Building Estimation

This document provides a quantity sheet for estimating construction materials for a building project. It includes 11 items with descriptions of the materials and calculations of quantities needed. The key materials include: - 84.12 cubic meters of excavation for footings - 1.39 cubic meters of footing plain cement concrete - 4.95 cubic meters of footing reinforced cement concrete - The total quantities are provided for each material.

Uploaded by

Melkamu Amushe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
348 views

Building Estimation

This document provides a quantity sheet for estimating construction materials for a building project. It includes 11 items with descriptions of the materials and calculations of quantities needed. The key materials include: - 84.12 cubic meters of excavation for footings - 1.39 cubic meters of footing plain cement concrete - 4.95 cubic meters of footing reinforced cement concrete - The total quantities are provided for each material.

Uploaded by

Melkamu Amushe
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 22

Building Estimation

QUANTITY SHEET
Width/ Height/
Sr. No. Item Description No. Length Breadth Depth Quantity
(m)
(m) (m)

1 Earthwork in Excavation in
Foundation:
Site clearnce 200mm with extera (1m
x 1m) working space 1 12.240 9.690 118.61
BULK Excavation (with working space
(0.25 x 0.25) 1 10.740 8.190 0.600 52.78
Footing (1m x 1m) 11 2.200 2.200 1.580 84.12
Depth From GL = 0.6 + 1 + 0.6
0.6 =Extra For working space
Total Qty= 84.12
2 Footing PCC
Footing (1m x 1m) 11 1.300 1.300 0.075 1.39
Thickness = 0.075
D = 0.150 + 1.0 + 0.150
Total Qty= 1.39
3 Footing RCC
Base(1m x 1m) 11 1.000 1.000 0.450 4.95
Thickness = 0.450

Total Qty= 4.95


4 Column up to Plinth Level RCC
Column 11 0.230 0.230 1.050 0.61

Total Qty= 0.61


5 Back-filling
5.a Back-filling In Footing
Excavation Area 11 2.200 2.200 1.580 84.12
Deduction
Site clearnce 200mm with extera (1m
x 1m) working space -1 12.240 9.690 0.200 -23.72
BULK Excavation (with working space
(0.25 x 0.25) -1 10.740 8.190 0.600 -52.78
Footing P.C.C -11 1.300 1.300 0.075 -1.39
Footing RCC -11 1.000 1.000 0.450 -4.95
Footing Column -11 0.230 0.230 1.050 -0.61
5.a Total Qty= -83.45
5.b Plinth Beam Back filling
Plinth area out to out 1 10.240 7.690 0.600 47.25
Deduction
L-1 -3 10.240 0.230 0.600 -4.24
L-2 -4 3.000 0.230 0.600 -1.66
L-3 -3 4.000 0.230 0.600 -1.66
L-4 -1 1.500 0.230 0.600 -0.21
L-5 -1 2.315 0.230 0.600 -0.32
5.b Total Qty= 39.17
5.a + 5.b Total Qty= -44.28
6 Plinth Beam RCC
Beam (230 mm x 600 mm)
L-1 3 10.240 0.230 0.600 4.24
L-2 4 3.000 0.230 0.600 1.66
L-3 3 4.000 0.230 0.600 1.66
L-4 1 1.500 0.230 0.600 0.21
L-5 1 2.315 0.230 0.600 0.32

Total Qty= 0.32


7 Grade Slab RCC
Plinth area out to out 1 10.240 7.690 0.100 7.87
Deduction
Column -11 0.230 0.230 0.100 -0.06

Total Qty= 7.82


8 Column Up to Slab Level RCC
Column 11 0.230 0.230 2.650 1.54

Total Qty= 1.54


9 Brick Masonry  
230 mm thick wall Brick Masonry
Long Wall 3 10.240 0.230 2.650 18.72
Shot wall-1 3 3.000 0.230 2.650 5.49
Shot wall-1 1 3.000 0.230 1.200 0.83
Shot Wall-2 3 4.000 0.230 2.650 7.31
Deduction
Column -11 0.230 0.230 2.650 -1.54
Window W -2 2.000 0.230 1.200 -1.10
Window W1 -2 1.500 0.230 1.200 -0.83
Window W2 -3 1.200 0.230 1.200 -0.99
Window W3 -1 1.200 0.230 1.500 -0.41
Door o -2 1.200 0.230 2.100 -1.16
Door D -1 1.200 0.230 2.100 -0.58
Door D1 -1 1.000 0.230 2.100 -0.48
Door MS -1 2.000 0.230 1.200 -0.55
Vent -1 0.900 0.230 0.600 -0.12
Vent V1 -1 0.600 0.230 0.600 -0.08

