This document provides an introduction to process optimization. It outlines the objective to understand the basics and techniques of process optimization. The agenda covers an introduction to optimization, the optimization framework, basic concepts, linear programming applications in chemical engineering, software tools, and a case study. Process optimization aims to find the best solution from available alternatives to maximize return on investment and productivity while minimizing costs.

Uploaded by

Vishal Bhopale
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views

Process Optimization

This document provides an introduction to process optimization. It outlines the objective to understand the basics and techniques of process optimization. The agenda covers an introduction to optimization, the optimization framework, basic concepts, linear programming applications in chemical engineering, software tools, and a case study. Process optimization aims to find the best solution from available alternatives to maximize return on investment and productivity while minimizing costs.

Uploaded by

Vishal Bhopale
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 40

BASIC INTRODUCTION

ON

PROCESS OPTIMIZATION
29/SEP/2020

AHMED MOHAMED SHAFIK ALI ATTIA

PEC PROCESS & OPERATIONS ENGINEERING EXPERT

[email protected] Ahmed Mohamed Shafik Ali Attia


SAFETY MOMENT

https://www.youtube.com/watch?v=grOA7iUIxGY

PEC
Ahmed Mohamed Shafik Ali Attia
OBJECTIVE

UNDERSTAND THE REQUIREMENT FOR PROCESS


OPTIMIZATION BASICS AND TECHNIQUES.

PEC
Ahmed Mohamed Shafik Ali Attia
AGENDA

 INTRODUCTION TO OPTIMIZATION.
 OPTIMIZATION FRAMEWORK.
 BASIC CONCEPTS IN OPTIMIZATION.
 LINEAR PROGRAMMING IN CHEMICAL ENGINEERING.
 APPLICATION OF OPTIMIZATION.
 SOFTWARE TOOLS FOR OPTIMIZATIONS.
 CASE STUDY.

PEC
Ahmed Mohamed Shafik Ali Attia
Vision of Optimization in Chemical Engineering

• The optimization involves the application of mathematical techniques & tools to find
out the best possible solution from several available alternatives.

• Maximum ROI – Return On Investment

• Higher productivity @ lowest applicable cost.

• Eliminate losses

• Utilize lower cost feed stock @ acceptable quality.

• Maximize the operating capacity of process equipments

• Design & operate the plant @ the most optimum condition - max production rate

PEC = Max profit, min waste generation & impact on environment


Ahmed Mohamed Shafik Ali Attia
Optimization – Definition

• Origin: Latin word “ Optimus” means “best”.

• Optimization: is the science of making best possible decisions

• By performing optimization, we aim to obtain the best result


under given circumstances

PEC
Ahmed Mohamed Shafik Ali Attia
Why we need to run Optimization studies?

1) Improve the process to realize optimum system potential.

2) Attain new or most efficient designs, maximize profits, reduce cost of


production, minimize loses & impact to event.

3) Utilize feedstock, energy, utilizing in the most efficient way (e.g. Heat
Integration).

4) Reduce waste generation, minimize the environmental Impact.

5) Determine the most desirable operating conditions and safe operation.

6) Meet product specification and max profit.

PEC
Ahmed Mohamed Shafik Ali Attia
Optimization Benefits

Improved plant performance such as


• Yield
• Availability
• Reduce energy consumption
• Reduce maintenance cost
• Reduce failure in equipment
• Minimize the unplanned shutdown

Example: To Optimize a distillation column performance, we will consider


Feed tray location, Reflux ratio, Reboiler duty.

PEC
Ahmed Mohamed Shafik Ali Attia
Optimization – Examples

• Design of HEX network (Heat Integration).

• Real time optimization of a distillation column.

• Model predictive control.

• Operations planning & scheduling.

• Pipeline sizing, Reactor sizing, Distillation column (CAPEX/OPEX).

• Predictive Maintenance (Machine Learning Applications) – Downtime


Planning.

