REPORT DATE:01-02-2023 DAILY REPORT MONTH OF

BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 460.608 463.402 1000
LT Room Feeder DG 6650.553 6650.553 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8294.202 8296.970 1000
AC Panel 3183.912 3185.057 1000
Power Panel 24.996 25.004 1000
Lighting Panel 138.488 138.541 1000
W/S UPS Panel- 20 KVA UPS 94.217 94.254 1000
Lab & Server Panel - 200 KVA UPS 4640.974 4642.588 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 02-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2794
0
2794

ALCATEL FEEDERS
KWH Units Remarks
2768
1145
8
53
37
1614
2857

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 02-02-2023

Completed date
Completed date
REPORT DATE:02-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 463.402 466.237 1000
LT Room Feeder DG 6650.553 6650.553 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8296.970 8299.858 1000
AC Panel 3185.057 3186.244 1000
Power Panel 25.004 25.019 1000
Lighting Panel 138.541 138.596 1000
W/S UPS Panel- 20 KVA UPS 94.254 94.291 1000
Lab & Server Panel - 200 KVA UPS 4642.588 4644.279 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 03-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2835
0
2835

ALCATEL FEEDERS
KWH Units Remarks
2888
1187
15
55
37
1691
2985

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 03-02-2023

Completed date
Completed date
REPORT DATE:03-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 466.237 468.951 1000
LT Room Feeder DG 6650.553 6650.553 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8299.858 8302.481 1000
AC Panel 3186.244 3187.330 1000
Power Panel 25.019 25.020 1000
Lighting Panel 138.596 138.655 1000
W/S UPS Panel- 20 KVA UPS 94.291 94.326 1000
Lab & Server Panel - 200 KVA UPS 4644.279 4645.792 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 04-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2714
0
2714

ALCATEL FEEDERS
KWH Units Remarks
2623
1086
1
59
35
1513
2694

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 04-02-2023

Completed date
Completed date
REPORT DATE:04-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 468.951 471.891 1000
LT Room Feeder DG 6650.553 6650.553 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8302.481 8305.392 1000
AC Panel 3187.330 3188.681 1000
Power Panel 25.020 25.023 1000
Lighting Panel 138.655 138.680 1000
W/S UPS Panel- 20 KVA UPS 94.326 94.349 1000
Lab & Server Panel - 200 KVA UPS 4645.792 4647.444 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
Fire alarm system test weekly pm work done
Public address system weekly pm work done
Panic bar weekly pm work done
Fire alarm system test weekly pm work done
CCTV system weekly pm work done
Access control system weekly pm work done
Carpentry weekly pm work done
Lighting weekly pm work done
UDB,HUB ROOM DB PM done.
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 05-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2940
0
2940

ALCATEL FEEDERS
KWH Units Remarks
2911
1351
3
25
23
1652
3054

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 05-02-2023

Completed date
Completed date
REPORT DATE:05-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 471.891 474.762 1000
LT Room Feeder DG 6650.553 6650.553 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8305.392 8308.242 1000
AC Panel 3188.681 3190.031 1000
Power Panel 25.023 25.026 1000
Lighting Panel 138.680 138.698 1000
W/S UPS Panel- 20 KVA UPS 94.349 94.368 1000
Lab & Server Panel - 200 KVA UPS 4647.444 4649.048 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 06-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2871
0
2871

ALCATEL FEEDERS
KWH Units Remarks
2850
1350
3
18
19
1604
2994

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 06-02-2023

Completed date
Completed date
REPORT DATE:06-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 474.762 477.665 1000
LT Room Feeder DG 6650.553 6650.553 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8308.242 8311.124 1000
AC Panel 3190.031 3191.343 1000
Power Panel 25.026 25.034 1000
Lighting Panel 138.698 138.752 1000
W/S UPS Panel- 20 KVA UPS 94.368 94.403 1000
Lab & Server Panel - 200 KVA UPS 4649.048 4650.656 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 07-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2903
0
2903

ALCATEL FEEDERS
KWH Units Remarks
2882
1312
8
54
35
1608
3017

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 07-02-2023

Completed date
Completed date
REPORT DATE:07-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 477.665 480.551 1000
LT Room Feeder DG 6650.553 6650.553 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8311.124 8313.989 1000
AC Panel 3191.343 3192.591 1000
Power Panel 25.034 25.042 1000
Lighting Panel 138.752 138.801 1000
W/S UPS Panel- 20 KVA UPS 94.403 94.440 1000
Lab & Server Panel - 200 KVA UPS 4650.656 4652.282 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 08-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2886
0
2886

ALCATEL FEEDERS
KWH Units Remarks
2865
1248
8
49
37
1626
2968

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 08-02-2023

Completed date
Completed date
REPORT DATE:08-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 480.551 483.497 1000
LT Room Feeder DG 6650.553 6650.553 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8313.989 8316.932 1000
AC Panel 3192.591 3193.909 1000
Power Panel 25.042 25.051 1000
Lighting Panel 138.801 138.853 1000
W/S UPS Panel- 20 KVA UPS 94.440 94.480 1000
Lab & Server Panel - 200 KVA UPS 4652.282 4653.940 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 09-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2946
0
2946

