Steel Beam 1: All Joists Shall Be 50X150 at 400 C/C, Unless Stated

The document provides details for the construction of a building foundation and structural members. It includes details for: 1) A cavity wall foundation with 100mm insulation, 103mm brickwork outer leaf, and 100mm blockwork inner leaf below ground level. 2) A concrete slab minimum 100mm thick above a compacted hardcore base. 3) Structural steel beams of various sizes, grades, and bearing requirements to support timber joists and the building. 4) Pad stones and bearing plates required under some steel beams. 5) Wall foundation details for foundations 600mm and 1200mm wide.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
168 views3 pages

Steel Beam 1: All Joists Shall Be 50X150 at 400 C/C, Unless Stated

The document provides details for the construction of a building foundation and structural members. It includes details for: 1) A cavity wall foundation with 100mm insulation, 103mm brickwork outer leaf, and 100mm blockwork inner leaf below ground level. 2) A concrete slab minimum 100mm thick above a compacted hardcore base. 3) Structural steel beams of various sizes, grades, and bearing requirements to support timber joists and the building. 4) Pad stones and bearing plates required under some steel beams. 5) Wall foundation details for foundations 600mm and 1200mm wide.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

WF1 STEEL BEAM 1

STEEL BEAM 5

STEEL BEAM 4
WF2

WF2
100mm Cavity full fill insulation 103mm Brickwork outer leaf
100mm Blockwork inner leaf

F.L.
Insulation & Screed concrete
to Architect's Details Bituminous DPC Min. 150mm ABOVE GL

Concrete slab (Min. 100mm)


Below ground level both STRUCTURAL MEMBERS
leaves to be built in
Compacted hardcore (Min. G.L. Trench-blocks or class
150mm) 'b' engineering
brickwork
STEEL BEAM 2 STEEL BEAM 3 Timber Joists

Sand binding (Min. 50mm) or Polythene Layer


Conc. Infill
STATUS OF EXISTING LINTEL T1
T2
2No. 50 X 200 C24
50 X 200 C24
SHALL BE VERIFIED All timbers C24 grade (unless stated)
C25 (grade of
concrete) trench fill Foundation to bear on
natural ballast with
Steel Beams (Grade S275)
bearing capacity 100
KN/m²
254X146X31 UB 254X254X73 UC RIDGE BEAM : 203 X 102 X 23 UB
STEEL BEAM 1 : 2 Nos. 254 X 102 X 25 UB
WF2, X = 600 MM (POCKET TO BE MADE STEEL BEAM 2 : 2 Nos. 203 X 102 X 23 UB
WF3, X = 1200 MM STEEL BEAM 3 : 2 Nos. 203 X 102 X 23 UB
AND FILLED AS PER STEEL BEAM 4 : 203 X 102 X 23 UB
WALL FOUNDATION DETAIL (WF2 & WF3) CONTRACTOR'S DETAIL) STEEL BEAM 5 : 203 X 102 X 23 UB
(NTS) Steel Beam 1 shall have minimum bearing
of 300 mm

WF3
Bearer Plates/ Pad Stones
300 X 100X 75 Pad Stone
300 X 250 X 15 Mild Steel
300 X 100 X 12 Mild Steel
100mm Cavity full fill insulation 103mm Brickwork outer leaf
100mm Blockwork inner leaf

F.L.
Insulation & Screed concrete
to Architect's Details Bituminous DPC Min. 150mm ABOVE GL

Concrete slab (Min. 100mm)


Below ground level both
leaves to be built in
Compacted hardcore (Min. G.L. Trench-blocks or class
150mm) 'b' engineering
brickwork
Conc. Infill
Sand binding (Min. 50mm) or Polythene Layer

C25 (grade of
concrete) trench fill Foundation to bear on
natural ballast with
bearing capacity 100
KN/m²

WF1, X = 600 MM
WF4, X = 500 MM

Client SPACES ARCHITECTURE


WALL FOUNDATION DETAIL (WF1 & WF4) WF4
(NTS)
L1/S 75 LINTEL BY IG LINTELS Project 40 CROMER ROAD
OR EQUIVALENT HORNCHURCH ESSEX
LEGEND
Job Title REAR & SIDE EXTENSION
TIMBER BEAM

STEEL BEAM
ALL JOISTS SHALL BE 50x150 @ Drawing Title PROPOSED FIRST FLOOR
LOAD BEARING WALL

EXTENSION/NEW WALL
400 C/C, UNLESS STATED Date Drawing No.

