Environmental Aspect-Impact Assessment - Maintenance Department

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 3

BLUE CIRCLE ORGANICS PVT LTD.

C-4,B-12,E-2,Chemicle Zone,MIDC,Ambernath 421501


Environmental Aspect-Impact Assessment - Maintenance Department

Sr. Process /Activity Description Significance Analysis Criteria


S P Q D Sigificance
Aspect Legal Total Score
Env. Aspect Env. Impact [ Yes /
[N/AB/E] Yes/ No Severity of Probability [ SPQD ]
Quantity Duration No ]
Impact of Occu.
1 Chilling Plant
Leakage of Oil N Liquid Waste N 1 4 2 1 8 N
Waste Generation (Insulation
Material) N Solid Waste N 3 2 2 2 24 N

Scrap Generation N Solid Waste N 2 3 2 1 12 N


Noise Generation N Sound Pollution N 4 5 1 2 40 N

Accidents - Blasts E Human Health and Other Y 5 1 1 1 5 Y

Effluent Generation N Water Pollution N 5 3 1 2 30 N


2 Dryer
Leakage of Oil N Liquid Waste N 1 4 1 1 4 N

Emissions N Air Pollution N 4 3 1 1 12 N

Waste Generation N Solid Waste N 2 5 1 1 10 N

Scrap Generation N Solid Waste N 2 1 1 1 2 N

Noise Generation N Sound Pollution N 4 5 1 2 40 N

Accidents - Blasts E Human Health and Other Y 5 1 1 1 5 Y

Effluent Generation N Water Pollution N 3 4 1 2 24 N


3 Cleaning
Dust Generation N Air Pollution N 2 5 2 1 20 N

Effluent Generation N Water Pollution N 2 5 1 1 10 N

Chindhi Generation N Solid Waste N 1 4 2 1 8 N


4 Oiling & Greasing of Machines
Spillage N Liquid Waste N 2 4 2 2 32 N

Leakage of Oil N Liquid Waste N 2 4 1 1 8 N

Consumption of Oil N Resource Cons. N 2 4 2 2 32 N

Waste Generation (Chindhi) N Solid Waste N 1 4 2 1 8 N

Accidents E Human Health and Other Y 5 1 1 1 5 Y


5 Cooling Tower
Leakages N Water Pollution N 4 5 2 2 80 Y

Waste Generation (Chindhi) N Solid Waste N 1 4 2 1 8 N

Accidents E Human Health and Other Y 5 1 1 1 5 Y


N
S
6 Electrical Power Distribution
Power Consumption N Resource Cons. Y 4 5 2 2 80 Y

Waste Generation N Electrical Waste N 2 3 2 2 24 N

Accidents E Human Health and Other Y 5 1 1 1 5 Y

SHEF013.00 1
BLUE CIRCLE ORGANICS PVT LTD.
C-4,B-12,E-2,Chemicle Zone,MIDC,Ambernath 421501
Environmental Aspect-Impact Assessment - Maintenance Department

Sr. Process /Activity Description Significance Analysis Criteria


S P Q D Sigificance
Aspect Legal Total Score
Env. Aspect Env. Impact [ Yes /
[N/AB/E] Yes/ No Severity of Probability [ SPQD ]
Quantity Duration No ]
Impact of Occu.
7 Indicators
Power Consumption N Resource Cons. Y 4 3 1 5 60 Y
8 Storage of Lubricants
Spillage N Liquid Waste N 2 5 2 1 20 N

Leakage of Oil N Liquid Waste N 2 5 1 1 10 N

Consumption of Oil N Resource Cons. N 3 4 2 1 24 N

Waste Generation (Chindhi) N Solid Waste N 1 4 2 1 8 N

Accidents E Human Health and Other Y 5 1 1 1 5 Y


9 Welding Machines
Power Consumption N Resource Cons. N 4 5 2 2 80 Y

Accidents AB Human Health and Other Y 5 1 1 1 5 Y


10 Disposal 24 N
waste genearation N Resource Cons. N 3 4 2 1

Accidents AB Human Health and Other Y 5 1 1 1 5 Y


11 Fire Extinguishers 30 N
Leakages N Waste N 5 3 2 1

Consumption N Resource Cons. N 5 1 2 1 10 N

Accidents E Human Health and Other Y 5 3 2 1 30 Y

SHEF013.00 2
Aspect Impact Assessment
Criteria
Score Likelyhood of Occurance of
Severity Quantity Detectibilty
Aspect

Major Environmental Accident Continuous Excessive More Than 24 Hours


5

Major soil / water / air


pollution, causing decay of any
Several Times a day Very High More Than 12 Hours
on- site /off-site ecological
system
4

Localized impact on flora /


Once a day High More Than 06 Hours
fauna / soil / air/ water
3

Minor contribution to global


Once a week Moderate More Than 01 Hour
environmental issues
2
Slight impact or negligible
Once a month or less frequent Low Immediately
1 impact