DIRction Estimate

SR# UNIT NAME UNIT QTY DAYS UNIT PRICE TOTAL PRICE Remarks
Media Wall Setup
Media Wall 16x10ft Wooden Frame with Flex & Cutout 1 1 16,000 16,000
Media Wall Floor 28x8ft Polished 1 1 17,920 17,920
Side Branded Panels 5x10 ft 2 1 5,000 10,000
#Tag Cutout with Base 6x2ft Silk Paint 1 1 45,000 45,000
Arena Entrance Setup - -
Main Entrance Tunnel 12x8 ft As Per Design 1 1 145,000 145,000
UV Floor for Tunnel 8x12 ft 1 1 14,400 14,400
Red Carpet 20x12 ft 1 1 9,600 9,600
Media Wall Complete Setup 1 1 36,000 36,000
Arena Branding
Arena Branding Panels 5x10 ft 16 1 5,000 80,000
Seating Arrangement -
Victorian Lounges for VIP's with Glass Tables 10 1 7,500 75,000 9 Seats per Lounge
Photography / Videography/Montage Development -
Photography/ Videography/ Drone Shots/ Montage 1 1 120,000 120,000
Main Stage Setup -
UV Floor 40x16ft height 2ft 1 1 120,000 120,000
3D Back wall 32x8ft 1 1 125,000 125,000
SMD Screen 16x8ft as per design 1 1 45,000 45,000
Side Branding Panels 4x8ft Flex with Frames 2 1 4,000 8,000
Rosturm/ Podium 1 1 8,000 8,000
U-Truss with Lights 44x16 ft 1 1 35,000 35,000
Sound System SP-4 Pairs 2 1 8,000 16,000
Miscellenuous -
Labor for Setup Installation/Removal 4 2 2,500 20,000
Logistatics Transportation 4 2 6,000 48,000
General Arena Lighting 1 1 35,000 35,000
Sub Total 1,028,920
Agency Commission 15% 154,338
Grand Total 1,183,258