EL-06 Earth Pit Testing Report

This test proforma document provides information for earthing installation work at a project site. It includes details of the client and contractor. There are sections to record the type and number of electrodes used, their material, and the results of general checks and earth resistance measurements for each electrode. Space is also provided for location details and any remarks. The contractor, client, and safety officer must sign off with date after completing the tests and measurements.

Uploaded by

shamshad ahamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
6K views1 page

EL-06 Earth Pit Testing Report

This test proforma document provides information for earthing installation work at a project site. It includes details of the client and contractor. There are sections to record the type and number of electrodes used, their material, and the results of general checks and earth resistance measurements for each electrode. Space is also provided for location details and any remarks. The contractor, client, and safety officer must sign off with date after completing the tests and measurements.

Uploaded by

shamshad ahamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ROHAN BUILDERS (I) PVT.LTD.

TEST PROFORMA
EARTHING INSTALLATION
Date:

Client :

Project :

Name of work :

Contractor :

Equipment Name & Number:


EARTH SYSTEM DATA

Type of electrode :

Total number of electrodes :

Material :

1.0 GENERAL CHECKS – 1)Condition of Earth Pit.2)Identification No .3)Earth pit construction

2.0 Measured earth resistance of each electrode in ohms

SI.NO Electrode Measured Resistance in Location Required Remarks


No. ohms

CONTRACTOR CLIENT/CONSULTANT

ELECTRICIAN NAME: NAME:

SIGN: SIGN:

DATE: DATE:

Safety Officer Name& Sign :----------------------------------------------------------------------------

RBIPL/EHS/EI: 06 RV: 00