PEC
Ahmed Mohamed Shafik Ali Attia
Optimization – Examples / Refinery

The objectives of refinery optimization (TARGET – Maximize Profit) include:


• Minimize crude OPEX at refinery
• Optimize refinery crude mix
• Optimize offspec generation and optimize overall product mix and dispatch
• Minimize quality giveaway
• Optimize fuel consumption, minimize losses
• Optimize utilization of the assets
• Optimize inventory management
• Optimize capacity utilization and shutdown planning
• Optimize unit operations maintaining highest standards of safety, catalyst life and activity,
etc.
PEC
Ahmed Mohamed Shafik Ali Attia
Optimization Framework
• All optimization problems are stated in some standard form.

• You have to identify the essential elements of a given problem


and translate them into a prescribed mathematical form.

• Requirements for application of optimization problem:

1.The design variables.

2.The constraints.

3.The objective (Target) function (Max / Min).

4.The process model.


PEC
Ahmed Mohamed Shafik Ali Attia
Optimization Framework – Design Variables

You need to know the design variables that affect the system.

• Example: reactor temp, feed rate, No. of trays In column, reflux ratio, Batch
time and reactor yield.

• A practical problem may involve many design variables

• Some of these maybe highly sensitive and heavily influence the process being
optimized. Choose these as design variables and others (not so sensitive
variables) maybe kept constant.

Note: If all the design variables are fixed, there is No scope for optimization.

Thus one or more variables must be relaxed so that the system becomes an Under
Determined System which has at least principle infinite no. of SOLUTIONS.

PEC
Ahmed Mohamed Shafik Ali Attia
Optimization Framework – Objective Function

A suitable objective function (cost function) is defined in terms of design


variables and often prices parameters.

The objective function may be technical or economic, which needs to be


either maximum or minimum

 Examples of economic objectives:-


1. Max profit.
2. Minimize cost of production.
 Examples of technical objectives:-
1. Maximize reactor yield.
2. Minimize size of equipment.
PEC 3. Minimize environmental impact.
Ahmed Mohamed Shafik Ali Attia
Optimization Framework – Objective Function

Note:- technical objectives (Target) are ultimately related to economics

In practical process plant there would be multi objective functions to be


optimized in one case only, therefore, there are more than one objective
functions.

PEC
Ahmed Mohamed Shafik Ali Attia
Optimization Framework – Constraints
The constraints requests some additional relationships among the
design variables and process parameters.
The constraints originates because design variables must satisfy
certain physical phenomena & certain resource limitation.

Example: Variable bounds: 0<x<1 (Don’t exceed the range at any


direction) (Max / Min)
• Equality constraints: Sum of mole fraction should be unity such as
for component balance equation in distillation column.

• In equality constraints: In packed reactor, process temp should be


less than the catalyst deactivation temp/acidic conditions PH<7,
stress developed any where in a component should be less than
PEC the maximum allowable stress
Ahmed Mohamed Shafik Ali Attia
Optimization Framework – Process Model

• A process model (HYSYS) is required to describe the manner in


which the design variables are related. The process model also
tells us how the objective function is affected by the design
variables.
• A model is a mathematical equation or is a collection of several
equations that define how the design variables are related and
the acceptable values these variables can take.

• Optimization studies are carried out using a simplified (but


reasonably accurate) model of a real system.

• Note:- working with real system (life) is time consuming,


expensive, risky & that’s why you need to work on a model
PEC rather than life case.
Ahmed Mohamed Shafik Ali Attia
Classification of Optimization Methods
• Based on presence/absence of constraints:
1. Optimization problems which are subject to one or more
constraints.

2. Unconstrained optimization problem- No constraints exists


(Not Practical).

• Based on nature of equation involved:-

1. Linear Programming (LP)

2. Non – Linear Programming (NLP)

PEC 3. Sequential Quadratic Programming (SQP) Ahmed Mohamed Shafik Ali Attia
Classification of Optimization Methods
• Based on nature of design variables:-
1. Continues optimization (Linear Programming )

2. Integer programming (IP) (integer values)

3. MILP mixed integer (Linear & Integer Programming)

4. MINLP (Non-Linear & Integer Programming)

• Based on local search methods or global search methods

• Based on number of object functions:


1. Single

2. Multi
PEC
Ahmed Mohamed Shafik Ali Attia
Examples of Optimization Application
Chemical reactor design:
Desired Product
D
FEED
REACTOR
A
Undesired Product
U

Target: Achieve design Conversion @ optimum cost


Possible Solutions:
• Increase Reactor Size at same separation capabilities
Cost Total Cost (energy) – (CAPEX).
Optimum Cost • Increase Separation requirements @ same reactor size
– (CAPEX).
Reactor Cost
• Optimize both, reactor size and the separation energy
requirements – (CAPEX / OPEX) - (Optimization
Separation Cost Path).

