NOTES TO SPECIFICATION WRITER
General Instructions:
The specifications listed constitute the standard for Operations and Maintenance
services (O&M) for all PBS facilities. Regions shall not reduce specification provisions,
but shall incorporate building specific requirements or adjustments as required.
Regions are encouraged to aggregate the services in the national specification across
multiple building locations to help further reduce their Contract costs. The region shall
conduct a comparative analysis of the requirements required in the specification to
determine those benefits through “economies of scale” and the best approach for
successful implementation. Additionally, the document has been designed to be flexible
and includes editor’s notes in blue and contained within square brackets “[[[ ]]]” to
clarify the intent in these sections.
Functional Guidelines:
● Each section and subsection has a specific numbering system; if your
building does not require a certain subsection, you must keep the
subsection numbering header in the specification, but mark it reserved.
● Add regional-specific information and additional requirements.
● Do not insert page numbering until you have completed the scope to avoid
confusion.
● Delete all blue editor’s notes and paragraphs when the specifications are
finalized.
● Some exhibits are intended for editor and shall be deleted before sending
to the Contractor. Exhibits 1 through 4 are to be submitted along with the
PBSW. Exhibit 5 is for the CO or designee, and Facility Manager. Exhibit 6
is to be included in SMART buildings running GSAlink technology.
● Be sure to complete the Building Information Sheet (See Exhibit 1) for each
building that is covered under the Contract.
● Contractor prices are to include labor, equipment, tools, supplies,
supervision, management, and subcontracted services, except as set forth
as Government-furnished, and otherwise to perform and provide the work
described in Performance Based Work Statement (PBWS).
● Tenants that delay Contractor access to the space they occupy shall
reimburse GSA for the cost of delay. The CO or their designee shall
specify in the contract what constitutes timely access to tenant’s space.
● Prior to sending out the specifications for Contractor’s bid, check with the
tenant’s occupancy agreement or reach out to the appropriate tenant
representative(s) to ensure the PBWS meets the tenant’s services
requirements. Tenant requirements that exceed the standard services are
reimbursable to GSA.
1
Table of Contents
Section 1 General Contract Requirements 11
1.0 GENERAL 11
1.1 Scope of Work 12
1.1.1 Discrepancy in the Specifications 12
1.2 Personnel 12
1.2.1 Contractor Key Personnel 13
1.2.2 Authority 13
1.2.3 Communication Equipment 14
1.2.4 Language 15
1.2.5 Employee Suitability 15
1.2.6 Employee Technical Qualifications 15
1.2.7 Certifications 16
1.2.8 Employee Training 17
1.2.9 Appearance 19
1.2.10 Standards of Conduct 19
1.2.11 Recording Presence 19
1.2.12 Personal Identity Verification Requirements 19
1.2.13 Credentials and Identification 19
1.2.14 Escorting 20
1.3 Quality Control Program 20
1.3.1 Quality Control Plan 20
1.3.2 Quality Control Plan Contents 21
1.4 Quality Assurance 21
1.4.1 Contracting Officer's Representative (COR) 22
1.4.2 Government Monitoring 22
1.4.3 Performance Evaluations 22
1.5 Physical Security 22
1.5.1 Key Control 23
1.5.2 Lock Combinations 23
1.6 Safeguarding Sensitive Data and Information Technology Resources 23
1.6.1 General 23
1.6.2 Safeguarding and Dissemination of Controlled Unclassified Information 24
1.7 Hours of Operation 26
1.7.1 Normal Working Hours 26
1.7.2 Core Coverage Hours 27
2
1.7.3 Recognized Holidays 27
1.7.4 Extended Operating Hours 27
1.7.5 Building Access 27
1.8 Conservation of Utilities 27
1.9 Use of NCMMS 28
1.9.1 General 28
1.9.2 Operations 28
1.9.3 Reporting 29
1.10 Documentation and Records 29
1.11 Ordinances, Taxes, Permits, and Licenses 29
1.12 Other Contractors 29
1.13 Government Forms 29
1.14 Contractor Maintenance Performance Plans 30
SECTION 2 DEFINITIONS 31
2.0 General 31
2.1 Above-Standard Services 31
2.2 Acceptance 31
2.3 Additional Services 31
2.4 Advanced Meters 31
2.5 Advanced Metering Systems 31
2.6 Annual Child Care Facility Survey 31
2.7 Architectural and Structural 31
2.8 Basic Services 32
2.9 Building Automation System (BAS) 32
2.10 Building Operating Plan 32
2.11 National Computerized Maintenance Management System (NCMMS) 32
2.12 Consumable Parts 32
2.13 Contracting Officer (CO) 32
2.14 Contracting Officer's Representative (COR) 33
2.15 Contractor 33
2.16 Core Coverage Hours 33
2.17 Corrective Maintenance 33
2.18 Demand Response Program 33
2.19 Emergency Callback 33
2.20 Environmentally Sustainable Products and Services 33
2.21 Exterior 34
3
2.22 Fire Protection and Life Safety Systems 34
2.23 GSAlink 34
2.24 Green Procurement Compilation (GPC) 34
2.25 Indefinite Quantity 34
2.26 Initial Deficiency Report 34
2.27 Miscellaneous Work 34
2.28 Modification of Contract 35
2.29 Non-Reimbursable Repairs 35
2.30 Normal Working Hours 35
2.31 Occupant Emergency Plan (OEP) 35
2.32 Ongoing Commissioning 35
2.33 Open Protocol Systems 35
2.34 Operations 36
2.35 Overtime Utilities 36
2.36 Partnering 36
2.37 Performance Based Work Statement (PBWS) 36
2.38 Predictive Maintenance 36
2.39 Preventive Maintenance 36
2.40 Quality Assurance Surveillance Plan (QASP) 36
2.41 Quality Control Plan 37
2.42 Rapid Building Assessment Program 37
2.43 Repair 37
2.44 Reimbursable Repair 37
2.45 Tour 37
2.46 Vertical Transportation Systems 37
2.47 Watch 37
2.48 Work Order 38
SECTION 3 GOVERNMENT-FURNISHED PROPERTY 39
3.0 General 39
3.1 Electric Power 39
3.2 Water Source 39
3.3 Contractor Office Space and Furnishings 39
3.4 Storage Space 39
3.5 Network Equipment and Computer Hardware 40
SECTION 4 CONTRACTOR- FURNISHED PROPERTY SUPPLIES/MATERIAL/EQUIPMENT
41
4.0 General 41
4
4.1 Specific Requirements 41
SECTION 5 OPERATIONS-SPECIFIC REQUIREMENTS 42
5.0 General 42
5.1 Tenant Environment 42
5.1.1 Tenant Furniture 42
5.2 Building Operating Plan 42
5.2.1 Components of the Building Operating Plan 43
5.3 Equipment Inventory 45
5.3.1 General: 45
5.3.2 Operations 46
5.3.3 Reporting 46
5.4 Safety Management 47
5.4.1 General 47
5.4.2 Workplace Safety and Health Program 47
5.4.3 Scheduling and Record Keeping 47
5.4.4 Fall Protection 48
5.4.5 Powered Platforms 48
5.4.6 Lock Out/Tag Out 48
5.4.7 Confined Spaces 48
5.4.8 Facility Hazards and Accidents 48
5.4.9 Disruptive or Hazardous Equipment 49
5.4.10 Scheduled Disruption to Utilities, Lighting, Fire Protection & Life Safety Systems, or
Space Conditioning 49
5.4.11 Safety Data Sheets and Hazard Communication Plan 49
5.4.12 Labeling and signage 50
5.4.13 Emergency Shutdown Instructions 50
5.4.14 Electrical Safety 50
5.4.15 Labeling of Electrical Circuits and Panels 50
5.5 Environmental Management 50
5.5.1 General 50
5.5.2 Refrigerants 51
5.5.3 Local Air Quality Management Operating Permits 52
5.5.4 Stationary Engines 52
5.5.5 Fuel Storage Tank Management 52
5.5.6 Solid Waste 52
5.5.7 Polychlorinated Biphenyl (PCB) Control 53
5.5.8 Asbestos Management 53
5
5.5.9 Disposition of Hazardous Waste 53
5.5.10 Backflow Prevention Devices 54
5.5.11 Potable Water Systems 54
5.5.12 Reporting 54
5.6 Energy and Water Efficiency 55
5.6.1 General 55
5.6.2 Operations 55
5.6.3 Reporting 56
5.7 Advanced Metering Systems 56
5.7.1 General 56
5.7.2 Operations 56
5.7.3 Maintenance 56
5.7.4 Reporting 57
5.8 Building Automation Systems and IT Controls 57
5.8.1 General 57
5.8.2 Operations 57
5.8.3 Maintenance 60
5.8.5 Reporting 61
5.8.6 Smart Building Technology 61
5.9 Fire Protection and Life Safety Equipment and Systems 62
5.9.1 General 62
5.9.2 Fire Alarm System Services and Emergency Communication Systems 63
5.9.3 Water-Based Fire Protection Systems 64
5.9.4 Fire-rated Door Assemblies 65
5.9.5 Fire Damper and Combination Fire/Smoke Dampers 65
5.9.6 Smoke Doors Assemblies 65
5.9.7 Smoke Dampers 65
5.9.8 Portable Fire Extinguishers 65
5.9.9 Non-Water-Based Fire Extinguishing Systems 66
5.9.10 Smoke Control Systems 66
5.9.11 Emergency and Standby Power Systems 66
5.9.12 Emergency Lighting Systems and Exit Signage 66
5.9.13 Fire Resistance Rated Construction 67
5.9.14 Lightning Protection Systems 68
5.9.15 Chemical Sensors 68
5.10 TOURS 68
6
5.10.1 General 68
5.10.2 Proactive Facility Tours 68
5.10.3 Minimum Tour Frequencies 69
5.10.4 Monitoring of Central Plant Equipment 69
5.10.5 Operating Logs and Tour Check Sheets 69
5.10.6 Reporting 70
5.11 Repairs 70
5.11.1 General 70
5.11.2 Operations 71
5.11.3 Warranties 72
5.11.4 Third-Party Contractors 73
5.12 Work Orders 73
5.12.1 General 73
5.12.2 Operations 73
5.12.3 Data Maintenance 75
5.12.4 Reporting 75
5.13 Additional Services Indefinite Quantity Provisions 76
5.13.1 General 76
5.13.2 Price Proposal for Additional Services Work Request 76
5.13.3 Additional (Non-Pricing Schedule) Subcontracts 76
5.13.4 Indirect Costs (Markup) 77
5.13.5 Proposal Review 77
5.13.6 Additional Services Work Request Ordering and Invoicing 77
5.13.7 Cost Documentation 77
5.13.8 Construction Services 77
5.14 Building Management and Support Services 78
5.14.1 General 78
5.14.2 Miscellaneous Work 78
5.14.3 Review of Design Documents 79
5.14.4 Inspections Assistance for Space Build Outs 79
5.14.5 Flag Procedures 79
5.14.6 Overtime Utilities 79
5.15 Monthly Progress Report 80
5.15.1 General 80
5.16 Reference Library 81
5.16.1 General 81
7
SECTION 6 MAINTENANCE SPECIFIC REQUIREMENTS 82
6.0 General 82
6.1 Maintenance Standard 82
6.2 Boiler Systems 83
6.2.1 General 83
6.2.2 Operation 83
6.2.3 Boiler Maintenance 83
6.2.4 Testing and Inspecting 83
6.2.5 Reporting 84
6.3 Air Distribution Equipment 84
6.3.1 General 84
6.3.2 Operation 84
6.3.3 Maintenance 85
6.3.4 Replacement of Air Filters 85
6.3.5 Testing and Inspecting 86
6.3.6 Reporting 86
6.4 Chiller Systems 86
6.4.1 General 86
6.4.2 Operation 86
6.4.3 Maintenance 86
6.4.4 Testing/Inspecting 86
6.4.5 Reporting 87
6.5 Cooling Towers 87
6.5.1 General 87
6.5.2 Operations 87
6.5.3 Maintenance 87
6.5.4 Testing 88
6.5.5 Reporting 88
6.6 HVAC Water Management 88
6.6.1 General 88
6.6.2 HVAC Water Management Plan 88
6.6.3 Operation 89
6.6.4 Maintenance 89
6.6.5 Testing and Inspecting 89
6.6.6 Reporting 90
6.6.7 Chemical Free Water Treatment System 93
8
6.7 Domestic Plumbing Systems 93
6.7.1 General 93
6.8 Lighting Systems 93
6.8.1 General 93
6.8.2 Operation 94
6.8.3 Maintenance 95
6.8.4 Testing and Inspecting 96
6.9 Electrical Switchgear and Switchboards 96
6.10 Emergency Power Equipment 96
6.10.1 General 96
6.10.2 Operation 97
6.10.3 Maintenance 97
6.10.4 Testing and Inspecting 97
6.10.5 Reporting 98
6.11 Oil Analysis and Oil Changes 98
6.11.1 General 98
6.11.2 Operations 99
6.11.3 Testing and Inspecting 99
6.11.4 Reporting 99
6.12 Vertical Transportation Systems 99
6.12.1 Elevator Associated Equipment Maintenance 99
6.13 Architectural and Structural Systems 100
6.13.1 General 100
6.13.2 Replacement Items and Painting 100
6.13.3 Machinery Rooms 101
6.13.4 Historic Buildings 101
6.13.5 Architectural Woodwork 101
6.13.6 Directories 102
6.13.7 Roofs 102
6.13.8 Roof Anchorages 102
6.14 Perimeter Access Control Systems (Security fixtures) 102
6.14.1 General 102
6.15 Child Care Center 103
SECTION 7 ADMINISTRATIVE INSTRUCTIONS 104
7.0 Initial Inspection 104
7.1 Existing Deficiency Inspection/Initial Deficiency Report 104
9
7.2 Startup Phase/Transition Phase 105
7.2 Startup Phase (New or Modernized Facility) 106
7.2.1 Startup Phase Schedule (Transition Phase) 107
7.2 Transition Phase 107
7.2.1 Transition Phase Schedule 108
7.3 Phase-out Transition Period 108
7.4 Contract Closeout Examination and Withholding of Final Payment 108
SECTION 8 PUBLICATIONS AND CITED STANDARDS 110
8.0 Publications 110
10
Section 1 General Contract Requirements
1.0 GENERAL
This is a Performance Based Work Statement (PBWS) for Facilities Engineering: Operations,
Maintenance, and Related Services defined under the scope of this contract. This PBWS
describes the minimum requirements of the U.S. General Services Administration (GSA) and
acceptable outcomes to be performed by the Operations and Maintenance Contractor (known
from here on as Contractor). All, or part of, the successful offeror’s Management Plan shall be
incorporated into the contract.
GSA seeks to establish a partnering relationship with the Contractor to accomplish the program
objectives in this contract. The objective of the partnering process is to provide an effective
problem-finding/problem-solving management team composed of personnel from both parties,
thus creating a single culture with one set of goals and objectives. Partnering requires that both
parties recognize and address those opportunities and challenges that shall be confronted to
help maintain the health of the Contractor/GSA relationship. The relationship is based on trust,
dedication to common goals, and an understanding of each other's individual expectations and
values. The team shall consider utilizing a facilities engineering and systems thinking approach
to provide solutions from a global perspective. The outcome of this initiative is for GSA to
leverage Contractor expertise to assist GSA in accomplishing these goals and objectives.
GSA intends to purchase Contractor provided technical and managerial expertise to assist in
the holistic management of assets over the long term. This program strategy has taken the
name “facilities engineering” and has proven to be a successful model resulting in efficient and
effective management of assets while maintaining a lower overall cost of operations. The
facilities engineering model is dependent upon an effective partnership with a highly skilled
Contractor whose objectives are based on mutual understanding of the stated requirements and
objectives. A higher level of effective communication between the Government and Contractor
is essential for partnering and for this performance based service contract to succeed, whereas
the success of this contract is shared between the Government and the Contractor. More
emphasis is placed on the Contractor’s self-management of quality, not the usual inspection by
Government inspectors, although that is a part of this contract as well. All parties shall act
proactively to reduce service cost.
11
GSA is committed to Federal leadership in the design, construction, and operation of high-
performance and sustainable buildings. A major element of this strategy is the implementation
of common strategies for operating and maintaining buildings. As a result, this contract requires
the Contractor to participate and partner with the Government in the initiative of obtaining high
performance and sustainable operations, inclusive of initiatives to conserve energy and water
consumption, recycling programs, meeting or exceeding specific environmental, regulatory, or
performance standards, and the utilization of green products and services. The following
sections detail the GSA minimum requirements and acceptable outcomes. The Contractor shall
closely monitor all aspects of the work, identify deficiencies and implement corrective action,
without reliance on Government oversight.
To the extent possible and consistent with EO 13788, the Contractor shall maximize the use of
goods, products and materials that are produced in the United States.
Additional services may be ordered at the discretion of GSA for work relating to the operations,
maintenance and repair or upgrade of the facilities listed above, but not covered in the basic
services of the contract. Government furnished items are specifically excluded in this contract,
except as specified in Section 3.
1.2 Personnel
[[[Note to Spec Writer: If a SLA is in place, insert “and conditions are maintained to meet
service level agreements per this contract and avoid any disruption”]]]
12
The Contractor shall adhere to the submitted staffing plan and subcontracting plan that was
submitted prior to award as part of the Bid proposal. Contractor shall submit
staffing/subcontractor plan that provides sufficient numbers of staff at the various levels of
expertise to ensure all scheduled and unscheduled services are performed and conditions are
maintained to avoid any disruption to the tenant. Any changes to the proposed staffing levels,
qualifications of proposed staff or key personnel, or the areas of expertise or disciplines of the
proposed staff shall be submitted for review and approval from the CO or their designee.
The Contractor shall designate a Contract Project Manager in writing and provide the name and
contact information to the CO. The Contract Project Manager is considered essential to the
work being performed under this Contract. Before removing, replacing, or diverting the Contract
Project Manager, the Contractor shall (1) notify the CO two weeks in advance and (2) submit
justification (including proposed substitutions) in sufficient detail to permit evaluation of the
impact on this Contract.
