Inspection and Test Plan PR
Inspection and Test Plan PR
Inspection and Test Plan PR
( ITP )
2/28
PURSUANT TO SPECIAL CONDITION 6, WE SKY ORYX JOINT VENTURE, VERIFY THAT THIS SUBMITTAL SATISFIES
ALL REQUIREMENTS OF THE CONTRACT, WITH THE EXCEPTION OF THE FOLLOWING CLARIFICATIONS/
PROPOSALS ACCEPTED BY THE ENGINEER;
M. HORIKAWA
PRINT NAME SIGNATURE DATE
Document No:25045-A1126-18-ITP-S-027
NDIA
New Doha International Airpoet Project
1.2 • Fabrication Drawings • Project Specifications Before Work Fabrication Drawing SOJV-QP-10-02/X-01
Commencement acceptance to SOJV H H H R
2 Meterials-Steel Framing (ASTM A572, ASTM A36) • Spec-05120/Clause 2.1 ASTM, drawings, 05120 MRR, Drawings H H R R
2.1 Paint Material Inspection • Spec-05120 Each D.O. (SOJV-
• Primer Paint • Supplier submittal Delivery MRR-014-01 rev 1 & x-004)
• Manufacturer H H R SR
product data, Safety
Data & application
procedure
Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but R - Review : Record/
proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/ Document review
Engineer not attend Monitoring
4/29
NDIA
New Doha International Airpoet Project
2.2 Welding Consumables • Spec-05120 Each ASME Section ll, Part C/ D.O & Batch
• SMAN Part2.1, Delivery AWS D 1.1, Section 5.3 Certificate /
• FCAW • 05060, part 2.1 Electrode log H H R SR
• SAW • Supplier submittal Register
3 Calibration
3.1 • Equipments Calibration • Calibration Procedure As per manufacturer/ • ISO10012-1:1992, • Calibration certificates
• Measuring Instrument calibration agency Part 1 - Metrological • Equipments
• NDT Testing Equipments recommendations. conformation system for Calibrationlog H H H S/R W
measuring equipment.
• For NDT Awa D1.1 &
ASME BPVC Section V
4 Fabrication
4.1 Marking and Cutting • Spec-05120 100% Dimensions tolerance Material
Part2.1,2.5c, 2.5.A.2, shall be as per identification and
2.5 I • AISC Specification for tracesbility /
• Approved shop Structural steel Inspection Request H W S SR
Drawings Building Part (25045-A1000-18-ITR-
16, Chapter M,M2,2 S-002& 001)
• Fabrication Tolerances
± 6 mm. for AESS.
• Fabrication Tolerances
are as per AISC for
Non- AESS.
Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but R - Review : Record/
proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/ Document review
Engineer not attend Monitoring
5/28
NDIA
New Doha International Airpoet Project
NDIA
New Doha International Airpoet Project
5 WELDING TESTING
5.1 Visual inspection of Welding • Spec -05060 Part 3.2 C 100% Weld Visual for Surface Weld Visual H W W S SR
• Drawings holes, cracks, Undercut, Inspection Report
Confirming to AWS D 1.1 (25045-A1000-18-
2004 Section (6.9), Table ITR-S-004)
6.1 (ITPA Endorsement
on Report)
5.2 Liquid Penetration test for Back gauging of Spec -05120, Part 2.9 As needed • AWS D1.1 - 2004 Visual
CP Welds Section (6.10) H H W S SR
NDIA
New Doha International Airpoet Project
Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but R - Review : Record/
proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/ Document review
Engineer not attend Monitoring
8/28
NDIA
New Doha International Airpoet Project
7.2 Primer Paint Application & Inspection • Spec-05120, part 2.3,2.7 Each Batch Check for Surface Paint report
• For AESS-Spec-09805 random inspection cleaning, Atmosphere (DFT)
part 2.3 conditions (25045-A1000-18-
(Temperatures & Humidity), ITR-S-006)
recommended maerials,
Dry Film Thickness
(DFT not less than 38μ) and
confirming with H W S SR
Manufacturer's
recommendations.
• For AESS primer DFT
(76μ ± 12.7 μ)
• Keep steel members
off ground and spaced
using pallets,
dunnage, or other
supports and spacers.
8.0 Final Inspection (Before Packing )
Inspection
H-Hold Point : Written notification required. Contractor may not W - Witness : Written notification required S - Surveillance : No notification required but R - Review : Record/
proceed beyond this point without written confirmation of the but Contractor may not proceed if OBI do activity may be subjected to OBI Surveillance/ Document review
Engineer not attend Monitoring
9/28
INSPECTION REQUEST
DRAWING NO:
TYPE OF INSPECTION
REMARKS :
Fit-Up Inspection
15/28
Groove
Joint No. Root Gap Root Face Remark Joint No. Root Gap Root Face Groove Angle Remark
Angle
Groove
PIECE MARK DRAWING NO. REV. Joint No. Root Gap Root Face Remark
Angle
E
20/28
VASUAL INSPECTION SUMMARY (As per AWS D1.1/D1.1M:2006 Sectuib 6.9, Tavle 6.1):
Item No. Inspection Category Result Item No. Inspection Category Result
Final Inspection
22/28
Inspection Report
Description ITP Activity No.
No.
INSPECTION RESULT:
Ultrasonic Testing (UT) Radiographic Testing (RT) Magnetic Particle Testing (MT)
e2 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11
DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
4-6ARCH1 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23
DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
B24 B25 B26 B27 B28 B29 B30 B31 B32 B33 B34 B35
DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E DD E
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
LEGEND:
Painting Inspection
27/28