Risk Assessment/Management Form

Ref:
Section / Dept: civil Activity: Risk Assessment for shifting of Location / Area :
Contractor :- M/S Simplex Infrastructures Truss by double hydra
Limited
Sl Basic Job Potential Consequen Current control measure Risk rating
No. Steps Hazard ce

P E A R
Only skilled &experienced work men deployed in
the job with safety shoe ,hand gloves ,safety
Get Injury/ helmet and tested tools &tackles. Use guide rope
Fall of materials during shifting of materials and always keep away 1 0 0 1
Fatality
from swing area.Daily tool box talk before starting
of job by crew supervisor.

All the wire rope sling & D-shackle visually


Failure of wire checked . Tested sling are colour coaded by a
rope sling/D- Get Injury specific colour .Daily tool box talk before starting 2 0 0 1
shackle of job by crew supervisor.
Skilled workmen shall be engaged for hooking of
Hooking of material.Hook of hydra must be provided with
Get injury hook latchaily tool box talk before starting of job 2 0 0 0
material
by crew supervisor.
People should maintain safe distance from the
load while lifting and shifting.Guied rope to be
fixed on both ends of the material.Communication
with the hydra operator will be one to one talk
and signal will be issued by the signal man with
blue helmet.
Shifting of the
steel/Channel
1 by Double Get injury 1 0 0 0
Hydra up to
max.5 MT
1of
Shifting of the
steel/Channel Shifting of material by double hydra will be carried
1 by Double out during day time only and both the hydra
Get injury operators,site engineer,safety officer and the 1 0 0 0
Hydra up to
max.5 MT Rigger will inspect the shifting route first.
After the prior permission of area incharge and
safety Manager/Dy manager ofMvripl the job will
start
The weight of the lifting materials should not
exceed 5MT
Shifting area should be of suitable for approach
People should not unhook the sling during
Unhooking of Injury to tension. Only skilled person will remove the sling 1 0 0 0
material person from the hook.
Marking of SWL at different lifting hooks of hydra.
Toppling of Hydra Only Trained & experienced operator operate
due to excess Injury / Fatality the hydra.Material above the safe working load 2 0 0 1
loading mentioned at the lifting position shall not be lifted.
One signal man will communicate both the hydra
operators and minimum 8persons will be engaged
for the job by the contractor
Man/Materials
Traffic Control The person includes-site engineer,2nos hydra 1 0 0 1
loss
operators,1no.signal man,one rigger,Safety
Manager and 2nos.hydra helpers
EXTRA PRECAUTIONS FOR 1) During turning both hydra to be
SHIFTING OF 10MT GALLERY stopped,repositioned and make the gallery
straight & then proceed the shifting

2) During entire shifting both hydra & the gallery


should be in a straight line

Prepaired by Approved by
Contractor Contractor
Date Date

2of
on / Area :

Initial Additio Ri
Proba
bility

Proba
bility

ual
Resid

risk
Risk nal sk
control ra
measur ti
P
n E A R
e
g

3 6

2 4

2 4

2 2

3of
2 2

2 2

2 4

2 2

Reviwed by
LPIL
Date

4of
Risk Assessment/Management Form
Ref:
Section / Dept: civil Activity: Risk Assessment for shifting of Location / Area :
Contractor :- M/S Simplex Infrastructures Truss by double hydra
Limited
Sl Basic Job Potential Consequen Current control measure Risk rating
No. Steps Hazard ce

P E A R
Only skilled &experienced work men deployed in
the job with safety shoe ,hand gloves ,safety
Get Injury/ helmet and tested tools &tackles. Use guide rope
Fall of materials during shifting of materials and always keep away 1 0 0 1
Fatality
from swing area.Daily tool box talk before starting
of job by crew supervisor.