ALCATEL FEEDERS
KWH Units Remarks
2943
1318
9
52
40
1658
3077

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 09-02-2023

Completed date
Completed date
REPORT DATE:09-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 483.497 485.920 1000
LT Room Feeder DG 6650.553 7061.800 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8316.932 8319.720 1000
AC Panel 3193.909 3195.156 1000
Power Panel 25.051 25.060 1000
Lighting Panel 138.853 138.896 1000
W/S UPS Panel- 20 KVA UPS 94.480 94.517 1000
Lab & Server Panel - 200 KVA UPS 4653.940 4655.503 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 10-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2423
411
2834

ALCATEL FEEDERS
KWH Units Remarks
2788
1247
9
43
37
1563
2899

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 10-02-2023

Completed date
Completed date
REPORT DATE:10-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 485.920 488.423 1000
LT Room Feeder DG 7061.800 7464.656 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8319.720 8322.609 1000
AC Panel 3195.156 3196.436 1000
Power Panel 25.060 25.069 1000
Lighting Panel 138.896 138.945 1000
W/S UPS Panel- 20 KVA UPS 94.517 94.553 1000
Lab & Server Panel - 200 KVA UPS 4655.503 4657.130 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 11-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2503
403
2906

ALCATEL FEEDERS
KWH Units Remarks
2889
1280
9
49
36
1627
3001

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 11-02-2023

Completed date
Completed date
REPORT DATE:11-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 488.423 491.389 1000
LT Room Feeder DG 7464.656 7464.656 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8322.609 8325.554 1000
AC Panel 3196.436 3197.825 1000
Power Panel 25.069 25.075 1000
Lighting Panel 138.945 138.981 1000
W/S UPS Panel- 20 KVA UPS 94.553 94.582 1000
Lab & Server Panel - 200 KVA UPS 4657.130 4658.756 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
Fire alarm system test weekly pm work done
Public address system weekly pm work done
Panic bar weekly pm work done
Fire alarm system test weekly pm work done
CCTV system weekly pm work done
Access control system weekly pm work done
Carpentry weekly pm work done
LDB 1 & 2
Exhust Fan #3
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 12-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2966
0
2966

ALCATEL FEEDERS
KWH Units Remarks
2945
1389
6
36
29
1626
3086

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 12-02-2023

Completed date
Completed date
REPORT DATE:12-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 491.389 494.256 1000
LT Room Feeder DG 7464.656 7464.656 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8325.554 8328.404 1000
AC Panel 3197.825 3199.119 1000
Power Panel 25.075 25.077 1000
Lighting Panel 138.981 139.000 1000
W/S UPS Panel- 20 KVA UPS 94.582 94.603 1000
Lab & Server Panel - 200 KVA UPS 4658.756 4660.380 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 13-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2867
0
2867

ALCATEL FEEDERS
KWH Units Remarks
2850
1294
2
19
21
1624
2960

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 13-02-2023

Completed date
Completed date
REPORT DATE:13-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 494.256 497.082 1000
LT Room Feeder DG 7464.656 7464.656 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8328.404 8331.208 1000
AC Panel 3199.119 3200.341 1000
Power Panel 25.077 25.085 1000
Lighting Panel 139.000 139.045 1000
W/S UPS Panel- 20 KVA UPS 94.603 94.640 1000
Lab & Server Panel - 200 KVA UPS 4660.380 4661.960 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 14-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2826
0
2826

ALCATEL FEEDERS
KWH Units Remarks
2804
1222
8
45
37
1580
2892

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 14-02-2023

Completed date
Completed date
REPORT DATE:14-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 497.082 499.966 1000
LT Room Feeder DG 7464.656 7464.656 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8331.208 8334.066 1000
AC Panel 3200.341 3201.569 1000
Power Panel 25.085 25.092 1000
Lighting Panel 139.045 139.094 1000
W/S UPS Panel- 20 KVA UPS 94.640 94.676 1000
Lab & Server Panel - 200 KVA UPS 4661.960 4663.586 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 15-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2884
0
2884

ALCATEL FEEDERS
KWH Units Remarks
2858
1228
7
49
36
1626
2946

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 15-02-2023

Completed date
Completed date
REPORT DATE:15-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 499.966 502.908 1000
LT Room Feeder DG 7464.656 7464.656 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8334.066 8336.972 1000
AC Panel 3201.569 3202.816 1000
Power Panel 25.092 25.100 1000
Lighting Panel 139.094 139.141 1000
W/S UPS Panel- 20 KVA UPS 94.676 94.716 1000
Lab & Server Panel - 200 KVA UPS 4663.586 4665.243 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 16-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2942
0
2942

