Generating Company: Name of Generating Station: Installed Capacity (MW)

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Annexure-XXII

DETAILS OF EMISSION CONTROL SYSTEM


Generating company:
Name of Generating station:
Installed Capacity (MW) :

Type of Emission Control System:


Under Operation/Anticipated Operation Date:

S.No. Particulars Units 2017-18 2018-19 2019-20 2020-21 2021-22


A
1 Gross Generation MU
2 Auxiliary Consumption - emission control MU
(Actual)
Auxiliary Consumption - emission control %
(Actual)
3 Auxiliary Consumption (Normative) %
4 Hours of Operation Hrs
5.0 O&M Expenses (Actual) with Breakup as per Rs. Crore
format
6.0 Other maintenace spares consumed^ Rs. Crore
7.0 Initial Spares consumed* Rs. Crore

Pls. Note: Where the system is yet not operational guaranteed parameter along with spares cost as per awarded contract to be furnished
* Not part of O&M expenses and Pls specify list of the same

S.No. Particulars Units 2017-18 2018-19 2019-20 2020-21 2021-22


Investment Approved* Investment Approved* Investment Approved* Investment Approved* Investment Approved*
Approval Approval Approval Approval Approval

1 Capital Cost of Emission Control System


1.1 Hard Cost Rs. Crore
1.1.1 Civil Works Rs. Crore
1.1.2 Plant and Machinery and others Rs. Crore
1.1.3 Initial Spares procured Rs. Crore
1.2 IDC Rs. Crore
1.3 IEDC Rs. Crore
1.4 Others. Pls specify Rs. Crore
1.4 Completed Cost Rs. Crore

* Wherever cost is yet to be approved by CERC and for which petition has been filed the actual claimed shall be submitted.
* Where the work is still under execution utility to submit the details of awarded cost

You might also like