0% found this document useful (0 votes)
78 views22 pages

Calculation Method For BoP Loss Test

The document calculates the balance of plant loss warranty for a wind turbine generator. It provides test date, readings from the SCADA and main transformer meters, accuracy classifications, auxiliary loads, plant operating status, wind speed, and calculated and corrected loss percentages. The calculated and corrected loss percentages are compared to an acceptance criteria of 2.2% to determine if the loss is within the warranty limits.

Uploaded by

Hau Nguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views22 pages

Calculation Method For BoP Loss Test

The document calculates the balance of plant loss warranty for a wind turbine generator. It provides test date, readings from the SCADA and main transformer meters, accuracy classifications, auxiliary loads, plant operating status, wind speed, and calculated and corrected loss percentages. The calculated and corrected loss percentages are compared to an acceptance criteria of 2.2% to determine if the loss is within the warranty limits.

Uploaded by

Hau Nguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 22

CALCULATION FOR BALANCE OF PLANT LOSS WARRANTY

Scope: “Balance of Plant excluding WTG Transformer Loss” means all losses of electrical energy from WTG Transforme
Test date SCADA at WTG Accuracy Corrected Meter at main Accuracy
transformer HV side class % SCADA at transformer HV side class %
(kWh) WTG (kWh)
transformer
HV side (kWh)
21-Aug 120568 0.5% +121171 116062 0.2%
20-Aug 246120 0.5% 247351 241388 0.2%
19-Aug 146674 0.5% 147407 142492 0.2%

18-May 37247 0.5% 37433 36510 0.2%


19-May 18305 0.5% 18397 17550 0.2%
15-May 246742 0.5% 247976 244021 0.2%
21-May 204651 0.5% 205674 201655 0.2%
22-May 463071 0.5% 465386 458080 0.2%
23-May 573574 0.5% 576442 565487 0.2%
electrical energy from WTG Transformer HV side up to the EVN Metering point at HV side of Main power transformers within substation bo
Corrected meter Auxiliary loads e.g Plant status Wind Calculated loss (%)
at main lighting, A/C.. (kWh) speed
transformer HV (m/s)
side (kWh) +
116295 1500 07 WT running 4.7 2.59
241870 1500 07 WT running 5.9 1.34
142777 1500 07 WT running 5.2 1.88

36583 1000 12 WT running 3.08 -0.72


17585 1000 12 WT running 2.41 -1.39
244509 1000 12 WT running 5.53 0.71
202058 1000 12 WT running 5.02 0.99
458996 1000 12 WT running 7.20 0.87
566618 1000 12 WT running 7.91 1.25
of Main power transformers within substation boundary, excluding air-conditioning, lighting loads as well as the power consumption of all th
Corrected loss (%) (ignore Acceptance
accuracy class) + criteria (%)

2.90 2.2
1.65 2.2
2.19 2.2

-0.41 2.2
-1.07 2.2
1.01 2.2
1.29 2.2
1.17 2.2
1.56 2.2
e power consumption of all the other site facilities
CALCULATION FOR BALANCE OF PLANT LOSS WARRANTY

Scope: “Balance of Plant excluding WTG Transformer Loss” means all losses of electrical energy from WTG Transforme
Test date SCADA at WTG Accuracy Corrected SCADA at WTG Meter at main Accuracy
transformer HV side class % transformer HV side transformer HV side class %
(kWh) (kWh) - (kWh)

21-Aug 120568 0.5% 119965 116062 0.2%


20-Aug 246120 0.5% 244890 241388 0.2%
19-Aug 146674 0.5% 145940 142492 0.2%

18-May 37247 0.5% 37061 36510 0.2%


19-May 18305 0.5% 18213 17550 0.2%
15-May 246742 0.5% 245508 244021 0.2%
21-May 204651 0.5% 203628 201655 0.2%
22-May 463071 0.5% 460756 458080 0.2%
23-May 573574 0.5% 570706 565487 0.2%
rical energy from WTG Transformer HV side up to the EVN Metering point at HV side of Main power transformers within substation bounda
Corrected meter at main Auxiliary loads e.g Plant status Wind Calculated loss
transformer HV side lighting, A/C.. (kWh) speed (%) (ignore
(kWh) + (m/s) accuracy class)

