN (D+E) 24,416.21

A.4.2.1.9 Pemasangan 1 kg tieroot besi beton ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.010 73,500.00 735.00
2 Tukang besi L.03 Oh 0.010 102,500.00 1,025.00
3 Tukang las L.03 Oh 0.010 102,500.00 1,025.00
4 Kepala tukang L.03 Oh 0.001 108,500.00 108.50
5 Mandor L.04 Oh 0.001 115,100.00 57.55
JUMLAH TENAGA KERJA 2,951.05
B BAHAN
1 Kawat Las Kg 0.063 38,500.00 2,425.50
2 Besi Beton Polos Kg 1.100 12,500.00 13,750.00
JUMLAH HARGA BAHAN 16,175.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 19,726.55
E Overhead & Profit 10% x D 1,972.66
F HARGA SATUAN PEKERJAAN (D+E) 21,699.21
A.4.2.1.10 Pemasangan 1 kg pabrikasi besi plat ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.046 73,500.00 3,344.25
2 Tukang las L.03 Oh 0.068 102,500.00 6,918.75
3 Kepala tukang L.03 Oh 0.023 108,500.00 2,441.25
4 Mandor L.04 Oh 0.001 115,100.00 57.55
JUMLAH TENAGA KERJA 12,761.80
B BAHAN
1 Besi Plat kg 1.200 22,000.00 26,400.00
2 Axytilin Botol 0.003 352,400.00 881.00
3 Kerosene liter 0.006 3,500.00 21.00
4 Sewa mesin bor besi Jam 0.125 20,000.00 2,500.00
JUMLAH HARGA BAHAN 29,802.00
C PERALATAN
1 Floor hardener kg 0.040 19,800.00 792.00
2 Sewa mesin las Jam 0.050 30,000.00 1,500.00
3 Sewa mesin potong besi Jam 0.001 20,000.00 21.82
JUMLAH HARGA ALAT 2,313.82
D Jumlah (A+B+C) 44,877.62
E Overhead & Profit 10% x D 4,487.76
F HARGA SATUAN PEKERJAAN (D+E) 49,365.38

A.4.2.1.11 Pemasangan 100 kg ericktion konstruksi baja ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.100 73,500.00 7,350.00
2 Tukang besi L.03 Oh 0.100 102,500.00 10,250.00
3 Kepala tukang L.03 Oh 0.001 108,500.00 108.50
4 Mandor L.04 Oh 0.005 115,100.00 575.50
JUMLAH TENAGA KERJA 18,284.00
B BAHAN
Solar liter 1.000 6,400.00 6,400.00
Minyak pelumas liter 0.100 25,000.00 2,500.00
JUMLAH HARGA BAHAN 8,900.00
C PERALATAN
1 Sewa alat Perakitan Baja IWF Jam 0.080 1,000,000.00 80,000.00
JUMLAH HARGA ALAT 80,000.00
D Jumlah (A+B+C) 107,184.00
E Overhead & Profit 10% x D 10,718.40
F HARGA SATUAN PEKERJAAN (D+E) 117,902.40

A.4.2.1.12 Pengerjaan 10 cm pengelasan dengan las listrik ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.040 73,500.00 2,940.00
2 Tukang besi L.03 Oh 0.020 102,500.00 2,050.00
3 Kepala tukang L.03 Oh 0.002 108,500.00 217.00
4 Mandor L.04 Oh 0.002 115,100.00 230.20
JUMLAH TENAGA KERJA 5,437.20
B BAHAN
1 Kawat Las kg 0.400 38,500.00 15,400.00
2 Solar liter 0.300 6,400.00 1,920.00
3 Minyak pelumas liter 0.040 25,000.00 1,000.00
JUMLAH HARGA BAHAN 18,320.00
C PERALATAN
1 Sewa mesin las Jam 0.017 30,000.00 510.00
JUMLAH HARGA ALAT 510.00
D Jumlah (A+B+C) 24,267.20
E Overhead & Profit 10% x D 2,426.72
F HARGA SATUAN PEKERJAAN (D+E) 26,693.92
A.4.2.1.13 Pemasangan 1 m1 kusen pintu dan jendela alluminium ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.043 73,500.00 3,160.50
2 Tukang kayu L.03 Oh 0.043 102,500.00 4,407.50
3 Kepala tukang L.03 Oh 0.004 108,500.00 466.55
4 Mandor L.04 Oh 0.002 115,100.00 241.71
JUMLAH TENAGA KERJA 8,276.26
B BAHAN
1 Alluminium Kusen 4" (natural) m' 1.100 137,500.00 151,250.00
2 Skrup 10,66 mm bh 0.200 400.00 80.00
3 Alat-alat bantu Set 0.060 50,000.00 3,000.00
JUMLAH HARGA BAHAN 154,330.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 162,606.26
E Overhead & Profit 10% x D 16,260.63
F HARGA SATUAN PEKERJAAN (D+E) 178,866.89

A.4.2.1.13.a1 Pemasangan 1 m1 kusen Aluminium Tiang Back Mullion ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.043 73,500.00 3,160.50
2 Tukang kayu L.03 Oh 0.043 102,500.00 4,407.50
3 Kepala tukang L.03 Oh 0.004 108,500.00 466.55
4 Mandor L.04 Oh 0.002 115,100.00 241.71
JUMLAH TENAGA KERJA 8,276.26
B BAHAN
1 Alluminium Alexindo Tiang Back Mullion m' 1.100 70,600.00 77,660.00
2 Skrup 10,66 mm buah 0.200 400.00 80.00
3 Alat-alat bantu Set 0.060 50,000.00 3,000.00
JUMLAH HARGA BAHAN 80,740.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 89,016.26
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 89,016.26

A.4.2.1.13.a2 Pemasangan 1 m1 kusen Aluminium Alexindo Transome CW ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.043 73,500.00 3,160.50
2 Tukang kayu L.03 Oh 0.043 102,500.00 4,407.50
3 Kepala tukang L.03 Oh 0.004 108,500.00 466.55
4 Mandor L.04 Oh 0.002 115,100.00 241.71
JUMLAH TENAGA KERJA 8,276.26
B BAHAN
1 Alluminium Alexindo Transome CW m' 1.100 80,453.00 88,498.30
2 Rubber Setting Block M1 1.100 18,000.00 19,800.00
3 Skrup 10,66 mm set 0.200 400.00 80.00
4 Alat-alat bantu Set 0.060 50,000.00 3,000.00
JUMLAH HARGA BAHAN 111,378.30
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 119,654.56
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 119,654.56
A.4.2.1.13.a3 Pekerjaan 1 Unit Daun Pintu Kaca Tempered Type P1 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Bahan
1 Kaca tempred 12mm (Diamond) m² 10.715 1,400,000.00 15,001,000.00
2 Fitingan pintu kaca set 4.000 550,000.00 2,200,000.00
3 Floorhinges mutu tinggi set 2.000 1,050,000.00 2,100,000.00
4 Handle pintu stainless steel T.60cm bh 2.000 450,000.00 900,000.00
5 Kunci pintu aluminium bh 2.000 375,000.00 750,000.00
JUMLAH HARGA BAHAN 20,951,000.00
B Tenaga
1 Biaya Pemasangan 20 % x Jumlah Harga Bahan Ls 0.200 20,951,000.00 4,190,200.00
JUMLAH HARGA TENAGA 4,190,200.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 25,141,200.00
E Overhead & Profit 10% x D 2,514,120.00
F HARGA SATUAN PEKERJAAN (D+E) 27,655,320.00

A.4.2.1.13.a4 Pekerjaan 1 Unit Kusen Aluminium . Daun Pintu Double Teakwod Lapis HPL Type P2 ( 80 x 200 ) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Bahan
1 Kusen Pintu Alexindo Aluminium (A.4.2.1.13) M1 4.800 178,866.89 858,561.05
2 Triplek 120x240x 6 mm M2 3.200 26,354.17 84,333.33
3 Pemasangan 1 m2 kaso, kayu kelas II (A.4.6.1.16) M2 3.200 112,321.55 359,428.96
4 Lapisan HPL (Uk.120x240)cm M2 3.200 78,263.89 250,444.44
5 Engsel Dekkson buah 3.000 27,500.00 82,500.00
6 Hendle Pintu Ex. Dorma Buah 1.000 225,000.00 225,000.00
JUMLAH HARGA BAHAN 1,860,267.79
B Tenaga
1 Biaya Pemasangan 15 % x Harga Bahan Ls 0.150 1,860,267.79 279,040.17
JUMLAH HARGA TENAGA 279,040.17
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 2,139,307.96
E Overhead & Profit 10% x D 213,930.80
F HARGA SATUAN PEKERJAAN (D+E) 2,353,238.76

A.4.2.1.13.a5 Pekerjaan 1 Unit Kusen Aluminium . Daun Pintu Double Teakwod Lapis HPL Type P3 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Bahan
1 Kusen Pintu Alexindo Aluminium (A.4.2.1.13) M1 5.600 178,866.89 1,001,654.56
2 Triplek 120x240x 6 mm M2 6.080 26,354.17 160,233.33
3 Pemasangan 1 m2 kaso, kayu kelas II (A.4.6.1.16) M2 6.080 112,321.55 682,915.02
4 Lapisan HPL (Uk.120x240)cm M2 6.080 78,263.89 475,844.44
5 Pemasangan 1 m2 kaca tebal 5 mm (A.4.6.2.17) M2 0.320 235,726.79 75,432.57
6 Engsel Dekkson buah 6.000 27,500.00 165,000.00
7 Hendle Pintu Ex. Dorma Buah 2.000 225,000.00 450,000.00
JUMLAH HARGA BAHAN 3,011,079.94
B Tenaga
1 Biaya Pemasangan 15 % x Harga Bahan Ls 0.150 3,011,079.94 451,661.99
JUMLAH HARGA TENAGA 451,661.99
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 3,462,741.93
E Overhead & Profit 10% x D 346,274.19
F HARGA SATUAN PEKERJAAN (D+E) 3,809,016.12
A.4.2.1.13.a6 Pekerjaan 1 Unit Daun Pintu Kaca Tempered Type P4 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Bahan
1 Kaca tempred 12mm (Diamond) m² 5.000 1,400,000.00 7,000,000.00
2 Fitingan pintu kaca set 4.000 550,000.00 2,200,000.00
3 Floorhinges mutu tinggi set 2.000 1,050,000.00 2,100,000.00
4 Handle pintu stainless steel T.60cm bh 2.000 450,000.00 900,000.00
5 Kunci pintu aluminium bh 2.000 375,000.00 750,000.00
JUMLAH HARGA BAHAN 12,950,000.00
B Tenaga
1 Biaya Pemasangan 20 % x Harga Bahan Ls 0.200 12,950,000.00 2,590,000.00
JUMLAH HARGA TENAGA 2,590,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 15,540,000.00
E Overhead & Profit 10% x D 1,554,000.00
F HARGA SATUAN PEKERJAAN (D+E) 17,094,000.00

A.4.2.1.13.a7 Pekerjaan 1 Unit Kusen Aluminium . Daun Pintu Aluminium Type P5 ( 70 x 200 ) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Bahan
1 Kusen Pintu Alexindo Aluminium (A.4.2.1.13) M1 4.700 178,866.89 840,674.36
2 Daun Pintu Aluminium Bh 1.000 750,000.00 750,000.00
3 Engsel Dekkson buah 3.000 27,500.00 82,500.00
4 Hendle Pintu Ex. Dorma Buah 1.000 225,000.00 225,000.00
JUMLAH HARGA BAHAN 1,898,174.36
B Tenaga
1 Biaya Pemasangan 15 % x Harga Bahan

C PERALATAN
Ls 0.150 1,898,174.36
JUMLAH HARGA TENAGA
284,726.15
284,726.15 OK
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,182,900.52
E Overhead & Profit 10% x D 218,290.05
F HARGA SATUAN PEKERJAAN (D+E) 2,401,190.57

A.4.2.1.13.a8 Pekerjaan 1 Unit Kusen Aluminium . Daun Pintu Double Teakwod Lapis HPL Type P6 ( 90 x 200 ) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Bahan
1 Kusen Pintu Alexindo Aluminium (A.4.2.1.13) M1 4.900 178,866.89 876,447.74
2 Triplek 120x240x 6 mm M2 3.600 26,354.17 94,875.00
3 Pemasangan 1 m2 kaso, kayu kelas II (A.4.6.1.16) M2 3.600 112,321.55 404,357.58
4 Lapisan HPL (Uk.120x240)cm M2 3.600 78,263.89 281,750.00
5 Engsel Dekkson buah 3.000 27,500.00 82,500.00
6 Hendle Pintu Ex. Dorma Buah 1.000 225,000.00 225,000.00
JUMLAH HARGA BAHAN 1,964,930.32
B Tenaga
1 Biaya Pemasangan 15 % x Harga Bahan Ls 0.150 1,964,930.32 294,739.55
JUMLAH HARGA TENAGA 294,739.55
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 2,259,669.87
E Overhead & Profit 10% x D 225,966.99
F HARGA SATUAN PEKERJAAN (D+E) 2,485,636.86
A.4.2.1.13.a9 Pekerjaan 1 Unit Curtain Wall Alexindo Aluminium Type CW 1 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Bahan
1 Pemasangan 1 m1 kusen Aluminium Tiang Back Mullion (A.4.2.1.13.a1) M1 65.950 89,016.26 5,870,622.35
2 Pemasangan 1 m1 kusen Aluminium Alexindo Transome CW (A.4.2.1.13.a2 M1 42.700 119,654.56 5,109,249.71
3 Bracket Mullion Bh 22.000 18,000.00 396,000.00
4 Pemasangan 1 m2 kaca blue green 8 mm (panasap) (A.4.6.2.17.a) M2 49.750 595,447.08 29,623,492.23
JUMLAH HARGA BAHAN 40,999,364.29
B PERALATAN

JUMLAH HARGA ALAT


C Jumlah (A+B+C) 40,999,364.29
D Overhead & Profit 10% x D 4,099,936.43
E HARGA SATUAN PEKERJAAN (D+E) 45,099,300.72

A.4.2.1.13.a10 Pekerjaan 1 Unit Curtain Wall Alexindo Aluminium Type CW 2 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Bahan
1 Pemasangan 1 m1 kusen Aluminium Tiang Back Mullion (A.4.2.1.13.a1) M1 81.750 89,016.26 7,277,079.26
2 Pemasangan 1 m1 kusen Aluminium Alexindo Transome CW (A.4.2.1.13.a2 M1 54.620 119,654.56 6,535,532.07
3 Bracket Mullion Bh 30.000 18,000.00 540,000.00
4 Pemasangan 1 m2 kaca blue green 8 mm (panasap) (A.4.6.2.17.a) M2 61.730 595,447.08 36,756,948.25
JUMLAH HARGA BAHAN 51,109,559.57
B PERALATAN

JUMLAH HARGA ALAT


C Jumlah (A+B+C) 51,109,559.57
D Overhead & Profit 10% x D 5,110,955.96
E HARGA SATUAN PEKERJAAN (D+E) 56,220,515.53

A.4.2.1.13.a11 Pekerjaan 1 Unit Curtain Wall Alexindo Aluminium Type CW 3 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Bahan
1 Pemasangan 1 m1 kusen Aluminium Tiang Back Mullion (A.4.2.1.13.a1) M1 47.100 89,016.26 4,192,665.85
2 Pemasangan 1 m1 kusen Aluminium Alexindo Transome CW (A.4.2.1.13.a2 M1 25.500 119,654.56 3,051,191.28
3 Bracket Mullion Bh 12.000 18,000.00 216,000.00
4 Pemasangan 1 m2 kaca blue green 8 mm (panasap) (A.4.6.2.17.a) M2 32.920 595,447.08 19,602,117.87
JUMLAH HARGA BAHAN 27,061,975.00
B PERALATAN

JUMLAH HARGA ALAT


C Jumlah (A+B+C) 27,061,975.00
D Overhead & Profit 10% x D 2,706,197.50
E HARGA SATUAN PEKERJAAN (D+E) 29,768,172.50

A.4.2.1.13.a12 Pekerjaan 1 Unit Window Wall Alexindo Aluminium Type J1 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Bahan
1 Pemasangan 1 m1 kusen Aluminium Tiang Back Mullion (A.4.2.1.13.a1) M1 25.200 89,016.26 2,243,209.75
2 Pemasangan 1 m1 kusen Aluminium Alexindo Transome CW (A.4.2.1.13.a2 M1 24.250 119,654.56 2,901,623.08
3 Bracket Mullion Bh 14.000 18,000.00 252,000.00
4 Pemasangan 1 m2 kaca blue green 8 mm (panasap) (A.4.6.2.17.a) M2 12.450 595,447.08 7,413,316.15
5 Pemasangan 1 m2 kaca tebal 5 mm (A.4.6.2.17) M2 2.200 235,726.79 518,598.93
6 Daun Jendela Aluminium (A.4.2.1.14) M2 3.245 586,324.20 1,902,504.76
7 Hak Angin Dekson AWH SQ 001 Set 4.000 170,400.00 681,600.00
8 Engsel Jendela Dekkson Bh 8.000 27,500.00 220,000.00
JUMLAH HARGA BAHAN 16,132,852.68
B PERALATAN

JUMLAH HARGA ALAT


C Jumlah (A+B+C) 16,132,852.68
D Overhead & Profit 10% x D 1,613,285.27
E HARGA SATUAN PEKERJAAN (D+E) 17,746,137.94
A.4.2.1.13.a13 Pekerjaan 1 Unit Window Wall Alexindo Aluminium Type J2 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Bahan
1 Pemasangan 1 m1 kusen Aluminium Tiang Back Mullion (A.4.2.1.13.a1) M1 18.000 89,016.26 1,602,292.68
2 Pemasangan 1 m1 kusen Aluminium Alexindo Transome CW (A.4.2.1.13.a2 M1 10.000 119,654.56 1,196,545.60
3 Bracket Mullion Bh 10.000 18,000.00 180,000.00
4 Pemasangan 1 m2 kaca blue green 8 mm (panasap) (A.4.6.2.17.a) M2 5.270 595,447.08 3,138,006.11
5 Pemasangan 1 m2 kaca tebal 5 mm (A.4.6.2.17) M2 0.540 235,726.79 127,292.47
6 Daun Jendela Aluminium (A.4.2.1.14) M2 0.978 586,324.20 573,190.54
7 Hak Angin Dekson AWH SQ 001 Set 2.000 170,400.00 340,800.00
8 Engsel Jendela Dekkson Bh 4.000 27,500.00 110,000.00
JUMLAH HARGA BAHAN 7,268,127.40
B PERALATAN

JUMLAH HARGA ALAT


C Jumlah (A+B+C) 7,268,127.40
D Overhead & Profit 10% x D 726,812.74
E HARGA SATUAN PEKERJAAN (D+E) 7,994,940.13

A.4.2.1.13.a14 Pekerjaan 1 Unit Window Wall Alexindo Aluminium Type J3 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Bahan
1 Pemasangan 1 m1 kusen Aluminium Tiang Back Mullion (A.4.2.1.13.a1) M1 7.200 89,016.26 640,917.07
2 Pemasangan 1 m1 kusen Aluminium Alexindo Transome CW (A.4.2.1.13.a2 M1 2.600 119,654.56 311,101.86
3 Bracket Mullion Bh 4.000 18,000.00 72,000.00
4 Pemasangan 1 m2 kaca blue green 8 mm (panasap) (A.4.6.2.17.a) M2 1.060 595,447.08 631,173.90
5 Pemasangan 1 m2 kaca tebal 5 mm (A.4.6.2.17) M2 0.260 235,726.79 61,288.96
6 Daun Jendela Aluminium (A.4.2.1.14) M2 0.478 586,324.20 280,497.50
7 Hak Angin Dekson AWH SQ 001 Set 1.000 170,400.00 170,400.00
8 Engsel Jendela Dekkson Bh 2.000 27,500.00 55,000.00
JUMLAH HARGA BAHAN 2,222,379.29
B PERALATAN

