0% found this document useful (0 votes)
62 views2 pages

CKAR310 - Assignment 2

This document provides instructions for Assignment 2 of an architectural materials and methods course. Students must analyze the building enclosures of two different buildings from selected architects in the Greater Toronto Area. For each building, they must include detailed descriptions, diagrams, construction details, images and information on the architect, building use, size, and date. The analysis should discuss the enclosure system, its performance, application, and contribution to architectural quality. Students will be evaluated based on the quality of their analysis and understanding of the enclosure systems, use of diagrams, comprehensiveness, and completeness. The assignment is worth 20% of the final grade.

Uploaded by

Toby Chidolue
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views2 pages

CKAR310 - Assignment 2

This document provides instructions for Assignment 2 of an architectural materials and methods course. Students must analyze the building enclosures of two different buildings from selected architects in the Greater Toronto Area. For each building, they must include detailed descriptions, diagrams, construction details, images and information on the architect, building use, size, and date. The analysis should discuss the enclosure system, its performance, application, and contribution to architectural quality. Students will be evaluated based on the quality of their analysis and understanding of the enclosure systems, use of diagrams, comprehensiveness, and completeness. The assignment is worth 20% of the final grade.

Uploaded by

Toby Chidolue
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

COURSE CKAR 310

MATERIALS AND METHODS

Assignment 2

Building Enclosure / Envelope


Select two different architects or architectural practices, at minimum one must be from the
listed provided, who practice in the Greater Toronto Area, and then select one of their buildings
to carry out a detailed building enclosure/envelope (wall and roof assembly) analysis. The
projects selected must be of two very different building envelope applications. For example, if
one is precast the other could be brick; if one is curtain-wall the other could be panellized
metal and so on.

Research the envelope system, its elements and materials. Prepare the analysis focusing on
its components, characteristics, performance and application as well as how the system
contributes to the architectural quality of the building. Also, include the appropriateness of the
enclosure to the type of building it has been applied to.

Your analysis should include at minimum the following:


x Detailed description of the building enclosure system
x Diagrams with appropriate labelling of the various parts of the assembly
x Architect
x Type of building
x Building Use/Programme
x Construction date
x Size: area and height
x Images and diagrams as required

The analysis must include diagrams, sections, details and other appropriate graphics to
illustrate the building system. Each selected building must be illustrated separately, allow
minimum 3 pages per building. The format is to be in 8-1/2 x 11, portrait format.

Architectural Practices

At minimum, select at least one architectural office from the Greater Toronto-area and select a
building. Contact the office and / or visit their website to determine a suitable completed
building.
x Shim and Sutcliffe Architects
x Gau Hastings Architects
x LGA Architects (formally Levitt Godman Architects)
x RAW Design
x Superkul Architects
x Teeple Architects
x Maclennan Jaunkalns Miller Architects
x Kuwabara Payne McKenna Blumberg Architects
x Hariri Pontarini Architects
x Diamond Schmitt Architects
x Baird Sampson Neuert Architects
x Architects Alliance Architects
x Saucier + Perrotte Architects
x Patkau Architects
x Moriyama + Teshima Architect
x Montgomery Sisam Architects
x Others (may be considered but requires pre approval from instructor)

Evaluation Criteria

1. Quality of the concepts discussed in the essay and analysis of the selected building
2. Degree of understanding of the intent of the building enclosure
3. Extent of comprehensively capturing the aspects of building and system
4. Coherence and quality of text
5. Graphic quality of analytical drawings
6. Comprehensiveness of the project in drawing, images and text
7. Quality of the enclosure evaluation
8. Completeness of the properties of materials, detailing strategies and other related topics
9. Degree of understanding of the building system used in the case study project
10. Overall layout and completeness of assignment.

Please footnote all references at the bottom of the page as well as include your name.
Assignment
Assignment 22 isis worth
worth20%
20%ofofthe
thefinal
finalclass
class grade
grade and is due at the beginning of the 6th
and
class
is dueon June
at the 13th, 2013
beginning ofat 2 pm.
class in 4 weeks at 6:30 pm.

You might also like