ALCATEL FEEDERS
KWH Units Remarks
2906
1247
8
47
40
1657
2999

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 16-02-2023

Completed date
Completed date
REPORT DATE:16-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 502.908 505.747 1000
LT Room Feeder DG 7464.656 7464.656 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8336.972 8339.779 1000
AC Panel 3202.816 3204.026 1000
Power Panel 25.100 25.108 1000
Lighting Panel 139.141 139.188 1000
W/S UPS Panel- 20 KVA UPS 94.716 94.752 1000
Lab & Server Panel - 200 KVA UPS 4665.243 4666.842 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 17-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2839
0
2839

ALCATEL FEEDERS
KWH Units Remarks
2807
1210
8
47
36
1599
2900

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 17-02-2023

Completed date
Completed date
REPORT DATE:17-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 505.747 508.663 1000
LT Room Feeder DG 7464.656 7464.656 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8339.779 8342.586 1000
AC Panel 3204.026 3205.324 1000
Power Panel 25.108 25.115 1000
Lighting Panel 139.188 139.236 1000
W/S UPS Panel- 20 KVA UPS 94.752 94.790 1000
Lab & Server Panel - 200 KVA UPS 4666.842 4668.441 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 18-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2916
0
2916

ALCATEL FEEDERS
KWH Units Remarks
2807
1298
7
48
38
1599
2990

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 18-02-2023

Completed date
Completed date
REPORT DATE:18-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 508.663 511.533 1000
LT Room Feeder DG 7464.656 7464.656 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8342.586 8345.523 1000
AC Panel 3205.324 3206.571 1000
Power Panel 25.115 25.119 1000
Lighting Panel 139.236 139.290 1000
W/S UPS Panel- 20 KVA UPS 94.790 94.811 1000
Lab & Server Panel - 200 KVA UPS 4668.441 4670.075 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 19-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2870
0
2870

ALCATEL FEEDERS
KWH Units Remarks
2937
1247
4
54
21
1634
2960

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 19-02-2023

Completed date
Completed date
REPORT DATE:19-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 511.533 514.400 1000
LT Room Feeder DG 7464.656 7464.656 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8345.523 8348.366 1000
AC Panel 3206.571 3207.839 1000
Power Panel 25.119 25.121 1000
Lighting Panel 139.290 139.303 1000
W/S UPS Panel- 20 KVA UPS 94.811 94.833 1000
Lab & Server Panel - 200 KVA UPS 4670.075 4671.709 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
Fire alarm system test weekly pm work done
Public address system weekly pm work done
water leakage detection system weekly pm work done
Fire alarm system test weekly pm work done
CCTV system weekly pm work done
Access control system weekly pm work done
Exhuast fan -1&2 weekly pm work done
Erath fit weekly pm work done
Carpentry weekly pm work done
Lighting weekly pm work done
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 20-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2867
0
2867

ALCATEL FEEDERS
KWH Units Remarks
2843
1268
2
13
22
1634
2939

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 20-02-2023

Completed date
Completed date
REPORT DATE:20-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 514.400 517.227 1000
LT Room Feeder DG 7464.656 7464.656 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8348.366 8351.172 1000
AC Panel 3207.839 3209.062 1000
Power Panel 25.121 25.129 1000
Lighting Panel 139.303 139.351 1000
W/S UPS Panel- 20 KVA UPS 94.833 94.868 1000
Lab & Server Panel - 200 KVA UPS 4671.709 4673.288 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 21-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2827
0
2827

ALCATEL FEEDERS
KWH Units Remarks
2806
1223
8
48
35
1579
2893

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 21-02-2023

Completed date
Completed date
REPORT DATE:22-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 517.227 520.163 1000
LT Room Feeder DG 7464.656 7464.656 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8351.172 8354.082 1000
AC Panel 3209.062 3210.319 1000
Power Panel 25.129 25.136 1000
Lighting Panel 139.351 139.404 1000
W/S UPS Panel- 20 KVA UPS 94.868 94.904 1000
Lab & Server Panel - 200 KVA UPS 4673.288 4674.938 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 23-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2936
0
2936

ALCATEL FEEDERS
KWH Units Remarks
2910
1257
7
53
36
1650
3003

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 23-02-2023

Completed date
Completed date
REPORT DATE:22-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 520.163 523.059 1000
LT Room Feeder DG 7464.656 7464.656 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8354.082 8356.958 1000
AC Panel 3210.319 3211.583 1000
Power Panel 25.136 25.144 1000
Lighting Panel 139.404 139.454 1000
W/S UPS Panel- 20 KVA UPS 94.904 94.940 1000
Lab & Server Panel - 200 KVA UPS 4674.938 4676.546 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 23-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2896
0
2896