PEC Target Conversion Conversion


Ahmed Mohamed Shafik Ali Attia
 Design of Pipeline

1. Size

2. Price of material (CAPEX).

3. Cost of infrastructure (CAPEX).

4. Energy Cost (OPEX).

 Optimization of CDU

1. Feedstock cost (OPEX).

2. Refined product cost (OPEX).

3. Profit Margin (OPEX).


PEC
Ahmed Mohamed Shafik Ali Attia
Optimization Problem Formulation

• In order to be able to perform optimization on any process,


firstly you will need to formulate the optimization problem.

• In order to formulate a proper optimization problem, you will


need to digest the following expressions:

1. Process Models for optimization

2. Degrees of freedom analysis

3. Optimization problems in chemical engineering

PEC
Ahmed Mohamed Shafik Ali Attia
Process Models for Optimization

• Optimization requires use of mathematical techniques for


maximization or minimization of an objective function (Variable
required to be approached – Target).

Note: With advent of computers, optimization have become part


of computer-aided design

• In order to use optimization algorithms on computers, we must


have a quantitative model available to compute the responses
of objective function.

PEC
Ahmed Mohamed Shafik Ali Attia
1- Process Models for Optimization

A process model is a set of equations that imitates reality and


cannot incorporate all features the real process. However, a
reasonably accurate model saves us time and money as we can
avoid repetitive experience & measurements.

Classification of process models:-


1. Theoretical Models.
2. Database Models (Practical).

Other classifications:-
1. Linear vs non linear models
2. Steady state vs non steady state

PEC
Ahmed Mohamed Shafik Ali Attia
2- Degrees of Freedom Analysis

• The degrees of freedom analysis gives us the number of design


variables that can be changed during optimization process to obtain
the optimal solution

• Degrees of freedom, DOF = No. of variables – No. of linear


independent equations (As in Algebra)

1. If DOF = 0, unique solution exists – no optimization is possible


2. If DOF> 0, under determined system - Infinite solution exist &
optimization is possible
3. DOF< 0, over determined system - No solution exists

PEC
Ahmed Mohamed Shafik Ali Attia
Introduction to Linear Programing
• Is one of the most effective and widely used optimization
techniques

• A linear programming model seeks to Maximize or Minimize a


linear function, subject to a set of linear constraints

• The linear model consists of the following:

1. A set of design variables

2. An objective function which is a linear function of design


variables

3. A set of linear equality or inequality constraints


PEC
Ahmed Mohamed Shafik Ali Attia
How do the linear constraints arise?

1. Production limitation:- equipment limitation, storage limits, market


constant

2. Raw material limitation

3. Safety restriction:- allowable operating ranges for temp &


pressure

4. Physical property specification:- product quality constraints when


a blend property can be calculated as an average of pure
component .

5. Mass & energy balance


PEC
Ahmed Mohamed Shafik Ali Attia
How to formulate linear programming model:-

1. Determine design variables

2. Determine objective function/target

3. Determine constraints

PEC
Ahmed Mohamed Shafik Ali Attia
Example for an Optimization Technique – MS Excel Solver

• Set variable cell process variable (put 1 as original value)

• Set objective cell target

• Select option don’t check assume linear or non linear

• Select method non linear, simplex LP, evolutionary

• Choose min value > 0 (non negative check box)

• Click solve you will get a dialog box stating that solver found a solution

• Check the Keep Solver Solution button & also select the Answer report

• If you have constraints then add then to solver & Click Solve

PEC
Ahmed Mohamed Shafik Ali Attia
Case Study 1 – Tank Area Optimization
Using MS. Excel Solver
• Objective

You have to design an open storage tank made of Stainless Steel with a square base.
The volume of the tank should be 50 m3.
Find the optimal dimensions of the tank that will require the least material and satisfy
minimum cost.