[[[Note to Spec Writer: For Union labor use Union terms, example Chief Engineer titles.]]]
The Contract Project Manager shall possess at least five years of recent (within the past seven
years) experience in the management and supervision of building mechanical operations and
maintenance for buildings of the approximate size, complexity and characteristics of the
buildings to be covered by this Contract. A detailed resume shall be submitted to the CO or
their designee for approval prior to the assignment of the project manager to the Contract. Both
new and replacement project manager’s shall meet these qualification standards. Minimally, the
resume shall contain:
a. The full name of the proposed project manager.
b. A detailed description of the proposed project manager’s employment history for the
previous five years. The names and addresses of the companies for whom the proposed
project manager worked for the past five years, along with the names and telephone
numbers of the immediate supervisors.
1.2.2 Authority
The Contract Project Manager shall have complete authority to act for the Contractor in every
detail during the term of the Contract, and shall have the authority to exercise financial
expenditures and controls, accept notices of deductions, inspection reports and all other
correspondence on behalf of the Contractor. This Contract requires onsite managerial
supervision. The Contractor can fulfill this requirement by having the Contract Project Manager
located onsite or having an additional onsite Supervisor. If the Contractor decides that the
requirement is to be filled with an onsite supervisor, the above requirements for Contract Project
Manager shall be the same.
13
1.2.3 Communication Equipment
The Contractor shall provide key operational personnel (Managers, Supervisors, and
Mechanical Engineers, Mechanical Supervisors, Operating Engineers, Heating, Ventilation and
Air Conditioning (HVAC) Mechanics) with portable electronic means to communicate with GSA
for all work covered under this Contract (Work Orders, emergencies, status of projects).
Outside of normal working hours, the Contractor shall maintain some designated form of
communication with on-call staff to allow the CO or their designee to contact such on-call staff at
any time for emergency response. Electronic communication methods are the following:
● Phone/Emails/Text messaging smartphone or tablet devices. The Contractor is
responsible for all initial and monthly costs associated with the device(s). In areas
where cellular service is unavailable, or unreliable, special exceptions shall be made by
the CO or designee on a case-by-case basis. Such devices shall be on the list of GSA-
approved devices and are to be processed through GSA’s procedures for remote mobile
management. This shall allow for mobile access to GSA email, the National
Computerized Maintenance Management System (NCMMS) mobile environment and
Building Automation Systems (BAS) alarms. The process for this and the list of currently
approved devices is available upon request. Contractor personnel under this Contract
must obtain and maintain an official GSA ENT account (this is your enterprise account
for signing into systems administered by GSA) and monitor their GSA email account for
all notifications.
● Fax. Receiving and sending faxes is acceptable as a secondary communication method
for locations that have problems with wireless device signal strength. However, delaying
faxes because of combined usage of voice and fax on the same line is not acceptable.
● Administrative Station – Contractor shall provide at least one Desktop/Laptop device per
each contract group of buildings for NCMMS. Contractor shall maintain the device per
GSA IT requirements, including patching and security software. Contractor shall provide
and maintain core Operating Systems, updates, revisions and Microsoft Office (MS
Office) tools.
[[[Note to Spec Writer: If the Government provides the Desktop/laptop per each
Contract Group of buildings for NCMMS, change the language to reflect that the
Government is providing the device.]]]
14
1.2.4 Language
On-site personnel and the Contractor’s Point of Contact (POC) for GSA need to be proficient in
English, and must be able to read, write, speak, and understand English.
The GSAR 552.237-71 Qualifications of Employees (1989) clause shall be followed at all times
during the performance of this Contract.
a. All Contract employees requiring routine unescorted access to federally controlled
facilities or information systems, or both, for more than six months (Regular Employees)
shall be required to undergo a suitability determination before a personal identification
verification (PIV) card is issued. Prior to the time that an identification card is issued,
such Regular Employees shall be required to comply with normal facility access control
procedures, including recording presence, temporary badging, and escorted entry, as
applicable.
b. Failure of a Regular Employee to receive a favorable suitability determination shall be
cause for removal of the employee from the work site and from other work in connection
with the Contract.
c. Contract employees working less than six months (Temporary Employees) shall, at the
Government's option, be required to undergo a lesser form of suitability determination.
Prior to the time that an identification card is issued, if at all, such Temporary Employees
shall be required to comply with normal facility access control procedures, including
recording presence, temporary badge, and escorted entry, as applicable.
d. The Government, at its sole discretion, may grant temporary suitability determinations to
Regular or Temporary Employees. However, the granting of a temporary suitability
determination to any such employee shall not be considered as assurance that a
favorable suitability determination shall follow.
e. The CO or designee shall provide the Contractor with the required clearance procedures
for obtaining necessary clearances. The Contractor shall comply with these clearance
procedures.
f. The Contractor shall be responsible for planning and scheduling its work in such a
manner as to account for facility access issues. Difficulties encountered by the
Contractor in gaining access to facilities by its employees and subcontractors shall not be
an excuse for any lack of Contractor performance under the Contract.
15
possess all certifications and licenses required by Federal, state and local jurisdictions and
National Fire Protection Association (NFPA) 72, National Fire Alarm Code, section 10.5, for
equipment that they shall be operating, maintaining, repairing, inspecting or testing. At a
minimum, a mechanic in each trade (e.g., electric, HVAC, plumbing) shall be a licensed
journeyman grade in the local municipality in which they are working. All personnel under the
team leader or sub-contractor personnel shall have the experience and skill set knowledge as
described in the Service Contract Act (SCA) Directory of Occupations, Fifth Edition or later. For
example, HVAC mechanics need to be as proficient as dictated by the 23410 and 23411 series
and general maintenance mechanic shall be as proficient as dictated by the 23370 series.
1.2.7 Certifications
Copies of all certifications for Contractor employees shall be kept on-site and provided to the
Government upon request. The Contractor shall provide to the CO or their designee
documentation of the certificates of training, licenses, and permits for all new employees not
later than seven business days prior to that person beginning work under the terms of this
Contract. The Contractor shall ensure that all certificates of training, licenses, permits, and
bonds are current and valid and are loaded in NCMMS.
16
1.2.7.3 Qualifications of Technicians
[Dry Chemical Extinguishing System], [Wet Chemical Extinguishing System]; [Clean
Agent Fire Extinguishing System]; [Halogenated Extinguishing System]; [Carbon Dioxide
Extinguishing System]; [Ventilation System Fire Extinguishing System]; [Smoke
Control]; [Fire Damper]; [Smoke Damper]; [Combination Fire/Smoke Damper]; [Fire-rated
Door Assemblies]; [Smoke Door Assemblies]; [Portable Fire Extinguisher]; [Emergency
and Standby Power]; [Emergency Lighting Equipment]; [Exit Signage]
Technicians shall be trained and possess a current training certificate for inspecting, testing,
and maintaining these components from an equipment manufacturer or a certificate by an
organization acceptable to the CO. The Contractor shall submit to the CO or designee the
certification document and expiration date, issued by the equipment manufacture or
organization confirming the technician has been trained, for each field technician and inspector
responsible for performing the inspection, testing, and maintenance of such systems/equipment
under the terms of this Contract.
Alternate certifications presenting evidence of equal or greater skills and qualification may be
substituted; however, the burden to evidence the quality of such certification falls fully upon the
vendor.
The Contractor shall ensure that all employees, including replacement workers, receive
asbestos training and refresher training in accordance with 40 C.F.R part 763 and 29 C.F.R.
part 1910. The Contractor shall follow all instructions for each asbestos class job as outlined in
29 C.F.R. part 1910. The training shall be conducted, at no additional expense to the
17
Government, within 60 calendar days of Contract start date. The Contractor shall submit written
certification to the CO or designee within five business days of the completion of training.
All HVAC personnel designated to operate, maintain, or repair, or any combination of HVAC
equipment or systems shall possess one or more of the following certifications:
a. North American Technician Excellence (NATE) HVAC Service Technician Certification
b. HVAC Excellence Professional Level Certification
c. UA Star HVAC Mastery Certification
All HVAC personnel designated, to operate, maintain, and or repair, or any combination of
HVAC equipment or systems shall maintain a minimum of 16 hours of continuing education per
year from either NATE, HVAC Excellence, or UA Star recognized provider program.
The Contractor shall submit written certification to the CO or designee.
The Contractor shall ensure that all employees, including replacement workers, receive lead
awareness training and refresher training in accordance with 29 CFR 1910.1025(l) (1) (i). The
training shall be conducted, at no additional expense to the Government, within 60 calendar
18
days of Contract start date. The Contractor shall submit written certification to the CO or
designee within five (5) business days of the completion of training.
1.2.9 Appearance
Contractor personnel shall present a neat appearance and be easily recognized. This shall be
accomplished by wearing uniforms bearing the name of the company and employee name.
Uniforms shall be regularly laundered, consistent among personnel classifications, and
maintained presentable to tenant personnel during all working hours.
The Contractor shall be responsible for ensuring that all identification credentials are returned to
the CO or designee whenever it’s employees leave the Contract (i.e., when the Contract has
been completed, employees leave the company, employees are dismissed or terminated or the
19
Government determines that the employee is to be removed from the contract). The Contractor
shall notify the CO or designee whenever employee badges are lost.
The Contractor shall be responsible for paying the Government for replacement credentials at
the current cost per badge.
1.2.14 Escorting
[[[Note to Spec Writer: Review security clearance policy for specific building escorting
and modify as appropriate.]]]
Temporary contract employees who do not have favorable preliminary or final suitability
determinations and need to work in non-public federally-controlled space must be escorted. In
those cases, the Contractor shall comply with the security clearance procedures for Escort Only
Contractors. All uncleared contract employees shall be escorted in non-public space by a
Government employee or another responsible cleared contract employee who is approved by
the CO or designee. Other Government agencies shall have specific agency security
requirements for their own space that shall only allow escort by Government employees or
those designated by their agency. Government employees or approved cleared contract
employees who provide escorts for uncleared contract employees shall always be within
eyesight of the uncleared contract employees. The Contract Government escort shall watch
uncleared employees and remain with uncleared contract employees for the entire time they are
in non-public federally controlled space. Any security violation of escort requirements by a
cleared and approved contract employee shall result in the immediate removal from the
Contract of all contract employees involved, i.e., escorts and uncleared escorted contract
employees. Also, violations of escort requirements by subcontract employees in accordance
with security requirements shall be grounds for loss of facility access for those individuals or
grounds for termination of Contract, or both.
20
responsibility of the Contractor and is due with the Contractor’s proposal.
The QC plan, revisions or updates shall be submitted for approval by the CO or designee. A
review of the QC Plan can be initiated by direction of the CO or designee.
1.3.2.2 Methods
The Contractor shall identify its methods for identifying and preventing deficiencies in the
quality of service performed before the level of performance becomes unacceptable.
21
success of this program. The Government shall order improvements, if it determines
the program is insufficient or ineffective.
d. Obtain tenant satisfaction and NCMMS survey information and require improvements
in service on the basis of such information to the extent such results correlate with
deficiencies in Contract requirements.
e. Conduct physical inspections of facility equipment and systems, including programs
and files maintained on computers in Contractor onsite offices and work areas, and
require correction of deficiencies noted.
f. Perform inspections with Government personnel or independent third party
inspectors.
The Government shall inspect the Contractor’s performance using a quality assurance program
(QASP) through random inspections, scheduled inspections, or any other method of inspection
by the COR or designee that the Government determines reflects the actual performance of this
Contract. Contractor performance shall be evaluated on the basis of the performance success
or deficiencies, success or failure in meeting contract requirements, and the Contractor’s record
of correcting deficiencies when noted. While corrective actions shall be noted, a record of
significant performance deficiencies shall lead to a performance evaluation that is less than
satisfactory even if the Contractor takes corrective action. The Contractor shall meet with the
CO or designee and other Government representatives, at the discretion of the CO or designee,
to review Contract performance.
22
Contractor use in accordance with the Government Property (GP) clause, Federal Acquisition
Regulation (FAR) 52.245-1. Any loss of integrity in the lock and keying system shall be
immediately reported to the COR.
23
e. CIO 2105.1 C, GSA Section 508: Managing Electronic and Information Technology
for Individuals with Disabilities
f. CIO 2106.2, GSA Social Media Policy
g. CIO 2107.1, Implementation of the Online Resource Reservation Software
h. CIO 2160.4A, Provisioning of Information Technology (IT) Devices
i. CIO 2162.2, Digital Signatures
j. CIO P 2165.2, GSA Telecommunications Policy
k. CIO P 2180.1, GSA Rules of Behavior for Handling Personally Identifiable
Information (Pll)
l. CIO 2182.2, Mandatory Use of Personal Identity Verification (PIV) Credentials
m. CIO P 1878.2A, Conducting Privacy Impact Assessments (PIAs) in GSA
n. HCO 9297.1,, GSA Data Release Policy
o. ADM P 9732.1 D, Suitability and Personnel Security. The Contractor and
subcontractors must insert the substance of this order in all subcontracts.
These policies can be found at the web site in document titled “Web Links” at: Operations and
Maintenance Specification
1.6.2.1 General
This subsection applies to all recipients of Controlled Unclassified Information (CUI), including
offerors, bidders, awardees, contractors, subcontractors, lessors, suppliers and manufacturers.
Dissemination of sensitive but unclassified paper and electronic building information shall be
made on a need to know basis in accordance with GSA Order PBS P 3490.2, a copy of which
shall be made available upon request.
24
number or its tax ID number, a copy of its business license and a valid state driver’s license with
photograph or other valid IDs with photograph. The Contractor shall keep this information
related to the subcontractor for the duration of the Contract and subcontract.
All GSA personnel and Contractors shall be provided CUI building information when needed for
the performance of official Federal, state, and local Government functions, such as for code
compliance reviews and for the issuance of building permits. Public safety entities such as fire
and utility departments shall require access to CUI building information on a need to know
basis. This clause shall not prevent or encumber the dissemination of CUI building information
to public safety entities.
1.6.2.4.2.1 By Mail
Contractors shall use only methods of shipping that provide services for monitoring receipt such
as track and confirm, proof of delivery, signature confirmation, or return receipt.
1.6.2.4.2.2 In Person
Contractors shall provide CUI building information only to authorized recipients with a need to
know such information.
25
1.6.2.6 Safeguarding CUI Documents
CUI building information (both electronic and paper formats) shall be protected. GSA
Contractors and subcontractors shall not take CUI building information outside of GSA or their
own facilities or network, except as necessary for the performance of that contract. Access to
the information shall be limited to those with a legitimate business need to know.
1.6.2.9 Incidents
All improper disclosures of CUI building information must be reported immediately to the CO. If
the Contract provides for progress payments, the CO shall withhold approval of progress
payments until the Contractor provides a corrective action plan explaining how the Contractor
shall prevent future improper disclosures of CUI building information. Progress payments shall
also be withheld for failure to comply with any provision in this clause until the Contractor
provides a corrective action plan explaining how the Contractor shall rectify any noncompliance
and comply with the clause in the future.
1.6.2.10 Subcontracts
The Contractor and subcontractors shall insert the substance of these subsections 1.6.2,
Safeguarding and Dissemination of Controlled Unclassified Information Building Information
through 1.6.2.9, Incidents, in all subcontracts.
26
1.7.2 Core Coverage Hours
The Contractor shall maintain a staff presence during the core coverage hours.[[[Spec. writer
specify hours before and after, recommend core coverage hours is one hour prior to and
one hour after normal working hours.]]] The Contractor shall ensure employees maintain
communications access with the CO or designee to allow contact by the Government at all
times during core coverage hours and to communicate effectively with CORs/Facility Managers
and Facility Manager Supervisors.
The following areas of the building regularly operate during hours outside of Normal Working
Hours; supporting equipment shall be operated and maintained by the Contractor so as to
support these extended operating hours.
27
operational methodology for tracking, trending and improving facility efficiencies. They shall
ensure, through use of operational logs, preventive maintenance, systems test and balance,
and other necessary means, an effective controls sequence of operations best meeting the
facility's current and future energy and utility goals. The Contractor must submit the
Performance Plan to the CO or designee for approval. This Performance Plan shall be part of
the Energy and Water Efficiency Monthly Report. Continually and systematically performing
these activities forms the backbone of a robust O&M contract and shall be a primary factor for
assessing the performance of the Contractor.
1.9.2 Operations
The Contractor shall use the NCMMS uploader templates to review and bulk update data in the
NCMMS. The NCMMS produces the uploader templates as Excel spreadsheets, pre-loaded
with data. The Contractor shall use the existing inventory and asset location list in the NCMMS.
Any bulk data changes or additions shall be submitted to the COR, using the NCMMS
generated/approved templates, linked to valid locations, assets/equipment in the NCMMS. The
Contractor shall perform data updates through the NCMMS user interface, instead of bulk
uploads.
CO or designee shall enforce inventory accuracy by reviewing the NCMMS equipment and
location data against equipment for which preventive maintenance was recently performed.
All personnel requiring access to GSA’s NCMMS shall obtain a Government access account
ENT credential and maintain an up to date system profile. At a minimum this shall entail logging
into the GSA system at least once every 30 business days to maintain an active profile, and
completing the mandatory annual GSA IT Security Training courses through GSA Online
University, find link at the web site in document titled “Web Links” at: Operations and
28
Maintenance Specification. For routine updates and notices the Contractors shall use the
gsa.gov email address as the sole communications venue and this email must be kept active.
The Contractor shall use the NCMMS mobile work management practices, including GSA
NCMMS mobile applications, to create, update and complete Work Orders; and record
start/finish/ complete times for Work Orders in real-time.
1.9.3 Reporting
Contractor shall deliver upon request of the COR or CO, reports produced from the NCMMS
and use the NCMMS to provide current Contract monthly submittal requirements, such as
monthly reporting quality control reports; completion of scheduled Work Orders, and Contract
reports of accomplishment of services for the CO or designee when requested.
29
1.14 Contractor Maintenance Performance Plans
This Contract requires in sections 5 and 6 that the Contractor provides specific plans to ensure
efficient and effective operation of equipment and systems. Plans that are required by this
Contract must be submitted per the specified schedule (see Exhibit 3) and shall be evaluated for
completeness. Government approval is required before they are accepted and implemented.