JUMLAH HARGA ALAT


C Jumlah (A+B+C) 2,222,379.29
D Overhead & Profit 10% x D 222,237.93
E HARGA SATUAN PEKERJAAN (D+E) 2,444,617.22

A.4.2.1.13.a15 Pekerjaan 1 Unit Kusen Aluminium dan Kaca 5 mmType BV ( 35 x 50 ) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A Bahan
1 Kusen Pintu Alexindo Aluminium (A.4.2.1.13) M1 1.700 178,866.89 304,073.71
2 Pemasangan 1 m2 kaca tebal 5 mm (A.4.6.2.17) M2 0.110 235,726.79 25,929.95
JUMLAH HARGA BAHAN 330,003.65
B Tenaga
1 Biaya Pemasangan 15 % x Harga Bahan Ls 0.150 330,003.65 49,500.55
JUMLAH HARGA TENAGA 49,500.55
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 379,504.20
E Overhead & Profit 10% x D 37,950.42
F HARGA SATUAN PEKERJAAN (D+E) 417,454.62
A.4.2.1.14 Pemasangan 1 m2 pintu dan jendela kaca rangka alluminium ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.085 73,500.00 6,247.50
2 Tukang kayu L.03 Oh 0.085 102,500.00 8,712.50
3 Kepala tukang L.03 Oh 0.009 108,500.00 976.50
4 Mandor L.04 Oh 0.005 115,100.00 575.50
JUMLAH TENAGA KERJA 16,512.00
B BAHAN
1 Alumunium strip m1 4.400 50,400.00 221,760.00
2 Profil kaca alluminium m1 4.500 62,500.00 281,250.00
3 Alat-alat bantu Set 0.270 50,000.00 13,500.00
JUMLAH HARGA BAHAN 516,510.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 533,022.00
E Overhead & Profit 10% x D 53,302.20
F HARGA SATUAN PEKERJAAN (D+E) 586,324.20

A.4.2.1.15 Pemasangan 1 m2 rolling door alluminium ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.000 73,500.00 73,500.00
2 Tukang besi L.03 Oh 1.000 102,500.00 102,500.00
3 Kepala tukang L.03 Oh 0.100 108,500.00 10,850.00
4 Mandor L.04 Oh 0.050 115,100.00 5,755.00
JUMLAH TENAGA KERJA 192,605.00
B BAHAN
1 Rolling door alluminium m2 1.000 497,000.00 497,000.00
JUMLAH HARGA BAHAN 497,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 689,605.00
E Overhead & Profit 10% x D 68,960.50
F HARGA SATUAN PEKERJAAN (D+E) 758,565.50

A.4.2.1.16 Pemasangan 1 m2 folding door besi ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.000 73,500.00 73,500.00
2 Tukang besi L.03 Oh 1.000 102,500.00 102,500.00
3 Kepala tukang L.03 Oh 0.100 108,500.00 10,850.00
4 Mandor L.04 Oh 0.050 115,100.00 5,755.00
JUMLAH TENAGA KERJA 192,605.00
B BAHAN
1 Pintu lipat baja Folding door besi strip 3 mm m2 1.000 760,000.00 760,000.00
JUMLAH HARGA BAHAN 760,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 952,605.00
E Overhead & Profit 10% x D 95,260.50
F HARGA SATUAN PEKERJAAN (D+E) 1,047,865.50
A.4.2.1.18 Pemasangan 1 m1 talang datar/ jurai seng bjls 28 lebar 90 cm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.200 73,500.00 14,700.00
2 Tukang kayu L.03 Oh 0.200 102,500.00 20,500.00
3 Kepala tukang L.03 Oh 0.020 108,500.00 2,170.00
4 Mandor L.04 Oh 0.001 115,100.00 115.10
JUMLAH TENAGA KERJA 37,485.10
B BAHAN
1 Seng plat BJLS 30 lebar 90 cm m1 1.050 85,100.00 89,355.00
2 Paku 1 - 3 cm kg 0.015 24,300.00 364.50
3 Papan kayu klas II m³ 0.019 6,500,000.00 123,500.00
JUMLAH HARGA BAHAN 213,219.50
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 250,704.60
E Overhead & Profit 10% x D 25,070.46
F HARGA SATUAN PEKERJAAN (D+E) 275,775.06

A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.1,6mm, modul 60 x 120 cm, dinding partisi ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.02 Oh 0.250 102,500.00 25,625.00
3 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
4 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 48,208.80
B BAHAN
1 Pipa Kotak 40 x 40 x 1.6 mm m' 3.500 22,000.00 77,000.00
2 Assesoris (perkuatan, las dll) Ls 3.500 15,000.00 52,500.00
JUMLAH HARGA BAHAN 129,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 177,708.80
E Overhead & Profit 10% x D 17,770.88
F HARGA SATUAN PEKERJAAN (D+E) 195,479.68

A.4.2.1.21 Pemasangan 1 m2 rangka pipa kotak 40.40.1,6mm, modul 60 x 60 cm, plafon ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.350 73,500.00 25,725.00
2 Tukang besi L.02 Oh 0.350 102,500.00 35,875.00
3 Kepala tukang L.03 Oh 0.035 108,500.00 3,797.50
4 Mandor L.04 Oh 0.018 115,100.00 2,071.80
JUMLAH TENAGA KERJA 67,469.30
B BAHAN
1 Pipa Kotak 40 x 40 x 1.6 mm m' 4.000 22,000.00 88,000.00
2 Assesoris (perkuatan, las dll) Ls 4.000 15,000.00 60,000.00
JUMLAH HARGA BAHAN 148,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 215,469.30
E Overhead & Profit 10% x D 21,546.93
F HARGA SATUAN PEKERJAAN (D+E) 237,016.23
A.4.2.1.21a Pemasangan 1 m2 rangka baja ringan hollow 40.40 tebal 0,3 mm, modul 60 x 60 cm, plafon ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.02 Oh 0.250 102,500.00 25,625.00
3 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
4 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 48,208.80
B BAHAN
1 Baja ringan hollow 40 x 40 mm m' 4.000 13,700.00 54,800.00
Doos
2 Skrup / Piles 1,5 Cm. 0.500 15,000.00 7,500.00
Kecil
JUMLAH HARGA BAHAN 62,300.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 110,508.80
E Overhead & Profit 10% x D 11,050.88
F HARGA SATUAN PEKERJAAN (D+E) 121,559.68

A.4.2.1.22 Pemasangan 1 m2 rangka besi hollow 1x40.20.1,6mm, modul 60 x 60 cm, lisplank ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.02 Oh 0.250 102,500.00 25,625.00
3 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
4 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 48,208.80
B BAHAN
1 Pipa Kotak 20 x 40 x 1.4 mm m' 4.000 12,650.00 50,600.00
2 Assesoris (perkuatan, las dll) Ls 4.000 15,000.00 60,000.00
JUMLAH HARGA BAHAN 110,600.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 158,808.80
E Overhead & Profit 10% x D 15,880.88
F HARGA SATUAN PEKERJAAN (D+E) 174,689.68

A.4.2.1.23a Pemasangan 1 m2 rangka besi siku 30 x 30 x 2 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.03 Oh 0.250 102,500.00 25,625.00
3 Tukang las L.03 Oh 0.250 102,500.00 25,625.00
4 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
5 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 73,833.80
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Besi Siku 30 x 30 x 2 mm m' 1.100 11,400.00 12,540.00
JUMLAH HARGA BAHAN 14,965.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 89,399.30
E Overhead & Profit 10% x D 8,939.93
F HARGA SATUAN PEKERJAAN (D+E) 98,339.23
A.4.2.1.23b Pemasangan 1 m2 rangka besi siku 40 x 40 x 3 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.03 Oh 0.250 102,500.00 25,625.00
3 Tukang las L.03 Oh 0.250 102,500.00 25,625.00
4 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
5 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 73,833.80
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Besi Siku 40 x 40 x 3 mm m' 1.100 12,500.00 13,750.00
JUMLAH HARGA BAHAN 16,175.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 90,609.30
E Overhead & Profit 10% x D 9,060.93
F HARGA SATUAN PEKERJAAN (D+E) 99,670.23

A.4.2.1.23c Pemasangan 1 m2 rangka besi siku 50 x 50 x 4 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.03 Oh 0.250 102,500.00 25,625.00
3 Tukang las L.03 Oh 0.250 102,500.00 25,625.00
4 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
5 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 73,833.80
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Besi Siku 50 x 50 x 4 mm m' 1.100 38,000.00 41,800.00
JUMLAH HARGA BAHAN 44,225.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 118,659.30
E Overhead & Profit 10% x D 11,865.93
F HARGA SATUAN PEKERJAAN (D+E) 130,525.23

A.4.2.1.24a Pemasangan 1 m2 rangka besi hollow 20 x 40 x 1,6 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.03 Oh 0.250 102,500.00 25,625.00
3 Tukang las L.03 Oh 0.250 102,500.00 25,625.00
4 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
5 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 73,833.80
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa Kotak 20 x 40 x 1.4 mm m' 1.100 12,650.00 13,915.00
JUMLAH HARGA BAHAN 16,340.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 90,774.30
E Overhead & Profit 10% x D 9,077.43
F HARGA SATUAN PEKERJAAN (D+E) 99,851.73
A.4.2.1.24b Pemasangan 1 m2 rangka besi hollow 40 x 40 x 1,6 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.03 Oh 0.250 102,500.00 25,625.00
3 Tukang las L.03 Oh 0.250 102,500.00 25,625.00
4 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
5 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 73,833.80
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa Kotak 40 x 40 x 1.6 mm m' 1.100 22,000.00 24,200.00
JUMLAH HARGA BAHAN 26,625.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 101,059.30
E Overhead & Profit 10% x D 10,105.93
F HARGA SATUAN PEKERJAAN (D+E) 111,165.23

A.4.2.1.24c Pemasangan 1 m2 rangka besi hollow 50 x 50 x 2 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.03 Oh 0.250 102,500.00 25,625.00
3 Tukang las L.03 Oh 0.250 102,500.00 25,625.00
4 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
5 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 73,833.80
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa Kotak 50 x 50 x 2.0 mm m' 1.100 28,500.00 31,350.00
JUMLAH HARGA BAHAN 33,775.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 108,209.30
E Overhead & Profit 10% x D 10,820.93
F HARGA SATUAN PEKERJAAN (D+E) 119,030.23

A.4.2.1.24d Pemasangan 1 m2 rangka besi hollow 100 x 100 x 3,2 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.03 Oh 0.250 102,500.00 25,625.00
3 Tukang las L.03 Oh 0.250 102,500.00 25,625.00
4 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
5 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 73,833.80
B BAHAN
1 Kawat Las kg 0.063 38,500.00 2,425.50
2 Pipa Kotak 100 x 100 x 3.2 mm m' 1.100 95,700.00 105,270.00
JUMLAH HARGA BAHAN 107,695.50
C PERALATAN
1 Sewa mesin las Jam 0.020 30,000.00 600.00
JUMLAH HARGA ALAT 600.00
D Jumlah (A+B+C) 182,129.30
E Overhead & Profit 10% x D 18,212.93
F HARGA SATUAN PEKERJAAN (D+E) 200,342.23
A.4.2.1.25 Pemasangan 1 m1 gording rangka besi hollow 40 x 40 x 1,6 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.02 Oh 0.250 102,500.00 25,625.00
3 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
4 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 48,208.80
B BAHAN
1 Pipa Kotak 40 x 40 x 1.6 mm m' 1.100 22,000.00 24,200.00
JUMLAH HARGA BAHAN 24,200.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 72,408.80
E Overhead & Profit 10% x D 7,240.88
F HARGA SATUAN PEKERJAAN (D+E) 79,649.68

A.4.2.1.25a Pemasangan 1 m1 gording baja ringan C 75, tebal 0,3 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.140 73,500.00 10,290.00
2 Tukang besi L.02 Oh 0.140 102,500.00 14,350.00
3 Kepala tukang L.03 Oh 0.014 108,500.00 1,519.00
4 Mandor L.04 Oh 0.007 115,100.00 828.72
JUMLAH TENAGA KERJA 26,987.72
B BAHAN
1 Baja ringan canal C75 m' 1.100 17,000.00 18,700.00
2 Skrup 10,66 mm bh 28.000 400.00 11,200.00
JUMLAH HARGA BAHAN 29,900.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 56,887.72
E Overhead & Profit 10% x D 5,688.77
F HARGA SATUAN PEKERJAAN (D+E) 62,576.49

A.4.2.1.26a Pemasangan 1 m1 gording rangka CNP 100 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.02 Oh 0.250 102,500.00 25,625.00
3 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
4 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 48,208.80
B BAHAN
1 Besi CNP 100 x 50 x 20 x 2,3 mm m' 1.100 55,800.00 61,380.00
JUMLAH HARGA BAHAN 61,380.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 109,588.80
E Overhead & Profit 10% x D 10,958.88
F HARGA SATUAN PEKERJAAN (D+E) 120,547.68
A.4.2.1.26b Pemasangan 1 m1 gording rangka CNP 125 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.02 Oh 0.250 102,500.00 25,625.00
3 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
4 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 48,208.80
B BAHAN
1 Besi CNP 125 x 50 x 20 x 2,3 mm m' 1.100 62,100.00 68,310.00
JUMLAH HARGA BAHAN 68,310.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 116,518.80
E Overhead & Profit 10% x D 11,651.88
F HARGA SATUAN PEKERJAAN (D+E) 128,170.68

A.4.2.1.26c Pemasangan 1 m1 gording rangka CNP 150 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.02 Oh 0.250 102,500.00 25,625.00
3 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
4 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 48,208.80
B BAHAN
1 Besi CNP 150 x 50 x 20 x 2,3 mm m' 1.100 68,200.00 75,020.00
JUMLAH HARGA BAHAN 75,020.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 123,228.80
E Overhead & Profit 10% x D 12,322.88
F HARGA SATUAN PEKERJAAN (D+E) 135,551.68

A.4.2.1.26d Pemasangan 1 m1 gording rangka CNP 200 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang besi L.02 Oh 0.250 102,500.00 25,625.00
3 Kepala tukang L.03 Oh 0.025 108,500.00 2,712.50
4 Mandor L.04 Oh 0.013 115,100.00 1,496.30
JUMLAH TENAGA KERJA 48,208.80
B BAHAN
1 Besi CNP 200 x 75 x 20 x 3,2 mm m' 1.100 129,800.00 142,780.00
JUMLAH HARGA BAHAN 142,780.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 190,988.80
E Overhead & Profit 10% x D 19,098.88
F HARGA SATUAN PEKERJAAN (D+E) 210,087.68
A.4.2.1.27 Pemasangan 1 m2 kuda-kuda baja ringan + reng atap genteng biasa/metal ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.200 73,500.00 14,700.00
2 Tukang besi L.02 Oh 0.450 102,500.00 46,125.00
3 Kepala tukang L.03 Oh 0.010 108,500.00 1,085.00
4 Mandor L.04 Oh 0.050 115,100.00 5,755.00
JUMLAH TENAGA KERJA 67,665.00
B BAHAN
1 Baja ringan canal C75 m' 3.720 17,000.00 63,240.00
2 Skrup 10,66 mm bh 28.000 400.00 11,200.00
3 Dynabol dia 12 x 120 mm bh 2.000 5,000.00 10,000.00
4 Reng canal 45 mm m' 5.400 9,900.00 53,460.00
JUMLAH HARGA BAHAN 137,900.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 205,565.00
E Overhead & Profit 10% x D 20,556.50
F HARGA SATUAN PEKERJAAN (D+E) 226,121.50

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A.4.4.1.2 Pemasangan 1 m2 dinding bata merah (5x11x22)cm t = 1 batu, 1 Pc : 3 Ps ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.600 73,500.00 44,100.00
2 Tukang batu L.02 Oh 0.200 102,500.00 20,500.00
3 Kepala tukang L.03 Oh 0.020 108,500.00 2,170.00
4 Mandor L.04 Oh 0.030 115,100.00 3,453.00
JUMLAH TENAGA KERJA 70,223.00
B BAHAN
1 Bata merah klas 1 buah 140.000 900.00 126,000.00
2 Semen Portland kg 32.950 1,400.00 46,130.00
3 Pasir pasang m³ 0.091 185,000.00 16,835.00
JUMLAH HARGA BAHAN 188,965.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 259,188.00
E Overhead & Profit 10% x D 25,918.80
F HARGA SATUAN PEKERJAAN (D+E) 285,106.80

A.4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = ½ batu, 1 Pc : 3 Ps ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.300 73,500.00 22,050.00
2 Tukang batu L.02 Oh 0.100 102,500.00 10,250.00
3 Kepala tukang L.03 Oh 0.010 108,500.00 1,085.00
4 Mandor L.04 Oh 0.015 115,100.00 1,726.50
JUMLAH TENAGA KERJA 35,111.50
B BAHAN
1 Bata merah klas 1 buah 70.000 900.00 63,000.00
2 Semen Portland kg 14.370 1,400.00 20,118.00
3 Pasir pasang m³ 0.040 185,000.00 7,400.00
JUMLAH HARGA BAHAN 90,518.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 125,629.50
E Overhead & Profit 10% x D 12,562.95
F HARGA SATUAN PEKERJAAN (D+E) 138,192.45
A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = ½ batu, 1 Pc : 4 Ps ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.300 73,500.00 22,050.00
2 Tukang batu L.02 Oh 0.100 102,500.00 10,250.00
3 Kepala tukang L.03 Oh 0.010 108,500.00 1,085.00
4 Mandor L.04 Oh 0.015 115,100.00 1,726.50
JUMLAH TENAGA KERJA 35,111.50
B BAHAN
1 Bata merah klas 1 buah 70.000 900.00 63,000.00
2 Semen Portland kg 11.500 1,400.00 16,100.00
3 Pasir pasang m³ 0.043 185,000.00 7,955.00
JUMLAH HARGA BAHAN 87,055.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 122,166.50
E Overhead & Profit 10% x D 12,216.65
F HARGA SATUAN PEKERJAAN (D+E) 134,383.15

A.4.4.1.10 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = ½ batu, 1 Pc : 5 Ps ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.300 73,500.00 22,050.00
2 Tukang batu L.02 Oh 0.100 102,500.00 10,250.00
3 Kepala tukang L.03 Oh 0.010 108,500.00 1,085.00
4 Mandor L.04 Oh 0.015 115,100.00 1,726.50
JUMLAH TENAGA KERJA 35,111.50
B BAHAN
1 Bata merah klas 1 buah 70.000 900.00 63,000.00
2 Semen Portland kg 9.800 1,400.00 13,720.00
3 Pasir pasang m³ 0.045 185,000.00 8,325.00
JUMLAH HARGA BAHAN 85,045.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 120,156.50
E Overhead & Profit 10% x D 12,015.65
F HARGA SATUAN PEKERJAAN (D+E) 132,172.15