116295 1000 07 WT running 4.7 3.02


241870 1000 07 WT running 5.9 1.55
142777 1000 07 WT running 5.2 2.23

36583 1000 12 WT running 3.08 -0.72


17585 1000 12 WT running 2.41 -1.39
244509 1000 12 WT running 5.53 0.71
202058 1000 12 WT running 5.02 0.99
458996 1000 12 WT running 7.20 0.87
566618 1000 12 WT running 7.91 1.25
ower transformers within substation boundary, excluding air-conditioning, lighting loads as well as the power consumption of all the other sit
Corrected loss (%) Acceptance
(take into account of criteria (%)
accuracy class)

2.30 2.2
0.83 2.2
1.52 2.2

-1.43 2.2
-2.11 2.2
0.00 2.2
0.28 2.2
0.17 2.2
0.55 2.2
wer consumption of all the other site facilities
CALCULATION FOR BALANCE OF PLANT LOSS WARRANTY

Scope: “Balance of Plant excluding WTG Transformer Loss” means all losses of electrical energy from WTG Transforme
Test date SCADA at WTG Accuracy Corrected SCADA at WTG Meter at main Accuracy
transformer HV side class % transformer HV side transformer HV side class %
(kWh) (kWh) + (kWh)

21-Aug 120568 0.5% 121171 116062 0.2%


20-Aug 246120 0.5% 247351 241388 0.2%
19-Aug 146674 0.5% 147407 142492 0.2%

18-May 37247 0.5% 37433 36510 0.2%


19-May 18305 0.5% 18397 17550 0.2%
15-May 246742 0.5% 247976 244021 0.2%
21-May 204651 0.5% 205674 201655 0.2%
22-May 463071 0.5% 465386 458080 0.2%
23-May 573574 0.5% 576442 565487 0.2%
rical energy from WTG Transformer HV side up to the EVN Metering point at HV side of Main power transformers within substation bounda
Corrected meter at main Auxiliary loads e.g Plant status Wind Calculate Corrected loss (%)
transformer HV side lighting, A/C.. (kWh) speed d loss (%) (take into account of
(kWh) - (m/s) (ignore accuracy class) -
accuracy
class)
115830 1000 07 WT running 4.7 3.02 3.75
240905 1000 07 WT running 5.9 1.55 2.26
142207 1000 07 WT running 5.2 2.23 2.95

36437 1000 12 WT running 4.7 -0.72 -0.01


17514 1000 12 WT running 5.9 -1.39 -0.67
243533 1000 12 WT running 5.2 0.71 1.41
201251 1000 12 WT running 4.7 0.99 1.70
457163 1000 12 WT running 5.9 0.87 1.58
564356 1000 12 WT running 5.2 1.25 1.96
rs within substation boundary, excluding air-conditioning, lighting loads as well as the power consumption of all the other site facilities
Acceptance
criteria (%)

2.2
2.2
2.2

2.2
2.2
2.2
2.2
2.2
2.2
e other site facilities
13-May-2022 14-May-2022 15-May-2022 16-May-2022

Total  WS  WS  WS Total  WS


Total Total
PWTG (kW average average average PWTG (kWh) average
P  (kWh)  P  (kWh) 
h)  24h (m/s)  WTG 24h (m/s)  WTG 24h (m/s)    24h (m/s) 