The Government reserves the right to require changes to the Contractor performance plans. All
plans shall take into consideration the following:
30
SECTION 2 DEFINITIONS
2.0 General
This section is a list of definitions to certain terms used in this PBWS.
2.2 Acceptance
“Acceptance” means an authorized representative of the Government has inspected and agreed
that the work meets all requirements of this Contract, including all documentation requirements.
31
2.8 Basic Services
Basic Services of the Contract consist of the recurring contract requirements for which the
Contractor is paid as a base price, i.e., the requirements established by the Contract, this
PBWS and related general and administrative requirements that do not contain provisions for
separate reimbursement. Indefinite Quantity services (Additional Services and Reimbursable
Repairs) are requirements outside of Basic Services for which payment is made on a case-by-
case basis.
32
2.14 Contracting Officer's Representative (COR)
Contracting Officer's Representatives (COR) shall be appointed by letter from the CO. CORs or
designees shall be the primary Government representatives for the administration of Contract,
shall have proper training and experience in inspecting contracts, but shall not have the
authority to modify the Contract.
2.15 Contractor
“Contractor” as used in this PBWS refers to the company or firm awarded this Contract.
33
2.21 Exterior
The exterior is the area from the building or facility extending to the legal property line.
This includes but not limited to entrances, landings, steps, sidewalks, parking areas, arcades,
courts, planters, lawns, irrigation systems, fountains, playground, security bollards, guard
booths, gates, fences, flagpoles, building-mounted poles, and ground lighting located adjacent
to the facility.
2.23 GSAlink
GSAlink is a strategic software analysis platform to leverage automated building analytics
technology to capture real-time building systems point data, apply rules-based analytics
software to the data and spot trends and deficiencies while reporting actionable events via the
NCMMS as a Work Order to building operators, O&M Contractors, and GSA Service Center
Facility Managers.
34
directed. Miscellaneous work shall be accomplished in the same time frame as routine service
calls, unless otherwise directed by the CO or designee.
35
2.34 Operations
“Operations” is the continual process of using building equipment systems to accomplish their
function, optimize building performance and improve energy efficiency. Operations includes
analysis of requirements and systems capabilities, operating controls and control systems,
responding to Work Orders, touring and observing equipment performance and condition,
adjusting equipment, identifying needed maintenance and repairs to equipment, and
maintaining lubrication and chemical treatments.
2.36 Partnering
Partnering is a formal management process in which all parties to an endeavor agree at the
outset to provide an effective problem-finding/problem-solving management team, composed of
personnel from both parties, thus creating a single culture with one set of goals and objectives.
Partnering also requires the recognition that risks and accountability shall be shared by both
parties and that maintaining a healthy partnership is everyone's responsibility. The outcome of
this initiative is for GSA to leverage Contractor technical, managerial and decision making
expertise to assist GSA in accomplishing the Contracts performance goals and objectives.
36
2.41 Quality Control Plan
The Quality Control Plan (QC plan) is the Contractor’s complete written system for identifying
and correcting deficiencies in the quality of services to prevent the level of performance in
operations from becoming unacceptable or negligent.
2.43 Repair
A “repair” is an act of restoring inoperable, dysfunctional or deteriorated equipment, systems or
material to a fully functional, non-deteriorated state. Repairs involve some combination of labor
and repair or replacement of the equipment, parts, components or materials.
2.45 Tour
A tour is generally a scheduled inspection of equipment rooms and installations including
computer rooms and, restrooms by Contractor operating personnel for the purpose of ensuring
that equipment is running properly, ensuring that equipment rooms are in good order and
without safety hazards, and making any necessary adjustments to operating controls or to
lubricate equipment. A tour inspection can be a combination of physical visits and automated
systems for the monitoring of equipment and systems. Operating logs and tour sheets are a
part of the tour program plan.
2.47 Watch
A watch involves performing certain requirements required for the operation of the HVAC
equipment (central systems over 300 tons), boilers, compressors, and related equipment in a
centralized location. Watches include, starting equipment, checking at designated intervals all
operating equipment in the area, recording readings, shifting equipment and loads, making
adjustments at the central control center, taking water samples, making tests, and adding
chemicals, as required.
37
2.48 Work Order
A Work Order (Work Request/Work Order) is a documented response entered into the NCMMS
to a request by GSA, the tenant or a Contractor’s observation that some equipment, system or
material covered by the Contract is inoperable, dysfunctional, deteriorated, or not within normal
operating parameters, or that the performance standard of the Contract is not being met. Work
Order response involves analysis of the problem and adjustment of operating or monitoring
controls or other immediate corrective action. Work Orders may be generated automatically
from interfaces to BAS, central communications service or diagnostic software.
38
SECTION 3 GOVERNMENT-FURNISHED PROPERTY
[[[Note to Spec Writer: Regions shall add items as appropriate. Delete items not
applicable to your facilities, as appropriate; e.g. phone lines, fax machines, computers,
copiers, software.]]]
3.0 General
The Contractor or the Contractor’s employees shall not use Government property in any manner
for any personal advantage, business gain, or other personal endeavor. The Contractor will
take appropriate precautions to safeguard and protect from damage, theft or misuse
government furnished equipment. Government furnished property lost, stolen or damaged due
to Contractor neglect shall be replaced at the expense of the Contractor.
39
3.5 Network Equipment and Computer Hardware
[[[Spec. Writer shall need to determine GSA responsibility in this subsection and
revise.]]]
Government-furnished network equipment and computer hardware shall be used in all cases for
PBS IT systems. Network equipment- includes any equipment that has IT routing and switching
functionality.
● Computer hardware includes PCs, laptops, and their peripherals (monitors,
microphones and keyboards).
● Proprietary system hardware/software can be Contractor provided, but is subject to
network and system testing, review and approval for connection to GSA’s network
and acceptance of the GSA IT.
Government-Furnished Equipment – GSA IT shall provide one laptop to newly integrated (to the
GSA network) BAS sites for the purpose of giving all users access to the building monitoring
and control systems. Please note availability of hardware is dependent on the availability of
budgeted funds dedicated for this purpose, which may or may not be renewed on an annual
basis. Existing GSA workstation refreshes shall still be coordinated through the regional Office
of the Chief Information Officer’s office. No hardware (workstations, servers, switches) shall be
provided unless an approved network diagram is submitted.
[[[Note to Spec Writer: If the Government provides a desktop or laptop for the purposes
of NCMMS please include this additional computer in this subsection.]]]
40
SECTION 4 CONTRACTOR- FURNISHED PROPERTY
SUPPLIES/MATERIAL/EQUIPMENT
4.0 General
The Contractor shall provide all labor, services, supplies, material, and equipment necessary to
perform efficiently and effectively the requirements of this Contract, except as explicitly stated
within this PBWS. At the expiration or termination of this Contract, all equipment furnished and
installed by the Contractor in the building shall remain and become the property of the
Government. All electronic data used to operate, track and maintain the facility remains the
property of the Government and must be turned over to the Government in an electronic media
identified by the Government. All non-electronic media used to operate, track and maintain the
facility remains the property of the Government and must be turned over to the Government in
good condition upon request or upon the completion of the Contract.
[[[Note to Spec Writer: If the Government provides a computer for NCMMS please delete
4.1.]]]
41
SECTION 5 OPERATIONS-SPECIFIC REQUIREMENTS
5.0 General
The Contractor shall provide building operations services for all systems covered by this
Contract, maintain uninterrupted utilities services, and environmental conditioning to tenants
during Normal Working Hours, and at other times as described in this PBWS, to preserve the
asset value of the facility and its systems, and minimize operating costs to the Government
without compromising other Contract objectives or requirements.
In newly constructed buildings without a BOP, the Contractor shall develop a BOP that includes
all O&M equipment and systems. The purpose of the BOP is to document the standard O&M
procedures for the building. An additional objective of this plan is that if key personnel are not
42
available then authorized and qualified staff shall be able to refer to the BOP and manage and
operate the building. The BOP contains critical information such as: who to contact, emergency
procedures, demand response, hours of operation, locations of emergency shut off valves,
confined entry space inventory, hazardous chemicals, the location of OEP, Continuity of
Operations Plan (COOP), drawings, and equipment Inventory. The Contractor shall execute the
Contract requirements in accordance with the approved BOP. The BOP must be submitted as
an electronic file (MS Word or Google.doc) with regular updates that reflect current personnel,
subcontractors, equipment, systems, and operating procedures, and entered in the NCMMS.
The Contractor shall revise as needed and annually review and update the BOP and submit to
the CO or designee an electronic file (MS Word, Google.doc) of the complete updated BOP on
the anniversary of the Contract start date of each Contract year. If the Contractor fails to submit
a satisfactory BOP the Government shall withhold payments until a satisfactory plan is
submitted.
The components of the BOP are compilation of requirements stated throughout the O&M
PBWS. Most of the information and documents shall be provided by the CO or designee to
complete this plan, such as OEP and COOP and drawings. At a minimum, the Contractor is
responsible for providing the following information within the BOP:
a. Contact information of local Contractor staff and corporate managerial staff.
b. Description of staffing, responsibilities and work schedules.
c. Identify personnel with QCP functions and the personnel with authority to commit funds,
and the dollar level of that authority for this Contract.
d. Standard operating procedures for operating building systems, including at a minimum:
1. Startup and shutdown times and procedures relative to various environmental
conditions.
2. Facility hours of operation – Normal and Core hours.
3. Procedures to accommodate tenant OTU requests. Provide listings of
mechanical equipment, hours of operation and separate procedures for heating
and cooling.
4. Energy Conservation – Performance Plan, Management and Control Systems,
peak load demand management procedures, and Advance Meter System (AMS)
data for conservation strategies (if applicable).
5. Other operating strategies to maximize efficiency and minimize energy
consumption.
6. Descriptions of major mechanical equipment, modes and sequences of
operations for equipment systems such as schedules, settings, startups, shut-
down and control sequences.
7. Locations of all major utility shut off, including gas, electric, water and steam (if
applicable).
43
8. Locations of all electric rooms and a narrative of the areas served by each
including emergency generators, substations and transformers, and equipment
that is on the emergency generator.
e. Architectural and Structural systems maintenance (e.g., facade, roof, gutters, drains, and
windows).
f. Building tour plan and watch locations, recording presence and documentation
procedures.
g. Maintenance schedules and procedures, and a reference to which preventive or
predictive maintenance standards or guides the Contractor shall use. For all fire
protection and life safety systems PBS preventive maintenance guides shall not be used.
The Contractor shall use the applicable NFPA code or standard (latest edition) to perform
the inspection, testing and maintenance (ITM) of all fire protection and life safety
systems. The Contractor shall perform all ITM in accordance with the frequency
schedules and test methods in the applicable NFPA code or standard. All ITM performed
must be recorded on the suggested ITM forms referenced in the applicable NFPA code or
standard.
h. List of test equipment to be maintained onsite to support troubleshooting and sensor
calibrations.
i. Vertical Transportation maintenance plan, if applicable, including escalators, elevators,
and dumbwaiters.
j. A description of how building equipment data is maintained and updated. Work Order
and repair procedures, including staffing and procedures for the Work Orders, during
operating hours, after hours and emergencies.
k. A description of key control procedures.
l. Safety, Security, Disaster Emergency Response, Recovery and Reporting Procedures.
Reference the location or incorporate contingency plans for:
1. Loss of the Contractor’s onsite personnel (i.e., strike, walkout, injury, abrupt
resignation). At a minimum, the Strike Contingency Plan (SCP) shall include
the following information:
a. Support Personnel: The SCP shall describe in detail how the
Contractor shall staff the building to provide the services defined in
this PBWS in the event of strikes by its employees. This includes
HSPD-12 requirements.
b. License and Certifications: The SCP shall describe in detail how the
Contractor shall provide personnel that meet experience
requirements, assuring the Government that all temporary or
replacement employees (including subcontractor employees) shall
meet the experience and license requirements defined in this PBWS.
2. Civil disturbance or major security threat.
3. Natural disasters, bombing, or other events that damage the building’s
structure or utilities.
4. Floods, including flooding caused by plumbing breaks.
5. Hazardous materials including asbestos, lead paint, leaks or spills and water
management.
44
6. Inoperability and impairment of fire protection and life safety systems
(including fire watch and impairment procedures (e.g., red tags).
7. Location of fire alarm control unit/fire control room/instructions to operate
Public Address system in emergency, if applicable.
8. Location of incoming municipal fire protection water supply.
9. Location of fire sprinkler riser rooms and isolation valves.
10. Location of fire pump.
11. Location of sump and sewage ejector pumps and emergency procedures.
12. Pressure booster and reducing stations, and backflow preventers.
13. Above and Underground Storage Tanks.
14. Confined Space Locations.
15. Portable Fire Extinguisher Locations.
16. Radon mitigation program, if applicable.
17. Description of safety procedures.
m. Contractor contingency plans to operate the building in support of the Government’s
COOP, OEP, loss of connectivity of the BAS, Shelter in Place, and Pandemic Influenza
Preparedness planning for the site.
n. Description of environmental regulatory requirements, such as Air Quality Management
District and include rules that apply to equipment in the building, which permits are
necessary, inspection and certification requirements, and other essential information.
Identify how the administrative and technical requirements shall be managed for the
timely accomplishment of all Contract requirements.
o. Contractor plan to support demand response or utility curtailment programs in which the
building participates, including communications protocols and curtailment activities. The
Contractor shall provide in its contract an estimate as a separate line item for performing
curtailment activities.
p. The Contractor shall develop and implement a written emergency plan that describes
procedures for its employees to follow during power failures, equipment failures, or other
emergencies within 30 calendar days of Contract start date. The Contractor shall also
review with its employees those parts of the plan necessary to protect workers in
emergencies.
5.3.1 General:
The Contractor shall maintain and update as required the building equipment inventory,
equipment labeling and maintenance records to ensure accurate data in the NCMMS for
building operations. Changes in the inventory can result in a negotiated price adjustment to the
Contract, which must be approved, in writing, by the CO. Omissions in the existing inventory do
not relieve the Contractor from the responsibility for the maintenance and repair of the
equipment. The Contractor may request an equitable adjustment pertaining only to physical
changes in building equipment which occur after the contract start date. This request shall be
45
submitted to the CO or designee for consideration. If the contractor maintained inventory data
does not meet Contract requirements (up-to-date, required equipment information) the CO will
take action to withhold payments.
5.3.2 Operations
The Contractor shall:
a. Collect and maintain an inventory of: (1) all equipment of types that require maintenance
or certifications pursuant to the PBS Maintenance Standards or applicable NFPA code or
standards (latest edition), (2) equipment that is operated through a sequence of
operations, (3) electronic controllers and network devices, (4) sensors, and (5) tenant
agency-owned equipment operated or maintained.
b. Collect and maintain the following equipment/system data including all applicable fire
protection and life safety equipment/system data: Equipment ID, Equipment Type,
Equipment Description, Asset Identification Code, all Nameplate data, Manufacturer,
Model Number, Serial Number, Equipment Status, Building Number, Location (including
floor, room, and location description) and install/initialization dates (as can be obtained
from nameplate or manufacturer data available). For fire alarm systems, the Contractor
shall also provide the current version of fire alarm software and the version of software
for any systems with which the fire alarm software interfaces. A digital photo of the
manufacturer’s nameplate shall be entered into NCMMS if no current photo is recorded
and stored in NCMMS.
c. Maintain or implement same asset identification system for new and replacement
equipment compliant with NCMMS-readable national asset identification coding. Some
asset identification systems include bar-coding, Radio Frequency identification or other
equipment tagging.
d. Update equipment data when equipment is added, removed or retrofitted as part of a
project, or discovered by GSA or the Contractor and log changes in accordance with
provided NCMMS training.
e. Review and update equipment records, including asset information, maintenance records
and preventive maintenance records, anytime maintenance is performed on a piece of
equipment.
f. Use the workflow processes within NCMMS or alternate means approved by the CO or
designee, to submit changes to the equipment inventory and preventive maintenance
schedule within five business days of collecting and gathering equipment information and
updating in NCMMS. All changes to equipment inventory and preventive maintenance
schedule must be approved by the CO or designee.
g. For assets covered by an ESPC contract, check the “ESPC” box on NCMMS Asset page;
collect and maintain ESPC contract information. [[[Note to Spec Writer: Remove if not
applicable.]]]
5.3.3 Reporting
The Contractor shall:
a. Provide all data to GSA in the NCMMS with certification that the inventory is complete
and accurate.
46
b. Annually certify that the Maintained Equipment Inventory is up-to-date and submit the
certified inventory to the CO or designee.
c. Contractor shall annually submit to the CO or designee an itemized equipment condition
assessment with its recommendation for equipment or system upgrades or replacements
(that has reached end of their life cycle), including a text description of each
recommended upgrade or replacement and its life-cycle cost analysis including estimated
project cost. The equipment condition assessment reports shall be produced in NCMMS
and submitted electronically as an email attachment to the CO or designee.
The Contractor shall immediately correct or mitigate any recognized safety or environmental
hazard. The Contractor shall notify the COR, other designated Government representative, or
appropriate authority if applicable. The Contractor shall be responsible for any fines or penalties
levied by any environmental or regulatory authority resulting from its action or inaction, (but not
actions or inactions of a third party or the Government).
5.4.2.1 Reporting
The site-specific safety and health program shall be submitted to the COR or designee for
review and approval within 30 calendar days of Contract start date. By approving the program,
GSA assumes no responsibility for the Contractor’s occupational safety and health program.
47
5.4.3.1 Reporting
All required safety tests, certifications, permits, plans, and other procedures required in this
PBWS shall be scheduled in the NCMMS Work Order system and documented in the NCMMS.
5.4.8.1 Hazards
The Contractor is responsible for ensuring safe working conditions and identifying hazards that
exist in the work environment. When the Contractor identifies any hazardous work condition,
regardless of cause, the Contractor he is responsible for protecting its employees from that
hazard and correcting hazards under its control. Hazards not under the control of the
Contractor, as well as all hazards that present an imminent danger, must be reported
immediately to the CO.
5.4.8.2 Accidents
The Contractor shall immediately notify and provide copies of all accident reports to OSHA and
to the CO or designee.