M.S. BEARER PLATE MARCH 2022 2140-3A


Revision:

Date:

PROPOSED FIRST FLOOR FRAMING PLAN Scale 1:50


1:50
SCALE 1:75
1m 0 1m 2m

1:75 Scale 1:75

1.5m 0 1.5m 3m
CL COL.

CL COL. 254X254X73 UC COLUMN


1
-
75 450 75 6
EX. GROUND E.L 400x400x20mm TK. MS BASE PLATE WELDED TO
THE COLUMN WITH 6MM FILLET WELD AROUND
50 300 50
600x600x500mm TK. 25 TK. NON SHRINKAGE HIGH L1/HD 75 LINTEL BY IG LINTELS
RC FOUNDATION STRENGTH GROUT
OR EQUIVALENT
50

150 300 150


2/2M16X400 DIA ANCHOR BOLTS
6 (GRADE 8.8)
150

600
600

400x400x20mm TK.

500
MS BASE PLATE
150

254x254x73 UC COLUMN 4M16X400mm. ANCHOR BOLTS


(GRADE 8.8)
50

25 TK. NON SHRINKAGE HIGH


C25/30 CONCRETE FOOTING
STRENGTH GROUT
STRUCTURAL MEMBERS

Timber Joists
SECTION 1-1 (NTS) STEEL COLUMN (254X254X73) FOUNDATION DETAILS (NTS) T1 2No. 50 X 200 C24
T2 50 X 200 C24
CL COL. All timbers C24 grade (unless stated)

Steel Beams (Grade S275)

RIDGE BEAM
75 450 75 RIDGE BEAM : 203 X 102 X 23 UB
STEEL BEAM 1 : 2 Nos. 254 X 102 X 25 UB
STEEL BEAM 2 : 2 Nos. 203 X 102 X 23 UB
50 300 50 600x500x500mm TK. STEEL BEAM 3 : 2 Nos. 203 X 102 X 23 UB
RC FOUNDATION
STEEL BEAM 4 : 203 X 102 X 23 UB
BEAM 3 BEAM 4 2/2M16X400 DIA ANCHOR BOLTS STEEL BEAM 5 : 203 X 102 X 23 UB
50 100 100 50

6 (GRADE 8.8)
Steel Beam 1 shall have minimum bearing
of 300 mm
500

254x146x31 UC COLUMN
400x300x20mm TK.
Bearer Plates/ Pad Stones
MS BASE PLATE
25 TK. NON SHRINKAGE HIGH 300 X 100X 75 Pad Stone
2/2 M16 BOLTS STRENGTH GROUT 300 X 250 X 15 Mild Steel
GRADE 8.8 PLATE 5 300 X 100 X 12 Mild Steel

BEAM - BEAM CONNECTION (NTS) SECTION 2-2 (NTS)

CL COL.

254X146X31 UC COLUMN
2
-

6
EX. GROUND E.L 300x400x20mm TK. MS BASE PLATE WELDED TO
THE COLUMN WITH 6MM FILLET WELD AROUND

25 TK. NON SHRINKAGE HIGH


STRENGTH GROUT L1/HD 75 LINTEL BY IG LINTELS
150 300 150
OR EQUIVALENT
170X150X15MM MS PLATE WELDED TO
BEAM 4 WITH 6MM FILLET WELD AROUND 40 70 40 600 LEGEND
50

500

TIMBER BEAM
170

4M16X400mm. ANCHOR BOLTS


(GRADE 8.8) STEEL BEAM
ALL JOISTS SHALL BE 50x150 @
50

C25/30 CONCRETE FOOTING LOAD BEARING WALL


PLATE 5 (NTS)
EXTENSION/NEW WALL
400 C/C, UNLESS STATED
STEEL COLUMN (254X146X31) FOUNDATION DETAILS (NTS) M.S. BEARER PLATE
Client SPACES ARCHITECTURE

Project 40 CROMER ROAD


PROPOSED ROOF FRAMING PLAN HORNCHURCH ESSEX
SCALE 1:75
Job Title REAR & SIDE EXTENSION

10
2/203X102X23 UB (BEAM 2) 2/203X102X23 UB (BEAM 3) 2/203X102X23 UB (BEAM 2) Drawing Title PROPOSED ROOF FRAMING
250X250X15MM MS PLATE WELDED TO 25 25
200
COLUMN WITH 6MM FILLET WELD AROUND Drawing No.
25 25 2 M16 BOLTS (GRADE 8.8)
Date
2/250X120X15MM MS PLATE WELDED 2/2 M16 BOLTS (GRADE 8.8)
60

