Risk Assessment For Shifting of Truss by Double Hydra
Risk Assessment For Shifting of Truss by Double Hydra
Risk Assessment For Shifting of Truss by Double Hydra
Ref:
Section / Dept: civil Activity: Risk Assessment for shifting of Location / Area :
Contractor :- M/S Simplex Infrastructures Truss by double hydra
Limited
Sl Basic Job Potential Consequen Current control measure Risk rating
No. Steps Hazard ce
P E A R
Only skilled &experienced work men deployed in
the job with safety shoe ,hand gloves ,safety
Get Injury/ helmet and tested tools &tackles. Use guide rope
Fall of materials during shifting of materials and always keep away 1 0 0 1
Fatality
from swing area.Daily tool box talk before starting
of job by crew supervisor.
Prepaired by Approved by
Contractor Contractor
Date Date
2of
on / Area :
Initial Additio Ri
Proba
bility
Proba
bility
ual
Resid
risk
Risk nal sk
control ra
measur ti
P
n E A R
e
g
3 6
2 4
2 4
2 2
3of
2 2
2 2
2 4
2 2
Reviwed by
LPIL
Date
4of
Risk Assessment/Management Form
Ref:
Section / Dept: civil Activity: Risk Assessment for shifting of Location / Area :
Contractor :- M/S Simplex Infrastructures Truss by double hydra
Limited
Sl Basic Job Potential Consequen Current control measure Risk rating
No. Steps Hazard ce
P E A R
Only skilled &experienced work men deployed in
the job with safety shoe ,hand gloves ,safety
Get Injury/ helmet and tested tools &tackles. Use guide rope
Fall of materials during shifting of materials and always keep away 1 0 0 1
Fatality
from swing area.Daily tool box talk before starting
of job by crew supervisor.
Prepaired by Approved by
Contractor Contractor
Date Date
6of
on / Area :
Initial Additio Ri
Proba
bility
Proba
bility
ual
Resid
risk
Risk nal sk
control ra
measur ti
P
n E A R
e
g
3 6
2 4
2 4
2 2
7of
2 2
2 2
2 4
2 2
Reviwed by
LPIL
Date
8of
Risk Assessment/Management Form
Ref:
Section / Dept: civil Activity: Risk Assessment for shifting of Location / Area :
Contractor :- M/S Simplex Infrastructures Truss by double hydra
Limited
Sl Basic Job Potential Consequen Current control measure Risk rating
No. Steps Hazard ce
P E A R
Only skilled &experienced work men deployed in
the job with safety shoe ,hand gloves ,safety
Get Injury/ helmet and tested tools &tackles. Use guide rope
Fall of materials during shifting of materials and always keep away 1 0 0 1
Fatality
from swing area.Daily tool box talk before starting
of job by crew supervisor.
Prepaired by Approved by
Contractor Contractor
Date Date
10of
on / Area :
Initial Additio Ri
Proba
bility
Proba
bility
ual
Resid
risk
Risk nal sk
control ra
measur ti
P
n E A R
e
g
3 6
2 4
2 4
2 2
11of
2 2
2 2
2 4
2 2
Reviwed by
LPIL
Date
12of