48
5.4.9 Disruptive or Hazardous Equipment
5.4.9.1 Tools
The CO or designee shall approve in advance the use of impact tools and power-actuated tools
during Normal working Hours. Burning or welding equipment shall be used only with written
permission from the facility management office or CO or designee. A Welding and Burning
Permit (GSA Form 1755 or equivalent) shall be issued in advance for each day welding or
burning is performed. Compress gas cylinders must be stored in accordance with 29
C.F.R.1910.101 and welding in a confined space requires specific confined space permitting
requirements.
5.4.10 Scheduled Disruption to Utilities, Lighting, Fire Protection & Life Safety Systems,
or Space Conditioning
Any work that will disrupt utilities, fire protection and life safety systems, lighting or space
conditioning for building tenants must be scheduled and approved in advance by the CO or
designee and generally must to be performed outside of Normal Working Hours.
49
5.4.12 Labeling and signage
The Contractor shall maintain the labeling of existing equipment, pipes, storage areas,
containers, confined space, and workspaces as well as associated signage, in accordance with
OSHA standards to ensure labels are visible and easily readable. Any equipment, pipes, and
other materials, newly installed by the Contractor that require labeling and signage per OSHA
standards shall be labeled immediately upon completion of the installation and maintained
throughout the Contract period.
The labeling of the electrical circuits and panels shall be maintained up-to-date either
in electronic format or hard copy blueprints when the Contractor adds or modifies electrical
circuits. This requires the Contractor to implement and document an overall electrical safety
program that meets the requirements outlined in NFPA 70E, Article 100 - General Requirements
for an Electrical Safety Related Work Practice. The CO or designee shall ensure all recorded
changes in electric panels from upgrades or renovations from the third party electrical work
subcontractors are transmitted to the Contractor to maintain the accuracy of labeling. In the
event the Contractor identifies a circuit through discovery, the Contractor must label the circuit in
accordance with NFPA 70B.
50
with all applicable Federal, state, and local laws and regulations related to building management
(e.g., permitting, inspection, testing and personnel safety, control of hazardous substances, and
certification) including those related to materials and associated systems used or removed in
the performance of this Contract. The Contractor shall be responsible for any fines or penalties
levied by any environmental or regulatory authority resulting from its action or inaction, (but not
resulting from the actions or inactions of a third-party or the Federal Government). The
Contractor’s maintenance, operations, materials and processes must use green products and
processes including products containing recycled content, environmentally sustainable products
and services, bio-based products, and products and services that minimize the use of energy,
water, and other resources. All required safety and environmental tests, certifications, permits,
and other procedures required in this PBWS shall be scheduled in the NCMMS Work Order
system.
5.5.2 Refrigerants
5.5.2.1 Operations
The Contractor shall comply with EPA section 608 regulations (40 C.F.R. part 82 under section
608 of the Clean Air Act) and associated state laws and regulations for refrigeration and air
conditioning equipment. All HVAC mechanics performing repairs on refrigerated equipment
shall possess a Universal Chlorofluorocarbon (CFC) Certification.
5.5.2.3 Testing/Inspections
The Contractor must maintain and test emergency devices and systems, such as refrigerant
monitors, automatic leak detection systems, alarms and purge ventilation systems as part of the
maintenance program. The Contractor must use appropriate media to test sensors as well as
alarm circuitry. The Contractor shall calculate and document the leak rate every time refrigerant
is added to equipment (unless the addition qualifies as a seasonal variance).
5.5.2.4 Reporting
The Contractor must immediately report refrigerant leaks, at or above a 10% leak rate, to the
CO or designee and take corrective action to repair leaks prior to the EPA 30-day deadline in
compliance with section 608 of the Clean Air Act. Repair of leaks shall be documented by both
an initial verification test and a follow-up verification test.
51
5.5.3 Local Air Quality Management Operating Permits
The Contractor shall comply with the operating permit requirements of the Local Air Quality
Management District (AQMD), and shall ensure operating permits for boilers; generators and
other emissions-producing equipment regulated by the local AQMD are up-to-date and have
copies available to the CO or designee via NCMMS immediately upon request. In the event of
fines or penalties levied by an AQMD, the Contractor shall be charged the cost as a
performance deduction under the Adjusting Payments clause. The Contractor shall submit
emissions reports when required by the regulating entity.
The Contractor shall comply with GSA Order 1095.2 PBS. “Fuel Storage Tank Management”
and all applicable Federal, state, and local regulatory requirements for the periodic inspection,
monitoring, permitting, certification, registration, maintenance, personnel training, and
recordkeeping for underground and aboveground storage tanks. Where GSA policy and
regulatory requirements differ regarding fuel storage tank management, the
more stringent directive shall apply.
The Contractor shall provide solid waste and recycling disposal services as needed and in
accordance with the Resource Conservation and Recovery Act (RCRA) Subtitle C Hazardous
Waste and Subtitle D Non-Hazardous Waste, associated EPA regulations (including 40 CFR
Part 246), state and local recycling mandates, Executive Order 13834, and applicable GSA/PBS
guidance provided by the COR. The Contractor shall aim to meet a minimum fifty percent (by
weight) waste diversion target, to support achievement of GSA sustainability targets. The
Contractor shall manage (handle, transport, collect, and dispose) non-hazardous construction
and demolition (C&D) waste separately from municipal solid waste (trash). Recycling,
composting (where feasible), and other alternatives to landfills and incineration are the preferred
methods for disposal of all solid waste (C&D and trash).
52
5.5.7 Polychlorinated Biphenyl (PCB) Control
[[[Note to Spec Writer: If there are no PCBs, delete this subsection]]]
The Contractor shall inspect all transformers containing polychlorinated biphenyls (PCBs) and
maintain records of such inspections in accordance with state, local, and EPA regulations. The
CO or designee shall be notified immediately if any such equipment is found to contain PCBs, or
suspected to contain PCBs. Equipment verified to contain PCBs, except lighting ballasts, shall
be labeled as containing PCBs. Any transformer leaks of PCBs shall be reported immediately
to the CO or designee. The Contractor shall inspect all leaks in accordance with state, local,
and EPA regulations. The Contractor shall properly dispose of caulk that contains PCBs. The
Contractor shall take immediate action to contain all leaks.
The Contractor shall be expected to perform, on occasion, Class III and Class IV asbestos work
as defined in 29 C.F.R. 1926.1101. The Contractor shall be prepared to deal with asbestos on
a small-scale, short-duration basis to effect emergency repairs and to clean up small spills. The
Contractor shall protect building tenants, visitors, and employees from asbestos exposure. The
Contractor shall comply with applicable OSHA regulations and all applicable Federal, state, and
local asbestos regulations. The Contractor shall immediately become familiar with, comply with,
and recommend any appropriate changes to the Government Asbestos Management Plan for
the building. If the Contractor disturbs materials its suspects may contain asbestos, the
Contractor must immediately report the condition to the CO or designee. Contractor personnel
who perform the above-mentioned work must have the appropriate training in accordance with
40 C.F.R. part 763, and the Contractor shall provide training records to demonstrate
compliance, including respirator suitability medical and fit test reports with Personal
Identification Information removed.
The Contractor shall ensure that on-site hazardous waste management is compliant with all
regulatory accumulation requirements (e.g., hold times, marking/labeling and container
management). All Hazardous and Universal Waste shipping documentation shall be maintained
for the life of the building. Universal Wastes (i.e., fluorescent lamps, batteries, certain
pesticides, and mercury-containing equipment) in quantities subject to Federal and State
Universal Waste Rules (40 C.F.R. part 273) shall be recycled or disposed of as Hazardous
Waste. Preference is given to recycling of intact items. Hazardous Wastes not subject to the
Universal Wastes Rule shall be managed in accordance with all applicable parts of 40 C.F.R.
part 260. As co-generators, the Contractor and Government mutually agree that the Contractor
shall perform generator duties on behalf of both parties. Generator requirements include to
53
hazardous waste generation, handling, accumulation, shipment and disposal, and also include
exception reporting as required. The Contractor must include the disposition of Hazardous and
Universal Waste as a Work Order in NCMMS with documentation attached.
5.5.12 Reporting
The Contractor shall provide all necessary information required in this subsection to comply with
environmental and reporting requirements, and agency sustainability goals in this specification.
The Contractor shall submit to the CO or designee the following reports.
[[[Note to Spec Writer: Remove (a) if this requirement is accomplished under another
PBWS.]]]
(a) Waste Reports. The Contractor shall submit a monthly report on waste handling
activities including disposal and recycling. The report shall contain shipping
information for hazardous and non-hazardous waste and be submitted by the 15th of
each month and upon request by the CO or designee. The report must include the
waste type, name and final disposition destination. All Hazardous and Universal
Waste shipping documentation shall be maintained for the life of the building. If the
Contractor performs non-hazardous solid waste management for the entire building,
they shall also report on these solid waste and recycling activities.
54
(b) Environmental Compliance. The Contractor shall collect and retain requisite data to
produce and make mandatory reports required by environmental regulatory agencies
including GSA programs, directives and orders, or as necessary to demonstrate
ongoing compliance with environmental regulatory operational requirements. These
reports include to waste generation, shipment and disposal, hazardous materials
storage (Tier II/Emergency Planning and Community Right-to-Know Act reporting),
release reporting, fuel tank registration, operator training records, and notices of
compliance for reciprocating internal combustion engines.
(c) Sustainable Purchasing Practices. The Contractor shall submit information on
sustainable purchasing practices specific to the performance of this Contract.
Records showing the monthly cost of sustainable cleaning products and materials
purchased must be provided to the United States Department of Agriculture and
copies to the CO or designee as required by RCRA. The Contractor shall select from
products that are EPA-designated (e.g. Comprehensive Procurement Guidelines
[CPG]) and USDA-designated in the Bio Preferred Program refer to the web site in
document titled “Web Links” at: Operations and Maintenance Specification, and all
other factors (such as price, performance, and availability) being equal, the Contractor
shall select the CPG item. For other purchases, unless the Contractor receives an
exemption from the CO or designee, the Contractor shall select USDA designated in
the Bio Preferred Program, products over products with other sustainable attributes.
Guidance for products designated under Federal sustainable product programs –
USDA Bio Preferred, EPA CPG, EPA Design for the Environment, and Department of
Energy, Energy Star and FEMP - can be found at the website in document titled Web
Links” at: Operations and Maintenance Specification. Sustainable products
designated under third-party programs include but not limited to Green Seal, Eco
Logo, and Environmental Choice. For those categories of products not recognized
by one of the aforementioned standard’s, preference shall be given to products
meeting the California Code of Regulations maximum allowable Volatile Organic
Compounds (VOC) levels for the appropriate cleaning product category (California Air
Resource Board/California Code of Regulations (CCR), 17, C.C.R. section 94509 –
(Topic cited; Standards for consumer products at the website in “Web Links” at:
Operations and Maintenance Specification.
5.6.2 Operations
The Contractor shall make full use of available analytic tools (e.g., BAS, AMS, GSAlink data,
PNNL E4 reports and GSA Rapid Assessment results, as applicable) to diagnose problems and
identify operational improvements. When equipment is being replaced, the Contractor, in
coordination with the CO or designee, shall pursue the use of energy-efficient replacement parts
and equipment items (not limited to Energy Star ® or FEMP-designated Energy Efficient
55
products, WaterSense, Safer Choice products) that shall meet or exceed the requirements of
this statement of work. Any rebates received from a service utility provider or Contractor shall
be assigned to the Government.
5.6.3 Reporting
On a monthly basis the Contractor shall read and record all available utility and fuel meters
(electric, gas, diesel fuel levels, water, cooling tower water make up, irrigation, etc.) and include
in the monthly progress report. The Contractor shall use the Energy and Water Efficiency
Monthly Report format (see Exhibit 2). The Contractor shall report monthly energy and water
usage as compared to the previous year and to explain usage trends. The report shall be
submitted to the CO or designee by the 5th business day of the subsequent month.
5.7.1 General
The purpose of the AMS is to monitor, identify and implement opportunities to reduce energy
usage at the building(s) and, in some cases, to verify that the utility companies are billing
correctly. In many cases, the AMS shall be connected to the BAS. It shall be the Contractor’s
responsibility to partner with GSA to utilize fully the AMS to develop and implement strategies
that will result in an overall reduction in energy consumption.
5.7.2 Operations
The Contractor shall verify daily that each of the advanced meter(s) are functioning properly and
are communicating to the regional and Central Office server, as applicable, and are accessible
via end-user interface (currently ION Enterprise Energy Management). Where advanced
meters are connected through the BAS, the Contractor shall verify daily proper information and
data sharing.
5.7.3 Maintenance
[[[Note to Spec Writer: Tailor the below language to your individual regional protocols on
communication repairs.]]]]]]
The Contractor is responsible for correcting immediately any onsite communication failure to
mitigate any loss of data. The Contractor shall create a Work Order in NCMMS to track
communication failure resolution. In the event of an onsite communications failure or data loss,
the Contractor shall refer to both the manufacturers and GSA’s troubleshooting guides. If this
does not resolve the issue, and advanced troubleshooting is necessary, the Contractor shall
take the next step within 72 hours of occurrence. For advanced troubleshooting, the Contractor
shall contact GSA's OFM Energy Division's Advanced Metering Support, guidance can be found
at the web site in document titled “Web Links” at: Operations and Maintenance
Specification and inform the COR. The advanced metering support team shall coordinate with
GSA IT support or vendors as necessary to assist the Contractor with getting the meter(s) back
online. The regional advanced metering lead shall be the Contractor’s main point of contact for
56
advanced metering issues. The Contractor shall add or update Advanced Meter Asset and
Location information in NCMMS. The Contractor shall be responsible for the re-commissioning,
which includes the calibration of the advanced meters in accordance with the manufacturer’s
recommended frequency or sooner, if there is evidence that the meters are not reading
correctly. If advanced meters cannot be calibrated by design, the Contractor shall notify the
COR when the meter is not performing as designed. Meter recommissioning documentation
shall be submitted as a Work Order via the NCMMS. Where weather sensing equipment is
installed as part of the AMS, the Contractor shall ensure proper daily communication.
5.7.4 Reporting
[[[Note to Spec Writer: Tailor the below language to your individual regional protocols.]]]
Contractor will be responsible for comparing monthly consumption collected by the AMS to the
actual utility bill consumption as a part of its ongoing monitoring efforts. Variances of more than
10% shall be reported to the GSA Energy Division, the COR and the Regional Advanced
Metering Lead who will assist with resolving the discrepancy. As a part of the re-commissioning
of meters previously offline, the Contractor shall confirm that all changes have been
documented and update on network diagrams, including any changes in Internet Protocol (IP)
addresses. The Contractor shall be responsible for recording recalibration of advanced
metering equipment in the Monthly Report and recorded in the NCMMS.
5.8.2 Operations
Equipment shall be operated according to the established sequence of operation for the BAS.
The Contractor is responsible for notifying the CO or designee if a sequence of operations,
equipment or schedule is not operating as designed or at the highest efficiency and resulting in
unnecessary energy use. The Contractor is responsible for retaining an adequate level of
expertise to manage the control systems. If the Contractor does not have a manufacturer
trained or equivalent BAS operator onsite, the Contractor shall enter into a subcontract,
57
including regular scheduled support (not merely support on a contingency basis), or remote
access (where available and subject to GSA IT governance security clearances and training),
with a firm that has these skills. This subcontract shall include regularly scheduled
maintenance, including sequence of operation tuning, calibration; BAS log review, and other
BAS system maintenance. The Contractor shall monitor the BAS for alarms at all times. A BAS
alarm after Normal Working Hours that impacts the building operations must corrected under
emergency call back Work Order service and recorded in the NCMMS. GSA-IT shall be
entering asset information for IP-enabled BAS controllers that are connected to the GSA
network.
All computers networked with building monitoring and control systems located inside GSA
facilities, or that provide storage of and access to GSA data, including data related to energy
usage, industrial systems controls, physical access controls, and lighting controls, are required
to be hosted exclusively on GSA’s physical network and system infrastructure, unless otherwise
accepted by CO or designee.
The Contractor shall maintain the following minimum standards described below.
58
The Contractor is not responsible for interconnecting cabling of the GSA onsite
network components.
g. Ensure that the Contractor staff receives preliminary favorable and ultimately
completely favorable adjudication of their Tier 1 clearance in accordance with the
HSPD-12 directive to obtain a GSA ENT user credential, which is required for all
system access. All elevated access, requires Tier II clearance.
h. Ensure that at no time a GSA hosted building monitoring and control system
made accessible to the public internet or via any third party network connection.
i. Be aware of building systems running on GSA IP Enterprise Network and be
capable of initiating troubleshooting, if network communications is suspect. This
means being familiar with the procedure for logging GSA IT Help Desk ticket and
following up to ensure ticket is being worked by assigned party.
59
o. Protect against Insufficient User Access Auditing, where device or application does not
have a mechanism to log/track activity by user.
p. Not use the use of end-of-life systems and application/system software that is no longer
supported by the manufacturer.
q. Use the latest, supported and approved operating systems.
r. Ensure that all proposed standard installation, operation, maintenance, updates, and
patching of software do not alter the configuration settings from the approved United
States Government Configuration Baseline.
s. Ensure that the use of commercially-provisioned circuits to manage building systems is
strictly prohibited. All circuits shall be provisioned through GSA IT.
t. Ensure workstation or server running building monitor and control system is not
connected to the public internet (Trusted Internet requirement of the 2100.1 order). The
system shall not be accessible from remotely.
u. Adhere to GSA-IT Security Procedural Guide, CIO-IT Security-16-76, Building
Technologies Technical Reference Guide, NIST IT Security Special Publications.
v. Ensure all IP-enabled devices and applications are approved by GSA-IT Security before
they are installed or connected on the GSA network.
w. Provide a network diagram of all IP-addressable devices that terminate on the GSA
network to the GSA IT program managers. GSA IT shall be included in the design phase
of the network infrastructure. Vendor-provided diagrams must be submitted in digital
display and in an editable format, such as Microsoft Visio.
x. Provide documentation and assist GSA-IT and PBS with performing disaster recovery so
that systems can function on the local area network (LAN) in an event of an outage.