Total Qty 230 mm Thick Wall= 24.49


115 mm thick wall Brick Masonry
Bath Room 1 1.500 0.115 2.650 0.46
Passage wall 1 2.315 0.115 2.650 0.71
Deduction
Door D2 -2 0.750 0.115 2.100 -0.36
Parapet Wall
Long Wall 2 10.240 0.115 1.000 2.36
Shot Wall 2 7.460 0.115 1.000 1.72
Total Qty 115 mm Thick Wall= 4.87
10 In Side Plaster
Bed Room
Long Wall 2 4.000 3.000 24.00
Shot wall 2 3.000 3.000 18.00
Deduction
Door D1 -0.5 1.000 2.100 -1.05
Window W2 -0.5 1.200 1.000 -0.60
Window W3 -0.5 1.200 1.200 -0.72
Kitchen + Dining
Long Wall 2 4.000 3.000 24.00
Shot wall 2 4.000 3.000 24.00
Deduction
Door O -0.5 1.200 2.100 -1.26
Window W2 -1 1.200 1.000 -1.20
Verandah
Long Wall 2 3.000 3.000 18.00
Shot wall 1 3.000 3.000 9.00
Shot wall 1 3.000 1.200 3.60
Deduction
Door MS -0.5 1.200 1.200 -0.72
Door D -0.5 1.200 2.100 -1.26
Window W -0.5 2.000 1.200 -1.20
DRG. Room
Long Wall 2 5.550 3.000 33.30
Shot wall 2 4.000 3.000 24.00
Deduction
Door O -1 1.200 2.100 -2.52
Door D -0.5 1.200 1.200 -0.72
Window W -0.5 2.000 1.200 -1.20
Window W1 -1 1.500 1.200 -1.80
Bath Room
Long Wall 2 1.500 3.000 9.00
Shot wall 2 1.200 3.000 7.20
Deduction
Door D2 -0.5 0.750 2.100 -0.79
Vent V1 -0.5 0.900 0.600 -0.27
W.C
Long Wall 2 1.500 3.000 9.00
Shot wall 2 1.000 3.000 6.00
Deduction
Door D2 -0.5 0.750 2.100 -0.79
Vent -0.5 0.600 0.600 -0.18
Passage
Long Wall 2 2.320 3.000 13.92
Shot wall 2 1.390 3.000 8.34
Deduction
Door D2 -1 0.750 2.100 -1.58
Door D1 -1 1.000 2.100 -2.10
Door O -1 1.200 2.100 -2.52

Total Qty In Side Plaster= 208.89


11 Out Side Plaster
Front Side 1 4.450 4.775 21.25
1 3.230 2.180 7.04
Lintel W 1 2.000 1.300 2.60
Deduction
Door MS -0.5 1.200 1.200 -0.72
Window W -0.5 2.000 1.200 -1.20
Back Side 1 7.690 4.775 36.72
Lintel W 2 2 1.200 1.300 3.12
Deduction
Window W 2 -1 1.200 1.000 -1.20
Right Side 1 10.240 4.775 48.90
Deduction
Window W -0.5 2.000 1.200 -1.20
Window W 3 -0.5 1.200 1.200 -0.72
Vent -0.5 0.600 0.600 -0.18
Vent V1 -0.5 0.900 0.600 -0.27
Left Side 1 10.240 4.775 48.90
Deduction
Window W 1 -1 1.500 1.200 -1.80
Window W 2 -0.5 1.200 1.000 -0.60
Parapet Wall
Long Wall 2 10.010 1.115 22.32
Shot Wall 2 7.460 1.000 14.92

Total Out Side Plaster Qty = 197.87


12 Ceiling Plaster
Bed Room 1 4.000 3.000 12.00
Kitchen + Dining 1 4.000 4.000 16.00
Verandah 1 3.000 3.000 9.00
DRG. Room 1 5.550 4.000 22.20
Bath Room 1 1.500 1.200 1.80
W.C 1 1.500 1.000 1.50
Passage 1 2.320 1.390 3.22

Total Out Side Plaster Qty = 65.72


13 Slab RCC
Slab Area 1 10.240 7.690 0.100 7.87
S-1 3 10.240 0.230 0.350 2.47
S-2 4 3.000 0.230 0.350 0.97
S-3 3 4.000 0.230 0.350 0.97
S-4 1 1.500 0.230 0.350 0.12
S-5 1 2.315 0.230 0.350 0.19