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A.4.4.2.3 Pemasangan 1 m2 plesteran 1 Pc : 3 Ps tebal 15 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.300 73,500.00 22,050.00
2 Tukang batu L.03 Oh 0.150 102,500.00 15,375.00
3 Kepala tukang L.03 Oh 0.015 108,500.00 1,627.50
4 Mandor L.04 Oh 0.015 115,100.00 1,726.50
JUMLAH TENAGA KERJA 40,779.00
B BAHAN
1 Semen Portland kg 7.776 1,400.00 10,886.40
2 Pasir pasang m³ 0.023 185,000.00 4,255.00
JUMLAH HARGA BAHAN 15,141.40
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 55,920.40
E Overhead & Profit 10% x D 5,592.04
F HARGA SATUAN PEKERJAAN (D+E) 61,512.44
A.4.4.2.20 Pemasangan 1 m1 plesteran skoning 1 Pc : 3 Ps lebar 10 cm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.080 73,500.00 5,880.00
2 Tukang batu L.03 Oh 0.400 102,500.00 41,000.00
3 Kepala tukang L.03 Oh 0.040 108,500.00 4,340.00
4 Mandor L.04 Oh 0.004 115,100.00 460.40
JUMLAH TENAGA KERJA 51,680.40
B BAHAN
1 Semen Portland kg 0.500 1,400.00 700.00
2 Pasir pasang m³ 0.013 185,000.00 2,405.00
JUMLAH HARGA BAHAN 3,105.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 54,785.40
E Overhead & Profit 10% x D 5,478.54
F HARGA SATUAN PEKERJAAN (D+E) 60,263.94

A.4.4.2.26 Pemasangan 1 m2 finishing siar pasangan batu kali, 1 Pc : 2 Ps ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.300 73,500.00 22,050.00
2 Tukang batu L.03 Oh 0.150 102,500.00 15,375.00
3 Kepala tukang L.03 Oh 0.015 108,500.00 1,627.50
4 Mandor L.04 Oh 0.015 115,100.00 1,726.50
JUMLAH TENAGA KERJA 40,779.00
B BAHAN
1 Semen Portland kg 6.340 1,400.00 8,876.00
2 Pasir pasang m³ 0.012 185,000.00 2,220.00
JUMLAH HARGA BAHAN 11,096.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 51,875.00
E Overhead & Profit 10% x D 5,187.50
F HARGA SATUAN PEKERJAAN (D+E) 57,062.50

A.4.4.2.27 Pemasangan 1 m2 acian semen ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.200 73,500.00 14,700.00
2 Tukang batu L.03 Oh 0.100 102,500.00 10,250.00
3 Kepala tukang L.03 Oh 0.010 108,500.00 1,085.00
4 Mandor L.04 Oh 0.010 115,100.00 1,151.00
JUMLAH TENAGA KERJA 27,186.00
B BAHAN
1 Semen Portland kg 3.250 1,400.00 4,550.00
JUMLAH HARGA BAHAN 4,550.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 31,736.00
E Overhead & Profit 10% x D 3,173.60
F HARGA SATUAN PEKERJAAN (D+E) 34,909.60
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3.32 Pemasangan 1 m2 lantai keramik motif (KW 1) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.700 73,500.00 51,450.00
2 Tukang batu L.02 Oh 0.350 102,500.00 35,875.00
3 Kepala tukang L.03 Oh 0.035 108,500.00 3,797.50
4 Mandor L.04 Oh 0.035 115,100.00 4,028.50
JUMLAH TENAGA KERJA 95,151.00
B BAHAN
1 Keramik kw I (motif) m² 1.100 79,200.00 87,120.00
2 Semen Portland kg 8.190 1,400.00 11,466.00
3 Pasir pasang m³ 0.045 185,000.00 8,325.00
4 Semen warna kg 2.000 16,800.00 33,600.00
JUMLAH HARGA BAHAN 140,511.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 235,662.00
E Overhead & Profit 10% x D 23,566.20
F HARGA SATUAN PEKERJAAN (D+E) 259,228.20

A.4.4.3.33 Pemasangan 1 m2 lantai keramik motif (KW 2) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.700 73,500.00 51,450.00
2 Tukang batu L.02 Oh 0.350 102,500.00 35,875.00
3 Kepala tukang L.03 Oh 0.035 108,500.00 3,797.50
4 Mandor L.04 Oh 0.035 115,100.00 4,028.50
JUMLAH TENAGA KERJA 95,151.00
B BAHAN
1 Keramik kw II (motif) m² 1.100 72,000.00 79,200.00
2 Semen Portland kg 8.190 1,400.00 11,466.00
3 Pasir pasang m³ 0.045 185,000.00 8,325.00
4 Semen warna kg 2.000 16,800.00 33,600.00
JUMLAH HARGA BAHAN 132,591.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 227,742.00
E Overhead & Profit 10% x D 22,774.20
F HARGA SATUAN PEKERJAAN (D+E) 250,516.20

A.4.4.3.34 Pemasangan 1 m2 lantai keramik polos (KW 1) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.700 73,500.00 51,450.00
2 Tukang batu L.02 Oh 0.350 102,500.00 35,875.00
3 Kepala tukang L.03 Oh 0.035 108,500.00 3,797.50
4 Mandor L.04 Oh 0.035 115,100.00 4,028.50
JUMLAH TENAGA KERJA 95,151.00
B BAHAN
1 Keramik kw I (polos) m² 1.100 65,400.00 71,940.00
2 Semen Portland kg 8.190 1,400.00 11,466.00
3 Pasir pasang m³ 0.045 185,000.00 8,325.00
4 Semen warna kg 2.000 16,800.00 33,600.00
JUMLAH HARGA BAHAN 125,331.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 220,482.00
E Overhead & Profit 10% x D 22,048.20
F HARGA SATUAN PEKERJAAN (D+E) 242,530.20
A.4.4.3.35 Pemasangan 1 m2 lantai keramik polos (KW 2) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.700 73,500.00 51,450.00
2 Tukang batu L.02 Oh 0.350 102,500.00 35,875.00
3 Kepala tukang L.03 Oh 0.035 108,500.00 3,797.50
4 Mandor L.04 Oh 0.035 115,100.00 4,028.50
JUMLAH TENAGA KERJA 95,151.00
B BAHAN
1 Keramik kw II (polos) m² 1.100 63,600.00 69,960.00
2 Semen Portland kg 8.190 1,400.00 11,466.00
3 Pasir pasang m³ 0.045 185,000.00 8,325.00
4 Semen warna kg 2.000 16,800.00 33,600.00
JUMLAH HARGA BAHAN 123,351.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 218,502.00
E Overhead & Profit 10% x D 21,850.20
F HARGA SATUAN PEKERJAAN (D+E) 240,352.20

A.4.4.3.36 Pemasangan 1 m2 lantai tegel abu-abu ukuran 20cm x 20cm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.700 73,500.00 51,450.00
2 Tukang batu L.02 Oh 0.350 102,500.00 35,875.00
3 Kepala tukang L.03 Oh 0.035 108,500.00 3,797.50
4 Mandor L.04 Oh 0.035 115,100.00 4,028.50
JUMLAH TENAGA KERJA 95,151.00
B BAHAN
1 Tegel abu abu uk. 20 x 20 cm buah 27.500 2,200.00 60,500.00
2 Semen Portland kg 9.800 1,400.00 13,720.00
3 Pasir pasang m³ 0.045 185,000.00 8,325.00
4 Semen warna kg 2.500 16,800.00 42,000.00
JUMLAH HARGA BAHAN 124,545.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 219,696.00
E Overhead & Profit 10% x D 21,969.60
F HARGA SATUAN PEKERJAAN (D+E) 241,665.60

A.4.4.3.37 Pemasangan 1 m2 lantai tegel warna bergaris ukuran 20cm x 20cm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.700 73,500.00 51,450.00
2 Tukang batu L.02 Oh 0.350 102,500.00 35,875.00
3 Kepala tukang L.03 Oh 0.035 108,500.00 3,797.50
4 Mandor L.04 Oh 0.035 115,100.00 4,028.50
JUMLAH TENAGA KERJA 95,151.00
B BAHAN
1 Tegel bergaris abu uk. 20 x 20 cm buah 27.500 2,850.00 78,375.00
2 Semen Portland kg 9.800 1,400.00 13,720.00
3 Pasir pasang m³ 0.045 185,000.00 8,325.00
4 Semen warna kg 2.500 16,800.00 42,000.00
JUMLAH HARGA BAHAN 142,420.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 237,571.00
E Overhead & Profit 10% x D 23,757.10
F HARGA SATUAN PEKERJAAN (D+E) 261,328.10
A.4.4.3.38 Pemasangan 1 m2 lantai granit motif ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.700 73,500.00 51,450.00
2 Tukang batu L.02 Oh 0.350 102,500.00 35,875.00
3 Kepala tukang L.03 Oh 0.035 108,500.00 3,797.50
4 Mandor L.04 Oh 0.035 115,100.00 4,028.50
JUMLAH TENAGA KERJA 95,151.00
B BAHAN
1 Granit m² 1.100 113,200.00 124,520.00
2 Semen Portland kg 8.190 1,400.00 11,466.00
3 Pasir pasang m³ 0.045 185,000.00 8,325.00
4 Semen warna kg 2.000 16,800.00 33,600.00
JUMLAH HARGA BAHAN 177,911.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 273,062.00
E Overhead & Profit 10% x D 27,306.20
F HARGA SATUAN PEKERJAAN (D+E) 300,368.20

A.4.4.3.38.a Pemasangan 1 m2 dinding granit motif ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.900 73,500.00 66,150.00
2 Tukang batu L.02 Oh 0.450 102,500.00 46,125.00
3 Kepala tukang L.03 Oh 0.045 108,500.00 4,882.50
4 Mandor L.04 Oh 0.045 115,100.00 5,179.50
JUMLAH TENAGA KERJA 122,337.00
B BAHAN
1 Granit m² 1.100 113,200.00 124,520.00
2 Semen Portland kg 9.300 1,400.00 13,020.00
3 Pasir pasang m³ 0.018 185,000.00 3,330.00
4 Semen warna kg 2.750 16,800.00 46,200.00
JUMLAH HARGA BAHAN 187,070.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 309,407.00
E Overhead & Profit 10% x D 30,940.70
F HARGA SATUAN PEKERJAAN (D+E) 340,347.70

A.4.4.3.40 Pemasangan 1 m1 plint keramik ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.090 73,500.00 6,615.00
2 Tukang batu L.02 Oh 0.090 102,500.00 9,225.00
3 Kepala tukang L.03 Oh 0.035 108,500.00 3,797.50
4 Mandor L.04 Oh 0.005 115,100.00 575.50
JUMLAH TENAGA KERJA 20,213.00
B BAHAN
1 Keramik list m' 5.300 15,000.00 79,500.00
2 Semen Portland kg 1.140 1,400.00 1,596.00
3 Pasir pasang m³ 0.003 185,000.00 555.00
4 Semen warna kg 0.025 16,800.00 420.00
JUMLAH HARGA BAHAN 82,071.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 102,284.00
E Overhead & Profit 10% x D 10,228.40
F HARGA SATUAN PEKERJAAN (D+E) 112,512.40
A.4.4.3.53a Pemasangan 1 m2 dinding keramik ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.900 73,500.00 66,150.00
2 Tukang batu L.02 Oh 0.450 102,500.00 46,125.00
3 Kepala tukang L.03 Oh 0.045 108,500.00 4,882.50
4 Mandor L.04 Oh 0.045 115,100.00 5,179.50
JUMLAH TENAGA KERJA 122,337.00
B BAHAN
1 Keramik dinding m² 1.100 82,000.00 90,200.00
2 Semen Portland kg 9.300 1,400.00 13,020.00
3 Pasir pasang m³ 0.018 185,000.00 3,330.00
4 Semen warna kg 2.750 16,800.00 46,200.00
JUMLAH HARGA BAHAN 152,750.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 275,087.00
E Overhead & Profit 10% x D 27,508.70
F HARGA SATUAN PEKERJAAN (D+E) 302,595.70

A.4.4.3.57 Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.000 73,500.00 73,500.00
2 Tukang batu L.02 Oh 0.500 102,500.00 51,250.00
3 Kepala tukang L.03 Oh 0.050 108,500.00 5,425.00
4 Mandor L.04 Oh 0.050 115,100.00 5,755.00
JUMLAH TENAGA KERJA 135,930.00
B BAHAN
1 Bata merah klas 2 buah 46.000 800.00 36,800.00
2 Semen Portland kg 12.440 1,400.00 17,416.00
3 Pasir pasang m³ 0.025 185,000.00 4,625.00
JUMLAH HARGA BAHAN 58,841.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 194,771.00
E Overhead & Profit 10% x D 19,477.10
F HARGA SATUAN PEKERJAAN (D+E) 214,248.10

A.4.4.3.58 Pemasangan 1 m2 dinding batu tempel hitam ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.000 73,500.00 73,500.00
2 Tukang batu L.02 Oh 0.500 102,500.00 51,250.00
3 Kepala tukang L.03 Oh 0.050 108,500.00 5,425.00
4 Mandor L.04 Oh 0.050 115,100.00 5,755.00
JUMLAH TENAGA KERJA 135,930.00
B BAHAN
1 Batu tempel hitam m² 1.100 220,000.00 242,000.00
2 Semen Portland kg 11.750 1,400.00 16,450.00
3 Pasir pasang m³ 0.035 185,000.00 6,475.00
JUMLAH HARGA BAHAN 264,925.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 400,855.00
E Overhead & Profit 10% x D 40,085.50
F HARGA SATUAN PEKERJAAN (D+E) 440,940.50
A.4.4.3.59 Pemasangan 1 m2 paving block tebal minimal 6 cm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.2500 73,500.00 18,375.00
2 Tukang batu L.02 Oh 0.2500 102,500.00 25,625.00
3 Kepala tukang L.03 Oh 0.0250 108,500.00 2,712.50
4 Mandor L.04 Oh 0.0025 115,100.00 287.75
JUMLAH TENAGA KERJA 47,000.25
B BAHAN
1 Paving Pres type bata t = 6 cm buah 48.000 1,400.00 67,200.00
2 Pasir urug m³ 0.050 140,000.00 7,000.00
JUMLAH HARGA BAHAN 74,200.00
C PERALATAN
Peralatan Kerja Paving Blok % 0.100 74,200.00 7,420.00
JUMLAH HARGA ALAT 7,420.00
D Jumlah (A+B+C) 128,620.25
E Overhead & Profit 10% x D 12,862.03
F HARGA SATUAN PEKERJAAN (D+E) 141,482.28

A.4.4.3.60 Pemasangan 1 m2 paving block tebal minimal 8 cm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.2500 73,500.00 18,375.00
2 Tukang batu L.02 Oh 0.2500 102,500.00 25,625.00
3 Kepala tukang L.03 Oh 0.0250 108,500.00 2,712.50
4 Mandor L.04 Oh 0.0025 115,100.00 287.75
JUMLAH TENAGA KERJA 47,000.25
B BAHAN
1 Paving Pres type bata t = 8 cm buah 48.000 1,800.00 86,400.00
2 Pasir urug m³ 0.050 140,000.00 7,000.00
JUMLAH HARGA BAHAN 93,400.00
C PERALATAN
Peralatan Kerja Paving Blok % 0.100 93,400.00 9,340.00
JUMLAH HARGA ALAT 9,340.00
D Jumlah (A+B+C) 149,740.25
E Overhead & Profit 10% x D 14,974.03
F HARGA SATUAN PEKERJAAN (D+E) 164,714.28

A.4.4.3.61 Pemasangan 1 m2 Alumunium Composite Panel tebal 4 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.1500 73,500.00 11,025.00
2 Tukang besi L.02 Oh 0.0750 102,500.00 7,687.50
3 Kepala tukang L.03 Oh 0.0080 108,500.00 868.00
4 Mandor L.04 Oh 0.0080 115,100.00 920.80
JUMLAH TENAGA KERJA 20,501.30
B BAHAN
1 Aluminium Composite Panel 4 mm lembar 0.365 1,000,000.00 365,000.00
2 Skrup fixer bh 20.000 2,500.00 50,000.00
JUMLAH HARGA BAHAN 415,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D Jumlah (A+B+C) 435,501.30
E Overhead & Profit 10% x D 43,550.13
F HARGA SATUAN PEKERJAAN (D+E) 479,051.43
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A.4.5.1.5 Pemasangan 1 m2 langit-langit tripleks ukuran (120x240) cm, tebal 3mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.100 73,500.00 7,350.00
2 Tukang kayu L.02 Oh 0.100 102,500.00 10,250.00
3 Kepala tukang L.03 Oh 0.010 108,500.00 1,085.00
4 Mandor L.04 Oh 0.005 115,100.00 575.50
JUMLAH TENAGA KERJA 19,260.50
B BAHAN
1 Triplek 120x240x 4 mm lembar 0.375 60,950.00 22,856.25
2 Paku 1 - 3 cm kg 0.030 24,300.00 729.00
JUMLAH HARGA BAHAN 23,585.25
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 42,845.75
E Overhead & Profit 10% x D 4,284.58
F HARGA SATUAN PEKERJAAN (D+E) 47,130.33

A.4.5.1.6 Pemasangan 1 m2 langit-langit calsiboard ukuran (120x240) cm tebal 3,5mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.100 73,500.00 7,350.00
2 Tukang kayu L.02 Oh 0.050 102,500.00 5,125.00
3 Kepala tukang L.03 Oh 0.005 108,500.00 542.50
4 Mandor L.04 Oh 0.005 115,100.00 575.50
JUMLAH TENAGA KERJA 13,593.00
B BAHAN
1 Calsiboard 120x240x3,5 mm lembar 0.364 71,300.00 25,953.20
2 Paku eternit kg 0.110 25,000.00 2,750.00
JUMLAH HARGA BAHAN 28,703.20
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 42,296.20
E Overhead & Profit 10% x D 4,229.62
F HARGA SATUAN PEKERJAAN (D+E) 46,525.82

A.4.5.1.7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240) cm, tebal 9mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.100 73,500.00 7,350.00
2 Tukang kayu L.02 Oh 0.050 102,500.00 5,125.00
3 Kepala tukang L.03 Oh 0.005 108,500.00 542.50
4 Mandor L.04 Oh 0.005 115,100.00 575.50
JUMLAH TENAGA KERJA 13,593.00
B BAHAN
1 Gypsum board 1200 x 2400 x 9 mm lembar 0.364 127,200.00 46,300.80
2 Paku eternit kg 0.110 25,000.00 2,750.00
JUMLAH HARGA BAHAN 49,050.80
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 62,643.80
E Overhead & Profit 10% x D 6,264.38
F HARGA SATUAN PEKERJAAN (D+E) 68,908.18
A.4.5.1.9 Pemasangan 1 m1 list langit-langit kayu profil ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.050 73,500.00 3,675.00
2 Tukang kayu L.02 Oh 0.050 102,500.00 5,125.00
3 Kepala tukang L.03 Oh 0.005 108,500.00 542.50
4 Mandor L.04 Oh 0.003 115,100.00 345.30
JUMLAH TENAGA KERJA 9,687.80
B BAHAN
1 List Kayu Profil m' 1.050 7,600.00 7,980.00
2 Paku 4 - 6 cm kg 0.010 23,400.00 234.00
JUMLAH HARGA BAHAN 8,214.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 17,901.80
E Overhead & Profit 10% x D 1,790.18
F HARGA SATUAN PEKERJAAN (D+E) 19,691.98

A.4.5.1.10 Pemasangan 1 m1 list palfond gipsum ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.050 73,500.00 3,675.00
2 Tukang kayu L.02 Oh 0.050 102,500.00 5,125.00
3 Kepala tukang L.03 Oh 0.005 108,500.00 542.50
4 Mandor L.04 Oh 0.003 115,100.00 345.30
JUMLAH TENAGA KERJA 9,687.80
B BAHAN
1 List Gypsum Profil m' 1.050 34,400.00 36,120.00
2 Paku 4 - 6 cm kg 0.010 23,400.00 234.00
JUMLAH HARGA BAHAN 36,354.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 46,041.80
E Overhead & Profit 10% x D 4,604.18
F HARGA SATUAN PEKERJAAN (D+E) 50,645.98