5.8.3 Maintenance
The Contractor shall not upgrade or patch any BAS device independent of a qualified support
from the manufacturer or its representative and then and only after consultation with GSA. The
Contractor shall cooperate with GSA and the BAS contractor to facilitate any upgrades GSA
deems necessary for the functionality or security of the BAS. The Government shall upgrade or
change control system software or reprogram control systems during the performance period of
60
the Contract. The Contractor shall not modify sequences of operation or control programs or
run systems manually without prior approval of the CO or designee in consultation with regional
subject matter expert (SME). Where sequence of operation changes are approved, the
Contractor shall provide accurate edits to the sequence of operation to document the changes
made.
BAS alarms shall be treated as Work Orders and responded to accordingly. Any adjustments to
set points to accommodate tenant comfort shall be approved in advance by the CO or designee.
Repetitive or associated alarms shall be treated in the aggregate and tracked under the Work
Order system established in the NCMMS. Communications for alarms set up for remote
notification shall be tested on a recurring basis.
5.8.4 Testing/Inspecting
[[[Note to Spec Writer: This can be removed if the Region has other methods to do
monitoring and correcting excessive energy use buildings.]]]
The Contractor shall conduct the six-step re-tuning procedure described in the Pacific Northwest
National Laboratory (http://retuningtraining.labworks.org/training/lms/). If Contractor does not
have adequate level of expertise to complete Re-tuning, all requirements shall be included in
BAS maintenance sub-contract. The initial frequency of the re-tuning is semi-annually to
coincide with the heating and cooling seasons. After completing two re-tuning cycles the CO or
designee in consultation with the Contractor shall determine the appropriate frequency of the re-
tuning effort based on the size and complexity of the facility. Re-tuning shall be reported to the
CO or designee and regional SME and documented in the monthly report. The re-tuning report
shall include any Contractor suggestions and corrective actions.
5.8.5 Reporting
[[[Note to Spec Writer: Delete GSAlink requirement, if not applicable.]]]
Deficiencies in the BAS system operations shall be identified by BAS trending, GSAlink or
Contractor's tours. All deficiencies shall be reported to the CO or designee immediately and
documented and included in the monthly report. BAS alarms logs shall be included in the
monthly report to show that they are being addressed. These logs shall include unique
usernames for the operator addressing the alarm.
GSA PBS has several programs in development and at various stages of implementation. One
of these programs includes Smart Building technologies. A key objective of implementing Smart
Technologies in GSA buildings is to capture and make available more real-time performance
data about the individual building systems (e.g., HVAC/BAS, lighting, and Advanced Meters).
This data shall be made available to the Contractor and as GSA analyzes this new trend of
61
monitoring building performance at a detailed level, building support personnel engagement
shall increase in significance over time. The Contractor is advised that tools, processes, data,
and some procedures shall be modified to meet GSA requirements for long-term improved
operational efficiencies. The Contractor shall continue to monitor developments in this area as
more buildings in the GSA portfolio deploy Smart Technologies.
New building technologies, and their convergence with traditional information technology, have
altered the way in which facilities can be monitored, maintained, and operated. Trends in
building systems technology have provided opportunities in the market place to alter the way
facilities managers use real-time data to operate their facilities more efficiently. Building
systems are getting increasingly more dependent on software, IT networks (physical and
wireless), servers, internet access, and cloud-based/hosted solutions. This shift in domain
expertise has outpaced traditional design and construction practices. As a result, building
operations and maintenance staff need to adapt, be more proactive, and leverage the
availability of real-time data to help them perform building systems support more effectively.
This shall involve more thorough planning and redefining some processes, procedures, and job
roles to better operate the facilities that have newer technology-based systems.
GSA is fielding diagnostic and optimization software to detect problems and inefficiencies in
equipment operation. The Contractor shall act on the recommendations of such diagnostic and
optimization software reporting. This shall include using the results of the diagnostic and
optimization software to generate a Work Order, or to respond to a Work Order automatically
generated by the diagnostic program application. The Contractor involved in diagnostic
software programs shall provide status updates of diagnostic results and attend monthly
meetings to report and troubleshoot diagnostic test results.
62
immediately notify the CO or designee of the condition requiring immediate action.
Within 24 hours following the notification of the CO, the Contractor shall provide to the
CO or designee a written report of the hazardous condition and recommended corrective
action.
f. Enter into NCMMS as a Work Order any deficiency identified by the Contractor during a
required inspection; evidence of correcting such deficiency, unless funding is not
available, shall be provided with the subsequent Contractor’s Monthly Progress Report
after correction action is completed.
g. Provide all tools, supplies and equipment necessary to inspect test, and maintain the fire
protection and life safety equipment and systems in accordance with applicable NFPA
codes or standards.
The Contractor shall ensure compliance with NFPA 72, National Fire Alarm and Signaling Code,
in the performance, inspection, testing, acceptance, and preventive maintenance or repair of fire
alarm and notification systems, equipment and components of said systems and all other
ancillary devices that operate related equipment. The Contractor shall maintain Remote
Supervising Station monitoring service equipment, all fire alarm transmitters and related
equipment.
[[[Note to Spec Writer. Were FPS or a third-party contractor is not monitoring the fire
alarm system, please insert this language: The Contractor shall provide and maintain
Remote Supervising Station equipment and monitoring services evaluated by
Underwriters Laboratories (UL) to UL Standard 827, Central Station Alarm Services
(UUFX Category Code) to monitor all fire alarm transmitters and related equipment.]]]
Fire alarm system or emergency communications system inspection, testing, maintenance, and
repair shall be performed during normal working hours when it does not interfere with building or
tenant operations. Testing that activates notification devices, initiates elevator recall or
activates HVAC shutdown shall always be tested after hours. When such inspection, testing,
maintenance, or repair is expected to interfere with building or tenant operations, it shall be
performed after normal working hours without additional costs to the Government. The
Contractor shall schedule with the GSA Facility Manager and the CO or designee all testing and
non-emergency shutdowns of such systems and assure that back-up protection is provided by
the Contractor (i.e., arrangement of additional personnel stationed in the areas affected and at
the fire alarm system control unit or emergency communications control unit) any time such
system is temporarily out of service.
When impairments to the systems occur or when impairments are identified during inspection,
testing or maintenance activities, the Contractor shall inform the GSA Facility Manager and the
CO or designee immediately. The Contractor shall follow the impairment procedures outlined in
63
NFPA 72 and provide a fire watch in areas left unprotected. The fire watch shall remain in place
until the systems are completely restored during the performance of routine service and testing
procedures. If fire watches are required, the labor costs of fire watches as part of the repair
costs are reimbursable less the reimbursable repair threshold.
When unwanted fire alarm system activations occur, without additional expense to the
Government, the Contractor shall be liable for all local fees associated with unwanted fire alarm
system activations that are caused by the Contractor and require local jurisdiction fire
department response to the building.
The Contractor will report unwanted fire alarms to the CO or designee at the close of each
business day and provide the follow information: the approximate time, date and location of the
system activation, a brief description of the fire alarm system activation, including initial device
activation, location of initial device, a brief reason for why the fire alarm system activated (if
known), how the fire department was notified and what time they arrived on scene, an
approximate count of how many building occupants evacuated the building and for how long in
minutes.
The Contractor shall ensure compliance with NFPA 25 in the inspection, testing and
maintenance and repair of water-based fire protection systems, and in the performance;
inspection, testing, preventive maintenance and repair of all devices that are components of
water-based fire suppression systems.
Water-based fire protection system inspection, testing, preventive maintenance, and repair shall
be performed during Normal Working Hours when it does not interfere with building operations.
When such inspection, testing, preventive maintenance, or repair is expected to interfere with
building operations; it shall be performed after normal working hours without additional costs to
the Government. The Contractor shall schedule with the Facility Manager and the CO or
designee all non-emergency shutdowns of the water-based fire protection system and back-up
protection shall be provided by the Contractor any time the water-based fire protection system is
expected to be out of service for more than 10 hours. When a water-based fire protection
system is returned to service, it shall be verified that the system is working properly in
accordance with the component action requirements in NFPA 25.
When impairments to the system occur or when impairments are identified during inspection,
testing, or preventive maintenance activities, the Contractor shall inform the GSA Facility
Manager and the CO or designee immediately. The Contractor shall follow the impairment
procedures outlined in NFPA 25 and provide a fire watch in areas left unprotected or if the
system is out of service for more than 10 hours in a 24-hour period. The fire watch shall remain
in place until the water-based fire protection system is completely restored to service. Note:
Temporarily shutting down a system as part of performing the routine inspection, testing,
64
preventive maintenance or repair on that system while under constant attendance by qualified
personnel and where the system can be restored to service shall not be considered impairment.
The Contractor shall ensure compliance with NFPA 80, Standard for Fire Doors and Other
Opening Protectives, in the inspection, testing, preventive maintenance and repairs of all fire-
rated door assemblies. Please note that the inspection of fire-rated door assemblies shall also
meet the requirements in NFPA 101, Life Safety Code.
The Contractor shall ensure compliance with the NFPA 80, Standard for Fire Doors and Other
Opening Protectives, in the inspection, testing, maintenance and repair of all fire dampers,
radiation dampers, and combination fire/smoke dampers. Please note that maintenance of
combination fire/smoke dampers shall also meet the requirements contained in NFPA 105,
Standard for the Installation of Smoke Door Assemblies and Other Opening Protectives.
The Contractor shall ensure compliance with the NFPA 105, Standard for the Installation of
Smoke Door Assemblies and Other Opening Protectives, in the inspection, testing, preventive
maintenance and repair of all smoke door assemblies.
The Contractor shall ensure compliance with NFPA 105, Standard for the Installation of Smoke
Door Assemblies and Other Opening Protectives, in the inspection, testing, preventive
maintenance and repairs of all smoke dampers.
The Contractor shall ensure compliance with NFPA 10, Standard for Portable Fire
Extinguishers; in the inspection, testing, preventive maintenance and repairs of all portable fire
extinguishers.
65
5.9.9 Non-Water-Based Fire Extinguishing Systems
[[[Note to Spec Writer: Remove if there are no non-water-based fire extinguisher systems
or if this subsection is covered under another PBWS.]]]
The Contractor shall ensure compliance with the following specified codes in the inspection,
testing, preventive maintenance and repairs of the following types of non-water-based fire
extinguishing systems:
a. Carbon dioxide extinguishing systems, NFPA 12, Standard on Carbon Dioxide
Extinguishing Systems.
b. Halogenated extinguishing systems, NFPA 12A, Standard on Halon 1301 Fire
Extinguishing Systems.
c. Dry chemical extinguishing systems, NFPA 17, Standard for Dry Chemical Extinguishing
Systems.
d. Wet chemical extinguishing systems, NFPA 17A, Standard for Wet Chemical
Extinguishing Systems.
e. Fire extinguishing systems, NFPA 96, Standard for Ventilation Control and Fire
Protection of Commercial Cooking Operations.
f. Clean agent fire extinguishing systems, NFPA 2001, Standard for Clean Agent Fire
Extinguishing Systems.
The Contractor shall ensure compliance with NFPA 92, Standard for Smoke Control Systems, in
the inspection, testing, preventive maintenance and repairs of smoke control systems.
The Contractor shall ensure compliance with the following specified codes in the inspection,
testing, preventive maintenance, repairs and exercising of equipment per the manufacturer’s
recommendations for the following types of emergency and standby power systems:
a. Emergency power supply systems, NFPA 110, Standard for Emergency and Standby
Power Systems.
b. Stored electrical energy emergency and standby power systems, NFPA 111, Standard on
Stored Electrical Energy Emergency and Standby Power Systems.
66
The Contractor shall ensure compliance with NFPA 101, Life Safety Code, in the inspection,
testing, preventive maintenance and repair for purchasing systems and signage to bring the
building up to code of emergency lighting systems, emergency lighting equipment, and exit
egress marking systems.
Materials and fire-stop systems used to protect membrane and through penetrations along with
joints and voids in fire resistance-rated construction and construction installed to resist the
passage of smoke shall be maintained. The materials and fire-stop systems shall be securely
attached to or bonded to the construction being penetrated with no openings visible through or
into the cavity of the construction. Where the system design number is known, the system shall
be inspected to the listing criteria and manufacturer’s installation instructions.
The Contractor shall notify the Facility Manager and the CO or designee of areas in the building
that firestop systems are lacking or compromised.
67
5.9.14 Lightning Protection Systems
[[[Note to Spec Writer: Remove if there are lightning protection systems or if this
subsection is covered under another PBWS.]]]
The Contractor shall ensure compliance with the inspection, testing, maintenance and repair of
lightning protection systems in accordance with NFPA 780 - Standard for the Installation of
Lightning Protection Systems.
The Contractor shall be responsible for the testing, maintenance and repair of chemical sensor
equipment as required by the manufacturer's recommendations. Those tests shall be
conducted by a certified manufacturer's representative. HVAC unit shutdowns and damper
shutdowns required as a result of a trip of the chemical sensor system shall be inspected and
documented. All documentation of the testing including the chemical sensor, HVAC shutdown,
and proper damper operation shall be documented in NCMMS within 48 hours of test
conclusion.
5.10 TOURS
5.10.1 General
The Contractor shall tour major building systems, equipment, tanks and anything requiring tours
mandated by any acts, codes or regulations as contained in this PBWS or any state or local
requirements. To accomplish this objective the Contractor shall develop a Tour Plan and submit
it to the CO or designee for approval, no later than end of Startup or transition phase. With the
advent of technology and innovation a “tour” is no longer exclusive to the physical walks. A tour
shall be a part, or a combination of physical visits and automated systems. Tours are an
opportunity to view equipment in different phases of operation, make adjustments, validate
controls, verify set points, check efficiency, physical condition of mechanical space, and overall
safety. It is not the intention of the Government to overly prescribe tour frequencies or
methodologies; instead, the Contractor is expected to develop tours at frequencies and using
methodologies that are of value to operations, inclusive of analytical decision making intended
to optimize operations based on real time performance data.
68
5.10.3 Minimum Tour Frequencies
a) Daily: Major HVAC equipment (when in operation), including boilers, chillers,
cooling towers, pneumatic control air compressors, air handler rooms, main
switchgear and primary electrical equipment rooms, fire alarm system and control
panels (fire alarm system control panels shall not have any unwanted trouble
conditions), steam system and reducing and regulating stations, and special HVAC
and uninterruptible power systems for critical functions.
b) Weekly: Distributed HVAC equipment including package units and external
condensers, pumps, motors, sewage ejectors, fire pumps, condensate drip pans and
generators. Incorporate moisture control tours to prevent building damage, minimize
mold contamination, illuminate leaks, and reduce health risks related to moisture.
c) Twice per Month: Battery systems.
d) Monthly: Transformers, secondary electrical rooms, switchgear, and primary
electrical equipment rooms.
Where central plant equipment (chillers over _____ tons [[[Insert tonnage]]] capacity, boilers
over ______pounds per square inch (psi) [[[Insert psi rating]]] is not (1) controlled by a
programmed Sequence of Operations in a BAS, (2) or capable of daily tracking and trending of
the operations in the plant or (3) centrally alarmed with alarm paging and operational watch
procedures, in addition to tour requirements specified elsewhere in this PBWS, the Contractor
shall ensure the following is performed:
a. Monitor the starting, stopping and loading of equipment.
b. Check all operating equipment in the watch area every two hours.
c. Record operating data in appropriate logs or records every two hours.
d. Make adjustments at the central control panel in response to changing operating
conditions.
69
e. Status in regards to operational parameters.
Contractor shall evaluate discrepancies in Operating Logs and Tour Sheets and the operational
performance shall be investigated and repaired when necessary. All work performed on
equipment as a result of a tour inspection shall have a Work Order generated in the NCMMS.
The O&M Contractor shall submit to the CO, or designee, a proposed Operating Logs and Tour
Sheets for approval prior to implementing the Tour Plan.
5.10.6 Reporting
Problems or conditions that shall potentially affect the efficient operation of the building or create
a negative impact on the tenant shall be immediately reported to the CO or designee.
5.11 Repairs
5.11.1 General
A “repair” is an act of restoring inoperable, dysfunctional or deteriorated equipment, systems, or
material to a fully functional, non-deteriorated state. Repairs involve some combination of labor
and repair or replacement of the equipment, parts, components or materials.
Any replacement parts used during the course of this Contract shall be of comparable or higher
quality and efficiency. The CO or designee shall require replacement of components with
components from the same manufacturer to maintain consistency throughout the building.
Materials and parts that are visible to building occupants shall be to building standard and
maintain the same appearance as similar materials and parts in the occupied space.
Components of control systems shall be replaced so as to maintain the tie-in to the control
system with no degradation of data throughput, memory, point capacity, data acquisition, or
programmability. Motors shall be replaced with premium efficiency motors as defined by the
NEMA MG-1 standard or in compliance with Local utility guide demand-side management
70
rebate guidelines. Old transformers shall be replaced with NEMA-rated class one efficiency
transformers in accordance with the NEMA TP-1 standard. Replacement of variable frequency
drives shall be done in accordance with recommendations found in NEMA, Application Guide for
AC Adjustable Speed Drive Systems. Energy Star-rated equipment shall be installed where
available and when there is no engineering or operational reason not to select an Energy Star
product. Energy-consuming items shall be the most efficient in their class. GSA Proving Ground
identified technologies with deployment potential for GSA shall be used when applicable.
The Contractor shall stock commonly used items and stay in good standing with a network of
suppliers that shall deliver ordered items without any delay. Repairs delayed due to supply
houses refusing to do business with the Contractor for any reason, is not an excuse to delay the
repair. Any equipment components/systems that can no longer be repaired shall be replaced.
These replacements shall be considered a repair and the shared liability amount threshold shall
apply.
5.11.2 Operations
A non-reimbursable repair is a repair or replacement requiring no more than ($_____) in cost for
repair parts and materials only (including any approved subcontracting costs). The cost of
consumable parts and materials shall not be calculated as part of the Contractor’s repair parts
and material costs. Non-reimbursable repairs are entirely the Contractor’s responsibility with no
reimbursement from the Government.