ALCATEL FEEDERS
KWH Units Remarks
2876
1264
8
50
36
1608
2966

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 23-02-2023

Completed date
Completed date
REPORT DATE:23-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 523.059 525.900 1000
LT Room Feeder DG 7464.656 7491.726 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8356.958 8359.796 1000
AC Panel 3211.583 3212.797 1000
Power Panel 25.144 25.151 1000
Lighting Panel 139.454 139.500 1000
W/S UPS Panel- 20 KVA UPS 94.940 94.979 1000
Lab & Server Panel - 200 KVA UPS 4676.546 4678.162 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 24-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2841
27
2868

ALCATEL FEEDERS
KWH Units Remarks
2838
1214
7
46
39
1616
2922

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 24-02-2023

Completed date
Completed date
REPORT DATE:24-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 525.900 528.782 1000
LT Room Feeder DG 7491.726 7491.726 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8359.796 8362.657 1000
AC Panel 3212.797 3214.024 1000
Power Panel 25.151 25.159 1000
Lighting Panel 139.500 139.547 1000
W/S UPS Panel- 20 KVA UPS 94.979 95.013 1000
Lab & Server Panel - 200 KVA UPS 4678.162 4679.777 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 25-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2882
0
2882

ALCATEL FEEDERS
KWH Units Remarks
2861
1227
8
47
34
1615
2931

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 25-02-2023

Completed date
Completed date
REPORT DATE:25-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 528.782 531.678 1000
LT Room Feeder DG 7491.726 7491.726 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8362.657 8365.529 1000
AC Panel 3214.024 3215.291 1000
Power Panel 25.159 25.163 1000
Lighting Panel 139.547 139.584 1000
W/S UPS Panel- 20 KVA UPS 95.013 95.040 1000
Lab & Server Panel - 200 KVA UPS 4679.777 4681.399 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 26-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2896
0
2896

ALCATEL FEEDERS
KWH Units Remarks
2872
1267
4
37
27
1622
2957

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 26-02-2023

Completed date
Completed date
REPORT DATE:26-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 531.678 534.544 1000
LT Room Feeder DG 7491.726 7491.726 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8365.529 8368.443 1000
AC Panel 3215.291 3216.574 1000
Power Panel 25.163 25.165 1000
Lighting Panel 139.584 139.598 1000
W/S UPS Panel- 20 KVA UPS 95.040 95.063 1000
Lab & Server Panel - 200 KVA UPS 4681.399 4683.068 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 27-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2866
0
2866

ALCATEL FEEDERS
KWH Units Remarks
2914
1283
2
14
23
1669
2991

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 27-02-2023

Completed date
Completed date
REPORT DATE:27-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 534.544 537.398 1000
LT Room Feeder DG 7491.726 7525.340 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8368.443 8371.234 1000
AC Panel 3216.574 3217.807 1000
Power Panel 25.165 25.171 1000
Lighting Panel 139.598 139.640 1000
W/S UPS Panel- 20 KVA UPS 95.063 95.098 1000
Lab & Server Panel - 200 KVA UPS 4683.068 4684.634 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 28-02-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2854
34
2888

ALCATEL FEEDERS
KWH Units Remarks
2791
1233
6
42
35
1566
2882

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 28-02-2023

Completed date
Completed date
REPORT DATE:28-02-2023 DAILY REPORT MONTH OF
BRIGADE MAGNUM FE
Feeder Name Opening Closing Multiplication Factor
LT Room Feeder EB 537.398 540.263 1000
LT Room Feeder DG 7525.340 7525.340 1

ALCATEL FEEDE
Feeder Name Opening Closing Multiplication Factor
Main Common Panel 8371.234 8379.071 1000
AC Panel 3217.807 3219.058 1000
Power Panel 25.171 25.178 1000
Lighting Panel 139.640 139.692 1000
W/S UPS Panel- 20 KVA UPS 95.098 95.135 1000
Lab & Server Panel - 200 KVA UPS 4684.634 4686.227 1000

DG SET'S RUNNING D
From Time From Time To Time Duration
Power failure-1 0:00 0:00 0:00
Power failure-2 0:00 0:00 0:00
Power failure-3 0:00 0:00 0:00
Total DG set's running Hours

EQUIPMENT HEALTHINES
Whether
Equipment Name Normal / Reason if Abnormal
Abnormal
UPS Normal
DG-380KVA Normal
Security systems Normal
Precision A/c Normal
CSU's Normal
DX Unit Normal
Split Ac Normal
AHU's Normal
VFD's Normal
Battery monitoring system Abnormal
CCTV Abnormal
Electrical Panels Normal 200 KVA UPS o/p energy meter 16% error