A.4.5.1.10 Pemasangan 1 m2 Rangka langit-langit besi hollow 40.40


Lihat pada kelompok PEKERJAAN Besi dan Alumunium ( A.4.2.1.21 )

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


A.4.5.2.9a Pemasangan 1 m2 atap galvalum 0.30 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.120 73,500.00 8,820.00
2 Tukang kayu L.03 Oh 0.060 102,500.00 6,150.00
3 Kepala tukang L.11 Oh 0.006 108,500.00 651.00
4 Mandor L.15 Oh 0.006 115,100.00 690.60
JUMLAH TENAGA KERJA 16,311.60
B BAHAN
1 Seng spandek 0,30 mm lebar 70 cm m2 1.333 41,250.00 55,000.00
2 Skrup / Piles 2,0 Cm. Dos 1.000 12,800.00 12,800.00
JUMLAH HARGA BAHAN 67,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 84,111.60
E Overhead & Profit 10% x D 8,411.16
F HARGA SATUAN PEKERJAAN (D+E) 92,522.76
A.4.5.2.9b Pemasangan 1 m2 atap galvalum 0.35 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.120 73,500.00 8,820.00
2 Tukang kayu L.03 Oh 0.060 102,500.00 6,150.00
3 Kepala tukang L.11 Oh 0.006 108,500.00 651.00
4 Mandor L.15 Oh 0.006 115,100.00 690.60
JUMLAH TENAGA KERJA 16,311.60
B BAHAN
1 Seng spandek 0,35 mm lebar 70 cm m2 1.333 47,850.00 63,800.00
2 Skrup / Piles 2,0 Cm. Dos 1.000 12,800.00 12,800.00
JUMLAH HARGA BAHAN 76,600.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 92,911.60
E Overhead & Profit 10% x D 9,291.16
F HARGA SATUAN PEKERJAAN (D+E) 102,202.76

A.4.5.2.9c Pemasangan 1 m2 atap galvalum 0.40 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.120 73,500.00 8,820.00
2 Tukang kayu L.03 Oh 0.060 102,500.00 6,150.00
3 Kepala tukang L.11 Oh 0.006 108,500.00 651.00
4 Mandor L.15 Oh 0.006 115,100.00 690.60
JUMLAH TENAGA KERJA 16,311.60
B BAHAN
1 Seng spandek 0,40 mm lebar 70 cm m2 1.333 57,750.00 77,000.00
2 Skrup / Piles 2,0 Cm. Dos 1.000 12,800.00 12,800.00
JUMLAH HARGA BAHAN 89,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 106,111.60
E Overhead & Profit 10% x D 10,611.16
F HARGA SATUAN PEKERJAAN (D+E) 116,722.76

A.4.5.2.10a Pemasangan 1 m2 atap PVC ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.120 73,500.00 8,820.00
2 Tukang kayu L.03 Oh 0.060 102,500.00 6,150.00
3 Kepala tukang L.11 Oh 0.006 108,500.00 651.00
4 Mandor L.15 Oh 0.006 115,100.00 690.60
JUMLAH TENAGA KERJA 16,311.60
B BAHAN
1 Genteng PVC (alderon atau setara) m² 1.200 170,000.00 204,000.00
2 Skrup / Piles 2,0 Cm. Dos 1.000 12,800.00 12,800.00
JUMLAH HARGA BAHAN 216,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 233,111.60
E Overhead & Profit 10% x D 23,311.16
F HARGA SATUAN PEKERJAAN (D+E) 256,422.76
A.4.5.2.10b Pemasangan 1 m2 atap PVC transparan ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.120 73,500.00 8,820.00
2 Tukang kayu L.03 Oh 0.060 102,500.00 6,150.00
3 Kepala tukang L.11 Oh 0.006 108,500.00 651.00
4 Mandor L.15 Oh 0.006 115,100.00 690.60
JUMLAH TENAGA KERJA 16,311.60
B BAHAN
1 Genteng PVC transparan (alderon atau setara) m² 1.200 210,000.00 252,000.00
2 Skrup / Piles 2,0 Cm. Dos 1.000 12,800.00 12,800.00
JUMLAH HARGA BAHAN 264,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 281,111.60
E Overhead & Profit 10% x D 28,111.16
F HARGA SATUAN PEKERJAAN (D+E) 309,222.76

A.4.5.2.19a Pemasangan 1 m1 bubungan galvalum 0.30 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.120 73,500.00 8,820.00
2 Tukang kayu L.03 Oh 0.060 102,500.00 6,150.00
3 Kepala tukang L.11 Oh 0.006 108,500.00 651.00
4 Mandor L.15 Oh 0.006 115,100.00 690.60
JUMLAH TENAGA KERJA 16,311.60
B BAHAN
1 Bubungan seng spandek 0,30 mm m1 1.100 30,000.00 33,000.00
2 Skrup / Piles 2,0 Cm. Dos 1.000 12,800.00 12,800.00
JUMLAH HARGA BAHAN 45,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 62,111.60
E Overhead & Profit 10% x D 6,211.16
F HARGA SATUAN PEKERJAAN (D+E) 68,322.76

A.4.5.2.19b Pemasangan 1 m1 bubungan galvalum 0.35 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.120 73,500.00 8,820.00
2 Tukang kayu L.03 Oh 0.060 102,500.00 6,150.00
3 Kepala tukang L.11 Oh 0.006 108,500.00 651.00
4 Mandor L.15 Oh 0.006 115,100.00 690.60
JUMLAH TENAGA KERJA 16,311.60
B BAHAN
1 Bubungan seng spandek 0,35 mm m1 1.100 35,000.00 38,500.00
2 Skrup / Piles 2,0 Cm. Dos 1.000 12,800.00 12,800.00
JUMLAH HARGA BAHAN 51,300.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 67,611.60
E Overhead & Profit 10% x D 6,761.16
F HARGA SATUAN PEKERJAAN (D+E) 74,372.76
A.4.5.2.19c Pemasangan 1 m1 bubungan galvalum 0.40 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.120 73,500.00 8,820.00
2 Tukang kayu L.03 Oh 0.060 102,500.00 6,150.00
3 Kepala tukang L.11 Oh 0.006 108,500.00 651.00
4 Mandor L.15 Oh 0.006 115,100.00 690.60
JUMLAH TENAGA KERJA 16,311.60
B BAHAN
1 Bubungan seng spandek 0,40 mm m1 1.100 40,000.00 44,000.00
2 Skrup / Piles 2,0 Cm. Dos 1.000 12,800.00 12,800.00
JUMLAH HARGA BAHAN 56,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 73,111.60
E Overhead & Profit 10% x D 7,311.16
F HARGA SATUAN PEKERJAAN (D+E) 80,422.76

A.4.5.2.20 Pemasangan 1 m1 bubungan genteng PVC ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.120 73,500.00 8,820.00
2 Tukang kayu L.03 Oh 0.060 102,500.00 6,150.00
3 Kepala tukang L.11 Oh 0.006 108,500.00 651.00
4 Mandor L.15 Oh 0.006 115,100.00 690.60
JUMLAH TENAGA KERJA 16,311.60
B BAHAN
1 Bubungan PVC (alderon atau setara) m1 1.100 90,000.00 99,000.00
2 Skrup / Piles 2,0 Cm. Dos 1.000 12,800.00 12,800.00
JUMLAH HARGA BAHAN 111,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 128,111.60
E Overhead & Profit 10% x D 12,811.16
F HARGA SATUAN PEKERJAAN (D+E) 140,922.76

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A.4.6.2.1 Pemasangan 1 buah kunci tanam antik ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 Oh 0.060 73,500.00 4,410.00
2 Tukang kayu L.02 Oh 0.600 102,500.00 61,500.00
3 Kepala tukang L.03 Oh 0.060 108,500.00 6,510.00
4 Mandor L.04 Oh 0.003 115,100.00 345.30
JUMLAH TENAGA KERJA 72,765.30
B BAHAN
1 Kunci Tanam Antik buah 1.000 319,400.00 319,400.00
JUMLAH HARGA BAHAN 319,400.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 392,165.30
E Overhead & Profit 10% x D 39,216.53
F HARGA SATUAN PEKERJAAN (D+E) 431,381.83
A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 Oh 0.010 73,500.00 735.00
2 Tukang kayu L.02 Oh 0.500 102,500.00 51,250.00
3 Kepala tukang L.03 Oh 0.050 108,500.00 5,425.00
4 Mandor L.04 Oh 0.005 115,100.00 575.50
JUMLAH TENAGA KERJA 57,985.50
B BAHAN
1 Kunci Tanam Biasa buah 1.000 119,700.00 119,700.00
JUMLAH HARGA BAHAN 119,700.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 177,685.50
E Overhead & Profit 10% x D 17,768.55
F HARGA SATUAN PEKERJAAN (D+E) 195,454.05

A.4.6.2.5 Pemasangan 1 buah kunci silinder ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 Oh 0.005 73,500.00 367.50
2 Tukang kayu L.02 Oh 0.500 102,500.00 51,250.00
3 Kepala tukang L.03 Oh 0.050 108,500.00 5,425.00
4 Mandor L.04 Oh 0.003 115,100.00 345.30
JUMLAH TENAGA KERJA 57,387.80
B BAHAN
1 Kunci Silinder buah 1.000 55,900.00 55,900.00
JUMLAH HARGA BAHAN 55,900.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 113,287.80
E Overhead & Profit 10% x D 11,328.78
F HARGA SATUAN PEKERJAAN (D+E) 124,616.58

A.4.6.2.6 Pemasangan 1 buah engsel pintu ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.015 73,500.00 1,102.50
2 Tukang kayu L.02 Oh 0.150 102,500.00 15,375.00
3 Kepala tukang L.03 Oh 0.015 108,500.00 1,627.50
4 Mandor L.04 Oh 0.001 115,100.00 92.08
JUMLAH TENAGA KERJA 18,197.08
B BAHAN
1 Engsel Nylon buah 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 48,197.08
E Overhead & Profit 10% x D 4,819.71
F HARGA SATUAN PEKERJAAN (D+E) 53,016.79
A.4.6.2.7 Pemasangan 1 buah engsel jendela ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.010 73,500.00 735.00
2 Tukang kayu L.02 Oh 0.100 102,500.00 10,250.00
3 Kepala tukang L.03 Oh 0.010 108,500.00 1,085.00
4 Mandor L.04 Oh 0.001 115,100.00 57.55
JUMLAH TENAGA KERJA 12,127.55
B BAHAN
1 Engsel H buah 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 15,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 27,127.55
E Overhead & Profit 10% x D 2,712.76
F HARGA SATUAN PEKERJAAN (D+E) 29,840.31

A.4.6.2.9 Pemasangan 1 buah kait angin ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.015 73,500.00 1,102.50
2 Tukang kayu L.02 Oh 0.150 102,500.00 15,375.00
3 Kepala tukang L.03 Oh 0.015 108,500.00 1,627.50
4 Mandor L.04 Oh 0.008 115,100.00 920.80
JUMLAH TENAGA KERJA 19,025.80
B BAHAN
1 Haag Angin Besar stel 1.000 8,200.00 8,200.00
JUMLAH HARGA BAHAN 8,200.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 27,225.80
E Overhead & Profit 10% x D 2,722.58
F HARGA SATUAN PEKERJAAN (D+E) 29,948.38

A.4.6.2.10 Pemasangan 1 buah grendel pintu ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.015 73,500.00 1,102.50
2 Tukang kayu L.02 Oh 0.150 102,500.00 15,375.00
3 Kepala tukang L.03 Oh 0.015 108,500.00 1,627.50
4 Mandor L.04 Oh 0.008 115,100.00 920.80
JUMLAH TENAGA KERJA 19,025.80
B BAHAN
1 Grendel Besar buah 1.000 15,100.00 15,100.00
JUMLAH HARGA BAHAN 15,100.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 34,125.80
E Overhead & Profit 10% x D 3,412.58
F HARGA SATUAN PEKERJAAN (D+E) 37,538.38
A.4.6.2.11 Pemasangan 1 buah grendel jendela ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.015 73,500.00 1,102.50
2 Tukang kayu L.02 Oh 0.150 102,500.00 15,375.00
3 Kepala tukang L.03 Oh 0.015 108,500.00 1,627.50
4 Mandor L.04 Oh 0.008 115,100.00 920.80
JUMLAH TENAGA KERJA 19,025.80
B BAHAN
1 Grendel Kecil buah 1.000 11,600.00 11,600.00
JUMLAH HARGA BAHAN 11,600.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 30,625.80
E Overhead & Profit 10% x D 3,062.58
F HARGA SATUAN PEKERJAAN (D+E) 33,688.38

A.4.6.2.16 Pemasangan 1 m2 kaca tebal 3 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.015 73,500.00 1,102.50
2 Tukang Kaca L.02 Oh 0.150 102,500.00 15,375.00
3 Kepala tukang L.03 Oh 0.015 108,500.00 1,627.50
4 Mandor L.04 Oh 0.001 115,100.00 92.08
JUMLAH TENAGA KERJA 18,197.08
B BAHAN
1 Kaca Polos 3 mm m² 1.100 150,000.00 165,000.00
2 Alat-alat bantu Set 0.050 50,000.00 2,500.00
JUMLAH HARGA BAHAN 167,500.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 185,697.08
E Overhead & Profit 10% x D 18,569.71
F HARGA SATUAN PEKERJAAN (D+E) 204,266.79

A.4.6.2.17 Pemasangan 1 m2 kaca tebal 5 mm ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.015 73,500.00 1,102.50
2 Tukang Kaca L.02 Oh 0.150 102,500.00 15,375.00
3 Kepala tukang L.03 Oh 0.015 108,500.00 1,627.50
4 Mandor L.04 Oh 0.001 115,100.00 92.08
JUMLAH TENAGA KERJA 18,197.08
B BAHAN
1 Kaca Polos 5 mm m² 1.100 176,000.00 193,600.00
2 Alat-alat bantu Set 0.050 50,000.00 2,500.00
JUMLAH HARGA BAHAN 196,100.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 214,297.08
E Overhead & Profit 10% x D 21,429.71
F HARGA SATUAN PEKERJAAN (D+E) 235,726.79
A.4.6.2.17.a Pemasangan 1 m2 kaca blue green 8 mm (panasap) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.015 73,500.00 1,102.50
2 Tukang kayu L.02 Oh 0.150 102,500.00 15,375.00
3 Kepala tukang L.03 Oh 0.015 108,500.00 1,627.50
4 Mandor L.04 Oh 0.001 115,100.00 92.08
JUMLAH TENAGA KERJA 18,197.08
B BAHAN
1 Kaca Darkrin 8 mm (panasap) m² 1.100 522,500.00 574,750.00
2 Sealant Tube 0.050 50,000.00 2,500.00
JUMLAH HARGA BAHAN 577,250.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 595,447.08
E Overhead & Profit 10% x D
F HARGA SATUAN PEKERJAAN (D+E) 595,447.08

A.4.6.2.18 Pemasangan 1 buah door closer ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.015 73,500.00 1,102.50
2 Tukang kayu L.02 Oh 0.150 102,500.00 15,375.00
3 Kepala tukang L.03 Oh 0.015 108,500.00 1,627.50
4 Mandor L.04 Oh 0.008 115,100.00 920.80
JUMLAH TENAGA KERJA 19,025.80
B BAHAN
1 Door Closer buah 1.000 495,000.00 495,000.00
JUMLAH HARGA BAHAN 495,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 514,025.80
E Overhead & Profit 10% x D 51,402.58
F HARGA SATUAN PEKERJAAN (D+E) 565,428.38

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A.4.7.1.4 Pengecatan 1 m2 bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.070 73,500.00 5,145.00
2 Tukang cat L.02 Oh 0.009 102,500.00 922.50
3 Kepala tukang L.03 Oh 0.006 108,500.00 651.00
4 Mandor L.04 Oh 0.003 115,100.00 345.30
JUMLAH TENAGA KERJA 7,063.80
B BAHAN
1 Meni Kayu kg 0.200 29,300.00 5,860.00
2 Plamir Kayu kg 0.150 22,500.00 3,375.00
3 Cat Kayu Mutu Menengah kg 0.170 40,000.00 6,800.00
4 Cat Kayu Mutu Tinggi kg 0.260 55,000.00 14,300.00
5 Kuas bh 0.010 7,500.00 75.00
6 Minyak Cat liter 0.030 33,000.00 990.00
7 Ampelas lembar 0.200 3,500.00 700.00
JUMLAH HARGA BAHAN 32,100.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 39,163.80
E Overhead & Profit 10% x D 3,916.38
F HARGA SATUAN PEKERJAAN (D+E) 43,080.18
A.4.7.1.6 Pelaburan 1 m2 bidang kayu dengan teak oil ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.040 73,500.00 2,940.00
2 Tukang cat L.02 Oh 0.063 102,500.00 6,457.50
3 Kepala tukang L.03 Oh 0.063 108,500.00 6,835.50
4 Mandor L.04 Oh 0.003 115,100.00 345.30
JUMLAH TENAGA KERJA 16,578.30
B BAHAN
1 Teak Oil liter 0.360 32,350.00 11,646.00
JUMLAH HARGA BAHAN 11,646.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 28,224.30
E Overhead & Profit 10% x D 2,822.43
F HARGA SATUAN PEKERJAAN (D+E) 31,046.73

A.4.7.1.7 Pelaburan 1 m2 bidang kayu dengan politur ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.040 73,500.00 2,940.00
2 Tukang cat L.02 Oh 0.060 102,500.00 6,150.00
3 Kepala tukang L.03 Oh 0.016 108,500.00 1,736.00
4 Mandor L.04 Oh 0.003 115,100.00 345.30
JUMLAH TENAGA KERJA 11,171.30
B BAHAN
1 Politur liter 0.150 42,000.00 6,300.00
2 Ampelas lembar 2.000 3,500.00 7,000.00
JUMLAH HARGA BAHAN 13,300.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 24,471.30
E Overhead & Profit 10% x D 2,447.13
F HARGA SATUAN PEKERJAAN (D+E) 26,918.43

A.4.7.1.8 Pelaburan 1 m2 bidang kayu dengan ter ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.100 73,500.00 7,350.00
2 Mandor L.04 Oh 0.006 115,100.00 690.60
JUMLAH TENAGA KERJA 8,040.60
B BAHAN
1T e e r liter 0.350 7,850.00 2,747.50
JUMLAH HARGA BAHAN 2,747.50
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 10,788.10
E Overhead & Profit 10% x D 1,078.81
F HARGA SATUAN PEKERJAAN (D+E) 11,866.91
A.4.7.1.10 Pengecatan 1 m2 tembok baru interior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.0200 73,500.00 1,470.00
2 Tukang cat L.02 Oh 0.0630 102,500.00 6,457.50
3 Kepala tukang L.03 Oh 0.0063 108,500.00 683.55
4 Mandor L.04 Oh 0.0025 115,100.00 287.75
JUMLAH TENAGA KERJA 8,898.80
B BAHAN
1 Plamir Tembok kg 0.100 11,150.00 1,115.00
2 Cat Tembok dasar kg 0.100 40,000.00 4,000.00
3 Cat Tembok interior kg 0.260 45,000.00 11,700.00
JUMLAH HARGA BAHAN 16,815.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 25,713.80
E Overhead & Profit 10% x D 2,571.38
F HARGA SATUAN PEKERJAAN (D+E) 28,285.18

