SPECIFICATION FOR TEMPERATURE ELEMENT


Customer Name : M/s. Arcler Mittal Nippon Steel, Paradeep
Project Name : 1x100 TPH Additive Grinding Unit

Project Number : 9101001771 Date : 05.09.2022

DESIGN DATA SHEET

1 Item Temperature Element


2 Application To sense Temperature in duct
GENERAL

3 Manufacturer Tempsen / Radix/ GIC


4 Model Number (*) To be filled by supplier in Annexure 1
5 Tag-No. Refer Annexure 1, Engraved SS Tag plate to be provided with unit
6 Quantity Refer Annexure 1
7 Ambient Temperature Min 19.4 °C / Max 36°C
8 Relative Humidity 94% Max (Approx.)
PROCESS DETAIL

9 Altitude Above MSL 3.5m above MSL


10 Area Of Classification Hazardous Area (Flameproof - Dust Group -F)
11 Service Refer Annexure 1
12 Operating Temperature 0 to 90 Deg.C
13 Mounting Refer Annexure 1
14 Duty Continuous
15 Type Screwed cover with SS 304 chain
16 Material Die Cast Aluminium
HEAD DETAILS

17 Degree Of Protection IP 65
18 Cable Entry ½” NPT Brass double compression cable gland to be provided with unit
Terminal block to be provided suitable for a terminating a wire up to 2.5
19 Electrical Connection
sq.mm conductor
20 Gasket Heat resist moisture proof
21 Conversion 3 Wire
22 Type 3 Wire DUPLEX
23 Material Platinum - 100 (PT-100)
24 Calibration To DIN Standards
25 Ice Point Resistance 100 Ohms at 0 Deg.C
26 Leads Hermatically sealed
PROBE / ELEMENT DETAILS

27 Sheath Material SS 316


28 Sheath Diameter 6 mm OD (Perfect matching with well to achieve faster response)
29 Connection 3 Wire
30 Type Of Fixing Spring loaded
31 Insulation Mineral
32 Accuracy +/- 0.5 % of span
33 Response Time (With Thermowell) 40 Sec
34 Insulation Resistance Shall not be less than 5 M Ohm at 490 Deg.C
35 Immersion Length Refer Annexure 1
36 End Connection Probe ½” NPT (M)
37 Mounting (Process Connection) Adjustable by Screw in SS 304
DESIGN DATA SHEET
38 Type Fabricated
39 Length To suit for the above Temperature Element with 50 mm stand off
THERMOWELL DETAILS

40 Material SS 316
41 Construction Straight & closed end tube
42 Wall Thickness 4 mm
43 Outer Diameter 16 mm
44 Inner Connection ½” NPT (F)
1 1/2" ANSI, 150#, CS flange with suitable adapter to adjust immersion length
45 Process Connection / Mounting Details along with counter flange, suitable nuts, bolts and spring washers etc. should
be included in the supply
(i). PT-100 RTD probe with adjustable screw
(ii). Flange type Thermowell
46 Accessories (iii). Counter flange, suitable nuts, bolts,spring washers and gasket
OTHER DETAILS

(iv). SS Tag Plate


(v). Cable Gland

47 Manuals, Test Certificates & Drawing 1 Set Along With Instrument


48 Inspection By Schenck,client,consultant
18 months from date of supply or 12 months from date of commissioning
49 Guarantee
whichever is earlier
Annexure 1

Sr. No. Service Immersion Length Input Range Tag-No. Quantity Model No. Remark
HGG NATURAL GAS LINE
1 300 mm 0 - 450 °C 3TE01 0216 1 (*)
TEMPERATURE
DYNAMIC CLASSIFIER INLET
2 300 mm 0 - 150 °C 3TE01 0207 1 (*)
TEMPERATURE
DYNAMIC CLASSIFIER INLET
3 300 mm 0 - 150 °C 3TE01 0203 1 (*)
TEMPERATURE
DYNAMIC CLASSIFIER INLET
4 300 mm 0 - 150 °C 3TE01 0206 1 (*)
TEMPERATURE

5 LINE O/L TEMPERATURE 300 mm 0 - 150 °C 3TE01 0217 1 (*)

6 LINE O/L TEMPERATURE 300 mm 0 - 150 °C 3TE01 0209 1 (*)

LINE I/L TEMPERATURE VENT


7 300 mm 0 - 150 °C 3TE01 0210 1 (*)
FAN

8 SPARE 300 mm 0 - 450 °C SPARE 1 (*)

GENERAL NOTES

1 This is preliminary specification. Order to be placed on supplier only after technical clarification from engineering.

2 Supplier to confirm specifications as mentioned above. Deviation/discrepancy if any should be informed before supplying the material.

3 (*) marked details to be clarified / confirmed by supplier.

4 Schenck data sheet number should be mentioned on all inspection reports & Drawings /Documents to be submitted for approval / records.

5 Mention parts catalogue number on GA / WIRING / BOM drawing.

6 All loose hardware to be packed separately.

7 The serial number should be mentioned on the unit and also on all inspection reports.

8 The equipment should be packed with adequately rigid packing with adequate bracing and waterproof packing to avoid any damage during transportation handling & storage.

9 The supplier is responsible for design, supply and operational guarantee of the unit for committed period from the date of commissioning.

10 Supplier should provide guarantee on utility & consumption parameters provided by them.
For specified input conditions and required output parameters, supplier to specify and supply all required components, accessories & mounting even if the same is not mentioned in
11
this datasheet.
12 Supplier need to be consider relevant points under General Notes as applicable.