Back Up Computations
Back Up Computations
Earthworks
A clearing and Grubbing
A = 18 X 15 = 270 sq.m
B. Soil Poisoning
A = 18 X 15 = 270m sq.m
C. Batter Board and Layouting
P = 18(1) + 15(2) = 36 + 80 = 66m
D. Excavation
Footings
I = 1.2m, W = 1 - 2m
Allowance 0.3m
H0-35m+1:05 = 14m N = 15 footings
L = 1.8mw = 1 x 8m
Volume: 1.8 x 1.8x1.4= 4.3536 cu.m
VTOTAL = 4.3536 X 18 = 68.04 m³
Backfill
Footing
Volume of Excavation of footing = 4.3536 cu.m
Volume of Footing = 0.504 cu.m
Buried Column= 0.3 x 0.3 x 1.05= 0.0945 cu.m
Volume For Backfill= 4.3536 - 0.504 - 0.0945 = 3.7551 m
VTOTAL= 3.7551 X 15 = 56.3265 cu.m
Wall Footing
Volume of Excavation of Wall Footing= 14.79m³
Volume of Wall Footing = 0.4 x 0.4 x 0.25 = 0.04 cu.m.
Volume of Buried Wall = 0.792 +0.126 +0.648 = 1.566 m³
Wall 1 = 8.8 x 0.15 X 0.6 = 0.792 m³
Wall 2 = 1.4 x 0.15 x 0.6 = 0.126 m³
Wall 3 = 7.2 x 0.15 x 0.6 = 0·648 m³
Volume For Backfill = 14.79 - 0.04 - 1.566 = 13.184 m³
TOTAL BACKFILL VOLUME = 56.3265+ 13.184 = 69.5105 m³
CONCRETE WORKS
A.Footings
B. Columns
Class A 1:2:4
C.Column Footings
Class A 1:2:4
D. Wall Footing
Class A 1:2:4
Class A 1:2:4
F. Beams
Class A 1:2:4
FORMWORKS
A. Footing
26.25 𝑠𝑞.𝑚.
Plywood = 2.88
= 9. 11 ≈ 10 𝑝𝑐𝑠.
333.64 𝐵𝐹.
No. of 2”𝑥 2” 𝑥 ½’= 4 𝐵𝐹/𝑝𝑐.
= 83. 41 ≈ 84𝑝𝑐𝑠.
B. Column Footing
22.05 𝑠𝑞.𝑚.
Plywood = 2.88
= 7. 65 ≈ 8 𝑝𝑐𝑠.
280.26 𝐵𝐹.
No. of 2”𝑥 2” 𝑥 ½’= 4 𝐵𝐹/𝑝𝑐.
= 70. 06 ≈ 71𝑝𝑐𝑠.
110.25 𝐵𝐹.
No. of 2”𝑥 3” 𝑥 12’= 4 𝐵𝐹/𝑝𝑐.
= 18. 38 ≈ 19𝑝𝑐𝑠.
● use it 2 times:
C. Wall Footing
𝑇𝐻𝐾 = 0.25𝑚, 𝑊𝑊 = 0.4𝑚, 𝐿 = 0.4𝑚
6.75 𝑠𝑞.𝑚.
Plywood = 2.88
= 2. 34 ≈ 3 𝑝𝑐𝑠.
85.79𝐵𝐹.
No. of 2”𝑥 2” 𝑥 ½’= 4 𝐵𝐹/𝑝𝑐.
= 21. 44 ≈ 22 𝑝𝑐𝑠.
75.6 𝑠𝑞.𝑚.
Plywood = 2.88
= 26. 25 ≈ 27𝑝𝑐𝑠.
1536.95 𝐵𝐹.
No. of 2”𝑥 2” 𝑥 ½’= 4 𝐵𝐹/𝑝𝑐.
= 384. 24 ≈ 385𝑝𝑐𝑠.
54 𝑥 7.0 = 378 BF
378 𝐵𝐹.
No. of 2”𝑥 3” 𝑥 12’= 6 𝐵𝐹/𝑝𝑐. = 63𝑝𝑐𝑠.
● use it 2 times:
1600.98 𝐵𝐹.
No. of 2”𝑥 2” 𝑥 ½’= 4 𝐵𝐹/𝑝𝑐.
= 400. 25 ≈ 401 𝑝𝑐𝑠.
393.75 𝐵𝐹.
No. of 2”𝑥 3” 𝑥 12’= 6 𝐵𝐹/𝑝𝑐.