A.4.7.1.10a Pengecatan 1 m2 tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.0200 73,500.00 1,470.00
2 Tukang cat L.02 Oh 0.0630 102,500.00 6,457.50
3 Kepala tukang L.03 Oh 0.0063 108,500.00 683.55
4 Mandor L.04 Oh 0.0025 115,100.00 287.75
JUMLAH TENAGA KERJA 8,898.80
B BAHAN
1 Aqua Proff kg 0.100 51,000.00 5,100.00
2 Cat Tembok dasar kg 0.100 40,000.00 4,000.00
3 Cat Tembok ekserior kg 0.260 95,000.00 24,700.00
JUMLAH HARGA BAHAN 33,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 42,698.80
E Overhead & Profit 10% x D 4,269.88
F HARGA SATUAN PEKERJAAN (D+E) 46,968.68

A.4.7.1.11 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.028 73,500.00 2,058.00
2 Tukang cat L.02 Oh 0.042 102,500.00 4,305.00
3 Kepala tukang L.03 Oh 0.004 108,500.00 455.70
4 Mandor L.04 Oh 0.003 115,100.00 345.30
JUMLAH TENAGA KERJA 7,164.00
B BAHAN
1 Cat Tembok dasar kg 0.120 40,000.00 4,800.00
2 Cat Tembok ekserior kg 0.180 95,000.00 17,100.00
JUMLAH HARGA BAHAN 21,900.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 29,064.00
E Overhead & Profit 10% x D 2,906.40
F HARGA SATUAN PEKERJAAN (D+E) 31,970.40
A.4.7.1.16 Pengecatan 1 m2 permukaan baja dengan menie besi ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.020 73,500.00 1,470.00
2 Tukang cat L.02 Oh 0.200 102,500.00 20,500.00
3 Kepala tukang L.03 Oh 0.020 108,500.00 2,170.00
4 Mandor L.04 Oh 0.003 115,100.00 287.75
JUMLAH TENAGA KERJA 24,427.75
B BAHAN
1 Meni Besi kg 0.100 33,700.00 3,370.00
2 Minyak Cat liter 0.010 33,000.00 330.00
3 Kuas bh 0.010 7,500.00 75.00
JUMLAH HARGA BAHAN 3,775.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 28,202.75
E Overhead & Profit 10% x D 2,820.28
F HARGA SATUAN PEKERJAAN (D+E) 31,023.03

A.4.7.1.17 Pengecatan 1 m2 permukaan baja (1 lapis cat dasar, 2 lapis cat penutup) ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.020 73,500.00 1,470.00
2 Tukang cat L.02 Oh 0.200 102,500.00 20,500.00
3 Kepala tukang L.03 Oh 0.020 108,500.00 2,170.00
4 Mandor L.04 Oh 0.003 115,100.00 287.75
JUMLAH TENAGA KERJA 24,427.75
B BAHAN
1 Meni Besi kg 0.100 33,700.00 3,370.00
2 Cat Besi Mutu Tinggi kg 0.200 60,000.00 12,000.00
3 Minyak Cat liter 0.010 33,000.00 330.00
4 Kuas bh 0.010 7,500.00 75.00
JUMLAH HARGA BAHAN 15,775.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 40,202.75
E Overhead & Profit 10% x D 4,020.28
F HARGA SATUAN PEKERJAAN (D+E) 44,223.03

A.4.7.1.18 Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.250 73,500.00 18,375.00
2 Tukang cat L.02 Oh 0.225 102,500.00 23,062.50
3 Kepala tukang L.02 Oh 0.023 108,500.00 2,441.25
4 Mandor L.04 Oh 0.008 115,100.00 863.25
JUMLAH TENAGA KERJA 44,742.00
B BAHAN
1 Meni Besi kg 0.100 33,700.00 3,370.00
2 Minyak Cat liter 0.010 33,000.00 330.00
3 Kuas bh 0.010 7,500.00 75.00
4 Balok Kayu klas III m³ 0.002 3,500,000.00 7,000.00
JUMLAH HARGA BAHAN 10,775.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 55,517.00
E Overhead & Profit 10% x D 5,551.70
F HARGA SATUAN PEKERJAAN (D+E) 61,068.70
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1 Pemasangan 1 buah closet duduk keramik ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 3.300 73,500.00 242,550.00
2 Tukang batu L.02 Oh 1.100 102,500.00 112,750.00
3 Kepala tukang L.03 Oh 0.010 108,500.00 1,085.00
4 Mandor L.04 Oh 0.160 115,100.00 18,416.00
JUMLAH TENAGA KERJA 374,801.00
B BAHAN
1 Closet Duduk Keramik buah 1.000 1,960,700.00 1,960,700.00
2 Perlengkapan 10% B.1 Ls 1.000 196,070.00 196,070.00
JUMLAH HARGA BAHAN 2,156,770.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 2,531,571.00
E Overhead & Profit 10% x D 253,157.10
F HARGA SATUAN PEKERJAAN (D+E) 2,784,728.10
A.5.1.1.2 Pemasangan 1 buah closet jongkok porslen ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
TENAGA
1 Pekerja L.01 Oh 0.700 73,500.00 51,450.00
2 Tukang batu L.02 Oh 1.000 102,500.00 102,500.00
3 Kepala tukang L.03 Oh 0.100 108,500.00 10,850.00
4 Mandor L.04 Oh 0.125 115,100.00 14,387.50
JUMLAH TENAGA KERJA 179,187.50
B BAHAN
1 Closet Jongkok Porselin buah 1.000 209,400.00 209,400.00
2 Semen Portland kg 6.000 1,400.00 8,400.00
3 Pasir pasang m³ 0.010 185,000.00 1,850.00
JUMLAH HARGA BAHAN 219,650.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 398,837.50
E Overhead & Profit 10% x D 39,883.75
F HARGA SATUAN PEKERJAAN (D+E) 438,721.25

A.5.1.1.3 Pemasangan 1 buah closet jongkok teraso ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.700 73,500.00 51,450.00
2 Tukang batu L.02 Oh 1.000 102,500.00 102,500.00
3 Kepala tukang L.03 Oh 0.100 108,500.00 10,850.00
4 Mandor L.04 Oh 0.125 115,100.00 14,387.50
JUMLAH TENAGA KERJA 179,187.50
B BAHAN
1 Closet Jongkok Teraso buah 1.000 89,500.00 89,500.00
2 Semen Portland kg 6.000 1,400.00 8,400.00
3 Pasir pasang m³ 0.010 185,000.00 1,850.00
JUMLAH HARGA BAHAN 99,750.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 278,937.50
E Overhead & Profit 10% x D 27,893.75
F HARGA SATUAN PEKERJAAN (D+E) 306,831.25

A.5.1.1.4 Pemasangan 1 buah urinoir ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.000 73,500.00 73,500.00
2 Tukang batu L.02 Oh 1.000 102,500.00 102,500.00
3 Kepala tukang L.03 Oh 0.100 108,500.00 10,850.00
4 Mandor L.04 Oh 0.050 115,100.00 5,755.00
JUMLAH TENAGA KERJA 192,605.00
B BAHAN
1 Urinoir Porselin (kualitas 1) buah 1.000 2,265,000.00 2,265,000.00
2 Semen Portland kg 6.000 1,400.00 8,400.00
3 Pasir pasang m³ 0.010 185,000.00 1,850.00
4 Perlengkapan 30% B.1 Ls 1.000 679,500.00 679,500.00
JUMLAH HARGA BAHAN 2,954,750.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 3,147,355.00
E Overhead & Profit 10% x D 314,735.50
F HARGA SATUAN PEKERJAAN (D+E) 3,462,090.50
A.5.1.1.5 Pemasangan 1 buah wastafel ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 1.200 73,500.00 88,200.00
2 Tukang batu L.02 Oh 1.450 102,500.00 148,625.00
3 Kepala tukang L.03 Oh 0.150 108,500.00 16,275.00
4 Mandor L.04 Oh 0.060 115,100.00 6,906.00
JUMLAH TENAGA KERJA 260,006.00
B BAHAN
1 Wastafel buah 1.000 1,450,000.00 1,450,000.00
2 Semen Portland kg 6.000 1,400.00 8,400.00
3 Pasir pasang m³ 0.010 185,000.00 1,850.00
4 Perlengkapan 15% B.1 Ls 1.000 217,500.00 217,500.00
JUMLAH HARGA BAHAN 1,677,750.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,937,756.00
E Overhead & Profit 10% x D 193,775.60
F HARGA SATUAN PEKERJAAN (D+E) 2,131,531.60

A.5.1.1.7 Pemasangan 1 buah bak fibreglass vol 1 m3 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.300 73,500.00 22,050.00
2 Tukang batu L.02 Oh 0.450 102,500.00 46,125.00
3 Kepala tukang L.03 Oh 0.045 108,500.00 4,882.50
4 Mandor L.04 Oh 0.015 115,100.00 1,726.50
JUMLAH TENAGA KERJA 74,784.00
B BAHAN
1 Bak Fiberglass 1,00 M3 buah 1.000 392,050.00 392,050.00
2 Perlengkapan 12% B.1 Ls 1.000 47,046.00 47,046.00
JUMLAH HARGA BAHAN 439,096.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 513,880.00
E Overhead & Profit 10% x D 51,388.00
F HARGA SATUAN PEKERJAAN (D+E) 565,268.00

A.5.1.1.8 Pemasangan 1 buah bak mandi batu bata vol 0,30 m3 ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 3.000 73,500.00 220,500.00
2 Tukang batu L.02 Oh 1.500 102,500.00 153,750.00
3 Kepala tukang L.03 Oh 0.150 108,500.00 16,275.00
4 Mandor L.04 Oh 0.015 115,100.00 1,726.50
JUMLAH TENAGA KERJA 392,251.50
B BAHAN
1 Bata merah klas 2 buah 150.000 800.00 120,000.00
2 Semen Portland kg 120.000 1,400.00 168,000.00
3 Pasir pasang m³ 0.300 185,000.00 55,500.00
4 Porselin kw I (polos) buah 360.000 3,177.00 1,143,720.00
5 Semen warna kg 6.000 16,800.00 100,800.00
JUMLAH HARGA BAHAN 1,588,020.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 1,980,271.50
E Overhead & Profit 10% x D 198,027.15
F HARGA SATUAN PEKERJAAN (D+E) 2,178,298.65
A.5.1.1.12 Pemasangan 1 buah bak cuci piring stainlessteel ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.050 73,500.00 3,675.00
2 Tukang batu L.02 Oh 0.500 102,500.00 51,250.00
3 Kepala tukang L.03 Oh 0.050 108,500.00 5,425.00
4 Mandor L.04 Oh 0.025 115,100.00 2,877.50
JUMLAH TENAGA KERJA 63,227.50
B BAHAN
1 Bak Cuci Stainless Steel buah 1.000 370,300.00 370,300.00
2 Perlengkapan 12% B.1 Ls 1.000 44,436.00 44,436.00
JUMLAH HARGA BAHAN 414,736.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 477,963.50
E Overhead & Profit 10% x D 47,796.35
F HARGA SATUAN PEKERJAAN (D+E) 525,759.85

A.5.1.1.18 Pemasangan 1 buah kran dia. 1/2” ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.010 73,500.00 735.00
2 Tukang batu L.02 Oh 0.100 102,500.00 10,250.00
3 Kepala tukang L.03 Oh 0.010 108,500.00 1,085.00
4 Mandor L.04 Oh 0.001 115,100.00 115.10
JUMLAH TENAGA KERJA 12,185.10
B BAHAN
1 Kran Air Dia. 1/2" buah 1.000 17,500.00 17,500.00
2 Seal Tape buah 0.025 6,125.00 153.13
JUMLAH HARGA BAHAN 17,653.13
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 29,838.23
E Overhead & Profit 10% x D 2,983.82
F HARGA SATUAN PEKERJAAN (D+E) 32,822.05

A.5.1.1.19 Pemasangan 1 buah kran dia. 3/4” ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA KERJA
1 Pekerja L.01 Oh 0.010 73,500.00 735.00
2 Tukang batu L.02 Oh 0.100 102,500.00 10,250.00
3 Kepala tukang L.03 Oh 0.010 108,500.00 1,085.00
4 Mandor L.04 Oh 0.001 115,100.00 115.10
JUMLAH TENAGA KERJA 12,185.10
B BAHAN
1 Kran Air Dia. 3/4" buah 1.000 20,000.00 20,000.00
2 Seal Tape buah 0.025 3,650.00 91.25
JUMLAH HARGA BAHAN 20,091.25
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 32,276.35
E Overhead & Profit 10% x D 3,227.64
F HARGA SATUAN PEKERJAAN (D+E) 35,503.99
A.5.1.1.20 Pemasangan 1 m1 pipa galvanis dia. 1/2” ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.054 73,500.00 3,969.00
2 Tukang batu L.02 Oh 0.090 102,500.00 9,225.00
3 Kepala tukang L.03 Oh 0.009 108,500.00 976.50
4 Mandor L.04 Oh 0.027 115,100.00 3,107.70
JUMLAH TENAGA KERJA 17,278.20
B BAHAN
1 Pipa GI Medium B Ø ½" m1 1.200 13,200.00 15,840.00
2 Perlengkapan 35% B.1 Ls 0.420 4,620.00 1,940.40
JUMLAH HARGA BAHAN 17,780.40
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 35,058.60
E Overhead & Profit 10% x D 3,505.86
F HARGA SATUAN PEKERJAAN (D+E) 38,564.46

A.5.1.1.21 Pemasangan 1 m1 pipa galvanis dia. 3/4” ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.054 73,500.00 3,969.00
2 Tukang batu L.02 Oh 0.090 102,500.00 9,225.00
3 Kepala tukang L.03 Oh 0.009 108,500.00 976.50
4 Mandor L.04 Oh 0.027 115,100.00 3,107.70
JUMLAH TENAGA KERJA 17,278.20
B BAHAN
1 Pipa GI Medium B Ø ¾" m1 1.200 17,500.00 21,000.00
2 Perlengkapan 35% B.1 Ls 0.420 6,125.00 2,572.50
JUMLAH HARGA BAHAN 23,572.50
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 40,850.70
E Overhead & Profit 10% x D 4,085.07
F HARGA SATUAN PEKERJAAN (D+E) 44,935.77

A.5.1.1.22 Pemasangan 1 m1 pipa PVC 1/2" ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.054 73,500.00 3,969.00
2 Tukang pipa PVC L.02 Oh 0.090 102,500.00 9,225.00
3 Kepala tukang L.03 Oh 0.009 108,500.00 976.50
4 Mandor L.04 Oh 0.027 115,100.00 3,107.70
JUMLAH TENAGA KERJA 17,278.20
B BAHAN
1 Pipa PVC AW Ø ½" m1 1.200 6,000.00 7,200.00
2 Perlengkapan 35% B.1 Ls 1.000 2,100.00 2,100.00
JUMLAH HARGA BAHAN 9,300.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 26,578.20
E Overhead & Profit 10% x D 2,657.82
F HARGA SATUAN PEKERJAAN (D+E) 29,236.02
A.5.1.1.23 Pemasangan 1 m1 pipa PVC 1" ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.054 73,500.00 3,969.00
2 Tukang pipa PVC L.02 Oh 0.090 102,500.00 9,225.00
3 Kepala tukang L.03 Oh 0.009 108,500.00 976.50
4 Mandor L.04 Oh 0.027 115,100.00 3,107.70
JUMLAH TENAGA KERJA 17,278.20
B BAHAN
1 Pipa PVC AW Ø 1" m1 1.200 9,900.00 11,880.00
2 Perlengkapan 35% B.1 Ls 1.000 3,465.00 3,465.00
JUMLAH HARGA BAHAN 15,345.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 32,623.20
E Overhead & Profit 10% x D 3,262.32
F HARGA SATUAN PEKERJAAN (D+E) 35,885.52

A.5.1.1.24 Pemasangan 1 m1 pipa PVC 1,5" ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.054 73,500.00 3,969.00
2 Tukang pipa PVC L.02 Oh 0.090 102,500.00 9,225.00
3 Kepala tukang L.03 Oh 0.009 108,500.00 976.50
4 Mandor L.04 Oh 0.027 115,100.00 3,107.70
JUMLAH TENAGA KERJA 17,278.20
B BAHAN
1 Pipa PVC AW Ø 1 ½" m1 1.200 16,500.00 19,800.00
2 Perlengkapan 25% B.1 Ls 1.000 4,125.00 4,125.00
JUMLAH HARGA BAHAN 23,925.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 41,203.20
E Overhead & Profit 10% x D 4,120.32
F HARGA SATUAN PEKERJAAN (D+E) 45,323.52

A.5.1.1.25 Pemasangan 1 m1 pipa PVC 2" ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.054 73,500.00 3,969.00
2 Tukang pipa PVC L.02 Oh 0.090 102,500.00 9,225.00
3 Kepala tukang L.03 Oh 0.009 108,500.00 976.50
4 Mandor L.04 Oh 0.027 115,100.00 3,107.70
JUMLAH TENAGA KERJA 17,278.20
B BAHAN
1 Pipa PVC AW Ø 2" m1 1.200 22,800.00 27,360.00
2 Perlengkapan 20% B.1 Ls 1.000 4,560.00 4,560.00
JUMLAH HARGA BAHAN 31,920.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 49,198.20
E Overhead & Profit 10% x D 4,919.82
F HARGA SATUAN PEKERJAAN (D+E) 54,118.02
A.5.1.1.26 Pemasangan 1 m1 pipa PVC 3" ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.054 73,500.00 3,969.00
2 Tukang pipa PVC L.02 Oh 0.090 102,500.00 9,225.00
3 Kepala tukang L.03 Oh 0.009 108,500.00 976.50
4 Mandor L.04 Oh 0.027 115,100.00 3,107.70
JUMLAH TENAGA KERJA 17,278.20
B BAHAN
1 Pipa PVC AW Ø 3" m1 1.200 42,000.00 50,400.00
2 Perlengkapan 20% B.1 Ls 1.000 8,400.00 8,400.00
JUMLAH HARGA BAHAN 58,800.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 76,078.20
E Overhead & Profit 10% x D 7,607.82
F HARGA SATUAN PEKERJAAN (D+E) 83,686.02

A.5.1.1.27 Pemasangan 1 m1 pipa PVC 4" ###

Harga Satuan Jumlah Harga


No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 Oh 0.054 73,500.00 3,969.00
2 Tukang pipa PVC L.02 Oh 0.090 102,500.00 9,225.00
3 Kepala tukang L.03 Oh 0.009 108,500.00 976.50
4 Mandor L.04 Oh 0.027 115,100.00 3,107.70
JUMLAH TENAGA KERJA 17,278.20
B BAHAN
1 Pipa PVC AW Ø 4" m1 1.200 64,500.00 77,400.00
2 Perlengkapan 20% B.1 Ls 1.000 12,900.00 12,900.00
JUMLAH HARGA BAHAN 90,300.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 107,578.20
E Overhead & Profit 10% x D 10,757.82
F HARGA SATUAN PEKERJAAN (D+E) 118,336.02
DAFTAR REKAPITULASI ANALISA HARGA SATUAN

KODE HARGA SATUAN


URAIAN ANALISA HARGA SATUAN SAT.
ANALISA ( Rp. )