15,979 4.3 11,627 4.2 23,996 5 10,124 4.2

WT02 9,994 4.36 10,262 4.16 20016 5.52 9098 4.34


WT04 9,954 4.40 10,398 4.21 19862 5.59 9395 4.47
WT06 9,915 4.39 10,640 4.24 19039 5.66 8871 4.4
WT08 10,132 4.35 10,995 4.18 19308 5.44 9134 4.31
WT10 10,007 4.32 9,765 3.86 18337 5.43 5877 4.25
WT12 13,869 4.76 16,183 5.19 27356 6.23 9814 4.59
WT14 12,046 4.43 9,300 4.05 19172 5.31 8763 4.43
WT16 10,386 4.24 8,940 3.95 18591 5.24 8562 4.39
WT18 11,471 4.23 9,068 3.87 19218 5.22 8644 4.33
WT20 11,476 4.21 8,783 3.80 18875 5.03 8129 4.23
WT22 13,143 4.52 13,525 4.70 25385 5.95 8722 4.44
WT24 10,343 4.44 12,607 4.52 21583 5.71 9699 4.5

4.39 130466.00 4.23 246742.00 5.53 104708.00 4.39

17-Jan 37247 18 36509.62


18-Jan 18305 19 17549.58
14-Jan 246742 15 244020.85
20-Jan 204651 21 201654.8
21-Jan 463071 22 458079.63
22-Jan 573574 23 565487
17-May-2022 18-May-2022 19-May-2022 20-May-2022 21-May-2022

Total  WS Total  WS Total  WS Total  WS


Total
PWTG (kWh) average PWTG (kWh) average PWTG (kWh) average PWTG (kWh) average
PWTG (kWh) 
  24h (m/s)    24h (m/s)    24h (m/s)    24h (m/s) 

3,509 3.5 2400 3.4 1,258 3.1 9,673 4.1 15,905

3970 3.12 3106 3.09 1,600 2.48 8,804 3.94 16,161


3944 3.13 3181 3.08 1,729 2.5 7,047 3.96 16,340
4062 3.19 3150 3.06 1,541 2.49 6,674 3.93 15,993
4174 3.12 3185 3 1,654 2.47 6,920 3.86 16,420
4109 3.15 3112 3 1,470 2.44 8,146 3.87 16,006
4060 3.21 2960 3.02 1,519 2.48 6,375 3.97 16,695
4259 3.15 3226 3.22 1,466 2.37 6,846 3.91 19,029
4029 3.09 3232 3.18 1,364 2.33 6,829 3.91 18,192
4017 3.07 3008 3.08 1,417 2.32 6,954 3.88 17,818
3714 3.02 2862 3.06 1,428 2.3 7,828 3.87 17,325
3822 3.03 2981 3.05 1,388 2.32 7,114 3.89 17,310
4169 3.13 3244 3.08 1,729 2.43 8,010 3.96 17,362

48329.00 3.12 37247.00 3.08 18305.00 2.41 87547.00 3.91 204651.00


21-May-2022 22-May-2022 23-May-2022 24-May-2022 25-May-2022

 WS  WS  WS  WS


Total Total Total Total
average average 24h average average
PWTG (kWh)  PWTG (kWh)  PWTG (kWh)  PWTG (kWh) 
24h (m/s)  (m/s)  24h (m/s)  24h (m/s) 

4.5 34,877 6.2 0 7.5 0 6.2 0

4.85 39,622 7.18 50566 7.88 17,560 5.2 35681


4.97 29,150 7.15 29790 7.97 17,933 5.34 35804
4.96 38,352 7.33 49270 8.09 17,628 5.26 35336
4.80 38,562 6.97 49729 7.75 17,420 5.02 35899
4.84 37,013 6.97 48238 7.76 16,968 5.2 35664
5.13 43,046 7.61 50062 8.12 23,587 6.34 34097
5.24 30,019 7.31 54812 8.11 25,485 6.12 32804
5.17 41,931 7.15 53698 8 23,676 5.98 32630
5.07 40,509 6.99 51542 7.85 23,385 5.89 32870
5.01 40,372 6.92 38043 7.52 22,011 5.73 33124
5.18 43,008 7.33 46683 7.81 24,147 6.29 31845
5.02 41,487 7.44 51141 8.02 18,919 5.29 37928

5.02 463071.00 7.20 573574.00 7.91 248719.00 5.64 413682.00


25-May-2022

 WS
average
24h (m/s) 

6.5

7
7.15
7.25
6.9
7.05
7.04
6.87
6.91
6.79
6.73
6.73
7.23

6.97