= 65. 63 ≈ 66 𝑝𝑐𝑠.
● use it 2 times:
F. Beams
1. RCB1
𝐿 = 0.3𝑚 𝑊𝑊 = 0.25𝑚
1. 4m – 8pcs
0.3𝑚 0.3𝑚
L= 4- 2
- 2
= 3.7m
112.48 𝑠𝑞.𝑚.
Plywood = 2.88
= 19. 53 ≈ 20𝑝𝑐𝑠.
2098.88 𝐵𝐹.
No. of 2”𝑥 2” 𝑥 ½’= 4 𝐵𝐹/𝑝𝑐.
= 524. 72 ≈ 525 𝑝𝑐𝑠.
4m 𝑥 8pcs = 32m
32 𝑥 6.0 = 192 BF
192 𝐵𝐹.
No. of 2”𝑥 3” 𝑥 12’= 6 𝐵𝐹/𝑝𝑐. = 32𝑝𝑐𝑠.
● use it 2 times:
2. 3m – 10pcs
0.3𝑚 0.3𝑚
L= 3- 2
- 2
= 2.7m
76.95 𝑠𝑞.𝑚.
Plywood = 2.88
= 26. 718 ≈ 27𝑝𝑐𝑠.
1435.88 𝐵𝐹.
No. of 2”𝑥 2” 𝑥 ½’= 4 𝐵𝐹/𝑝𝑐.
= 358. 97 ≈ 359 𝑝𝑐𝑠.
3m 𝑥 10pcs = 30m
30 𝑥 6.0 = 180 BF
180 𝐵𝐹.
No. of 2”𝑥 3” 𝑥 12’= 6 𝐵𝐹/𝑝𝑐. = 30𝑝𝑐𝑠.
● use it 2 times:
30 𝑥 50% = 15 pcs.
Quantity of Plywood: 15 pcs. - 2”𝑥 2” 𝑥12’ Lumber
3. 2.5m - 3pcs
0.3𝑚 0.3𝑚
L= 2.5- 2
- 2
= 2.2m
15.675 𝑠𝑞.𝑚.
Plywood = 2.88
= 5. 443 ≈ 6 𝑝𝑐𝑠.
292.50 𝐵𝐹.
No. of 2”𝑥 2” 𝑥 ½’= 4 𝐵𝐹/𝑝𝑐.
= 73. 125 ≈ 74 𝑝𝑐𝑠.
7.5 𝑥 6.0 = 45 BF
45 𝐵𝐹.
No. of 2”𝑥 3” 𝑥 12’= 6 𝐵𝐹/𝑝𝑐. = 7. 5 ≈ 8 𝑝𝑐𝑠.
● use it 2 times:
2. RB1
1. 4m-8pcs
L = 0.25m W = 0.2m
L= 3.75m
96 𝑠𝑞.𝑚.
Plywood = 2.88
= 16. 67 ≈ 17 𝑝𝑐𝑠.
1719.3648 𝐵𝐹.
No. of 2”𝑥 2” 𝑥 ½’= 4 𝐵𝐹/𝑝𝑐.
= 429. 84 ≈ 430 𝑝𝑐𝑠.
32 𝑥 6.0 = 192 BF
192 𝐵𝐹.
No. of 2”𝑥 3” 𝑥 12’= 6 𝐵𝐹/𝑝𝑐. = 32 𝑥 80% ≈ 25. 6 ≈ 26 𝑝𝑐𝑠.
● use it 2 times:
2. 3m-10pcs
P = 0.8
66 𝑠𝑞.𝑚.
Plywood = 2.88
𝑥 50% = 11. 46 ≈ 12𝑝𝑐𝑠.
1231.56 𝐵𝐹.
No. of 2”𝑥 2” 𝑥 ½’= 4 𝐵𝐹/𝑝𝑐.
𝑥 50% = 153. 95 ≈ 154 𝑝𝑐𝑠.
30 𝑥 6 = 180 BF
180 𝐵𝐹.
No. of 2”𝑥 3” 𝑥 12’= 6 𝐵𝐹/𝑝𝑐. 𝑥 50% = 15 𝑝𝑐𝑠.
3. 2.5m - 3pcs
P = 0.8
13.5 𝑠𝑞.𝑚.
Plywood = 2.88
𝑥 50% = 3𝑝𝑐𝑠.
2591.91 𝐵𝐹.
No. of 2”𝑥 2” 𝑥 ½’= 4 𝐵𝐹/𝑝𝑐.