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A.2.2.1.1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 m M2 540,990.41
A.2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 m M2 27,500.00
A.2.2.1.3 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 m M2 2,503,530.26
A.2.2.1.4 Pengukuran dan pemasangan 1 m1 Bouwplank M1 144,331.55
A.2.2.1.5 Pembuatan 1 m2 kantor sementara lantai plesteran M2 625,688.13
A.2.2.1.6 Pembuatan 1 m2 rumah jaga (konstruksi kayu) M2 2,200,451.00
A.2.2.1.7 Pembuatan 1 m2 gudang semen dan peralatan M2 1,872,457.60
A.2.2.1.8 Pembuatan 1 m2 bedeng pekerja M2 1,798,793.35
A.2.2.1.9 Pembersihan 1 m2 lapangan dan perataan M2 14,415.50
A.2.2.1.10 Pembuatan 1 m2 steger/perancah dari bambu M2 379,021.28
A.2.2.1.11 Pembuatan 1 buah kotak adukan ukuran 40cm x 50cm x 25cm BH 296,864.70
A.2.2.1.12 Pembuatan 1 m2 jalan sementara M2 141,376.95
A.2.2.1.13 Pembongkaran 1 m3 beton bertulang M3 1,211,876.16
A.2.2.1.14 Pembongkaran 1 m3 dinding tembok bata M3 630,688.08
A.2.2.1.14a Pembongkaran 1 m3 dinding tembok bata lantai 2 M3 970,782.12
A.2.2.1.15 Pembongkaran 1 m2 lantai ubin / keramik M3 118,612.48
A.2.2.1.16 Pembongkaran 1 m3 kusen kayu M3 697,425.70
A.2.2.1.17 Pengupasan 1 m2 pleseteran M2 63,722.21
A.2.2.1.18 Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm M2 10,734.02

A.1.5.1 HARGA SATUAN PEKERJAAN TANAH


A.1.5.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m M3 63,802.75
A.1.5.1.2 Penggalian 1 m3 tanah biasa sedalam 2 m M3 78,462.45
A.1.5.1.3 Penggalian 1 m3 tanah biasa sedalam 3 m M3 93,375.37
A.2.3.1.4 Penggalian 1 m3 tanah keras sedalam 1 m M3 84,901.52
A.2.3.1.5 Penggalian 1 m3 tanah cadas sedalam 1 m M3 128,871.60
A.2.3.1.6 Penggalian 1 m3 tanah lumpur sedalam 1 m M3 102,717.45
A.2.3.1.7 Pengerjaan striping 1 m2 tanah tebing setinggi 1 m M2 4,675.55
A.2.3.1.8 Pembuangan 1 m3 tanah sejauh 30 m M3 27,946.60
A.1.5.1.9 Pengurugan kembali 1 m3 galian tanah M3 46,755.50
A.1.5.1.10 Pemadatan tanah 1 m3 tanah (per 20 cm) M3 46,755.50
A.1.5.1.11 Pengurugan 1 m3 dengan pasir urug M3 210,321.10
A.1.5.1.14 Pengurugan 1 m3 sirtu padat M3 260,977.75
A.1.5.1.15 Pengurugan 1 m3 dengan tanah urug M3 157,521.10

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah campuran 1 Pc : 5 Ps M3 788,628.50
A.3.2.1.4 Pemasangan 1 m3 pondasi batu belah campuran 1 Pc : 6 Ps M3 762,828.00
A.3.2.1.5 Pemasangan 1 m3 pondasi batu belah campuran 1 Pc : 8 Ps M3 727,468.50
A.3.2.1.6 Pemasangan 1 m3 pondasi batu belah campuran 1 Pc : 1 Kp : 2 Ps M3 538,123.30
A.3.2.1.7 Pemasangan 1 m3 pondasi batu belah campuran 1 Pc : 3 Kp : 10 Ps M3 662,708.20
A.3.2.1.8 Pemasangan 1 m3 pondasi batu belah campuran ¼ Pc : 1 Kp : 4 Ps M3 638,199.10
A.3.2.1.9 Pemasangan 1 m3 batu kosong (anstamping) M3 427,355.94
A.3.2.1.10 Pemasangan 1 m3 pondasi siklop, 610% beton, 1 Pc : 2 Ps : 3 Kr dan 410% batu belah M3 2,767,427.47
A.3.2.1.11 Pemasangan 1 m3 pondasi sumuran, dia. 100 cm M3 891,978.51

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.1 Pembuatan 1 m3 beton mutu f’ = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 M3 1,010,699.89
A.4.1.1.2 Pembuatan 1 m3 beton mutu f’ = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 M3 1,052,997.37
A.4.1.1.3 Pembuatan 1 m3 beton mutu f’ = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 M3 1,085,481.56
A.4.1.1.4 Pembuatan 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 M3 946,695.44
A.4.1.1.5a Pembuatan 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 M3 1,022,458.17
A.4.1.1.5b Pembuatan 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 (overhead) M3 1,124,703.98
A.4.1.1.6 Pembuatan 1 m3 beton mutu f’ = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 M3 1,055,367.03
A.4.1.1.7 Pembuatan 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 M3 1,081,755.78
A.4.1.1.8 Pembuatan 1 m3 beton mutu f’ = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 M3 1,096,927.48
A.4.1.1.9 Pembuatan 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 M3 1,123,050.23
A.4.1.1.10 Pembuatan 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 M3 1,131,062.00
A.4.1.1.11 Pembuatan 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 M3 1,205,872.95
A.4.1.1.12 Pembuatan 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 M3 1,216,410.65
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir Kg 148,089.90
A.A4.1.1.17 Pembesian 1 kg dengan besi polos atau besi ulir Kg 14,808.99
A.4.1.1.18 Pemasangan 10 kg kabel presstressed polos/strands Kg 157,451.58
A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi M2 259,353.60
A.4.1.1.21 Pemasangan 1 m2 bekisting untuk sloof M2 141,073.60
A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom M2 131,397.13
A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok M2 245,263.80
A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai M2 294,763.80
A.4.1.1.25 Pemasangan 1 m2 boundeck untuk lantai M2 301,772.00
A.4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga M2 407,188.80
B.21.a Pemasangan 1 M2 Begisiting Untuk Permukaan Beton Biasa Multiplek 9 mm ata 18 mm M2 191,552.68
B.35. Bongkar 1 M2 Begisting Secara Biasa ( Analisa SDA ) M2 2,303.13
A.A.4.1.1.27a Pemasangan 1 m3 beton bertulang (sloof 15/20) M3 5,600,396.34
A.A.4.1.1.27b Pemasangan 1 m3 beton bertulang (sloof 15/25) M3 5,285,787.97
A.A.4.1.1.28 Pemasangan 1 m3 beton bertulang (sloof 25/30) M3 5,556,929.67
A.A.4.1.1.29 Pemasangan 1 m3 beton bertulang (sloof 25/35) M3 5,536,441.27
A.A.4.1.1.30 Pemasangan 1 m3 beton bertulang (sloof 30/35) M3 4,836,225.27
A.A.4.1.1.31 Pemasangan 1 m3 beton bertulang (kolom 11/11) M3 7,813,580.33
A.A.4.1.1.32 Pemasangan 1 m3 beton bertulang (kolom 13/13) M3 7,380,887.86
A.A.4.1.1.33a Pemasangan 1 m3 beton bertulang (kolom 15/15) M3 6,160,491.14
A.A.4.1.1.33b Pemasangan 1 m3 beton bertulang (kolom 15/20) M3 5,217,580.08
A.A.4.1.1.34 Pemasangan 1 m3 beton bertulang (kolom 20/20) M3 6,582,978.25
A.A.4.1.1.34a Pemasangan 1 m3 beton bertulang (kolom 20/40) M3 3,705,491.34
A.A.4.1.1.35a Pemasangan 1 m3 beton bertulang (kolom 25/25) M3 5,862,895.52
A.A.4.1.1.35b Pemasangan 1 m3 beton bertulang (kolom 25/30) M3 6,568,162.53
A.A.4.1.1.35c Pemasangan 1 m3 beton bertulang (kolom 25/35) M3 6,883,854.70
A.A.4.1.1.36a Pemasangan 1 m3 beton bertulang (kolom 30/40) M3 5,609,240.74
A.A.4.1.1.36b Pemasangan 1 m3 beton bertulang (kolom 40/40) M3 5,273,190.94
A.A.4.1.1.36c Pemasangan 1 m3 beton bertulang (kolom 40/60) M3 5,588,400.27
A.A.4.1.1.36d Pemasangan 1 m3 beton bertulang (kolom Ø 30) M3 6,068,893.92
A.A.4.1.1.37 Pemasangan 1 m3 beton bertulang (kolom 50/50) M3 5,914,445.60
A.A.4.1.1.38 Pemasangan 1 m3 beton bertulang (ring balok 13/15) M3 8,838,855.93
A.A.4.1.1.38a Pemasangan 1 m3 beton bertulang (ring balok 13/13) M3 8,288,547.72
A.A.4.1.1.39 Pemasangan 1 m3 beton bertulang (balok 13/13) M3 8,288,547.72
A.A.4.1.1.40 Pemasangan 1 m3 beton bertulang (balok 13/15) M3 8,838,855.93
A.A.4.1.1.41a Pemasangan 1 m3 beton bertulang (balok 15/15) M3 7,850,261.88
A.A.4.1.1.41b Pemasangan 1 m3 beton bertulang (balok 15/20) M3 9,740,540.50
A.A.4.1.1.41c Pemasangan 1 m3 beton bertulang (balok 15/25) M3 9,647,204.92
A.A.4.1.1.42a Pemasangan 1 m3 beton bertulang (balok 15/20) M3 7,280,897.60
A.A.4.1.1.42b Pemasangan 1 m3 beton bertulang (balok 20/30) M3 8,613,578.70
A.A.4.1.1.42c Pemasangan 1 m3 beton bertulang (balok 25/40) M3 6,900,462.02
A.A.4.1.1.42d Pemasangan 1 m3 beton bertulang (balok 30/50) M3 6,853,071.11
A.A.4.1.1.42e Pemasangan 1 m3 beton bertulang (balok 40/70) M3 5,162,657.32
A.A.4.1.1.42f Pemasangan 1 m3 beton bertulang (ring balok 40/30) M3 8,596,889.84
A.A.4.1.1.42g Pemasangan 1 m3 beton bertulang (balok latei 40/40) M3 6,883,773.16
A.A.4.1.1.42h Pemasangan 1 m3 beton bertulang (ring balok 25/20) M3 9,682,351.44
A.A.4.1.1.43 Pemasangan 1 m3 beton bertulang (plat 8 cm) M3 4,026,225.47
A.A.4.1.1.44 Pemasangan 1 m3 beton bertulang (plat 10 cm) M3 4,909,146.66
A.A.4.1.1.45 Pemasangan 1 m3 beton bertulang (plat 12 cm) M3 4,373,611.80
A.A.4.1.1.45.a Pemasangan 1 m3 beton bertulang (plat 15 cm) M3 3,828,597.41
A.A.4.1.1.45.b Pemasangan 1 m3 beton wiremes 8 mm (plat lantai 12 cm) M3 1,981,404.45
A.A.4.1.1.46 Pemasangan 1 m3 plat beton bertulang 1 lapis (12 cm) + plat boundeck 0,75 mm M3 5,071,670.09
A.A.4.1.1.47a Pemasangan 1 m3 beton bertulang (dinding 8 cm) M3 5,653,232.31
A.A.4.1.1.47b Pemasangan 1 m3 beton bertulang (dinding 10 cm) M3 6,882,085.66
A.A.4.1.1.48a Pemasangan 1 m3 pondasi beton bertulang (foot plat 80 x 80 X 20 cm) M3 6,699,601.32
A.A.4.1.1.48b Pemasangan 1 m3 pondasi beton bertulang (foot plat 100 x 100 X 25 cm) M3 4,504,537.34
A.A.4.1.1.48c Pemasangan 1 m3 pondasi beton bertulang (foot plat 120 x 120 X 40 cm) M3 4,185,988.06
A.A.4.1.1.48d Pemasangan 1 m3 pondasi beton bertulang (foot plat 150 x 150 X 40 cm) M3 4,386,300.17
A.A.4.1.1.48e Pemasangan 1 m3 pondasi beton bertulang (foot plat 200 x 250 X 50 cm) M3 4,134,903.76
A.A.4.1.1.49a Pemasangan 1 m3 selimut beton kolom baja WF 300 (1) M3 3,801,312.25
A.A.4.1.1.49b Pemasangan 1 m3 selimut beton kolom baja WF 300 (1/2) M3 4,227,136.30
A.A.4.1.1.50a Pemasangan 1 m3 selimut beton kolom baja WF 250 (1) M3 4,365,833.27
A.A.4.1.1.50b Pemasangan 1 m3 selimut beton kolom baja WF 250 (1/2) M3 4,847,622.76
A.A.4.1.1.51a Pemasangan 1 m3 selimut beton kolom baja WF 200 (1) M3 4,957,120.37
A.A.4.1.1.51b Pemasangan 1 m3 selimut beton kolom baja WF 200 (1/2) M3 5,778,352.45
A.A.4.1.1.52a Pemasangan 1 m3 selimut beton balok baja WF 300 (1) M3 5,098,885.93
A.A.4.1.1.52b Pemasangan 1 m3 selimut beton balok baja WF 300 (1/2) M3 5,893,722.31
A.A.4.1.1.53a Pemasangan 1 m3 selimut beton balok baja WF 250 (1) M3 10,771,746.78
A.A.4.1.1.53b Pemasangan 1 m3 selimut beton balok baja WF 250 (1/2) M3 3,986,114.98
A.A.4.1.1.54a Pemasangan 1 m3 selimut beton balok baja WF 200 (1) M3 12,365,961.48
A.A.4.1.1.54b Pemasangan 1 m3 selimut beton balok baja WF 200 (1/2) M3 4,701,467.73
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1 Pemasangan 1 kg besi profil Kg 35,481.93
A.4.2.1.2a Pemasangan 1 kg besi SCH 40 Kg 23,691.03
A.4.2.1.2b Pemasangan 1 m1 rangka pipa GI dia. 1 inchi (medium B) M1 42,444.24
A.4.2.1.3a Pemasangan 1 m1 rangka pipa GI dia. 1,5 inchi (medium A) M1 114,197.24
A.4.2.1.3b Pemasangan 1 m1 rangka pipa GI dia. 1.5 inchi (medium B) M1 55,512.24
A.4.2.1.4a Pemasangan 1 m1 rangka pipa GI dia. 2 inchi (medium A) M1 138,639.24
A.4.2.1.4b Pemasangan 1 m1 rangka pipa GI dia. 2 inchi (medium B) M1 67,007.24
A.4.2.1.5a Pemasangan 1 m1 rangka pipa GI dia. 3 inchi (medium A) M1 218,015.24
A.4.2.1.5b Pemasangan 1 m1 rangka pipa GI dia. 3 inchi (medium B) M1 93,627.24
A.4.2.1.6a Pemasangan 1 m1 rangka pipa GI dia. 4 inchi (medium A) M1 309,733.24
A.4.2.1.6b Pemasangan 1 m1 rangka pipa GI dia. 4 inchi (medium B) M1 117,585.24
A.4.2.1.7 Pemasangan 1 m1 rangka pipa GI dia. 6 inchi (medium A) M1 464,855.24
A.4.2.1.8 Pemasangan 1 kg trakstang besi beton Kg 24,416.21
A.4.2.1.9 Pemasangan 1 kg tieroot besi beton Kg 21,699.21
A.4.2.1.10 Pemasangan 1 kg pabrikasi besi plat Kg 49,365.38
A.4.2.1.11 Pemasangan 100 kg ericktion konstruksi baja 100 Kg 117,902.40
A.4.2.1.12 Pengerjaan 10 cm pengelasan dengan las listrik 10 Cm 26,693.92
A.4.2.1.13 Pemasangan 1 m1 kusen pintu dan jendela alluminium M1 178,866.89
A.4.2.1.13.a1 Pemasangan 1 m1 kusen Aluminium Tiang Back Mullion M1 89,016.26
A.4.2.1.13.a2 Pemasangan 1 m1 kusen Aluminium Alexindo Transome CW M1 119,654.56
A.4.2.1.13.a3 Pekerjaan 1 Unit Daun Pintu Kaca Tempered Type P1 Unit 27,655,320.00
A.4.2.1.13.a4 Pekerjaan 1 Unit Kusen Aluminium . Daun Pintu Double Teakwod Lapis HPL Type P2 ( 80 x 200 ) Unit 2,353,238.76
A.4.2.1.13.a5 Pekerjaan 1 Unit Kusen Aluminium . Daun Pintu Double Teakwod Lapis HPL Type P3 Unit 3,809,016.12
A.4.2.1.13.a6 Pekerjaan 1 Unit Daun Pintu Kaca Tempered Type P4 Unit 17,094,000.00
A.4.2.1.13.a7 Pekerjaan 1 Unit Kusen Aluminium . Daun Pintu Aluminium Type P5 ( 70 x 200 ) Unit 2,401,190.57
A.4.2.1.13.a8 Pekerjaan 1 Unit Kusen Aluminium . Daun Pintu Double Teakwod Lapis HPL Type P6 ( 90 x 200 ) Unit 2,485,636.86
A.4.2.1.13.a9 Pekerjaan 1 Unit Curtain Wall Alexindo Aluminium Type CW 1 Unit 45,099,300.72
A.4.2.1.13.a10 Pekerjaan 1 Unit Curtain Wall Alexindo Aluminium Type CW 2 Unit 56,220,515.53
A.4.2.1.13.a11 Pekerjaan 1 Unit Curtain Wall Alexindo Aluminium Type CW 3 Unit 29,768,172.50
A.4.2.1.13.a12 Pekerjaan 1 Unit Window Wall Alexindo Aluminium Type J1 Unit 17,746,137.94
A.4.2.1.13.a13 Pekerjaan 1 Unit Window Wall Alexindo Aluminium Type J2 Unit 7,994,940.13
A.4.2.1.13.a14 Pekerjaan 1 Unit Window Wall Alexindo Aluminium Type J3 Unit 2,444,617.22
A.4.2.1.13.a15 Pekerjaan 1 Unit Kusen Aluminium dan Kaca 5 mmType BV ( 35 x 50 ) Unit 417,454.62
A.4.2.1.14 Pemasangan 1 m2 pintu dan jendela kaca rangka alluminium M2 586,324.20
A.4.2.1.15 Pemasangan 1 m2 rolling door alluminium M2 758,565.50
A.4.2.1.16 Pemasangan 1 m2 folding door besi M2 1,047,865.50
A.4.2.1.17 Pemasangan 1 m2 jendela nako & tralis M2 384,378.61
A.4.2.1.18 Pemasangan 1 m1 talang datar/ jurai seng bjls 28 lebar 90 cm M1 275,775.06
A.4.2.1.19 Pemasangan 1 m1 talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm M1 113,103.43
A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.1,6mm, modul 60 x 120 cm, dinding partisi M2 195,479.68
A.4.2.1.21 Pemasangan 1 m2 rangka pipa kotak 40.40.1,6mm, modul 60 x 60 cm, plafon M2 237,016.23
A.4.2.1.21a Pemasangan 1 m2 rangka baja ringan hollow 40.40 tebal 0,3 mm, modul 60 x 60 cm, plafon M2 121,559.68
A.4.2.1.22 Pemasangan 1 m2 rangka besi hollow 1x40.20.1,6mm, modul 60 x 60 cm, lisplank M2 174,689.68
A.4.2.1.23a Pemasangan 1 m2 rangka besi siku 30 x 30 x 2 mm M2 98,339.23
A.4.2.1.23b Pemasangan 1 m2 rangka besi siku 40 x 40 x 3 mm M2 99,670.23
A.4.2.1.23c Pemasangan 1 m2 rangka besi siku 50 x 50 x 4 mm M2 130,525.23
A.4.2.1.24a Pemasangan 1 m2 rangka besi hollow 20 x 40 x 1,6 mm M2 99,851.73
A.4.2.1.24b Pemasangan 1 m2 rangka besi hollow 40 x 40 x 1,6 mm M2 111,165.23
A.4.2.1.24c Pemasangan 1 m2 rangka besi hollow 50 x 50 x 2 mm M2 119,030.23
A.4.2.1.24d Pemasangan 1 m2 rangka besi hollow 100 x 100 x 3,2 mm M2 200,342.23
A.4.2.1.25 Pemasangan 1 m1 gording rangka besi hollow 40 x 40 x 1,6 mm M1 79,649.68
A.4.2.1.25a Pemasangan 1 m1 gording baja ringan C 75, tebal 0,3 mm M1 62,576.49
A.4.2.1.26a Pemasangan 1 m1 gording rangka CNP 100 mm M1 120,547.68
A.4.2.1.26b Pemasangan 1 m1 gording rangka CNP 125 mm M1 128,170.68
A.4.2.1.26c Pemasangan 1 m1 gording rangka CNP 150 mm M1 135,551.68
A.4.2.1.26d Pemasangan 1 m1 gording rangka CNP 200 mm M1 210,087.68
A.4.2.1.27 Pemasangan 1 m2 kuda-kuda baja ringan + reng atap genteng biasa/metal M2 226,121.50
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.1 Pemasangan 1 m2 dinding bata merah (5x11x22)cm t = 1 batu, 1 Pc : 2 Ps M2 299,115.30
A.4.4.1.2 Pemasangan 1 m2 dinding bata merah (5x11x22)cm t = 1 batu, 1 Pc : 3 Ps M2 285,106.80
A.4.4.1.2a Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = 1,5 batu, 1 Pc : 3 Ps M2 427,660.20
A.4.4.1.3 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = 1 batu, 1 Pc : 4 Ps M2 275,657.80
A.4.4.1.4 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = 1 batu, 1 Pc : 5 Ps M2 270,790.30
A.4.4.1.5 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = 1 batu, 1 Pc : 6 Ps M2 269,162.30
A.4.4.1.6 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = 1 batu, 1 Pc : 3 Kp : 10 Ps M2 250,222.50
A.4.4.1.7 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = ½ batu, 1 Pc : 2 Ps M2 144,838.65
A.4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = ½ batu, 1 Pc : 3 Ps M2 138,192.45
A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = ½ batu, 1 Pc : 4 Ps M2 134,383.15
A.4.4.1.10 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = ½ batu, 1 Pc : 5 Ps M2 132,172.15
A.4.4.1.11 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = ½ batu, 1 Pc : 6 Ps M2 130,706.95
A.4.4.1.12 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = ½ batu, 1 Pc : 8 Ps M2 128,107.65
A.4.4.1.13 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = ½ batu, 1 Pc : 3 Kp : 10 Ps M2 125,044.15
A.4.4.1.14 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = ½ batu, 1 Pc : 1 Kp : 1 Ps M2 111,633.17
A.4.4.1.15 Pemasangan 1 m2 dinding bata merah (5x12x22)cm t = ½ batu, 1 Pc : 1 Kp : 2 Ps M2 113,657.61
A.4.4.1.22 Pemasangan 1 m2 dinding terawang (rooster) 10x20x40cm, 1 Pc : 3 Ps M2 2,372,685.15
A.4.4.1.23 Pemasangan 1 m2 dinding terawang (rooster) 10x20x40cm, 1 Pc : 4 Ps M2 2,372,685.15
A.4.4.1.24 Pemasangan 1 m2 dinding bata berongga ekspose 10x20x40cm, 1 Pc : 3 Ps M2 5,462,928.90