Non-reimbursable repairs shall be completed within ( ) hours (continuous time, includes after
hours and weekends) from identification of the problem unless an extension is approved by the
CO or designee. The Work Order shall be put into a status field in NCMMS to indicate the
nature of any delay, with appropriate remarks.
71
Contractor shall only apply overhead and profit after the Contractor's shared liability has been
subtracted.
[[[Note to Spec Writer: The region may consider a lower threshold limit as a best practice
to negotiate a lower Contract cost. In this example, assume the non-reimbursable repair
threshold is $500.00.]]]
Example:
A repair is identified and estimated by the Contractor to cost $1,200.00 for repair parts and
materials only. The CO or designee shall verify and approve both the need for the repair and
the $1,200.00 estimated cost of repair parts and materials. In this example, the Contractor shall
pay the first $500.00 of the repair and GSA shall pay the remaining $700.00.
a. Total estimated approved cost for repair parts and materials to complete repair
$1,200.00
b. Contractor’s shared liability amount to be subtracted (same amount as the non-
reimbursable threshold)
-$ 500.00
c. Total to be paid by GSA to the Contractor for the repair
$700.00
The required completion date for reimbursable repairs shall be established when the CO or
designee approves the work in writing, as mutually agreed upon by the CO or designee and the
Contractor. The Contractor shall attempt to complete work as promptly as feasible. Immediately
upon identification of a reimbursable repair, the Contractor shall create a Work Order in the
NCMMS and defer it by putting it in a “hold” status until required approval is obtained from the
appropriate CO or designee.
5.11.3 Warranties
The Contractor shall contact installers or manufacturers, as appropriate, for work that is covered
under a warranty and maintain records of warranty service. The Contractor shall avoid actions
that would invalidate a warranty, unless authorized by the CO or designee. If an installer or
manufacturer fails to comply with the terms of a warranty, the Contractor shall immediately
notify the CO or designee.
72
5.11.4 Third-Party Contractors
The Government reserves the right to order repairs from a third party contractor. If the repair is
a reimbursable repair, the Government shall inform the Contractor of the outside source’s price,
and deduct $_______ [[[Insert threshold. Note: This shall be the same figure used to
define the threshold for non-reimbursable repairs in subsection 5.11.2.1]]], or the third
party contractor’s price, whichever is less, from the Contractor’s payments. Contractor shall
ensure current-in-force warranty information is maintained in NCMMS and checked prior to
maintenance on affected equipment.
5.12.2 Operations
GSA uses a NCMMS to manage the work of the Contractor. It is used to manage all work,
scheduled and unscheduled maintenance and repairs, any building environment-related tenant
complaints, associated documentation and any miscellaneous work required for all buildings.
The Contractor shall operate a Work Request/Work Order management system and
administrative support functions during Normal Working Hours and act as a central point of
contact for the Government and building occupants. The administrative support can be off site.
Management activities include accepting Work Orders from a Service Call Center [[[delete if
not applicable]]], generating Work Orders and as the need arises and, tracking and
maintaining Work Order data records. This includes Work Orders for work not under the scope
of this Contract (i.e., performing a central Work Order desk function for the facility, regardless of
who is responsible for responding to the Work Order) and janitorial, pest control, elevator and
landscaping service calls, when requested.
The Contractor shall enter all minimally required data into the NCMMS, including all Work
Orders and resultant Work Orders, Work Order description, problem cause, and remedy,
timestamps, work start, and completion, as well as time to complete any necessary action and
log entries. The Contractor shall update Work Orders in NCMMS timely, preferably within one
73
hour of change in status, and in all cases in same day as the work status changed (e.g.,
reported, assigned, started, or completed).
Primary duties of the Contractor to manage the majority of the work are:
a) Attend required training on the use and maintenance of the Work Order management
tools provided by the Government and to increase proficiency in the tools.
b) Operate as a central point of contact for the Government and building occupants to take
all Work Orders, and track and maintain Work Order records in the NCMMS. Including
communicating any work requests not under the scope of this Contract that are received
through regular channels. Work not under this scope shall be entered and tracked in the
NCMMS for proper disposition as directed by GSA.
c) For tenant Work Requests, Contractor shall also record tenant contact information,
tenant agency and email address of tenant requesting work.
[[[Note to Spec Writer, you shall need to describe in the above subparagraph the
direction you wish to give the O&M on NCMMS Administrative duties, e.g.,
entering, closing out service calls and dispatching.]]]
d) Uses NCMMS for mobile work management practices to the greatest extent practicable.
This includes using the NCMMS mobile application for management and input of Work
Orders, and documentation of time to complete Work Orders in real-time, when possible.
[[[Note to Spec Writer: Remove if not applicable.]]]
e) Document in NCMMS Work Orders for all work performed, including routine Work
Orders, urgent Work Orders, emergency Work Orders and emergency call back Work
Orders.
f) Generate reports using the NCMMS for the CO or designee as requested and in a
format and media as requested.
74
has been secured and adequate temporary repairs have been made. Permanent repair shall
be governed by the repair provisions in this PBWS. The Contractor shall provide a written
account of any emergency call back; including costs incurred and plan for permanent
correction of the problem, to the CO or designee no later than the morning of the next
business day. If the emergency call back is expected to take more than two hours to resolve,
the Contractor must get approval from the CO or designee.
5.12.4 Reporting
All Work Orders shall document and capture minimally required information, including;
75
Work Order description, resolution information, timestamps, work notes, and other
completion information, in accordance with provided training, guidance and standard
operating procedures. Monthly reporting of the Work Order status shall include data on all
types of maintenance, repairs, service calls (i.e., emergency, urgent, overdue, and tenant
complaints), and accounting of deferred, completed, and active Work Orders with estimated
completion dates by type of work (i.e., reimbursable, repair, and Work Orders) resulting from
testing and inspections, and any equipment out of service.
All additional information requests made by the Government shall be responded by within one
business day. All such requests shall be communicated to the Contractor with a detailed
explanation of the information that is requested.
5.13.2.2 Labor
The price for labor required to complete the ASWR shall identify the labor categories and rates
from the price schedule in this Contract. This includes the labor categories and rates for any
subcontracts awarded under this Contract. Proposed and actual costs shall be recorded.
76
price of labor is reasonable, e.g., competitive quotes for the work, justification of only one
source, and any other additional information to assist the Government in determining the
reasonableness of the proposed subcontract(s). The Contractor shall compete subcontractor
opportunities for the work to the maximum extent practicable.
The Government shall review the Contractor’s ASWR proposal and may request additional
information regarding the technical approach or the price of the prospective ASWR.
The Construction Services relate to the O&M of the facilities, the equipment detailed in the
Contract, i.e., the basic services provided by the Contractor under this Contract, and tenant
77
improvements. Examples of such Construction Services include O&M repairs, systems
upgrades, or tenant services within the facilities covered under the basic services of the
Contract.
At the request of the CO or designee, submitted as an NCMMS Work Order, the Contractor
shall provide a price proposal to accomplish an ASWR within four days of the request. The
price proposal shall be completed on the Construction Services Form (see Exhibit 4). The
Contractor shall provide a detailed basis of estimate for the total firm fixed price (cost and fee)
for performing the Construction Services. [[[Note to Spec Writer: If you are using Unit Price
Agreements, insert the following sentence, otherwise delete it.]]] If this Contract includes a
Unit Price Agreement, the Contractor shall propose the Unit Price for Construction Services. If
this Contract includes an Overhead and Profit (markup), the Contractor shall include the
Overhead and Profit (markup) in its basis of estimate.
Construction Services valued at greater than $2,000.00 are subject to the Wage Rate
Requirements in accordance with FAR subpart 22.4 and other specific regulatory supplements.
Applicable regulatory requirements shall be identified by the CO and included in the AWSR.
Contractor shall update NCMMS to match any changes resulting from Construction Services.
To assist GSA in these efforts, and when requested by the COR or designee through a NCMMS
Work Order, the Contractor shall provide reasonable and competent assistance during Normal
Working Hours to GSA personnel or other GSA contractors, at no cost to GSA, on performing
energy studies, commissioning services, engineering studies, building condition evaluations,
project designs within the building, and equipment or system surveys. Such assistance shall
include escorting investigatory personnel through spaces in the building in accordance with
building security requirements, explaining the operation and condition of equipment and
systems to investigatory personnel and providing access to trend data, maintenance records,
reference library materials, and other pertinent building technical data to investigatory
personnel. The COR or designee shall inform the Contractor as far in advance as possible of
the actual date and time these services are needed. Any impact on regular scheduled work
shall be identified with the COR and approved in advance for deferment.
78
these requirements generally requires skilled and experienced general labor, common supplies,
and small hand and power tools of the building trades. As part of the monthly price for
preventive/predictive maintenance services, the Contractor shall provide a total of ___ hours
and up to $ ____ of parts and supplies per calendar month (hours and dollar amounts are not
cumulative to succeeding months) when requested by the COR through a NCMMS Work Order
to accomplish discretionary work in the buildings covered by this Contract. The Contractor shall
furnish the labor, tools and consumable materials, as necessary, to perform the work. The
Contractor shall implement a plan for accurately recording hours of labor and costs of parts and
supplies expended. At a minimum, all costs, including labor hours, materials shall be recorded
and delivered by the Contractor in the monthly report.
[[[Note to Spec Writer you must determine the number of hours and dollar value of parts
to insert.]]]
5.14.3.1 Reporting
The Contractor shall provide input or propose ideas that can improve the operations.
The Contractor shall raise, lower and place at half-staff the United States Flag, agency
pennants, and other flags (e.g., POW flag) provided by GSA. This service shall be provided
when directed by the CO or designee.
79
agencies and are considered above standard services. The Contractor does not have to be
physically present, but shall ensure that the utilities are scheduled for these hours and are
provided for per the OTU request. OTU hours shall be included in the Monthly Report. The
Contractor shall track the OTU and have information available at building management request.
5.15.1 General
The Contractor shall use the GSA-developed reports of monthly progress or other submittal
requirements (e.g., quality control, asset inventory), using NCMMS data, to describe the status
of maintenance and operations as of the last day of the performance month. The Contractor
shall provide reports to the CO or designee as requested and in a format and media as
requested with a preference for electronic submittal. The Monthly Progress Report shall be
submitted to the CO or designee by the [[[5th business day of the subsequent month.]]] This
report shall include the: Work Order status of all types of maintenance, inspections, repairs,
service calls (highlight overdue and tenant complaints), including deferred, completed and
active (include estimated completion date), by type of work i.e., reimbursable, repair and Work
Orders resulting from testing and inspections, and any equipment out of service.
80
m. Meter readings.
5.16.1 General
The Contractor shall maintain a comprehensive reference library that includes building design or
record documents, renovation or equipment retrofit design or record documents, maintenance
reference documents, applicable NFPA codes and standards, fire protection system as-built
drawings, fire protection system operations and maintenance manuals with copies of approved
submittals, fire protection system parts list, fire protection system zoning scheme, fire protection
system sequence of operation matrix, HVAC Operations Manual (if one has been developed),
building operating plan, energy and other building technical studies, hazardous materials
surveys, and other documents necessary to document the design, function, and condition of the
building. The Contractor shall safeguard this information in accordance with the provisions of
subsection 1.6.2, Safeguarding and Dissemination of Controlled Unclassified Building
Information.
81
SECTION 6 MAINTENANCE SPECIFIC REQUIREMENTS
6.0 General
[[[Note to Spec Writer: The CO shall consult with the SME on Contractor’s scheduled
Preventive Maintenance Plan to confirm this meets GSA’s minimal PM requirements. If
the Contractor uses the PBS O&M Standards (PM Guides), the Contractor may propose
changing the frequency of a preventive maintenance job plan to meet the specific
requirements of that particular piece of equipment. Any proposed changes need
approval of the CO or designee.]]]
The Contractor shall establish an effective Preventive Maintenance Plan for scheduling and
performing scheduled preventive maintenance on all building equipment and systems requiring
a preventive maintenance procedure covered under the scope of this Contract. The Contractor
shall submit the Preventative Maintenance Plan as part of the Contractor’s proposal. This plan
will be approved by the CO or designee, the plan is to include the Contractor’s approach to
maintenance and repair and list of equipment/systems receiving a preventive maintenance
procedure as well as the specific maintenance standard or guide describing the preventive
maintenance procedure, and frequency. Once approved this Preventive Maintenance Plan
must be incorporated into the Building Operating Plan described subsection 5.2.1.f above and
Contractor shall update NCMMS within ____ business days [[[Insert number of business
days]]] to match the Government approved plan. The Contractor shall complete preventive
maintenance in the month scheduled. Contractor shall provide accurate and timely tracking of
preventive maintenance in NCMMS and minimize preventive maintenance backlog. Preventive
maintenance planning, reporting and backlog are used in PBS national performance measures
and GSA quality assurance.
82
f. The equipment requires inspection, testing and maintenance in accordance with NFPA
codes and standards.
g. The equipment requires maintenance in accordance with any other provision of this
Contract.
The Contractor shall schedule preventive maintenance and begin maintenance on new
equipment in the NCMMS, when the extended maintenance service is completed by the installer
and the Contractor ensures that all pertinent warranty information and proposed maintenance
plans are sufficient to uphold warranty obligations.
6.2.2 Operation
The Contractor shall operate boiler systems according to established operational standards
outlined in the current Building Operating Plan. The intent is to operate as efficiently as possible
while protecting all assets from freezing conditions. Boiler operations shall be logged daily while
in operation. The Contractor shall be familiar with the requirements of the local AQMD and shall
ensure operating permits for boilers, and all other emissions producing equipment regulated by
the AQMD are up-to-date and have copies available for the CO or designee. Operating
readings shall be logged daily and posted during boiler operation. During curtailment
operations, all diesel fuel used shall be reimbursable by the Government.
83
boiler and unfired pressure vessel inspections. The Contractor shall implement boiler shutdown
and summer lay-up procedures to protect the boilers from corrosion during the off-season. A
combustion (flue gas) analysis shall be performed annually at the beginning of each heating
season on all fossil fueled boilers. This test helps the Contractor adjust the boiler to its optimum
efficiency. A report that includes the manufacturer’s efficiency rating by design shall be
provided to the COR within seven business days of the test that shows the readings before any
adjustments are made. A follow-up report shall be provided to the COR within seven days after
any adjustments are made to document compliance.
6.2.5 Reporting
Daily logs of the boiler shall be annotated by the Contractor on an approved boiler log and kept
at the boiler. After the third-party inspection of a boiler, the Contractor shall have the inspector
complete GSA Form 349 (Inspection Report of Boiler) for each boiler inspected. After the third
party inspection of an unfired pressure vessel, the Contractor shall have the inspector complete
GSA Form 350 (Inspection Report of Unfired Pressure Vessel) for each vessel inspected.
These two forms, the GSA Forms, 349, and 350 shall be kept in a file, while a third form shall be
kept on the equipment itself. This third form is GSA Form 1034 (Certificate of Inspection). All
inspections and tests shall also be scheduled and annotated in the NCMMS and reported in the
monthly report.
6.3.2 Operation
The Contractor shall operate air distribution systems in accordance with their design and the
approved sequence of operations and any other requirements within this Contract. The
Contractor shall follow ASHRAE 202-2103 (Commissioning Process for Buildings and Systems)
or later versions, if superseded, when operating this type of equipment. The Contractor shall be
responsible for making immediate adjustments or corrections that fall within the proposed
maintenance plan, generated Work Orders and any other requirements under this Contract.
The Contractor shall make recommendations and perform adjustments to controls, adjust BAS
settings, correct set points, and restore equipment to automatic operation as approved by the
CO or designee. The Contractor shall identify all alarm points with originating point identification
information (device ID, point number, description) to manipulate the system to monitor
conditions, track and trend operational criteria. The Contractor shall make every reasonable
effort to protect all assets regarding air distribution systems and associated equipment listed in
this Contract from freezing conditions.
84
6.3.3 Maintenance
The Contractor shall use GSA preventive maintenance standards or the manufacturer’s
recommended maintenance procedures, or a combination of the two procedures to perform
maintenance as long as the method is submitted to the CO or designee for prior review and
approval. This as well as all preventive maintenance covered in this contract will be addressed
in the Contractors submitted Preventive Maintenance Plan. The equipment requiring the
Contractor’s proposed maintenance plan shall include all of the building equipment associated
with the air distribution systems up to and including the final discharge of air into occupied
spaces. At a minimum, the maintenance plan shall include applying lubricants, cleaning fan
housings, fans, coils, dampers, air diffuser/grilles, air handling unit (AHU) sections, and
equipment rooms, and replacing consumable parts or components.
The Contractor shall use high efficiency air filters when replacing the filters in air handlers and
other equipment that use air filtration. The Contractor shall only use air filters with known
Minimum Efficiency Reporting Value (MERV), as defined in the ANSI/ASHRAE Standard 52.2
and required in accordance with the most current PBS-P100. The Contractor shall replace air
filters with the air filters that have the highest MERV value consistent with the feet per minute of
the fan. The Contractor shall maintain minimum ventilation standards in ASHRAE Standard
62.1 with the current revision year. Prior to installation, the COR shall approve the filters to be
used. At a minimum for an AHU with pre- and post-filters, the Contractor shall replace the pre-
filters quarterly or as deemed necessary by the Magnehelic gauges or BAS-connected
monitoring devices, and the post filters annually or as deemed necessary by the Magnehelic
gauges. The rooftop unit, variable air volume, power Induction unit), fan coil, computer room, or
any other air distribution filters shall be changed as required by the Preventive Maintenance
Plan, but at least annually.
85
6.3.5 Testing and Inspecting
The Contractor shall ensure that air distribution components operate on a system level per the
design intent and sequence of operations by testing and inspecting the units. The testing of the
air distribution system shall also include the integration with other equipment in the building
including chillers, boilers, variable air volume system component, fans, ductwork, and air
intakes. The Contractor shall conduct regular inspections of air filters to ensure that the filters
are changed as recommended by the manufacturer or when they have become clogged. The
Contractor shall conduct inspections of the condensate drip pans of all AHU, A/C package units,
window A/C units, and other equipment items and systems that physically have drip pans to
ensure that they drain properly. Such inspections shall be conducted in accordance with the
tour program and be performed no less frequently than ___. [[[Note to Spec Writer to
determine frequency as regional protocol requires.]]] Pans that are not level or that leak
shall be reported to the CO or designee. All drip pans shall be treated with an appropriate
biocide to control the growth of algae, mold or other organisms or fungi. If any condensate pans
are inaccessible, the Contractor shall notify the CO or designee immediately.