• Problem Formation:

Assume
X: Length of base
Y: Height of the tank

Quantity of material will depend on the total surface area of the tank

A = X^2 + 4XY -------------- This is the objective function

PEC
Ahmed Mohamed Shafik Ali Attia
Case Study 1 – Tank Area Optimization
Using MS. Excel Solver
A = X^2 + 4XY -------------- This is the objective function

Volume is give as a Constraint in the problem statement = 50 m3

Since volume = Area of base * Height

50 = X^2 * Y

Therefore,

Y=50 / X^2-------------------equation i

Since Total Surface Area of tank = Area of square + Area of base

Area = 4XY + X^2, substitute using equation i

Therefore, Area = X^2 + 4X (50/X^2) = X2 + 200/X Objective Function


PEC
Ahmed Mohamed Shafik Ali Attia
Case Study 1 – Tank Area Optimization
Using MS. Excel Solver
• There are two paths to proceed:
1. Short Path – Semi Quantitative Optimization.
2. Proper Engineered Path – Quantitative Optimization.

1. Semi-Quantitative Optimization
o Since the equation relating Area to Length is ready, then you can assume various values
for X, from 1 to 9, and then plot a curve for X versus Min Area.
o Trend will be as shown below:
X Area
1 201.00
2 104.00
3 75.67
4 66.00
5 65.00
6 69.33
7 77.57
8 89.00
9 103.22

o From the trend you can assume that the minimum area will be associated with a length
between 4 – 5 m.
PEC
Ahmed Mohamed Shafik Ali Attia
Case Study 1 – Tank Area Optimization
Using MS. Excel Solver
• There are two paths to proceed:
1. Short Path – Semi Quantitative Optimization.
2. Proper Engineered Path – Quantitative Optimization.

2. Proper Engineered Path – Quantitative Optimization:


o Use MS Excel Solver to get the accurate values of X & The associated Minimum Area.
o Following the steps of Solver discussed previously, you will get the below results:
Microsoft Excel 15.0 Answer Report
Worksheet: [Book1]Sheet1
Report Created: 7/9/2020 1:56:19 PM
Result: Solver found a solution. All Constraints and optimality conditions are satisfied.
Solver Engine
Engine: GRG Nonlinear
Solution Time: 0.047 Seconds.
Iterations: 4 Subproblems: 0
Solver Options
Max Time Unlimited, Iterations Unlimited, Precision 0.000001, Use Automatic Scaling
Convergence 0.0001, Population Size 100, Random Seed 0, Derivatives Forward, Require Bounds
Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume NonNegative

Objective Cell (Min)


Cell Name Original Value Final Value
$C$5 Objective Function 201 64.6330407

PEC Variable Cells


Cell Name Original Value Final Value Integer
$C$4 Variable Function 1 4.641588834 Contin Ahmed Mohamed Shafik Ali Attia
Case Study 2 - Hydrocarbon Pipeline Optimization
Using Simulation
• Objective

Optimally determine the best suited pipeline size considering the material cost of the
pipe, pump (CAPEX) and the associated running cost of pumping system (OPEX).

• Constraints:

1. Pipeline ANSI rating 300# and 600#.


2. Pipeline Length 125 km.
3. Diesel design flow of 725 m³/hr.
4. Operational hours of 16 hrs.
5. Potential pipe sizes (X), of 16”, 18” and 20”.
6. ACCE (Aspen Capital Cost Estimator) for pipeline cost estimate.
PEC 7. APEA (Aspen Process Economic Evaluation) for pump fixed and running cost.
Ahmed Mohamed Shafik Ali Attia
Case Study 2 - Hydrocarbon Pipeline Optimization
Using Simulation

• Case 1- Base Case:

1. Design Flow 725 m³/hr.


2. ANSI rating 600#.
3. Operational hours: 16 hrs.
4. Pipe ID: 16”.

Variable ID 16”
Pump Discharge Pressure @ 725m³/hr. 74.7 barg
Pipeline CAPEX ($) 25,581,335
PEC Pump OPEX ($/year) 679,345 Ahmed Mohamed Shafik Ali Attia
Case Study 2 - Hydrocarbon Pipeline Optimization
Using Simulation