All the wire rope sling & D-shackle visually


Failure of wire checked . Tested sling are colour coaded by a
rope sling/D- Get Injury specific colour .Daily tool box talk before starting 2 0 0 1
shackle of job by crew supervisor.
Skilled workmen shall be engaged for hooking of
Hooking of material.Hook of hydra must be provided with
Get injury hook latchaily tool box talk before starting of job 2 0 0 0
material
by crew supervisor.
People should maintain safe distance from the
load while lifting and shifting.Guied rope to be
fixed on both ends of the material.Communication
with the hydra operator will be one to one talk
and signal will be issued by the signal man with
blue helmet.
Shifting of
theGallery by
1 Double Hydra Get injury 1 0 0 0
up to max.5
MT
5of
Shifting of
theGallery by Shifting of material by double hydra will be carried
1 Double Hydra out during day time only and both the hydra
Get injury operators,site engineer,safety officer and the 1 0 0 0
up to max.5
MT Rigger will inspect the shifting route first.
After the prior permission of area incharge and
safety Manager/Dy manager of LIPL the job will
start
The weight of the lifting materials should not
exceed 5MT
Shifting area should be of suitable for approach
People should not unhook the sling during
Unhooking of Injury to tension. Only skilled person will remove the sling 1 0 0 0
material person from the hook.
Marking of SWL at different lifting hooks of hydra.
Toppling of Hydra Only Trained & experienced operator operate
due to excess Injury / Fatality the hydra.Material above the safe working load 2 0 0 1
loading mentioned at the lifting position shall not be lifted.
One signal man will communicate both the hydra
operators and minimum 8persons will be engaged
for the job by the contractor
Man/Materials
Traffic Control The person includes-site engineer,2nos hydra 1 0 0 1
loss
operators,1no.signal man,one rigger,Safety
Manager and 2nos.hydra helpers
EXTRA PRECAUTIONS FOR 1) During turning both hydra to be
SHIFTING OF 10MT GALLERY stopped,repositioned and make the gallery
straight & then proceed the shifting

2) During entire shifting both hydra & the gallery


should be in a straight line

Prepaired by Approved by
Contractor Contractor
Date Date

6of
on / Area :

Initial Additio Ri
Proba
bility

Proba
bility

ual
Resid

risk
Risk nal sk
control ra
measur ti
P
n E A R
e
g

3 6

2 4

2 4

2 2

7of
2 2

2 2

2 4

2 2

Reviwed by
LPIL
Date

8of
Risk Assessment/Management Form
Ref:
Section / Dept: civil Activity: Risk Assessment for shifting of Location / Area :
Contractor :- M/S Simplex Infrastructures Truss by double hydra
Limited
Sl Basic Job Potential Consequen Current control measure Risk rating
No. Steps Hazard ce

P E A R
Only skilled &experienced work men deployed in
the job with safety shoe ,hand gloves ,safety
Get Injury/ helmet and tested tools &tackles. Use guide rope
Fall of materials during shifting of materials and always keep away 1 0 0 1
Fatality
from swing area.Daily tool box talk before starting
of job by crew supervisor.

All the wire rope sling & D-shackle visually


Failure of wire checked . Tested sling are colour coaded by a
rope sling/D- Get Injury specific colour .Daily tool box talk before starting 2 0 0 1
shackle of job by crew supervisor.
Skilled workmen shall be engaged for hooking of
Hooking of material.Hook of hydra must be provided with
Get injury hook latchaily tool box talk before starting of job 2 0 0 0
material
by crew supervisor.
People should maintain safe distance from the
load while lifting and shifting.Guied rope to be
fixed on both ends of the material.Communication
with the hydra operator will be one to one talk
and signal will be issued by the signal man with
blue helmet.
Shifting of
theGallery by
1 Double Hydra Get injury 1 0 0 0
up to max.5
MT
9of
Shifting of
theGallery by Shifting of material by double hydra will be carried
1 Double Hydra out during day time only and both the hydra
Get injury operators,site engineer,safety officer and the 1 0 0 0
up to max.5
MT Rigger will inspect the shifting route first.
After the prior permission of area incharge and
safety Manager/Dy manager of LIPL the job will
start
The weight of the lifting materials should not
exceed 5MT
Shifting area should be of suitable for approach
People should not unhook the sling during
Unhooking of Injury to tension. Only skilled person will remove the sling 1 0 0 0
material person from the hook.
Marking of SWL at different lifting hooks of hydra.
Toppling of Hydra Only Trained & experienced operator operate
due to excess Injury / Fatality the hydra.Material above the safe working load 2 0 0 1
loading mentioned at the lifting position shall not be lifted.
One signal man will communicate both the hydra
operators and minimum 8persons will be engaged
for the job by the contractor
Man/Materials
Traffic Control The person includes-site engineer,2nos hydra 1 0 0 1
loss
operators,1no.signal man,one rigger,Safety
Manager and 2nos.hydra helpers
EXTRA PRECAUTIONS FOR 1) During turning both hydra to be
SHIFTING OF 10MT GALLERY stopped,repositioned and make the gallery
straight & then proceed the shifting

2) During entire shifting both hydra & the gallery


should be in a straight line

Prepaired by Approved by
Contractor Contractor
Date Date

10of
on / Area :

Initial Additio Ri
Proba
bility

Proba
bility

ual
Resid

risk
Risk nal sk
control ra
measur ti
P
n E A R
e
g

3 6

2 4

2 4

2 2

11of
2 2

2 2

2 4

2 2

Reviwed by