HVAC BMS System Normal


Pre-Action System Normal
Fire Panel Normal
Whether
Equipment Name-Carpentry Normal / Reason if Abnormal
Abnormal
Door Closures Normal
Doors (Handles & door alignment) Normal
Floor spring Normal
Whether
Equipment Name (Plumbing) Normal / Reason if Abnormal
Abnormal
Urinal Normal
Wash basin Normal
Dish Wash basin Normal
Solenoid valve`s Abnormal
W/C Flush Normal
Health faucet Normal
Seat covers Normal
wash basin taps Normal
Wash basin tap spindle Normal
Drain block if any Normal
Whether
Cafeteria Equipment's Normal / Reason if Abnormal
Abnormal
Micro oven. Total =2Nos Normal
Refrigerator-1Nos Normal
REGULAR WORK ACTIVITI
Checked & Updated AHU, UPS, PAC & Electrical panel daily check list.
Checked LDB's, UPS DB's,Lighting DB's and ELDB's found normal.
Switched ON workstation lights as per requirements
Hourly UPS reading recorded & all its parameters.
Checked & Updated daily PAC, AHU, & Hub room temp check list .
Every two hours temperature reading recorded for the PAC units, Lab & Hub Room.
Taking the Access report(First IN & Last Out Entry report)
A' Check carried of the basement 380KVA DG.
Switching OFF Workstation Unwanted Lightings
Recording KWH reading of all the feeders & BTU Meter reading @ 00:00Hrs.
Water dispenser & Coffee vending machine switched OFF
VENDOR & IN HOUSE WORK AC
PORT MONTH OF FEBRUARY - 2023 SUBMISSION DATE: 01-03-2023
RIGADE MAGNUM FEEDERS
KWH Units Remarks
2865
0
2865

ALCATEL FEEDERS
KWH Units Remarks
7837
1251
7
52
37
1593
2940

G SET'S RUNNING DETAILS


Remarks

PMENT HEALTHINESS REPORT


Complaint Complaint Date of last
Action taken Status
Date Number action
Quote received & Shared 13-Jun-22