6.3.6 Reporting
The Contractor shall report and enter into the NCMMS any and all activities performed with
respect to air distribution system and its components, including Work Orders completed.
6.4.2 Operation
The Contractor shall operate the chiller systems according to established operational standards
with manufacturer’s guides, industry standards or as otherwise directed by the CO or designee.
The intent is to operate as efficiently as possible while protecting all assets. Chillers shall be
logged daily while in operation utilizing a GSA-approved chiller log.
6.4.3 Maintenance
The Contractor shall use GSA’s preventive maintenance standards or the manufacturer’s
recommended maintenance procedures, or a combination of the two to perform maintenance,
as long as the method is submitted to the CO or designee for prior review and approval.
Maintenance shall be accomplished by the chiller manufacturer’s authorized service technician.
6.4.4 Testing/Inspecting
Nondestructive Chiller Tube Analysis (Eddy Current) - Chillers with tube and shell heat
exchangers, both evaporator and condenser, shall have an eddy current test performed every
three years. The test shall be performed by a Level II technician, certified by the American
Society for Nondestructive Testing, per SNT-TC-1A - Personnel Qualification and Certification in
86
Nondestructive Testing/Inspection. The test shall be performed in accordance with current
American Society of Mechanical Engineers standards. Refer to current Preventive Maintenance
Guide for additional requirements. The Contractor shall take pictures of the tubes, tube sheets
and end plates of water cooled chillers with tube and shell heat exchangers after the removal of
the end plates prior to brushing the tubes and again after the brushing of the tubes. These
pictures shall be uploaded into the NCMMS. The Contractor shall notify the CO or designee at
least two business days prior to the removal of the end plates so that GSA has the opportunity
to observe the condition of the tubes right after the removal of the end plates. All inspections
and tests shall also be scheduled and annotated. Contractor shall provide the CO or designee
with two copies of the written report within 14 business days of the test. The report shall include
findings and recommendations. The Contractor shall document the report by uploading it into
the NCMMS.
6.4.5 Reporting
Daily logs of the chiller(s) shall be annotated on an approved chiller log and kept at the chiller or
the onsite Contractor’s office and uploaded into the NCMMS. With low pressure chillers daily
logs shall include purge run times and pump out times. Logs are to be Included in the monthly
report.
6.5.1 General
The cooling tower equipment is a critical component to HVAC operations. By design this
device removes heat in the condenser water loop by the process of evaporation. In this
process the returning water can take on properties that are detrimental to the proper functions
of the HVAC system. The Contractor shall ensure proper maintenance of this equipment in
order to ensure proper HVAC operations.
6.5.2 Operations
Due to factors such as geographic location, altitude, local weather conditions, and prevailing
winds, etc., setting and maintaining a set-point for water temperature is a complex process that
has high local variability. Therefore, the Contractor shall to ensure that the Contractor staff
understands the established control sequences for the operation of the cooling tower. The
Contractor shall propose a better sequence that offers greater efficiency. Before enactment of
the new sequence, the Contractor shall submit the proposal to the CO or designee for
consideration and approval.
6.5.3 Maintenance
Due to the evaporation process taking place inside the tower, regular cleaning of the tower to
minimize the accumulation of dirt and scale is required. The Contractor shall ensure proper
87
maintenance of the equipment by inhibiting and removing mineral scale, corrosion, bacterial
contamination, and general fouling of the water and by physically cleaning the tower on a
regular basis. The Contractor shall use GSA’s preventive maintenance standards to perform
maintenance, or use the manufacturer’s recommended maintenance procedures, or a
combination of both as long as the method is submitted to the CO or designee for prior review
and approval.
6.5.4 Testing
The Contractor shall test the water in accordance with the water treatment section of this
contract. All equipment associated with the cooling tower shall be checked for proper
operation and free of scale, corrosion and other contamination affecting performance of the
tower. Testing must include vibration cutout switch where installed.
6.5.5 Reporting
All maintenance and all service calls associated with cooling towers shall be reported in the
NCMMS. Because of the importance of this critical equipment, GSA requires the Contractor
advise the CO immediately if it is not operating properly or is offline for any reason.
Water treatment is a constant balancing act, which means that an effective treatment plan has
to be flexible in its ability to meet requirements. A “one size fits all” concept does not work well
88
when creating an effective and efficient water treatment plan. Size, location, geography, and
altitude all play a factor in deciding the best water treatment plan.
6.6.3 Operation
The Contractor shall control corrosion, scale, algae, and bacterial growth in all HVAC assets
and systems throughout the building. The Contractor shall be responsible for compliance with
all applicable local sanitation requirements, discharge regulations, district air quality regulations,
and other environmental laws and regulations. The scope of this work extends to related safety
equipment (e.g., emergency eyewash stations), all of which shall be maintained in accordance
with all applicable OSHA standards.
6.6.4 Maintenance
The Contractor shall implement an effective HVAC water loop maintenance plan as part of a
comprehensive HVAC equipment maintenance program. This plan shall include the methods,
procedures, references and industry standards that the Contractor has elected to use to execute
the maintenance plan. The plan shall also detail procedures, special tools and equipment,
treatment procedures, chemicals and water chemistry criteria, preventive maintenance and
testing frequencies, and anticipated schedules for shutdown, start up, and cleaning.
The Contractor shall perform a comprehensive initial water treatment analysis (laboratory
analysis) within 30 calendar days of the Contract award to assist in developing the HVAC Water
Management Plan. This initial analysis shall establish a baseline and shall be used to inform
and validate the effectiveness of the Contractor’s Plan.
89
e) If testing results are outside of established parameters in the Plan, the Contractor shall
immediately investigate the cause of the deficiency and implement corrective action to
restore the system to established parameters. The Contractor shall immediately notify
the CO, or designee of the situation, explain the cause of the non-compliance
condition and the actions taken to remedy the problem.
f) After corrective action has been implemented, the Contractor shall perform a second
test to verify that the system is operating within established parameters.
g) All testing and retesting results shall be entered into the NCMMS by the Contractor.
h) Glycol-water solutions in all building systems shall be tested monthly to determine the
percentage glycol. The glycol water solution in all building systems shall be tested
annually for pH, reserve alkalinity, inhibitor levels, and degree of contamination. If
testing results indicate that glycol or additives must be added to maintain proper
chemistry then the Contractor shall be responsible for glycol or additives additions. If
the test results indicate full replacement is necessary then the Government shall be
responsible for all associated costs. The test results must be documented in NCMMS,
using (virtual) meters, where practical.
6.6.6 Reporting
The initial analysis of the HVAC water system(s) shall be reported to the CO and designee
immediately after the results are known. It shall be the responsibility of the Contractor to correct
any non-compliant conditions at no cost to the Government as soon as a solution has been
reviewed and approved by the CO or designee. Any initial cost that exceeds the repair threshold
shall be a shared liability. Once the parameters are within the established tolerances the
Contractor shall be responsible to maintain equipment and chemistry at the Contractor's cost.
The periodic water treatment and testing reports shall be included in the monthly progress
reports. All other analysis reports performed to analyze or mitigate non-conforming issues shall
be brought to the attention of the CO or designee immediately. The monthly progress reports
shall include the following items:
The Contractor shall compare cooling tower water treatment results with the Chiller Operating
Log. Trending and best practices shall be identified and proposed to CO or designee for review
and approval prior to implementation in an effort to establish the most efficient systems
operations based on conditions.
90
Table of GSA established HVAC water management criteria
Open Loop
91
Closed Loop
Total Dissolved
Solids Maximum: 2000 ppm or
Quarterly (3 months)
(TDS) or (2500µS/cm)
Conductivity
Polyphosphates
Monthly 10- 20 ppm
(PO4)
Corrosion Inhibitor
Monthly Defined By Consultant
Residual
92
6.6.7 Chemical Free Water Treatment System
[[[Note to Spec Writer. If the building has a Chemical-Free Water Treatment System
insert this clause. Also insert the type of system and locations.]]]
HVAC loops that are treated by chemical-free water treatment systems shall be tested and
maintained by an authorized Original Equipment Manufacturer (OEM) certified vendor. The
Contractor shall provide a qualified independent water treatment specialist to draw a set of
water samples monthly. Tests shall be performed as described in the water treatment plan.
Samples shall be analyzed and a monthly report containing all pertinent information, relative to
the conditions found, shall be submitted to the CO or designee with the monthly progress
report. In facilities where makeup water is metered, makeup water quantities used shall be
tracked and reported.
93
requirements in all occupied areas. Illuminated areas of responsibility typically include
entrances, landings, steps, sidewalks, parking areas, garages, arcades, highly decorative
courtrooms, historic fixtures, fountains, security bollards, stairwells, auditoriums, flagpoles,
building-mounted fixtures, pole lighting, elevator car interior lighting and ground lighting located
adjacent to the facility and extending to the property line. Exemptions include elevator exterior
car lighting, associated hoist ways and machine room lighting, specialty lighting integral to
artwork, experimental fixtures, and some lighting control systems to be identified by the CO.
For agency-owned specialized lighting systems the Contractor shall not be responsible for the
controls (front end). The Contractor shall be responsible for replacement of ballasts, lights and
drivers. The Contractor shall not be responsible for requirements lighting associated with
furniture.
6.8.2 Operation
To maintain operating consistency of illumination in the workspaces, the illuminance levels shall
need to be adjusted through the reprogramming of existing fixtures, or by installing additional
hardware or software under the guidance of the CO or designee. These adjustments shall be
made without changing fixtures if possible (e.g. automatic lighting controls, tuning dimmable
ballasts, and de-lamping). The Contractor is advised that while the PBS-P100 establishes
target lighting levels, aspects such as lighting quality, specific tenant requirements, energy
efficiency, and other individual factors also have an impact on the application of lighting in
spaces.
When tenant improvement or space alteration work is being planned in the building, the CO or
designee shall request that the Contractor be a part of the planning and inspection in the space
to verify that all lighting levels and controls operate as required for the space. The Contractor
must immediately report to the CO or designee obvious problems or conditions that shall
potentially affect the efficient operation of the building or create a negative impact on the tenant
as a result of tenant improvement.
The Contractor shall assist in a curtailment program in consultation with the CO or designee.
The Contractor shall implement all approved curtailment measures which typically include
turning off or de-lamping unnecessary lighting, or implementing setback schedules to create a
more energy efficient lighting strategy in accordance with the curtailment program. This shall at
times require knowledgeable Contractor staff familiar with the building’s BAS software so that
modifications to lighting schedules can occur. Lighting replacements as part of a curtailment
program shall qualify for a utility rebate and are therefore subject to the rules set forth by the
participating utility. The Contractor must investigate the potential for rebates for any lighting
replacement activities for which they are responsible. New lighting components shall be tested
by an accredited national laboratory (UL or designated equivalent) according to the PBS-P100
Guidance. Replacement components shall be of equal or greater energy efficiency and life
expectancy.
94
6.8.3 Maintenance
The Contractor shall respond promptly to routine Work Orders for all lighting issues. The
Contractor shall replace failed lamps, LEDs and/or ballasts, with the most efficient products
available in accordance with existing building standards defined by the PBS-P100 or as
otherwise directed by the CO or designee. In lieu of such standards, lamps shall be replaced
with the most efficient products available matching type and color temperature of other lamps in
visual range of the replacement.
The Contractor shall establish and implement a recycling program for fluorescent lamps and
other light bulbs in accordance with U.S. Environmental Protection agency and GSA standards.
All handling, storage, labeling, reporting and disposal of mercury containing lamps shall be in
compliance with Universal Waste Rule guidelines, guidance can be found at the web site in
document titled “Web Links” at: Operations and Maintenance Specification.
Hazardous Wastes not subject to the Universal Waste Rule guidelines must be managed in
accordance with 40 C.F.R. part 260. Universal Wastes (i.e., fluorescent lamps, solid state
lighting (SSL) components, and certain batteries) subject to the Universal Waste Rules
guidelines shall be recycled or disposed of as Hazardous Waste. Preference is given to
recycling of intact items. Replacement and proper disposal of all burned-out ballasts, including
PCB ballasts, shall be the responsibility of the Contractor (see subsection 5.5.9). All lighting
changes, Work Orders, fixture schedules and inventory lists, shall be input into the NCMMS and
updated regularly.
Replacing incandescent or fluorescent lamps in existing fixtures with lamps of differing design or
light sources requires the input and approval of the CO or designee, and advisably a lighting
expert plus the energy program manager, to ensure a successful replacement. If SSL LEDs are
being considered as a replacement, the Contractor shall experiment with a proposed LED
replacement lamp or fixture before a widespread replacement is undertaken to ensure that all
lighting criteria are met with respect to required illuminance levels, tenant satisfaction, light
distribution, temperature of the lamps, Color Rendering Index (where important to the
requirements) energy efficiency, and safety standards. This is a key consideration in performing
satisfactory lighting operations and maintenance.
There shall be light ballasts containing PCBs in the buildings covered by this Contract.
Replacement and proper disposal of all burned-out ballasts, including PCB ballasts, shall be the
responsibility of the Contractor. Fluorescent lamps and ballasts, SSL components, exit light
fixtures, batteries, and other items in any quantity subject to the Universal Waste Rules for
Hazardous Waste Management shall be stored and disposed of in accordance with State
requirements. In addition, all fluorescent lamps and ballasts shall be recycled and records
maintained. The Contractor shall include a hazardous waste manifest of disposed items in the
monthly report. The Contractor shall continuously update the inventory of all new and existing
lamps, fixtures and SSL. The use of bulb crushers is strictly prohibited.
Records including Bill of Lading or receipt of recycling must be obtained for each Universal
Waste disposal action. Any other lighting related waste (i.e., LEDs and non-PCB/DEHP light
95
ballasts) shall be properly characterized and disposed of in accordance with the Resource
Conservation and Recovery Act; recycling is preferred method of disposal. Local area recycling
programs shall provide information on accepted electronic lighting waste. Receipt of recycling
for electronic or electronic-like waste shall be maintained and included in the Monthly Progress
Report.
[[[Note to Spec Writer- If your region has a separate elevator contract, a review of the
elevator contract for this building is necessary to determine this scope below. Optional
based upon elevator requirements for building.]]]
The Contractor shall not be responsible for maintaining lighting within hoist ways, elevator
machine rooms, the pit, car top or elevator cars, including all emergency lighting; provided
however, that the Contractor shall be required to supply the replacement lamps to the elevator
contractor.
6.10.1 General
The Contractor shall ensure that all standby and emergency power equipment and related
systems are ready to respond at all times to protect the occupants of the building and to
maintain critical services during the event of a normal power outage. These services include-
the performance, inspection, testing, acceptance, and preventive maintenance and repair of
standby and emergency power equipment, supplies, electricity distribution from the generators,
and fuel distribution to the generators.
96
6.10.2 Operation
[[[Note to Spec Writer: If it is your regional policy for the government to buy the fuel for
generators, you will need to modify this Contract sub section specification to your
regional policy.]]]
All Fuel tanks shall be filled by the Government or the previous contractor at the beginning of
the Contract period and by the Contractor at the end of the Contract period. The Contractor
shall check and record all diesel or propane fuel tank levels monthly and record in the NCMMS.
The Contractor is responsible for any consumables used during day-to-day operation of a
generator, i.e., exercising the generator and related electrical components, testing of oil and fuel
reserves, and fuel tank filling. The Contractor shall be reimbursed for the cost of the fuel for fuel
consumed by the operation of a generator for an extended period (more than four hours per
event) or due to a power loss. If the operation of the generator is caused by Contractor
negligence, the Contractor shall be liable for the full cost of refueling. The Contractor shall not
allow the fuel level to drop below 70 percent. When the fuel level drops to 70 percent, the
Contractor shall notify the CO or designee of the need for refueling and the cost associated and
receive approval from the CO or designee prior to refilling the tank. The Contractor shall
provide fuel up to [[[insert average annual fuel cost]]] per Contract year. The Contractor shall
maintain a running log containing the amount of fuel used and the log must be available to the
CO or designee upon request. The Government shall pay for all fuel after the [[[insert average
annual fuel cost]]] limit is reached each year the contract is in effect. Fuel oil shall be tested
by a qualified third party vendor/subcontractor at minimum annually. The analysis and
recommendations shall be provided to COR. Contractor shall take corrective actions and follow
recommendations provided in the analysis, and document within NCMMS (Work Orders).
Reports and analysis shall be uploaded as attachments to the asset record. Fuel oil must be
conditioned and treated to maintain the minimum quality standards established in American
Society for Testing and Materials (ASTM) D396-08a, “STANDARD SPECIFICATION FOR
FUEL”.
6.10.3 Maintenance
The Contractor shall ensure a preventive maintenance schedule is developed and executed in
conformance with manufacturers’ equipment recommendations and the following NFPA
standards:
● NFPA 110, Standard for Emergency and Standby Power Systems
● NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power Systems
97
procedure is developed that complies with NFPA and the training is documented and annual
refresher training is conducted.
[[[Note to Spec Writer: Identify if outside load bank is required to perform testing.]]]
6.10.5 Reporting
The Contractor shall report the status of the emergency generator and automatic transfer switch
in the monthly report, including operational status and present condition, planned or completed
preventive maintenance and repairs, main and day tank fuel levels, and fuel purchases.
98
6.11.2 Operations
The Contractor shall establish and implement an oil analysis program incorporating the
manufacturer’s recommendations. Periodic oil analysis shall include chillers of 50 tons or
greater cooling capacity. Generator oil additives shall not be used.
6.11.4 Reporting
Where oil analysis indicates a need for corrective action, an appropriate Work Order shall be
created in the NCMMS and the appropriate corrective action taken by the Contractor.
Documentation shall include periodic oil analysis tests to be performed at least annually,
diagnostic standards, and parameters for oil changes. Subsequent to analysis, the Contractor
shall submit the report in the NCMMS as an attachment to the Work Order.