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A.4.4.2.1 Pemasangan 1 m2 plesteran 1 Pc : 1 Ps tebal 15 mm M2 71,989.06
A.4.4.2.2 Pemasangan 1 m2 plesteran 1 Pc : 2 Ps tebal 15 mm M2 64,671.86
A.4.4.2.3 Pemasangan 1 m2 plesteran 1 Pc : 3 Ps tebal 15 mm M2 61,512.44
A.4.4.2.4 Pemasangan 1 m2 plesteran 1 Pc : 4 Ps tebal 15 mm M2 59,350.50
A.4.4.2.5 Pemasangan 1 m2 plesteran 1 Pc : 5 Ps tebal 15 mm M2 58,131.26
A.4.4.2.6 Pemasangan 1 m2 plesteran 1 Pc : 6 Ps tebal 15 mm M2 57,152.04
A.4.4.2.7 Pemasangan 1 m2 plesteran 1 Pc : 7 Ps tebal 15 mm M2 56,616.34
A.4.4.2.8 Pemasangan 1 m2 plesteran 1 Pc : 8 Ps tebal 15 mm M2 56,080.64
A.4.4.2.9 Pemasangan 1 m2 plesteran 1 Pc : 1/2 Kp : 3 Ps tebal 15 mm M2 57,866.38
A.4.4.2.10 Pemasangan 1 m2 plesteran 1 Pc : 2 Kp : 8 Ps tebal 15 mm M2 55,042.68
A.4.4.2.11 Pemasangan 1 m2 plesteran 1 Pc : 1 Kp : 1 Ps tebal 15 mm M2 48,202.44
A.4.4.2.12 Pemasangan 1 m2 plesteran 1 Pc : 1 Kp : 2 Ps tebal 15 mm M2 49,418.16
A.4.4.2.13 Pemasangan 1 m2 plesteran 1 Pc : 1 Ps tebal 20 mm M2 86,550.20
A.4.4.2.14 Pemasangan 1 m2 plesteran 1 Pc : 3 Ps tebal 20 mm M2 69,879.15
A.4.4.2.14a Pemasangan 1 m2 plesteran 1 Pc : 3 Ps tebal 30 mm (isian anyaman bambu) M2 115,448.24
A.4.4.2.15 Pemasangan 1 m2 plesteran 1 Pc : 4 Ps tebal 20 mm M2 79,387.22
A.4.4.2.16 Pemasangan 1 m2 plesteran 1 Pc : 5 Ps tebal 20 mm M2 77,829.40
A.4.4.2.17 Pemasangan 1 m2 plesteran 1 Pc : 6 Ps tebal 20 mm M2 76,455.94
A.4.4.2.18 Pemasangan 1 m2 plesteran 1 Pc : 1 Kp : 2 Ps tebal 20 mm M2 69,476.88
A.4.4.2.19 Pemasangan 1 m2 berapen 1 Pc : 5 Ps tebal 15 mm M2 35,825.79
A.4.4.2.20 Pemasangan 1 m1 plesteran skoning 1 Pc : 3 Ps lebar 10 cm M1 60,263.94
A.4.4.2.23 Pemasangan 1 m2 plesteran ciprat 1 Pc : 2 Ps M2 46,496.45
A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah M2 27,337.75
A.4.4.2.25 Pemasangan 1 m2 finishing siar pasangan conblock ekspose M2 13,053.59
A.4.4.2.26 Pemasangan 1 m2 finishing siar pasangan batu kali, 1 Pc : 2 Ps M2 57,062.50
A.4.4.2.27 Pemasangan 1 m2 acian semen M2 34,909.60
A.4.4.2.28 Pemasangan 1 m2 acian kapur M2 37,724.91

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


A.4.4.3.32 Pemasangan 1 m2 lantai keramik motif (KW 1) M2 259,228.20
A.4.4.3.33 Pemasangan 1 m2 lantai keramik motif (KW 2) M2 250,516.20
A.4.4.3.34 Pemasangan 1 m2 lantai keramik polos (KW 1) M2 242,530.20
A.4.4.3.35 Pemasangan 1 m2 lantai keramik polos (KW 2) M2 240,352.20
A.4.4.3.36 Pemasangan 1 m2 lantai tegel abu-abu ukuran 20cm x 20cm M2 241,665.60
A.4.4.3.37 Pemasangan 1 m2 lantai tegel warna bergaris ukuran 20cm x 20cm M2 261,328.10
A.4.4.3.38 Pemasangan 1 m2 lantai granit motif M2 300,368.20
A.4.4.3.38.a Pemasangan 1 m2 dinding granit motif M2 340,347.70
A.4.4.3.40 Pemasangan 1 m1 plint keramik M1 112,512.40
A.4.4.3.53a Pemasangan 1 m2 dinding keramik M2 302,595.70
A.4.4.3.57 Pemasangan 1 m2 dinding bata pelapis 3cm x 7cm x 24cm M2 214,248.10
A.4.4.3.58 Pemasangan 1 m2 dinding batu tempel hitam M2 440,940.50
A.4.4.3.59 Pemasangan 1 m2 paving block tebal minimal 6 cm M2 141,482.28
A.4.4.3.60 Pemasangan 1 m2 paving block tebal minimal 8 cm M2 164,714.28
A.4.4.3.61 Pemasangan 1 m2 Alumunium Composite Panel tebal 4 mm M2 479,051.43

A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A.4.5.1.5 Pemasangan 1 m2 langit-langit tripleks ukuran (120x240) cm, tebal 3mm M2 47,130.33
A.4.5.1.6 Pemasangan 1 m2 langit-langit calsiboard ukuran (120x240) cm tebal 3,5mm M2 46,525.82
A.4.5.1.7 Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240) cm, tebal 9mm M2 68,908.18
A.4.5.1.9 Pemasangan 1 m1 list langit-langit kayu profil M1 19,691.98
A.4.5.1.10 Pemasangan 1 m1 list palfond gipsum M1 50,645.98
A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.1 Pemasangan 1 m2 atap genteng lokal M2 99,491.76
A.4.5.2.2 Pemasangan 1 m2 atap genteng karang pilang/kodok M2 143,551.43
A.4.5.2.3 Pemasangan 1 m2 atap genteng pejaten M2 121,551.43
A.4.5.2.4 Pemasangan 1 m2 atap genteng beton M2 117,796.80
A.4.5.2.5 Pemasangan 1 m2 atap asbes gelombang 105 cm x 240 cm M2 48,987.73
A.4.5.2.6 Pemasangan 1 m2 atap asbes gelombang 92 cm x 180 cm M2 62,880.73
A.4.5.2.7 Pemasangan 1 m2 atap sirap kayu M2 441,467.73
A.4.5.2.7a Pemasangan 1 m2 atap genteng metal biasa 0,35 mm M2 104,093.11
A.4.5.2.7b Pemasangan 1 m2 atap genteng metal berpasir 0,35 mm M2 165,913.11
A.4.5.2.7c Pemasangan 1 m2 atap genteng metal biasa 0,40 mm M2 134,929.78
A.4.5.2.7d Pemasangan 1 m2 atap genteng metal berpasir 0,40 mm M2 204,779.78
A.4.5.2.8 Pemasangan 1 m2 atap seng gelombang BJLS 30 M2 98,922.56
A.4.5.2.9a Pemasangan 1 m2 atap galvalum 0.30 mm M2 92,522.76
A.4.5.2.9b Pemasangan 1 m2 atap galvalum 0.35 mm M2 102,202.76
A.4.5.2.9c Pemasangan 1 m2 atap galvalum 0.40 mm M2 116,722.76
A.4.5.2.10a Pemasangan 1 m2 atap PVC M2 256,422.76
A.4.5.2.10b Pemasangan 1 m2 atap PVC transparan M2 309,222.76
A.4.5.2.11 Pemasangan 1 m1 bubungan genteng lokal M1 101,112.22
A.4.5.2.12 Pemasangan 1 m1 bubungan genteng karang pilang/kodok M1 114,862.22
A.4.5.2.13 Pemasangan 1 m1 bubungan genteng pejaten M1 102,762.22
A.4.5.2.14 Pemasangan 1 m1 bubungan genteng beton M1 132,365.20
A.4.5.2.15 Pemasangan 1 m1 bubungan asbes gelombang 92 cm M1 131,623.14
A.4.5.2.16 Pemasangan 1 m1 bubungan asbes gelombang 105 cm M1 221,251.14
A.4.5.2.17a Pemasangan 1 m1 bubungan genteng metal biasa 0,35 mm M1 96,760.18
A.4.5.2.17b Pemasangan 1 m1 bubungan genteng metal berpasir 0,35 mm M1 118,012.18
A.4.5.2.17c Pemasangan 1 m1 bubungan genteng metal biasa 0,40 mm M1 111,148.18
A.4.5.2.17d Pemasangan 1 m1 bubungan genteng metal berpasir 0,40 mm M1 127,648.18
A.4.5.2.18 Pemasangan 1 m1 bubungan seng spandek 0,40 mm M1 71,044.71
A.4.5.2.19a Pemasangan 1 m1 bubungan galvalum 0.30 mm M1 68,322.76
A.4.5.2.19b Pemasangan 1 m1 bubungan galvalum 0.35 mm M1 74,372.76
A.4.5.2.19c Pemasangan 1 m1 bubungan galvalum 0.40 mm M1 80,422.76
A.4.5.2.20 Pemasangan 1 m1 bubungan genteng PVC M1 140,922.76
A.4.5.2.21 Pemasangan 1 m2 lisplank seng plat BJLS 25 M1 121,178.31
A.4.5.2.22 Pemasangan 1 m2 lisplank kalsiplank 20 cm 1 lapis M1 51,562.28

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


A.4.6.1.1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I M3 11,756,123.50
A.4.6.1.7 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas II M2 548,178.40
A.4.6.1.7.1 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I M2 1,037,085.50
A.4.6.1.15 Pemasangan 1 m3 konstruksi gordeng, kayu kelas II M3 10,213,877.85
A.4.6.1.16 Pemasangan 1 m2 kaso, kayu kelas II M2 112,321.55
A.4.6.1.17 Pemasangan 1 m2 reng, kayu kelas II M2 69,971.55
A.4.6.1.17a Pemasangan 1 m2 reng, kayu jati kelas I, awet I M2 27,833.30
A.4.6.1.18 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II M2 330,121.55
A.4.6.1.19 Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II M2 457,171.55
A.4.6.1.20 Pemasangan 1 m2 rangka atap sirap, kayu kelas II M2 111,591.04
A.4.6.1.21 Pemasangan 1 m2 rangka langit-langit (50x100)cm, kayu kelas II M2 157,346.75
A.4.6.1.22 Pemasangan 1 m2 rangka langit-langit (60x60)cm, kayu kelas II M2 159,891.60
A.4.6.1.25 Pemasangan 1 m2 rangka dinding pemisah (60x120)cm, kayu kelas II M2 242,509.63
A.4.6.1.26 Pemasangan 1 m2 dinding pemisah teakwood 3 mm rangkap M2 190,580.83
A.4.6.1.27 Pemasangan 1 m2 dinding pemisah tripleks 6 mm rangkap, rangka kayu kelas II M2 304,607.14
A.4.6.1.28 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I M2 344,627.80
A.4.6.1.29 Pemasangan 1 m1 talang datar/jurai seng plat M1 235,711.30
A.4.6.1.30 Pemasangan 1 m2 anyaman bambu isian dinding M2 137,789.63
A.4.6.1.31 Pemasangan 1 m2 kawat harmonika isian dinding M2 131,189.63

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A.4.6.2.1 Pemasangan 1 buah kunci tanam antik Bh 431,381.83
A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa Bh 195,454.05
A.4.6.2.5 Pemasangan 1 buah kunci silinder Bh 124,616.58
A.4.6.2.6 Pemasangan 1 buah engsel pintu Bh 53,016.79
A.4.6.2.7 Pemasangan 1 buah engsel jendela Bh 29,840.31
A.4.6.2.9 Pemasangan 1 buah kait angin Bh 29,948.38
A.4.6.2.10 Pemasangan 1 buah grendel pintu Bh 37,538.38
A.4.6.2.11 Pemasangan 1 buah grendel jendela Bh 33,688.38
A.4.6.2.16 Pemasangan 1 m2 kaca tebal 3 mm M2 204,266.79
A.4.6.2.17 Pemasangan 1 m2 kaca tebal 5 mm M2 235,726.79
A.4.6.2.17.a Pemasangan 1 m2 kaca blue green 8 mm (panasap) M2 595,447.08
A.4.6.2.18 Pemasangan 1 buah door closer Bh 565,428.38
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.4 Pengecatan 1 m2 bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) M2 43,080.18
A.4.7.1.6 Pelaburan 1 m2 bidang kayu dengan teak oil M2 31,046.73
A.4.7.1.7 Pelaburan 1 m2 bidang kayu dengan politur M2 26,918.43
A.4.7.1.8 Pelaburan 1 m2 bidang kayu dengan ter M2 11,866.91
A.4.7.1.10 Pengecatan 1 m2 tembok baru interior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) M2 28,285.18
A.4.7.1.10a Pengecatan 1 m2 tembok baru eksterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) M2 46,968.68
A.4.7.1.11 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) M2 31,970.40
A.4.7.1.16 Pengecatan 1 m2 permukaan baja dengan menie besi M2 31,023.03
A.4.7.1.17 Pengecatan 1 m2 permukaan baja (1 lapis cat dasar, 2 lapis cat penutup) M2 44,223.03
A.4.7.1.18 Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah M2 61,068.70

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1.1 Pemasangan 1 buah closet duduk keramik Bh 2,784,728.10
A.5.1.1.2 Pemasangan 1 buah closet jongkok porslen Bh 438,721.25
A.5.1.1.3 Pemasangan 1 buah closet jongkok teraso Bh 306,831.25
A.5.1.1.4 Pemasangan 1 buah urinoir Bh 3,462,090.50
A.5.1.1.5 Pemasangan 1 buah wastafel Bh 2,131,531.60
A.5.1.1.7 Pemasangan 1 buah bak fibreglass vol 1 m3 Bh 565,268.00
A.5.1.1.8 Pemasangan 1 buah bak mandi batu bata vol 0,30 m3 Bh 2,178,298.65
A.5.1.1.12 Pemasangan 1 buah bak cuci piring stainlessteel Bh 525,759.85
A.5.1.1.18 Pemasangan 1 buah kran dia. 1/2” M1 32,822.05
A.5.1.1.19 Pemasangan 1 buah kran dia. 3/4” Bh 35,503.99
A.5.1.1.20 Pemasangan 1 m1 pipa galvanis dia. 1/2” M1 38,564.46
A.5.1.1.21 Pemasangan 1 m1 pipa galvanis dia. 3/4” M1 44,935.77
A.5.1.1.22 Pemasangan 1 m1 pipa PVC 1/2" M1 29,236.02
A.5.1.1.23 Pemasangan 1 m1 pipa PVC 1" M1 35,885.52
A.5.1.1.24 Pemasangan 1 m1 pipa PVC 1,5" M1 45,323.52
A.5.1.1.25 Pemasangan 1 m1 pipa PVC 2" M1 54,118.02
A.5.1.1.26 Pemasangan 1 m1 pipa PVC 3" M1 83,686.02
A.5.1.1.27 Pemasangan 1 m1 pipa PVC 4" M1 118,336.02
Analisa EI-310

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : EI. 310


JENIS PEKERJAAN : Galian Tanah Menggunakan Alat Berat, Material Dibuang Setempat
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0590 9,700.00 572.76


2. Mandor (L04) Jam 0.0059 16,442.86 97.09

JUMLAH HARGA TENAGA 669.85

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator 80-140 HP E.11.a Jam 0.0295 592,397.28 17,489.82

2. Alat Bantu Ls 1.0000 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 18,489.82

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 19,159.68


E. OVERHEAD & PROFIT 10% x D 1,915.97
F. HARGA SATUAN PEKERJAAN ( D + E ) 21,075.65
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-311

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 3.1.1


JENIS PEKERJAAN : Galian Tanah Menggunakan Alat Berat, Material diangkut keluar lokasi Pekerjaan
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0590 9,700.00 572.76


2. Mandor (L04) Jam 0.0295 16,442.86 485.46

JUMLAH HARGA TENAGA 1,058.22

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator 80-140 HP E.11.a Jam 0.0295 592,397.28 17,489.82


2. Dump Truck 3,5 ton E.08.a Jam 0.0872 179,451.63 15,655.02
3. Alat Bantu Ls 1.0000 1,000.00 1,000.00

JUMLAH HARGA PERALATAN 34,144.84

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 35,203.06


E. OVERHEAD & PROFIT 3% x D 1,056.09
F. HARGA SATUAN PEKERJAAN ( D + E ) 36,259.15
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
PEMERINTAH KABUPATEN SUMBAWA
DINAS PEMUDA OLAHRAGA DAN PARIWISATA
Jln. Bungur No. 01 Telp. 0371 - 23713 Sumbawa Besar

RENCANA JADWAL PELAKSANAAN


KEGIATAN : PENGADAAN SARANA DAN PRASARANA OLAH RAGA
PEKERJAAN : PEMBANGUNAN GEDUNG OLAH RAGA (GOR) TYPE B DAN SARANANYA
LOKASI : KAB. SUMBAWA - PROV. NUSA TENGGARA BARAT
TAHUN ANGGARAN : 2019

BOBOT MINGGU KE -
NO. URAIAN PEKERJAAN SAT. VOLUME KET.
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

A PEKERJAAN PENDAHULUAN
1 Memasang papan nama proyek Ls #REF! #REF! #REF!
2 Mengukur dan memasang bowplank Ls #REF! #REF! #REF!
3 Menyiapkan air kerja Ls #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
4 Mobilisasi dan demobilisasi alat Ls #REF! #REF! #REF!
5 Membongkar bangunan lama dengan alat Ls #REF! #REF! #REF! #REF!
6 Membongkar tower RRI Ls #REF! #REF! #REF! #REF!
7 Membuat Direksi Keet 2 x (3 x 9 m) M2 #REF! #REF! #REF!
8 Membuat pagar pengaman M1 180.00 #REF! #REF! #REF!
9 Biaya Keselamatan dan Kesehatan Kerja Ls 1.00 #REF! #REF! #REF!