Action taken Status

Action taken Status

Complaint Complaint Date of last % of work


Action taken
Date Number action completion

LAR WORK ACTIVITIES DETAILS

N HOUSE WORK ACTIVITIES DETAILS


MISSION DATE: 01-03-2023

Completed date
Completed date
LT ROOM EB / Brigade LT ROOM
DATE
Opening Closing Consum. Cumulative Opening
1-Feb-2023 460608 463402 2794 2794 6650.553
2-Feb-2023 463402 466237 2835 5629 6650.553
3-Feb-2023 466237 468951 2714 8343 6650.553
4-Feb-2023 468951 471891 2940 11283 6650.553
5-Feb-2023 471891 474762 2871 14154 6650.553
6-Feb-2023 474762 477665 2903 17057 6650.553
7-Feb-2023 477665 480551 2886 19943 6650.553
8-Feb-2023 480551 483497 2946 22889 6650.553
9-Feb-2023 483497 485920 2423 25312 6650.553
10-Feb-2023 485920 488423 2503 27815 7061.800
11-Feb-2023 488423 491389 2966 30781 7464.656
12-Feb-2023 491389 494256 2867 33648 7464.656
13-Feb-2023 494256 497082 2826 36474 7464.656
14-Feb-2023 497082 499966 2884 39358 7464.656
15-Feb-2023 499966 502908 2942 42300 7464.656
16-Feb-2023 502908 505747 2839 45139 7464.656
17-Feb-2023 505747 508663 2916 48055 7464.656
18-Feb-2023 508663 511533 2870 50925 7464.656
19-Feb-2023 511533 514400 2867 53792 7464.656
20-Feb-2023 514400 517227 2827 56619 7464.656
21-Feb-2023 517227 520163 2936 59555 7464.656
22-Feb-2023 520163 523059 2896 62451 7464.656
23-Feb-2023 523059 525900 2841 65292 7464.656
24-Feb-2023 525900 528782 2882 68174 7491.726
25-Feb-2023 528782 531678 2896 71070 7491.726
26-Feb-2023 531678 534544 2866 73936 7491.726
27-Feb-2023 534544 537398 2854 76790 7491.726
28-Feb-2023 537398 540263 2865 79655 7525.340
Total (EB+DG) Units /
LT ROOM DG / Brigade
Brigade Feeder
Closing Consum. Cumulative KWH Units
6650.553 0 0 2794
6650.553 0 0 2835
6650.553 0 0 2714
6650.553 0 0 2940
6650.553 0 0 2871
6650.553 0 0 2903
6650.553 0 0 2886
6650.553 0 0 2946
7061.800 411 411 2834
7464.656 403 814 2906
7464.656 0 814 2966
7464.656 0 814 2867
7464.656 0 814 2826
7464.656 0 814 2884
7464.656 0 814 2942
7464.656 0 814 2839
7464.656 0 814 2916
7464.656 0 814 2870
7464.656 0 814 2867
7464.656 0 814 2827
7464.656 0 814 2936
7464.656 0 814 2896
7491.726 27 841 2868
7491.726 0 841 2882
7491.726 0 841 2896
7491.726 0 841 2866
7525.340 34 875 2888
7525.340 0 875 2865
Diff. b/w Brigade &
Alcatel Main Incomer
Alcatel Feeder
KWH Units Opening Closing Consum. Cumulative
26 8294.202 8296.970 2768 2768
-53 8296.970 8299.858 2888 5656
91 8299.858 8302.481 2623 8279
29 8302.481 8305.392 2911 11190
21 8305.392 8308.242 2850 14040
21 8308.242 8311.124 2882 16922
21 8311.124 8313.989 2865 19787
3 8313.989 8316.932 2943 22730
46 8316.932 8319.720 2788 25518
17 8319.720 8322.609 2889 28407
21 8322.609 8325.554 2945 31352
17 8325.554 8328.404 2850 34202
22 8328.404 8331.208 2804 37006
26 8331.208 8334.066 2858 39864
36 8334.066 8336.972 2906 42770
32 8336.972 8339.779 2807 45577
109 8339.779 8342.586 2807 48384
-67 8342.586 8345.523 2937 51321
24 8345.523 8348.366 2843 54164
21 8348.366 8351.172 2806 56970
26 8351.172 8354.082 2910 59880
20 8354.082 8356.958 2876 62756
30 8356.958 8359.796 2838 65594
21 8359.796 8362.657 2861 68455
24 8362.657 8365.529 2872 71327
-48 8365.529 8368.443 2914 74241
97 8368.443 8371.234 2791 77032
28 8371.234 8374.071 2837 79869
All UPS Transformer
HVAC PANEL
losses
CONSUMPTION Opening Closing Consum. Cumulative
-89 3183.912 3185.057 1145 1145
-97 3185.057 3186.244 1187 2332
-71 3186.244 3187.330 1086 3418
-143 3187.330 3188.681 1351 4769
-144 3188.681 3190.031 1350 6119
-135 3190.031 3191.343 1312 7431
-103 3191.343 3192.591 1248 8679
-134 3192.591 3193.909 1318 9997
-111 3193.909 3195.156 1247 11244
-112 3195.156 3196.436 1280 12524
-141 3196.436 3197.825 1389 13913
-110 3197.825 3199.119 1294 15207
-88 3199.119 3200.341 1222 16429
-88 3200.341 3201.569 1228 17657
-93 3201.569 3202.816 1247 18904
-93 3202.816 3204.026 1210 20114
-183 3204.026 3205.324 1298 21412
-23 3205.324 3206.571 1247 22659
-96 3206.571 3207.839 1268 23927
-87 3207.839 3209.062 1223 25150
-93 3209.062 3210.319 1257 26407
-90 3210.319 3211.583 1264 27671
-84 3211.583 3212.797 1214 28885
-70 3212.797 3214.024 1227 30112
-85 3214.024 3215.291 1267 31379
-77 3215.291 3216.574 1283 32662
-91 3216.574 3217.807 1233 33895
-103 3217.807 3219.058 1251 35146
RAW POWER PANEL LIGHTING PANEL

Opening Closing Consum. Cumulative Opening Closing


24996 25004 8 8.0 138.488 138.541
25004 25019 15 23 138.541 138.596
25019 25020 1 24 138.596 138.655
25020 25023 3 27 138.655 138.680
25023 25026 3 30 138.680 138.698
25026 25034 8 38 138.698 138.752
25034 25042 8 46 138.752 138.801
25042 25051 9 55 138.801 138.853
25051 25060 9 64 138.853 138.896
25060 25069 9 73 138.896 138.945
25069 25075 6 79 138.945 138.981
25075 25077 2 81 138.981 139.000
25077 25085 8 89 139.000 139.045
25085 25092 7 96 139.045 139.094
25092 25100 8 104 139.094 139.141
25100 25108 8 112 139.141 139.188
25108 25115 7 119 139.188 139.236
25115 25119 4 123 139.236 139.290
25119 25121 2 125 139.290 139.303
25121 25129 8 133 139.303 139.351
25129 25136 7 140 139.351 139.404
25136 25144 8 148 139.404 139.454
25144 25151 7 155 139.454 139.500
25151 25159 8 163 139.500 139.547
25159 25163 4 167 139.547 139.584
25163 25165 2 169 139.584 139.598
25165 25171 6 175 139.598 139.640
25171 25178 7 182 139.640 139.692
GHTING PANEL W/S UPS O/G

