0% found this document useful (0 votes)
43 views6 pages

Ug Project Format-Bca

This document outlines project review dates and requirements for final year BCA students at Bharath Institute of Higher Education and Research. It provides the project schedule which includes 0th, 1st, and 2nd reviews on specific dates from January to March. The final review involves submitting the final dissertation in a prescribed format along with 2 CDs on March 27th. It also includes the required project format for the dissertation, which should include sections like introduction, system configuration, analysis, design, testing, implementation, and maintenance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views6 pages

Ug Project Format-Bca

This document outlines project review dates and requirements for final year BCA students at Bharath Institute of Higher Education and Research. It provides the project schedule which includes 0th, 1st, and 2nd reviews on specific dates from January to March. The final review involves submitting the final dissertation in a prescribed format along with 2 CDs on March 27th. It also includes the required project format for the dissertation, which should include sections like introduction, system configuration, analysis, design, testing, implementation, and maintenance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

BHARATH INSTITUTE OF HIGHER EDUCATION AND

RESEARCH
BHARATH INSTITUTE OF SCIENCE AND TECHNOLOGY
FACULTY OF ARTS & SCIENCE
DEPARTMENT OF BCA

PROJECT – REVIEW DATES

Following are the reviews to be noted by all the FINAL year BCA students in
connection with their PROJECT. The following is the distribution of the project marks.
BCA
Internal Assessment 40
Practical 60
Total 100

Each review will carry equal distribution of Internal Assessment marks. Students
who do not make it on the respective allotted reviews will be liable to lose their internal
assessment marks allotted for that review.

Reviews Date Details to Submit


Project Title, Software Used (Front
0th Review 30-1-2019 and Back end)
PPT Presentation about the Project
1 Review
st
20-2-2019 (Abstract, Tables, Forms and
Reports) and its salient features.
PPT Presentation of complete flow
2nd Review 13-3-2019 of project with Design Tools. Live
Demo if Possible
Submission of Final Project
Dissertation in the Prescribed
Final
27-3-2019 Format (3 copies) + 2
Review
CD
Note: Review Time: 9.00 a.m.
Rough documentation should be shown to the respective guide before binding.
PROJECT FORMAT

TITLE OF THE PROJECT

A Project Report
Submitted for the Partial fulfillment for the award of degree of

BACHELOR OF COMPUTER APPLICATIONS

By

NAME :

REGISTER No. :

Under the guidance of


GUIDE NAME

BHARATH INSTITUTE OF HIGHER EDUCATION AND


RESEARCH
173, AGHRAM ROAD, SELAIYAR,
CHENNAI – 600 073
APRIL – 2019
BHARATH INSTITUTE OF HIGHER EDUCATION AND
RESEARCH
173, AGHRAM ROAD, SELAIYAR,
CHENNAI – 600 073

DEPARTMENT OF COMPUTER APPLICATIONS

This is to certify that the Project entitled TITLE is original record work done by NAME ,
REG.NO., under my guidance and supervision for the partial fulfillment of award of
degree in Bachelor of Computer Applications, as per syllabus prescribed by the Bharath
Institute of Higher Education and Research, Selaiyur, Chennai.

GUIDE HEAD OF THE DEPARTMENT

Submitted for the Viva-Voce examination held on at Bharath


Institute of Higher Education and Research, Selaiyur, Chennai.

Date :

INTERNAL EXAMINER EXTERNAL EXAMINER


ACKNOWLEDGEMET

First I wish to thank the Almighty who gave me good health and success throughout my

project work. I thank my parents without whom nothing would have been possible this support

was the foundation of my efforts.

I wish to express my heart full thanks to our Honorable Founder

Dr.S. Jagathrakshagan, President Dr.J.Sundeep Aanand, Bharath Institute of Higher

Education and Research, for this encouragement that we are receiving our academic career.

I devote my thanks to esteemed Dr.V.Kanagasabai, Vice-chancellor and

Dr.J. Hameed Hussain, Dean- Engineering, Bharath Institute of Higher Education and

Research.

I express my sincere feeling to gratitude to Dr.A.Muthukumaravel, Dean – Faculty of

Arts & Sciecne, Professor & Head, Department of MCA, I devote my thanks to esteemed

(Guide name), Faculty of BCA for their encouragement and the valuable guidance throughout

the project work.

I express my sincere thanks to all the Third Year BCA students by their own capability,

efficient and worthy guidance, which was quite encouraging and support throughout the project

to get it successful.

I also thank people who directly or indirectly gave me encouragement and support

throughout the project. Last but not least, I offer my cardinal thanks to my friends, and other staff

members and well-wishers for their continuous encouragement throughout my career.

Name of the Student


DECLARATION

I hereby declare that this project report entitled “Title of the Project” embodies the
report of my project work carried out during Final Semester having Project in Department of
Computer Applications under the guidance of (Name of the Faculty with Designation) and has
not been submitted previously for the award of other degrees by me or others to any institute or
any university to the best of my knowledge.
CONTENTS
S.NO DESCRIPTION PAGE NO
INTRODUCTION
1. 1.1. Abstract
1.2. Project Description
SYSTEM CONFIGURATION
2. 2.1. Hardware Requirements
2.2. Software Requirements
SYSTEM ANLAYSIS
3. 3.1. Existing System
3.2. Proposed System
SYSTEM DESIGN
4. 4.1. DFD / ER
4.2. Data Dictionary
SYSTEM TESTING
5.1. Unit Testing
5.2. Integrated Testing
5. 5.3. Black Box Testing
5.4. White Box Testing
5.5. Verification Testing
5.6. Validation Testing
5.7. User Acceptance Testing
6. SYSTEM IMPLEMENTATION
7. SYSTEM MAINTENANCE
APPENDIX
8. 8.1. Source Code
8.2. Screen shots
8.3. Reports
9. CONCLUSION
10. FUTURE ENHANCEMENTS
11. BIBLIOGRAPHY
Note :

1. Font Size – 12 points


2. Font Name – Times New Roman
3. Font Style – Normal
4. Line Spacing – 1.5

Soft Binding Sheet – White Colour

You might also like