• Case 2:

1. Design Flow 725 m³/hr.


2. ANSI rating 300#.
3. Operational hours: 16 hrs.
4. Pipe ID: 18’’.

Variable ID 18”
Pump Discharge Pressure @725m³/hr. 42.7 barg
Pipeline CAPEX ($) 25,286,779
PEC Pump OPEX ($/year) 386,270 Ahmed Mohamed Shafik Ali Attia
Case Study 2 - Hydrocarbon Pipeline Optimization
Using Simulation
• Case 3:

1. Design Flow 725 m³/hr.


2. ANSI rating 300#.
3. Operational hours: 16 hrs.
4. Pipe ID: 20”.

Variable ID 20”
Pump Discharge Pressure@ 725m³/hr. 27.6 barg
Pipeline CAPEX ($) 29,643,110
PEC Pump OPEX ($/year) 248,313 Ahmed Mohamed Shafik Ali Attia
Case Study 2 - Hydrocarbon Pipeline Optimization
Using Simulation
Key Results
Variable Case 2 Case 3 Case 1

Pipe ID. 18” 20” 16”

ANSI rating. 300# 300# 600#

Pump Discharge Pressure @ 725m³/hr. 42.7 barg 27.6 barg 74.7 barg

Pipeline CAPEX ($) 25,286,779 29,643,110 25,581,335

Design Pressure Exceedance Pump Shut-in Exceeds 47.7 Pump Shut-in within 47.7 Pump Shut-in within 94
barg barg barg

Pump CAPEX ($) 349,200 292,600 445,600

Pump OPEX ($/year) considering 16hrs 386,270 248,313 679,345

Ahmed Mohamed Shafik Ali Attia


Case Study 2 - Hydrocarbon Pipeline Optimization
Using Simulation
Conclusions
CASE 2 CAN BE DISQUALIFIED WHERE THE SHUT OFF PRESSURE OF THE
EXPORT PUMP WILL EXCEED THE DESIGN PRESSURE OF 47.7 BARG.
• CASE 1 AND CASE 3 ARE TECHNICALLY VIABLE WHERE THEM MEET THE
FLOW REQUIREMENTS AND THE DESIGN PRESSURE OF 300# AND 600#
RESPECTIVELY.
• CASE 1 (16” PIPELINE - ANSI 600#) HAS REPORTED A LOWER CAPEX TO CASE
3 (20” - ANSI 300#), HOWEVER THE PUMP COST AND ELECTRICITY COST OF
CASE 1 IS HIGHER.
• ALTHOUGH CASE 1 HAS REPORTED LOWER PIPELINE CAPEX, HOWEVER, IT
CAN BE DISMISSED FOR THE FOLLOWING REASONS:
• PUMP OPEX IS NEARLY THREE TIMES THE VALUE OF CASE 3.
• MAXIMUM OPERATING PRESSURE UNDER CASE 1 IS 2.8 TIMES OF CASE 3. AS A
RESULT, THE EXPECTED PEAK SURGE AND RELIEVING VOLUME WOULD RESULTS IN A
BIGGER SRV SIZE AND MORE RELIEVING VOLUME.

PEC
Ahmed Mohamed Shafik Ali Attia
Case Study 2 - Hydrocarbon Pipeline Optimization
Using Simulation
Recommendation
CONSIDERING PREVIOUS TECHNICAL DISCUSSION AND OUTCOMES
FROM TECHNO-ECONOMIC ANALYSIS, IT IS RECOMMENDED TO:
• CASE 3 IS DEEMED MORE FAVORABLE AND TECHNICALLY VIABLE
TO CATER FOR THE OPERATIONAL REQUIREMENTS (DESIGN FLOW
RATE AND LESS SURGE DEMAND) AND MORE ECONOMIC
COMPARED TO CASE 1 AND CASE 2.

PEC
Ahmed Mohamed Shafik Ali Attia
NOW YOU KNOW
IT’S ALL ABOUT
CAPEX VS OPEX

THANK YOU