Consum. Cumulative Opening Closing Consum. Cumulative


53 53 94.217 94.254 37 37
55 108 94.254 94.291 37 74
59 167 94.291 94.326 35 109
25 192 94.326 94.349 23 132
18 210 94.349 94.368 19 151
54 264 94.368 94.403 35 186
49 313 94.403 94.440 37 223
52 365 94.440 94.480 40 263
43 408 94.480 94.517 37 300
49 457 94.517 94.553 36 336
36 493 94.553 94.582 29 365
19 512 94.582 94.603 21 386
45 557 94.603 94.640 37 423
49 606 94.640 94.676 36 459
47 653 94.676 94.716 40 499
47 700 94.716 94.752 36 535
48 748 94.752 94.790 38 573
54 802 94.790 94.811 21 594
13 815 94.811 94.833 22 616
48 863 94.833 94.868 35 651
53 916 94.868 94.904 36 687
50 966 94.904 94.940 36 723
46 1012 94.940 94.979 39 762
47 1059 94.979 95.013 34 796
37 1096 95.013 95.040 27 823
14 1110 95.040 95.063 23 846
42 1152 95.063 95.098 35 881
52 1204 95.098 95.135 37 918
Lab & Server UPS O/P Total Sub LAB
feeder Units
Opening Closing Consum. Cumulative Opening
4640.974 4642.588 1614 1614 2857 2268.782
4642.588 4644.279 1691 3305 2985 2269.594
4644.279 4645.792 1513 4818 2694 2270.458
4645.792 4647.444 1652 6470 3054 2271.256
4647.444 4649.048 1604 8074 2994 2272.154
4649.048 4650.656 1608 9682 3017 2273.030
4650.656 4652.282 1626 11308 2968 2273.889
4652.282 4653.940 1658 12966 3077 2274.707
4653.940 4655.503 1563 14529 2899 2275.548
4655.503 4657.130 1627 16156 3001 2276.335
4657.130 4658.756 1626 17782 3086 2277.181
4658.756 4660.380 1624 19406 2960 2278.066
4660.380 4661.960 1580 20986 2892 2278.950
4661.960 4663.586 1626 22612 2946 2279.812
4663.586 4665.243 1657 24269 2999 2280.696
4665.243 4666.842 1599 25868 2900 2281.600
4666.842 4668.441 1599 27467 2990 2282.471
4668.441 4670.075 1634 29101 2960 2283.476
4670.075 4671.709 1634 30735 2939 2284.231
4671.709 4673.288 1579 32314 2893 2285.121
4673.288 4674.938 1650 33964 3003 2285.981
4674.938 4676.546 1608 35572 2966 2286.879
4676.546 4678.162 1616 37188 2922 2287.755
4678.162 4679.777 1615 38803 2931 2288.635
4679.777 4681.399 1622 40425 2957 2289.516
4681.399 4683.068 1669 42094 2991 2290.400
4683.068 4684.634 1566 43660 2882 2291.310
4684.634 4686.227 1593 45253 2940 2292.162
LABPANEL A LABPANEL B

Closing Consum. Cumulative Opening Closing Consum.


2269.594 812 812 2201.971 2202.704 733
2270.458 864 1676 2202.704 2203.473 769
2271.256 798 2474 2203.473 2204.160 687
2272.154 898 3372 2204.160 2204.911 751
2273.030 876 4248 2204.911 2205.640 729
2273.889 859 5107 2205.640 2206.370 730
2274.707 818 5925 2206.370 2207.109 739
2275.548 841 6766 2207.109 2207.863 754
2276.335 787 7553 2207.863 2208.574 711
2277.181 846 8399 2208.574 2209.313 739
2278.066 885 9284 2209.313 2210.052 739
2278.950 884 10168 2210.052 2210.791 739
2279.812 862 11030 2210.791 2211.509 718
2280.696 884 11914 2211.509 2212.248 739
2281.600 904 12818 2212.248 2213.001 753
2282.471 871 13689 2213.001 2213.728 727
2283.476 1005 14694 2213.728 2214.526 798
2284.231 755 15449 2214.526 2215.196 670
2285.121 890 16339 2215.196 2215.938 742
2285.981 860 17199 2215.938 2216.656 718
2286.879 898 18097 2216.656 2217.405 749
2287.755 876 18973 2217.405 2218.136 731
2288.635 880 19853 2218.136 2218.870 734
2289.516 881 20734 2218.870 2219.603 733
2290.400 884 21618 2219.603 2220.339 736
2291.310 910 22528 2220.339 2221.098 759
2292.162 852 23380 2221.098 2221.809 711
2293.030 868 24248 2221.809 2222.533 724
EL B BTU Chilled water Consumption