𝑥 50% = 32 𝑝𝑐𝑠.
7.5 𝑥 6 = 45BF
45𝐵𝐹.
No. of 2”𝑥 3” 𝑥 12’= 6 𝐵𝐹/𝑝𝑐. 𝑥 50% = 3. 75 ≈ 4 𝑝𝑐𝑠.
P = 0.8
19.8 𝑠𝑞.𝑚.
Plywood = 2.88
𝑥 50% = 4𝑝𝑐𝑠.
369.47 𝐵𝐹.
No. of 2”𝑥 2” 𝑥 ½’= 4 𝐵𝐹/𝑝𝑐.
𝑥 50% = 47 𝑝𝑐𝑠.
3m 𝑥 3pcs = 9m
9 𝑥 6 = 54BF
54𝐵𝐹.
No. of 2”𝑥 3” 𝑥 12’= 6 𝐵𝐹/𝑝𝑐. 𝑥 50% = 4. 5 ≈ 5 𝑝𝑐𝑠.
REINFORCEMENT:
Footing:
# of cut bars =
# of cut bars =
Computing wastage:
9m - (5 × 1.56) = 1.2 m
# Of intersections: 8 × 8 = 64
Wall footing
# of cut bars =
# of cut bars =
Computing wastage:
9m - (20 × 0.45) = 1.2 m
(5 pcs - 6m × 12mm Ø)
Tie wires
# Of intersections: 3 × 3 = 9
Columns
l Set 1 = 1 - 16mm Ø × 6m
Per columns:
4pcs - 16mm Ø × 6m
For 15 columns:
4 × 15 = 60 pcs - 16mm Ø × 6m
# of cut bars =
Computing wastage:
(5 pcs - 6m × 12mm Ø)
Tie wires
Beams
1. 4m - 8pcs
2. 3m - 10pcs
3. 2.5m - 3pcs
1. 3m - 3pcs
Using 9m:
6pcs - 12mm Ø × 9m
RB1: L= 250mm, W = 200mm, Cover = 40mm, 6 - 12mm Ø
1. 4m - 8pcs
Using 6m:
64pcs - 16mm Ø × 6m
2. 3m - 10pcs
Using 9m:
40pcs - 16mm Ø × 9m
3. 2.5m - 3pcs
Using 7.5m:
1. 3m - 3pcs
Bar length = 3000mm + 300mm + 300mm + 256mm + 256mm - 40mm -
40mm = 4032mm or 4.032m
Using 9m:
6pcs - 12mm Ø × 9m
1. 4m - 8pcs
Using 6m:
48pcs - 12mm Ø × 6m
2. 3m - 10pcs
Using 9m:
30pcs - 16mm Ø × 9m
3. 2.5m - 3pcs
TOTAL ESTIMATION:
1. 64pcs – 16mm Ø x 6m
2. 48pcs – 12mm Ø x 6m
3. 12pcs – 16mm Ø x 7.5m
4. 9 pcs – 12mm Ø x 7.5m
5. 36 pcs – 12mm Ø x 9m
6. 40pcs – 16mm Ø x 9m
BEAMS STIRRUPS
Stirrups= 10mm Ø
1. 4m - 8pcs
Spacing:
Effective depth = 300mm - 40mm - 10mm - 8mm = 242mm or 0.242m
Max spacing:
# of stirrups =
Using 6m: :
46 pcs - 10mm Ø × 6m
2. 3m - 10pcs
Spacing:
Max spacing:
# of stirrups =
Using 6m: :
44 pcs - 10mm Ø × 6m
3. 2.5m - 10pcs
Spacing:
Max spacing:
# of stirrups =
Using 6m: :
11 pcs - 10mm Ø × 6m
1. 3m - 3pcs
Spacing:
Max spacing:
# of stirrups =
Using 6m: :
11 pcs - 10mm Ø × 6m
1. 4m - 8pcs
Spacing:
Max spacing:
# of stirrups =
Using 6m: :
48 pcs - 10mm Ø × 6m
2. 3m - 10pcs
Spacing:
Max spacing:
# of stirrups =
Using 6m: :
46 pcs - 10mm Ø × 6m
3. 2.5m - 3pcs
Spacing:
Max spacing:
# of stirrups =
12pcs - 10mm Ø × 6m
Total estimation:
2788𝑚
Tiewire in kg: 53𝑘𝑔/𝑚
= 54. 28𝑘𝑔