200
TO BEAM 2/3 WITH 6MM FILLET WELD MARCH 2022 2140-4A
250

60 60
120
60

Revision:
PLATE 1 PLATE 3
PLATE 1 (NTS) PLATE 2 (NTS) PLATE 2 PLATE 4
Date:

254X254X73 UC 254X146X31 UC Scale 1:50


1:50

25 25 25 25 250X146X15MM MS PLATE WELDED


250X146X15MM MS PLATE WELDED TO 200 200 1m 0 1m 2m
COLUMN WITH 6MM FILLET WELD AROUND TO BEAM 2 WITH 6MM FILLET WELD
73 73

73 73

Scale 1:75
146

146

1:75
PLATE 3 (NTS) PLATE 4 (NTS) BEAM (2&3) TO COLUMN (254X254X73) CONNECTION (NTS) BEAM (2) TO COLUMN (254X146X31) CONNECTION (NTS)
1.5m 0 1.5m 3m
STEELWORK STRUCTURAL NOTES: GENERAL NOTES AND HEALTH AND SAFETY :
1. All workmanship is to comply with BS EN 1993-1-1 and 1. New Timber Floor · The lengths and spans used in these calculations are for
BS EN 1090-2 and the latest edition of the National a) Structural timbers to be a minimum of 40mm clear design purposes only and should not be used as a basis for
Structural Steelwork Specification (NSSS) for building of chimney breasts. Floor joists to be 25mm (min)
ordering materials/fabrication purposes. Note, the design
construction, and all clauses, including appendices are clear of existing ceiling joists.
span in these calculations is not the same as clear span.
deemed to be part of this specification. b) Structural timbers to be a minimum stress grade of
C24 · All lengths and spans used in these calculations should be
2. All structural steel sections are to be of specified grade
complying to applicable code from the following list; BS c) Trimmers: double/treble floor joists where there is verified on site prior to commencement of any
4-1:2005, BS EN 10210-2:2006, BS EN 10025-2:2004. a stud partition wall. Multiple joists to be bolted construction works. Contractor and/or steel fabricator to
together with M12 bolts with large washers at take their dimensions on site.
3. All bolts are to be grade 8.8 black bolts to BS 4190
600mm centres staggered · Builder/contractor is to check that the Structural Engineers
unless noted otherwise on the structural drawings.
d) Provide 1200mm long G.M.S straps @800 c/c
4. Site welding shall not be permitted. proposal (i.e. location of steel beams/trimmers etc) is
screwed into masonry wall and notched and
feasible and necessary before ordering materials. Open up
5. Setting out dimensions are to be obtained from the screwed into joists at floor level.
top of walls etc to determine existing spans & necessity of
Architect's drawings. The steelwork fabricator shall e) Herringbone or solid strutting at 1800c/c
steels/beams.
obtain all necessary dimensions from site. alternatively to be secured to joists.
· All specified structural elements (i.e. steel beams, steel
6. The contractor is to carry out a full site survey to
establish the lengths of all steel members connecting 2. Floor Beam column, timber beams/trimmers, etc) to be installed in
to existing structure prior to preparation of fabrication a) Steel beam bearing plates or padstones to be single continuous length unless stated otherwise.
drawings. bedded on sand and cement centrally located
· All load bearing walls, foundations and structural elements
under steel beam and flush with inner face of
7. No splices are permitted in any elements. are to be exposed and checked on site with the building
brickwork. Pocket in party/flank wall to be made
8. All welding is to comply with BS EN 1011 parts 1 & 2. control officer, prior to the commencement of works for
good with concrete or masonry.
All welds are to be 6mm fillet welds or full-strength suitability.
b) Internal partitions assumed to be load bearing in
butt welds unless noted otherwise on the drawings. structural design are to be verified on site by the · Any deviation from the design assumptions is to be
9. Where endplates, capping plates, baseplates, etc. are contractor for their capacity to bear the extra loads reported to the Architect/ Engineer prior to
shown at the end of a steel element, these are to be proposed - prior to construction. commencement of works.
welded to the steel element with a 6mm fillet weld. c) Existing foundations should be checked to · The existing building is assumed to be in good structural
That weld is to extend around the entire contract determine if adequate to bear any proposed
order and any defects are to be reported to the
perimeter between the plate and steel element. additonal loads.
Architect/Engineer.
10. Minimum connection between steel elements to be
3. Carpentry Specification · The temporary stability of the structure during all stages of
4no. M16 bolts with 15mm thick end plate unless
noted otherwise. a) All timber materials and workmanship to be in the construction work is the responsibility of the