Cumulative Opening Closing Consum. Cumulative


733 680514 680775 261 261
1502 680775 681019 244 505
2189 681019 681292 273 778
2940 681292 681292 0 778
3669 681292 681292 0 778
4399 681292 681570 278 1056
5138 681570 681775 205 1261
5892 681775 682095 320 1581
6603 682095 682345 250 1831
7342 682345 682642 297 2128
8081 682642 682897 255 2383
8820 682897 682987 90 2473
9538 682987 683175 188 2661
10277 683175 683502 327 2988
11030 683502 683850 348 3336
11757 683850 684194 344 3680
12555 684194 684521 327 4007
13225 684521 684521 0 4007
13967 684521 684521 0 4007
14685 684521 684804 283 4290
15434 684804 685148 344 4634
16165 685148 685472 324 4958
16899 685472 685716 244 5202
17632 685716 686053 337 5539
18368 686053 686053 0 5539
19127 686053 686053 0 5539
19838 686053 686321 268 5807
20562 686321 686639 318 6125
Date Main Incomer UPS & Transformers AC Panel Power Panel
1-Feb-2023 2794 -89 1145 8
2-Feb-2023 2835 -97 1187 15
3-Feb-2023 2714 -71 1086 1
4-Feb-2023 2940 -143 1351 3
5-Feb-2023 2871 -144 1350 3
6-Feb-2023 2903 -135 1312 8
7-Feb-2023 2886 -103 1248 8
8-Feb-2023 2946 -134 1318 9
9-Feb-2023 2423 -111 1247 9
10-Feb-2023 2503 -112 1280 9
11-Feb-2023 2966 -141 1389 6
12-Feb-2023 2867 -110 1294 2
13-Feb-2023 2826 -88 1222 8
14-Feb-2023 2884 -88 1228 7
15-Feb-2023 2942 -93 1247 8
16-Feb-2023 2839 -93 1210 8
17-Feb-2023 2916 -183 1298 7
18-Feb-2023 2870 -23 1247 4
19-Feb-2023 2867 -96 1268 2
20-Feb-2023 2827 -87 1223 8
21-Feb-2023 2936 -93 1257 7
22-Feb-2023 2896 -90 1264 8
23-Feb-2023 2841 -84 1214 7
24-Feb-2023 2882 -70 1227 8
25-Feb-2023 2896 -85 1267 4
26-Feb-2023 2866 -77 1283 2
27-Feb-2023 2854 -91 1233 6
28-Feb-2023 2865 -103 1251 7
Lighting Panel UPS-W/S-O/G Lab & Server UPS O/P
53 37 1614
55 37 1691
59 35 1513
25 23 1652
18 19 1604
54 35 1608
49 37 1626
52 40 1658
43 37 1563
49 36 1627
36 29 1626
19 21 1624
45 37 1580
49 36 1626
47 40 1657
47 36 1599
48 38 1599
54 21 1634
13 22 1634
48 35 1579
53 36 1650
50 36 1608
46 39 1616
47 34 1615
37 27 1622
14 23 1669
42 35 1566
52 37 1593
Housekeeping Service / FEB-2023
Sl. No. Description Location Status Remark
1 Wash room cleaning & Upkeep Ground Floor Completed
2 Meeting room cleaning & chair arranging Ground Floor Completed
3 AHU room cleaning Ground Floor Completed
4 Cleaning & Upkeep of Restroom Ground Floor Completed
5 Cleaning & Upkeep of Reception Area Ground Floor Completed
6 Printing machine cleaning & maintenance Ground Floor Completed
7 Pantry vending machine cleaning & maintenance Ground Floor Completed
8 Upkeep of Carpet area Ground Floor Completed
9 Workstation cleaning Ground Floor Completed
10 Garbage pickup Ground Floor Completed
11 Gym Room cleaning & upkeep Ground Floor Completed
12 BMS Room cleaning Ground Floor Completed
13 Plate & Spoon washing Ground Floor Completed
14 Pantry cleaning & upkeep Ground Floor Completed
15 Maintenance of the Stationary items Ground Floor Completed
Crockery Materials FEB-2023
Sl. No. Crockery Materials 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Spoons 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24 24
2 Visitor Spoons 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
3 Lunch Plates 91 91 91 91 91 91 91 91 91 91 91 91 91 91 91 91
4 Cups 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9
5 Saucers 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
6 Serving Trays 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
7 Pantry Chairs 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16
8 Pantry Tables 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
9 Snacks Plate 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11
10 Serving Glass 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
11 Serving plates (Medium) 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
12 Serving plates (Small) 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
13 Bowls(Medium) 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
14 Bowls(Small) 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
15 Bowl with Lid(Large) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
B-2023
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
24 24 24 24 24 24 24 24 24 24 24 24
11 11 11 11 11 11 11 11 11 11 11 11
91 91 91 91 91 91 91 91 91 91 91 91
9 9 9 9 9 9 9 9 9 9 9 9
18 18 18 18 18 18 18 18 18 18 18 18
1 1 1 1 1 1 1 1 1 1 1 1
16 16 16 16 16 16 16 16 16 16 16 16
4 4 4 4 4 4 4 4 4 4 4 4
11 11 11 11 11 11 11 11 11 11 11 11
8 8 8 8 8 8 8 8 8 8 8 8
5 5 5 5 5 5 5 5 5 5 5 5
8 8 8 8 8 8 8 8 8 8 8 8
8 8 8 8 8 8 8 8 8 8 8 8
8 8 8 8 8 8 8 8 8 8 8 8
2 2 2 2 2 2 2 2 2 2 2 2

You might also like