0% found this document useful (0 votes)
98 views1 page

Rhu Ii Edited

The document is a floor plan for a building officials office in Cebu City, Philippines. It includes dimensions and labels for various rooms in meters. There is an administration office, records room, minor surgical room, delivery room, labor room, newborn screening area, toilets, janitor's closet, and other areas. The building officials have recommended approval of this floor plan.

Uploaded by

KevinNavidad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
98 views1 page

Rhu Ii Edited

The document is a floor plan for a building officials office in Cebu City, Philippines. It includes dimensions and labels for various rooms in meters. There is an administration office, records room, minor surgical room, delivery room, labor room, newborn screening area, toilets, janitor's closet, and other areas. The building officials have recommended approval of this floor plan.

Uploaded by

KevinNavidad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

REPUBLIC OF THE PHILIPPINES

CEBU CITY

A B C C
OFFICE OF THE BUILDING
OFFICIALS
25.30

12.00 13.30 RECOMMENDING APPROVAL

7.50 3.00 1.50 3.20 3.91 1.99 1.50 1.40 1.30


DATE

A-1
A

1.40
MALE FEMALE
WASTE TOILET TOILET
HOLDING

5 AREA

1.10
SCRUB UP AREA
EMERGENCY
T&B EXIT JANITORS
DELIVERY ROOM LABOR ROOM CLOSET
3.00

ADMIN OFFICE / MINOR SURGICAL


RECORDS ROOM

1.80
T&B
PLACENTAL
PWD
PIT

NEW BORN

1.20
1.50

SCREENING H A L L W A Y H A L L W A Y
AREA

4 TOILET
SCRUB

AREA
UP 4
1.20

2.10
BREAST
SUPPLY WASHING
STERILIZATION PHARMACY STAFF OFFICE AREA FEEDING

14.00
ROOM AREA ROOM
13.00

RECEPTION AREA

TOILET W

3 3
1

2.90
ADMITTING AREA

B
5.70

RECOVERY
ROOM
WAITING AREA B-1
D
1
FAMILY PLANNING MHO / EXAMINATION
WAITING AREA WAITING AREA
ROOM CONSULTATION ROOM

2 OFFICE
2

1.90
PWD TOILET

1.60
ENTRANCE ENTRANCE 1 ENTRANCE
1.60

C O R R I D O R

1 1

C-1
C
PARKING AREA
FOR AMBULANCE

ramp ramp ramp


3.00 1.50 4.50 3.00 2.10 2.60 2.41 4.19 2.00

25.30

A B C C
BIRTHING HOME & BANTAYAN PRIMARY CARE
1 FACILITY - CLINICAL SERVICES FLOOR PLAN
A 1 SCALE: 1:75 meters

NG B A N
PROJECT TITLE: CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET CONTENT: SHEET NO.:
AN TA
Y

REPUBLIC OF THE PHILIPPINES


YA
BA

PROVINCE OF CEBU COMPLETION OF BANTAYAN


MUNICIPALITY OF BANTAYAN PRIMARY CARE FACILITY CLINICAL A1
AS SHOWN
SERVICES AREA (PHASE 2) JONEIL N. GIL ATHLINUTCHEN D. HUBAHIB JOSE RECHIE DELOS REYES , MPA HON. ARTHUR E. DESPI 2
BU
LA

LA
WI CE
OFFICE OF THE MUNICIPAL ENGINEER
G A N NG
Location: Brgy. Suba, Bantayan, Cebu Draftsman Engineer I OIC - MEO / Executive Assistant II Municipal Mayor

You might also like