Total RCC Slab Qty= 12.59


14 In Side Paint
Bed Room
Long Wall 2 4.000 3.000 24.00
Shot wall 2 3.000 3.000 18.00
Bed Room Ceiling 1 4.000 3.000 12.00
Deduction
Door D1 -1 1.000 2.100 -2.10
Window W2 -1 1.200 1.000 -1.20
Window W3 -1 1.200 1.200 -1.44
Kitchen + Dining
Long Wall 2 4.000 3.000 24.00
Shot wall 2 4.000 3.000 24.00
Kitchen + Dining Ceiling 1 4.000 4.000 16.00
Deduction
Door O -1 1.200 2.100 -2.52
Window W2 -2 1.200 1.000 -2.40
Verandah
Long Wall 2 3.000 3.000 18.00
Shot wall 1 3.000 3.000 9.00
Shot wall 1 3.000 1.200 3.60
Verandah Ceiling 1 3.000 3.000 9.00
Deduction
Door MS -1 1.200 1.200 -1.44
Door D -1 1.200 2.100 -2.52
Window W -1 2.000 1.200 -2.40
DRG. Room
Long Wall 2 5.550 3.000 33.30
Shot wall 2 4.000 3.000 24.00
DRG. Room Ceiling 1 5.550 4.000 22.20
Deduction
Door O -2 1.200 2.100 -5.04
Door D -1 1.200 1.200 -1.44
Window W -1 2.000 1.200 -2.40
Window W1 -2 1.500 1.200 -3.60
Bath Room
Long Wall 2 1.500 3.000 9.00
Shot wall 2 1.200 3.000 7.20
Bath Room Ceiling 1 1.500 1.200 1.80
Deduction
Door D2 -1 0.750 2.100 -1.58
Vent V1 -1 0.900 0.600 -0.54
W.C
Long Wall 2 1.500 3.000 9.00
Shot wall 2 1.000 3.000 6.00
W.C Ceiling 1 1.500 1.000 1.50
Deduction
Door D2 -1 0.750 2.100 -1.58
Vent -1 0.600 0.600 -0.36
Passage
Long Wall 2 2.320 3.000 13.92
Shot wall 2 1.390 3.000 8.34
Passage Ceiling 1 2.320 1.390 3.22
Deduction
Door D2 -2 0.750 2.100 -3.15
Door D1 -2 1.000 2.100 -4.20
Door O -2 1.200 2.100 -5.04

Total Qty In Side Plaster= 252.14


15 Out Side Plaster
Front Side 1 4.450 4.775 21.25
1 3.230 2.180 7.04
Lintel W 1 2.000 1.300 2.60
Deduction
Door MS -1 1.200 1.200 -1.44
Window W -1 2.000 1.200 -2.40
Back Side 1 7.690 4.775 36.72
Lintel W 2 2 1.200 1.300 3.12
Deduction
Window W 2 -1 1.200 1.000 -1.20
Right Side 1 10.240 4.775 48.90
Deduction
Window W -1 2.000 1.200 -2.40
Window W 3 -1 1.200 1.200 -1.44
Vent -1 0.600 0.600 -0.36
Vent V1 -1 0.900 0.600 -0.54
Left Side 1 10.240 4.775 48.90
Deduction
Window W 1 -2 1.500 1.200 -3.60
Window W 2 -1 1.200 1.000 -1.20
Parapet Wall
Long Wall 2 10.010 1.115 22.32
Shot Wall 2 7.460 1.000 14.92

Total Out Side Plaster Qty = 191.18


Unit

Sum Data as per Drawing Length Width Height

m2

cu m
cu m Plit area 10.24 7.69
Footing P.C.C 1.3 1.3 0.075
Footing R.C.C 1 1 0.45
cu m Column Size 0.23 0.23
Plinth Beam 0.23 0.6
cu m

cu m

cu m

cu m

cu m

cu m

cu m

cu m

cu m
cu m
cu m
cu m
cu m

cu m

cu m
cu m
cu m
cu m
cu m
cu m
cu m

cu m
cu m
cu m
cu m
cu m

cu m

cu m

cu m

cu m

cu m

cu m Plan
Footing Location

cu m
cu m
cu m
cu m

cu m
cu m
cu m
cu m
cu m
cu m
cu m
cu m
cu m
cu m
cu m

cu m

cu m
cu m
Section
cu m

cu m
cu m
cu m

Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.

Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m. Elevation

Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.

Sq.m.
Sq.m.

Sq.m.
Sq.m.

Sq.m.
Sq.m.

Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.

Sq.m.

Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.

Sq.m.
cu m

Sq.m.

Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.

Sq.m.

cu m
cu m
cu m
cu m
cu m
cu m

cu m

Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.

Sq.m. Slab Beam


Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.

Sq.m.

Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.

Sq.m.
Sq.m.
Sq.m.
Sq.m.
Sq.m.

Sq.m.
Sq.m.

Sq.m.
Sq.m.

Sq.m.
Plinth Beam

ng Location
Plinth Beam