99
Contractor shall maintain elevator cab lighting, (not light associated with hoist ways, elevator
machine rooms, the pit, car top or elevator cars) and electrical equipment (including elevator
transformers and disconnects) not directly part of elevator systems, and HVAC systems
associated with elevator machine rooms and systems. The Contractor shall provide assistance
if required in performing elevator testing, including after Normal Work Hour requirements.
[[[Note to Spec Writer: If any of this equipment is within the scope of the elevator
maintenance contract, adjust the language accordingly. If any wheelchair lifts, hydraulic
loading ramps or window washing scaffolding equipment are in the building, indicate
who is responsible; maintenance responsibilities for these systems vary. Identify
number of elevator tests to be performed and estimated hours of assistance
necessary.]]]
The Contractor must perform all architectural and structural maintenance and repairs or
replacements to the building interior and exterior extending to the property line. The Contractor
must ensure the integrity of elements and materials in compliance with Federal, state, and
national codes and standards (e.g., fireproofing materials, fire-stopping, fire and smoke doors,
etc.). The Contractor must ensure the building is free of missing components or defects that
could affect the safety, appearance, or intended use of the facility or could prevent any
electrical, mechanical, fire protection and life safety, plumbing or structural system from
functioning in accordance with its design intent.
Architectural Repairs and Replacements are intended to maintain the integrity of the building
envelope (preventing water leaks through proactively addressing cracks, minor tuck pointing
failures, reattaching loose roof flashing, fixing window cracked by weather or seal failures, water
damaged ceiling tile) and address safety hazards (such as tripping concerns or hazards of
falling materials). It is not to address cosmetic issues or to perform cyclic maintenance such as
minute cracks in terrazzo floors, scaling of concrete sidewalks, repainting for the purpose of
refreshing an area's look.
100
Painting is considered “touch-up,” for purposes of this Contract and is to repair a specific and
limited damaged area of prepared wall, paint or other architectural components. Painting shall
extend to logical break points such as the floor or ceiling corners, door frames to avoid a
patched look.
Repainting to correct for normal wear and tear to painted surfaces over time (Cyclic paint) is not
required. Restriping of parking areas, driveways, roads, and vehicle inspection areas is
required where striping is damaged or worn in a specific location, but not for general wear and
tear of a large area over time. Repairs or replacement to pavement, walkways and facades are
required where a specific location is damaged but not where an extensive area (defined as over
20% of the type of replacement) is degraded. Painting in mechanical areas needed for OSHA
compliance, consistent equipment appearance, or other safety reasons is required.
The Contractor shall consider any building 50 years old or older as historically significant,
regardless of National Register status and must contact the Regional Historic Preservation
Officer (RHPO) before undertaking any work in the building. In addition, the following
documents shall be consulted for any work involving the preservation of historic buildings:
a) Historic Building Preservation Plan (HBPP).
b) Historic Structure Report (HSR); and
c) The Secretary of the Interior’s Standards for Rehabilitation and Guidelines for
Rehabilitating Historic Buildings.
In some architecturally significant areas, it shall be necessary to adjust minimum setbacks for
temperatures and humidity control from the established building standards to maintain and
protect finished woodwork. These parameters shall be established as necessary by the CO or
designee, in consultation with the RHPO. The Contractor shall be responsible for adjusting and
maintaining those parameters as established.
101
6.13.6 Directories
The Contractor shall maintain building directories, including electronic directories and tenant
common corridor signage but not electronic directories belonging to the tenants. The updating
of information within the directories is typically done by the Government or by the Tenants.
6.13.7 Roofs
Roof repairs and routine roof preventive maintenance are necessary to protect the structures
from significant degradation. Minor roof repair definition and cost thresholds of [[[Insert total
Dollar cost]]] shall be discussed with the CO or designee as an important part of this work to
be able to distinguish this work from construction projects. Therefore every repair scope of work
shall be discussed with the CO or designee before work is undertaken.
The Contractor is responsible for repair and maintenance of perimeter access control (PAC)
system components, including key cards/pads, magnetic door holders, loop and detection
sensors, wedge plates and pop-up barriers and bollards, sliding gates, garage doors, gate arms
and operators, interconnecting cabling between system components, and onsite field
controllers. This also includes door strikes, magnetic door contacts, request to exit sensors and
remote release buttons. The Contractor is not responsible for central processing units and
servers, including software, and programming of user’s badges for facility access or purchasing
of individual badges and other supplies. Where feasible, the Contractor shall be responsible for
manually operating systems in the event of a failure of the automatic operator in order to allow
access to the facility. Manual operation of the primary access doors or barriers controlled by the
PACs system is limited to opening and closing once per day. Manually operating systems shall
be coordinated and authorized by the CO or designee and are considered part of the Basic
Services during Normal Working Hours and reimbursable after hours. The Contractor shall
track these assets and their maintenance.
102
6.15 Child Care Center
[[[Note to Spec Writer: delete if not applicable.]]]
The Contractor shall maintain all fixed equipment and systems, including playground
equipment and carbon monoxide detectors associated with the Child Care Center. The
Contractor shall repair systems upon request (including kitchen and laundry equipment)
and according to work items identified by the Annual Child Care Center Survey.
103
SECTION 7 ADMINISTRATIVE INSTRUCTIONS
7.0 Initial Inspection
The contractor(s) (i.e., incoming Contractor for new facility, outgoing contractor and incoming
Contractor for an existing facility) and the CO or designee shall make a complete and
systematic initial inspection together during the startup phase for a new facility or the transition
phase for an existing facility that shall include all mechanical, electrical, fire protection, and life
safety systems, environmental systems, utility system, windows, motorized blinds, if applicable,
doors, and other structural features for which maintenance and repairs are covered by the
PBWS. The purpose of this inspection is to discover and list in an existing deficiency report all
deficiencies that exists in the equipment and systems covered by the PBWS, as well as the
Contractor's (incoming contractor) itemized price (including labor, materials, overhead, and
profit) for correcting each deficiency. This report covers all equipment and systems within the
building regardless whether or not they are listed in the building inventory. The Government will
elect to have all or any part of this work performed by the incumbent contractor, incoming
Contractor, Government employees, or other contractors. The incumbent contractor will be
given the opportunity to correct items in the Initial Deficiency Report. The existing deficiency
report shall not include any items that would be replaced, repaired or adjusted during the
performance of normal preventive or predictive maintenance.
[[[Note to Spec Writer: Regions can alter language in 7.1, as needed. Regions can
choose to allow the Contractor to conduct the existing deficiency inspection without the
CO or designee present. In these instances the following language shall be inserted:
“The CO or designee shall defer/approve inspection activities without the presence of a
Government representative, subject to adequate documentation of conditions found by
the Contractor”.]]]
[[[It is recommended that a GSA staff or equipment specialist accompany the Contractor
on this inspection.]]]
The existing deficiency inspection and list is meant to identify and document deficiencies that
exist in the equipment and systems covered by this PBWS, but that shall not be repaired during
routine preventive maintenance, and includes the Contractor's itemized price (including labor,
materials, overhead, and profit) for correcting each deficiency. Existing deficiency Inspections
are viewed as primarily “visual inspections” not a teardown inspection. If preventive
maintenance, repair, or any other types of teardown or detailed engineering inspections later
disclose a possible deficiency, then the determination of whether or not the deficiency was
"Initial" will be made by the CO and COR. This inspection is required to be documented
including all data required by the Initial Deficiency Report. If applicable, the Contractor will
photograph the identified deficiency and provide a detailed explanation and location of the
deficiencies. The Contractor shall submit an Initial Deficiency Report to the CO or designee for
approval not later than ___ business days [[[Insert timeframe, recommend 15 business
days]]] after the award of the Contract. Any dispute between the Government and the
104
Contractor as to the classification of an Initial Deficiency Report items shall be resolved under
the Disputes Clause of the Contract (FAR 52.233-1). After submission of the Initial Deficiency
Report the Contractor shall provide itemized estimates for correcting each deficiency that has
been identified by the Contracting Officer or designee and the estimates shall remain in effect
for ______ business days. [[[Insert timeframe]]] Deficiencies discovered after the submission
of the Initial Deficiency Report shall not be considered pre-existing for purposes of this Contract,
unless equipment is operational and cannot be secured and inspected. Any piece of equipment
or system that cannot be inspected shall be identified as such within NCMMS asset records logs
at the beginning of the deficiency report stating why it cannot be secured and inspected. An
estimate of when the Contractor reasonably expects to be able to inspect the piece of
equipment shall be provided. Equipment that can be brought into an acceptable level of
operation through basic preventive maintenance and operational procedures must be done so
and at no additional cost to the Government. As each piece of equipment is examined the
Contractor shall document what shall be accomplished, if anything, to bring the equipment into
an acceptable level of operation. Equipment shall be placed on a repair priority schedule by the
Contractor, which schedule must be reviewed adjusted, and approved by the COR. The
Contractor shall be responsible for making immediate adjustments or corrections that fall within
the scope of routine preventive maintenance and operations required by this Contract. This
includes making adjustments to controls; adjusting the BAS software, (e.g., correcting set
points; reloading programs; restoring equipment being operated manually to automatic
operation) this does not include changing established sequences of operation or programming
sequences; testing water sensors, applying lubricants; cleaning fan housings, fans, coils,
dampers, AHU sections, and equipment rooms, and replacing consumable parts or
components. When an existing deficiency in an item is corrected, the Contractor shall assume
full responsibility for the subsequent repair of the item as covered under the terms of this
Contract at no additional cost to the Government. Nothing in the Initial Deficiency Report shall
be construed as diminishing the obligations imposed by this Contract upon the Contractor to
operate any deficient item (to the extent operable) or to adjust or maintain any such item.
If there is not an accurate building inventory available, then include a separate line item
cost in RFP to provide additional time and funds for the Contractor capture a new
inventory.
105
The Startup Phase language immediately below is for O&M services following new
construction or a major recapitalization renovation project. Regions may decide to
separate the costs associated with the Startup Phase as a line item.]]]
106
l. Contractor shall obtain ENT credentials.
m. Complete the Government-furnished NCMMS training as well as the re-tuning training.
OR
The Contractor shall provide within _____ business days [[[Insert timeframe]]] of transition
services prior to the Contract start date to assist transitioning between contractors. [[[Note to
Spec Writer: Refer to the note above and choose to ask the Contractor to either account
for this cost in its monthly Contract amount or to account for this cost in a separate line
item.]]] The purpose of this phase is to permit a transition that is seamless to the tenants and
to assess the condition of the building and incomplete maintenance work at the time of
contractor transition. During this period, the incoming Contractor shall:
a. Revise and submit to the CO or designee by the end of the startup phase an updated
building operating plan.
b. Inspect the condition of all equipment and systems for which the Contractor shall assume
responsibility.
c. Revalidate and provide corrections to NCMMS locations and equipment
inventory. Provide Work Order history and document all deferred or open Work
Orders. Provide a consolidated list of Work Orders that are deferred, open, pending
completion and submit an Action Plan on completing these items. The Contractor shall
provide certification to the CO or designee that the equipment inventory is complete and
accurate in NCMMS.
d. Review the preventive maintenance schedule in the NCMMS. Cross-check preventive
maintenance schedules and guides used by the outgoing contractor versus any newly
proposed guides and schedules. The new periodic maintenance schedule and guides
shall be based off of the last time preventive maintenance was performed and in
accordance with the requirements of this Contract.
e. Review the current schedule of maintenance and revalidate in line with accepted
proposed maintenance schedule.
f. Be responsible for creating and maintaining the preventive maintenance schedule in the
NCMMS and entering data of past performance of maintenance for each piece of
equipment where needed.
g. Complete the Government-furnished NCMMS training, as well as the re-tuning training.
107
h. Submit an Initial Deficiency Report, including an itemized estimate for correcting each
deficiency to the CO or designee not later than ___ business days [[[Insert timeframe,
recommend 15 business days]]] after the award of the Contract.
i. If the Contractor-proposes custom job plans, obtain approval from the CO or designee
and load the custom job plans into the NCMMS. Note: The NCMMS contains PBS job
plans, and the latest Preventive Maintenance Guide.
108
designee shall provide an existing deficiency list to the Contractor. The Contractor shall have
30 business days from the receipt of this list to correct all items that fall within the scope of this
contract.
It remains the responsibility of the Contractor to make all adjustments (preventive maintenance
and repairs) to bring all equipment to an acceptable level of performance and satisfaction as
determined by the CO or designee. All such work is to be completed and found acceptable by
the CO or designee prior to the Contract expiration date. Final payment shall be reduced by the
value of work not completed or found unacceptable.
109
SECTION 8 PUBLICATIONS AND CITED STANDARDS
8.0 Publications
The following publications, executive orders and legislative acts are incorporated by reference
as setting quality, performance, and design standards for work required in this PBWS. Unless a
specific date is provided, references are for the current edition published at the time of issue of
the solicitation, including any addenda or errata published by the issuing organization. The
Contractor is responsible for obtaining access to all referenced documents at its own expense.
[[[Note to Spec Writer: Regions shall add or delete references as applicable to their
location. Indicate whether the publications shall be provided by the region or if they are
available via the web site in document titled “Web Links” at: Operations and Maintenance
Specification.]]]]
110
● Clean Water, 33 U.S.C. § 1251 et. seq.
● DOE/EE-0157, International Performance Measurement and Verification Protocol
● Energy Policy Act of 2005, 42 .U.S.C. § 13201 et. seq. and 42 U.S.C. 15801 et seg
● Energy Independence and Security Act of 2007, 42 U.S.C. et seg.
● EPA Green Book
● EPA Purple Book
● Executive Order 13693 Planning for Federal Sustainability in the Next Decade
● Executive Order 13788 Buy American and Hire American
● GSA Order CIO 2100.1K GSA Information Technology Security Policy
● GSA Sustainable Environmental Management System (GSA.GOV/SEMS)
● GSAlink Standard Operating Procedure, refer to website page: Operations and
Maintenance Specification.
● Guideline 3-1990 and addendum, or latest, FAR 52.223-2, Affirmative Procurement
of Biobased Products Under Service and Construction Contracts; ARI Standard 700-
1988,Specifications for Refrigerants or latest edition, and appendix A to 40, C.F.R.,
part 82, subpart F, Recycling and Emissions Reduction.
● International Building Code
● International Fire Code
● International Plumbing Code
● International Mechanical Code
● National Board of Boiler and Pressure Vessel Inspectors, National Board Inspection
Code
● NETA Maintenance Testing Specification for Electrical Power Distribution Equipment
and Systems
● TP-1,National Electrical Manufacturers Association (NEMA), Guide for Determining
Energy- Efficiency for Distribution Transformers
● NEMA MG-1., Motors and Generators
● NEMA Application Guide for AC Adjustable Speed Drive Systems
● NFPA 10, Standard for Portable Fire Extinguishers
● NFPA 12, Standard on Carbon Dioxide Extinguishing Systems
● NFPA 12A, Standard on Halon 1301 Fire Extinguishing Systems
● NFPA 13, Standard for the Installation of Sprinkler Systems
● NFPA 14, Standard for the Installation of Standpipe and Hose Systems
● NFPA 17, Standard for Dry Chemical Extinguishing Systems
● NFPA 17A, Standard for Wet Chemical Extinguishing Systems
● NFPA 20, Standard for the Installation of Stationary Pumps for Fire Protection
● NFPA 22, Standard for Water Tanks for Private Fire Protection
● NFPA 24, Standard for the Installation of Private Fire Service Mains and Their
Appurtenances
● NFPA 25, Standard for the Inspection, Testing, and Maintenance of Water-Based
Fire Protection Systems
● NFPA 54-ANSI Z223.1 - National Fuel Gas Code
● NFPA 70, National Electrical Code
● NFPA 70E, Standard for Electrical Safety in the Workplace
111
● NFPA 70B, Recommended Practice for Electrical Equipment Maintenance
● NFPA 72, National Fire Alarm and Signaling Code
● NFPA 80, Standard for Fire Doors and Other Opening Protectives
● NFPA 85, Boiler and Combustible Systems Hazards Code
● NFPA 92, Standard for Smoke Control Systems
● NFPA 96, Standard for Ventilation Control and Fire Protection of Commercial
Cooking Operations
● NFPA 101, Life Safety Code
● NFPA 105, Standard for the Installation of Smoke Door Assemblies and Other
Opening Protectives
● NFPA 110, Standard for Emergency and Standby Power Systems
● NFPA 111, Standard on Stored Electrical Energy Emergency and Standby Power
Systems
● NFPA 780 - Standard for the Installation of Lightning Protection Systems
● NFPA 2001, Standard on Clean Agent Fire Extinguishing Systems
● National Institute for Certification in Engineering Technologies (NICET) publications
and issuances
● National Institute for Safety and Health publications and issuances
● Presidential Memorandum, June 20, 2014 entitled: “Creating a Federal Strategy to
Promote the Health of Honey Bees and Other Pollinators”
● PBS Order 1095.2 Fuel Storage Tank Management
● PBS Order 100.7 Drinking Water Quality Management
● Property Managers Child Care Desk Guide
● Resource Conservation and Recovery Act, 42 U.S.C. 6901 et seg.
● Safe Drinking Water Act, PL 93-523, as amended, 42 U.S.C. 300f et seg.
● Sheet Metal and Air Conditioning Contractors National Association HVAC Systems
Testing, Adjusting and Balancing
● Technology Policy for PBS-Owned Building Monitoring and Control Systems refer to
website page: Operations and Maintenance Specification
● 29 C.F.R. part 1910, OSHA General Industry Standards
● 29 C.F.R. part 1926, Safety and Health Regulations for Construction
● 40 C.F.R. Protection of Environment
40 C.F.R. part 761, Polychlorinated Biphenyls (PCBs) Manufacturing, Processing,
Distribution in Commerce, and Use Prohibitions, in general and specifically with
regard to Electrical Transformers
● 40 C.F.R., 141.43, Sections A and D, EPA Safe Drinking Water
● 41 C.F.R. part 102-74, – Facility Management
● Toxic Substances Control Act, 15 U.S.C. § 2601- 2629 et. seq.