B PEKERJAAN PENYIAPAN LAHAN


I PEKERJAAN PERSIAPAN
1 Membersihkan tanaman / pohon besar Ls 1.00 #REF! #REF! #REF!
2 Mengupas tanah lapisan atas dengan alat Ls 1.00 #REF! #REF!

II PEKERJAAN TANAH
1 Menggali tanah berbatu dengan alat M3 #REF! #REF! #REF! #REF!
2 Mengangkut tanah hasil galian dengan alat M3 #REF! #REF! #REF!
3 Pemadatan tanah urugan dengan alat Layer #REF! #REF! #REF!

III PEKERJAAN TALUD PENGAMAN TANAH


1 Menggali tanah pondasi M3 52.41 #REF! #REF! #REF!
2 Memasang pasangan batu talud M3 #REF! #REF! #REF! #REF! #REF! #REF!
3 Plesteran M2 #REF! #REF! #REF!
4 Siaran M2 #REF! #REF! #REF! #REF! #REF!

C PEKERJAAN STRUKTUR
I PEKERJAAN TANAH
1 Menggali tanah pondasi menerus (type 1) M3 #REF! #REF! #REF!
2 Menggali tanah pondasi menerus (type 2) M3 #REF! #REF! #REF!
3 Menggali tanah pondasi tangga (type 3) M3 #REF! #REF! #REF!
4 Menggali tanah pondasi tangga (type 4) M3 #REF! #REF! #REF!
5 Menggali tanah pondasi foot plate 200/150 (FT-1) M3 #REF! #REF! #REF!
6 Menggali tanah pondasi foot plate 150/150 (FT-2) M3 #REF! #REF! #REF!
7 Menggali tanah pondasi foot plate 80/80 (FT-3) M3 #REF! #REF! #REF!
8 Menggali tanah pondasi foot plate (FT-4) - menerus M3 #REF! #REF! #REF!
9 Urugan pasir dibawah pondasi M3 #REF! #REF! #REF! #REF!
10 Urugan pasir dibawah lantai M3 #REF! #REF! #REF!

II PEKERJAAN PONDASI BATU


1 Memasang batu kosong M3 #REF! #REF! #REF!
2 Memasang pondasi batu kali / belah type 1 M3 #REF! #REF! #REF! #REF!
3 Memasang pondasi batu kali / belah type 2 M3 #REF! #REF! #REF! #REF!
4 Memasang pondasi batu kali / belah type 3 M3 #REF! #REF! #REF! #REF!
5 Memasang pondasi rollag bata tangga M2 #REF! #REF! #REF!

III PEKERJAAN BETON


1 Memasang lantai kerja pondasi foot plate M3 #REF! #REF! #REF!
2 Memasang pondasi foot plate 200 x 150 x 50 (FT-1) M3 #REF! #REF! #REF! #REF!
3 Memasang pondasi foot plate 150 x 150 x 40 (FT-2) M3 #REF! #REF! #REF! #REF!
4 Memasang pondasi foot plate 80 x 80 x 30 (FT-3) M3 #REF! #REF! #REF! #REF!
5 Memasang pondasi foot plate tangga 80 tebal 30 (FT-4) M3 #REF! #REF! #REF! #REF!
6 Memasang kolom beton 40/60 (K1) M3 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
7 Memasang kolom beton 40/40 (K2) M3 #REF! #REF! #REF! #REF! #REF! #REF!
8 Memasang kolom beton 20/20 (K3) M3 #REF! #REF! #REF! #REF! #REF! #REF!
9 Memasang kolom beton 30/40 (KS) M3 #REF! #REF! #REF! #REF! #REF! #REF!
10 Memasang kolom beton 13/13 (KP) M3 #REF! #REF! #REF! #REF! #REF! #REF!
11 Memasang sloof beton 25/35 (S1) M3 #REF! #REF! #REF! #REF! #REF! #REF!
12 Memasang sloof beton 20/30 (S2) M3 #REF! #REF! #REF! #REF! #REF! #REF!
13 Memasang sloof beton 15/20 (S3) M3 #REF! #REF! #REF! #REF! #REF! #REF!
14 Memasang balok beton 30/50 (B1) M3 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
15 Memasang balok beton 30/40 (B2) M3 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
16 Memasang balok beton 25/30 (B3) M3 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
17 Memasang balok beton 15/20 (B4) M3 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
18 Memasang balok latei beton 13/15 M3 #REF! #REF! #REF! #REF!
19 Memasang ringbalk beton 13/15 M3 #REF! #REF! #REF!
20 Memasang plat beton tribun M3 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
21 Memasang plat beton tangga + bordes + ruang lantai 2 M3 #REF! #REF! #REF! #REF! #REF!

IV PEKERJAAN LANTAI DAN DINDING


1 Memasang rabat beton lantai bawah keramik M3 #REF! #REF! #REF! #REF! #REF!
2 Memasang rabat beton lantai lapangan M3 #REF! #REF! #REF! #REF! #REF!
3 Memasang keramik lantai ruangan M2 #REF! #REF! #REF! #REF! #REF!
4 Memasang keramik lantai teras dan tangga M2 #REF! #REF! #REF! #REF! #REF!
5 Memasang keramik lantai KM/WC M2 #REF! #REF! #REF! #REF! #REF!
6 Memasang keramik dinding KM/WC M2 #REF! #REF! #REF! #REF! #REF!
7 Memasang lantai vinyl tebal 4mm M2 #REF! #REF! #REF! #REF!
8 Memasang dinding bata M2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
9 Plesteran dinding pondasi M2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
10 Plesteran dinding tembok dan beton M2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!
11 Acian plesteran M2 #REF! #REF! #REF! #REF! #REF! #REF! #REF!

V PEKERJAAN ATAP
1 Memasang rangka baja profile IWF Kg #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
2 Memasang base plate Kg #REF! #REF! #REF! #REF!
3 Memasang end plate Kg #REF! #REF! #REF! #REF!
4 Memasang rip plate Kg #REF! #REF! #REF! #REF!
5 Memasang trackstank Kg #REF! #REF! #REF! #REF!
6 Memasang kait angin Kg #REF! #REF! #REF! #REF!
7 Memasang dudukan gording Kg #REF! #REF! #REF! #REF!
8 Pekerjaan eriction 100 Kg #REF! #REF! #REF! #REF! #REF! #REF!
9 Pekerjaan pengelasan 10 Cm #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
10 Memasang angkur baut Bh #REF! #REF! #REF!
11 Memasang baut 19 Bh #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
12 Memasang baut 16 Bh #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
13 Memasang gording besi CNP M1 #REF! #REF! #REF! #REF!
14 Memasang atap PVC solid M2 #REF! #REF! #REF! #REF!
15 Memasang atap PVC transparan M2 #REF! #REF! #REF! #REF!
16 Bubungan PVC solid M1 #REF! #REF! #REF!
17 Memasang talang air M1 #REF! #REF! #REF!

VI PEKERJAAN PINTU DAN JENDELA


1 Memasang pintu folding gate M2 #REF! #REF! #REF! #REF! #REF!
2 Memasang rolling door M2 #REF! #REF! #REF! #REF! #REF!
3 Memasang kusen alumunium M1 #REF! #REF! #REF! #REF! #REF!
4 Memasang pintu kaca M2 #REF! #REF! #REF! #REF! #REF!
5 Memasang jendela kaca M2 #REF! #REF! #REF! #REF! #REF!
6 Memasang pintu KM/WC M2 #REF! #REF! #REF! #REF! #REF!
7 Memasang kaca mati M2 #REF! #REF! #REF! #REF! #REF!
8 Memasang engsel pintu Bh #REF! #REF! #REF! #REF! #REF!
9 Memasang engsel jendela Bh #REF! #REF! #REF! #REF! #REF!
10 Memasang kunci tanam biasa Bh #REF! #REF! #REF! #REF! #REF!
11 Memasang grendel pintu dan jendela Bh #REF! #REF! #REF! #REF! #REF!
12 Memasang glass block Bh #REF! #REF! #REF! #REF! #REF!

VII PEKERJAAN PLAFOND


1 Memasang rangka plafond baja ringan M2 #REF! #REF! #REF! #REF!
2 Memasang penutup plafond gypsum board M2 #REF! #REF! #REF! #REF!
3 Memasang list plafond gypsum M1 #REF! #REF! #REF! #REF!

VIII PEKERJAAN SANITAIR


1 Memasang closed duduk porselin Bh #REF! #REF! #REF!
2 Memasang wastafel Bh #REF! #REF! #REF!
3 Memasang floor drain Bh #REF! #REF! #REF!
4 Memasang jet washer Bh #REF! #REF! #REF!
5 Memasang kran air 1/2" M1 #REF! #REF! #REF!
6 Memasang jaringan air bersih pipa PVC AW Ø 1/2" M1 #REF! #REF! #REF!
7 Memasang jaringan air kotor pipa PVC AW Ø 3" M1 #REF! #REF! #REF!
8 Memasang jaringan air kotor pipa PVC AW Ø 4" M1 #REF! #REF! #REF!
9 Membuat Septiktank kapasitas 1 m3 Ls 1.00 #REF! #REF!
10 Membuat Septiktank kapasitas 2 m3 Ls #REF! #REF! #REF!
11 Membuat ground tank kapasitas 5 m3 Ls #REF! #REF! #REF! #REF! #REF!
12 Memasang partisi cubicel toilet M2 #REF! #REF! #REF!
13 Memasang meteran air PDAM Ls 1.00 #REF! #REF! #REF!

D PEKERJAAN ARSITEKTURAL
I PEKERJAAN BESI DAN ORNAMEN
1 Memasang rangka besi ACP M2 #REF! #REF! #REF! #REF! #REF! #REF!
2 Memasang panel ACP tebal 4 mm M2 #REF! #REF! #REF! #REF! #REF! #REF!
3 Memasang railing besi tribun M2 #REF! #REF! #REF! #REF! #REF! #REF!
4 Memasang angin-angin besi M2 #REF! #REF! #REF! #REF! #REF! #REF!
5 Memasang ornamen besi teras depan M2 #REF! #REF! #REF! #REF! #REF! #REF!
6 Memasang railing tribun VIP dan Media M2 #REF! #REF! #REF! #REF! #REF! #REF!
II PEKERJAAN PENGECATAN
1 Mengecat pondasi baru M2 #REF! #REF! #REF! #REF!
2 Mengecat tembok baru interior M2 #REF! #REF! #REF! #REF!
3 Mengecat tembok baru eksterior M2 #REF! #REF! #REF! #REF!
4 Mengecat plafond M2 #REF! #REF! #REF! #REF!
5 Mengecat list plafond M2 #REF! #REF! #REF! #REF!
6 Mengecat besi M2 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

E PEKERJAAN MEKANIKAL
I FIRE FIGHTING INSTALATION SYSTEM
1 Box Hydrant Type. C unit 1.00 #REF! #REF! #REF!
2 Pillar Hydrant unit 1.00 #REF! #REF! #REF!
3 Siamese Connection unit 1.00 #REF! #REF! #REF!
4 Check Valve unit 1.00 #REF! #REF! #REF!
5 Gate Valve dia. 100 mm unit 1.00 #REF! #REF! #REF!
6 Gate Valve dia. 150 mm unit 1.00 #REF! #REF! #REF!
7 Catodic Lot 1.00 #REF! #REF! #REF!
8 Pipe Wrapping Lot 1.00 #REF! #REF! #REF!
9 Black steel pipe sch 40 dia. 100mm M 30.00 #REF! #REF! #REF!
10 Black steel pipe sch 40 dia. 150mm M 15.00 #REF! #REF! #REF!

II AIR CONDITIONING & EXCHAUST FAN


1 AC split 2 PK unit 6.00 #REF! #REF!
2 AC split 1,5 PK unit 5.00 #REF! #REF!
3 Ceiling Exhaust Fan 80 CMH unit 15.00 #REF! #REF!

III SOUND SYSTEM Ls 1.00 Delayed


IV PAPAN SKOR DIGITAL Ls 2.00 Delayed
V PERALATAN 6 CABANG OLAHRAGA Ls 1.00 Delayed
VI PENGADAAN GENERATOR LISTRIK Ls 1.00 Delayed

F PEKERJAAN ELEKTRIKAL
I INSTALASI KWH PLN
1 Biaya Penyambungan (BP) PLN Daya 66.000 VA Ls 1.00 #REF! #REF! #REF!
2 Biaya Uang Jaminan Langanan (UJL) Ls 1.00 #REF! #REF! #REF!
3 Biaya Pemeriksaan Instalasi Listrik Tegangan Rendah Ls 1.00 #REF! #REF! #REF!
4 Jasa Supervisi Instalasi Listrik Ls 1.00 #REF! #REF! #REF!
5 Gambar Instalasi Listrik Ls 1.00 #REF! #REF! #REF!
6 Biaya Uji Coba & Comisioning Ls 1.00 #REF! #REF! #REF!

II JARINGAN KABEL DAYA / POWER LISTRIK


1 Pengadaan Kabel daya NYFGBY 4x95 mm2 M 10.00 #REF! #REF!
2 Pengadaan Kabel daya NYFGBY 4x95 mm2 M 20.00 #REF! #REF!
3 Pengadaan Kabel daya NYFGBY 4x50 mm2 M 60.00 #REF! #REF!
4 Pengadaan Kabel daya NYFGBY 4x50 mm2 M 10.00 #REF! #REF!

III PANEL DAYA DISTRIBUSI


1 Pengadaan dan pemasangan Panel Utama Set 1.00 #REF! #REF!
2 Pengadaan dan pemasangan Panel 1A Set 1.00 #REF! #REF!
3 Pengadaan dan pemasangan Panel 1B Set 1.00 #REF! #REF!
4 Pengadaan dan pemasangan Panel 2A Set 1.00 #REF! #REF!
5 Pengadaan dan pemasangan Panel 2B Set 1.00 #REF! #REF!

IV INSTALASI LISTRIK LANTAI I


1 Pengadaan Pemasangan Lampu Down Light 5" Philips LED 1 x 18 watt Bh 67.00 #REF! #REF! #REF! #REF!
2 Outbow Panel LED light Lampu Model Bulat philips 18W Bh 42.00 #REF! #REF! #REF! #REF!
3 Pengadaan Pemasangan stopkontak Bh 24.00 #REF! #REF! #REF! #REF!
4 Pengadaan Pemasangan saklar tunggal Bh 10.00 #REF! #REF! #REF! #REF!
5 Pengadaan Pemasangan saklar ganda Bh 20.00 #REF! #REF! #REF! #REF!
6 Pemasangan titik instalasi lampu dlm pipa conduit Ttk 133.00 #REF! #REF! #REF! #REF!
7 Pemasangan titik instalasi stop kontak dalam pipa conduit Ttk 5.00 #REF! #REF! #REF! #REF!
8 Pemasangan titik instalasi Exhaus Fan dalam pipa conduit Ttk 14.00 #REF! #REF! #REF! #REF!
9 Pemasangan titik instalasi AC dalam pipa conduit Ttk 10.00 #REF! #REF! #REF! #REF!

V INSTALASI LISTRIK LANTAI II


1 Pengadaan Pemasangan Lampu Down Light 5" Philips LED 1 x 18 watt Bh 8.00 #REF! #REF! #REF! #REF!
2 Outbow Panel LED light Lampu Model Bulat philips 18W Bh 6.00 #REF! #REF! #REF! #REF!
3 Lampu Sorot Tembak HPIT HPI-T 400W COMPLETE SET SNI Komponen Philips Bh 40.00 #REF! #REF! #REF! #REF!
4 Lampu Master LED Sport Expertcolor MV Bh 20.00 #REF! #REF! #REF! #REF!
5 Pengadaan Pemasangan stopkontak Bh 5.00 #REF! #REF! #REF! #REF!
6 Pengadaan Pemasangan saklar tunggal Bh 3.00 #REF! #REF! #REF! #REF!
7 Pengadaan Pemasangan saklar ganda Bh 1.00 #REF! #REF! #REF! #REF!
8 Pemasangan titik instalasi lampu dlm pipa conduit Ttk 54.00 #REF! #REF! #REF! #REF!
9 Pemasangan titik instalasi stop kontak dlm pipa conduit Ttk 5.00 #REF! #REF! #REF! #REF!
10 Pemasangan titik instalasi Exhaus Fan dalam pipa conduit Ttk 1.00 #REF! #REF! #REF! #REF!
11 Pemasangan titik instalasi AC dalam pipa conduit Ttk 1.00 #REF! #REF! #REF! #REF!

VI PEKERJAAN KABEL TRAY / LEDDER - - -


1 Kabel Tray Uk 300x50x2400x1.2mm Bh 200.00 #REF! #REF! #REF! #REF!
2 Kabel Ladder Uk 300x100x2400x1.2mm Bh 50.00 #REF! #REF! #REF! #REF!
3 Elbow tray Bh 8.00 #REF! #REF! #REF! #REF!
4 Tee Tray Bh 25.00 #REF! #REF! #REF! #REF!
5 Cross Tray Ttk 16.00 #REF! #REF! #REF! #REF!
6 Jointing Ttk 100.00 #REF! #REF! #REF! #REF!
7 Bracket Mounting Ttk 150.00 #REF! #REF! #REF! #REF!
8 Aksesoris (Mur, Baut + gantungan) Set 1.00 #REF! #REF! #REF! #REF!

VII INSTALASI PENANGKAL PETIR


1 penangkal petir Radius 80-100 M' dengan spit dengan tiang tinggi : 2 mtr Set 4.00 #REF! #REF! #REF!
2 Kabel pentanahan 1 X BC 70 mm2 M 160.00 #REF! #REF! #REF!
3 Pentanahan dengan pipa GIP 1 " Medium A. didalamnya Ttk 2.00 #REF! #REF! #REF!
4 Bak kontrol 40 cm X 40 cm dengan kedalaman 40 cm Set 2.00 #REF! #REF! #REF!
5 tes dan Ijin - Ijin Ls 2.00 #REF! #REF! #REF!

RENCANA MINGGU INI #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

RENCANA KOMULATIF MINGGU INI - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

Dibuat Oleh,
Konsultan Perencana
CV. MASSA TEKNIKA

ARIEF RAHMAN, ST
Ketua Tim

You might also like