accordance with BS 5268: Part 2 Structural Use of contractor.
11. Where any different steel materials or steel materials Timber
with different finishes (e.g. Painted steel, Galvanized · The contractor is responsible for all of the temporary
b) All concealed timbers to be treated with works for the project, for the full duration of the project.
steel, Stainless steel, etc.) in contact or are connected pre-injected wood preservatives, plus all cut ends
together, all contact surfaces between them are to be Contractors shall provide proper conventional needles and
to be painted props, ensuring that loads are adequately transferred to
isolated to prevent contact and corrosion.
c) All timber to be treated by vacuum pressure the ground.
12. The contractor is to design and detail all connections impregnation of organic or water born preservative
(including those between steel and other materials), to a dry salt retention in accordance with the · The dimensions used in the calculations are not cut lengths
not already detailed on the Structural Engineer's manufacturers recommendations. of steel. the contractor is responsible for taking site
drawings, in accordance with the appropriate, current d) No notches, holes or rebates to be cut in any dimensions and applying appropriate bearing lengths,
Eurocode, British Standards (if still applicable) or other member without the written agreement of the which will be a 100mm minimum, or as indicated on the
applicable standard and building regulation where such structural engineer. drawings.
exists. e) Double joists and rafters to be bolted together · Due to the weight of the steel members (up to 110kg), the
13. Detailing of steelwork (if requested by the client) @600mm centres with 12mm diametre bolts and contractor shall make provision for lifting off transport and
50x50x3mm washer plates. moving them to the location for erection. Appropriate
-All steelwork elements shall be detailed by the
contractor. f) All fixings in roof space (nails/screws/bolts and lifting equipment shall be provided, e.g. hoist's, crane's,
hangers) are to be galvanized unless noted genie lifts etc. Sufficient man-power shall be available to
-The contractor is to prepare a full 3D model of all otherwise. ensure that the steelwork can safely be erected. All the
steelwork in the building on a specialist detailing
lifting activities to be carried out as per the lifting
package to ensure that all elements, junctions,
dimensions, etc. fit together correctly and do not operations and lifting equipment regulations 1998 (loler)
project outside of the structural zones. · Site welding is not allowed, unless prior agreement is made
Note: with SDA and building control. Prior to any agreement the Client SPACES ARCHITECTURE
-A full set of fabrication drawings shall be provided by
1. Existing rafters to be strengthened - 50x150 C24 contractor must provide proof of the welding operative's
the contractor for comment by the
Architect/Structural Engineer. timbers to be bolted onto existing rafters (M8 bolts qualifications. On site weld testing may be required. Project 40 CROMER ROAD
@ 400c/c.) to provide 50mm air gap
-The contractor must allow time and costs for at least TEMPORARY WORKS & STABILITY HORNCHURCH ESSEX
2. double floor joists under partitions and chimney
three submissions/resubmissions of fabrication trimming · The contractor is entirely responsible for maintaining the
drawings followed by comments from the design team 3. all walls used to support proposed loads to be stability and structural integrity of all existing and proposed Job Title REAR & SIDE EXTENSION
within their programme. checked on site for their adequacy and agreed with structures, within and adjacent to, the works from the date
-The contractor's programme must allow at least 10 the building inspector prior to the commencement for possession/commencement of the site until practical Drawing Title NOTES
working days between the Engineer's receipt of a full of works completion of the works.
set of fabrication drawings and the Engineer returning · The contractor shall produce a full method statement and Date Drawing No.
comments. This time period applies to each temporary works proposals prior to commencement of any MARCH 2022 2140-5A
submission/re-submission of fabrication drawings. works on site.
Revision:
14. All bolt pockets, spaces below base plates, etc. at · Design , installation and removal of the temporary works
column bases and beam bearings to be completely to be carried out by the contractor as per the contractors Date:
filled with Fosroc Conbextra grout. temporary works procudure , ususally based on BS5975