Master Risk Assessment Form
Master Risk Assessment Form
Master Risk Assessment Form
Activity Title:
Activity Outline:
What are the List the harm Risk Evaluation What control measures are, or will be put, in place to control Risk Evaluation with
hazards? associated with the without controls in the risk before commencing the activity? controls in place
hazard place List all elimination, substitution, engineering and/or Likelihood (1-5) X
Likelihood (1-5) X administrative controls Consequences (1-5) =
Consequences (1-5) Risk Rating* (1-25)
= Risk Rating* (1-25)
First Aid
Waste handling
Emergency
Competency Record
Name of worker Measure of Assessor comments Competent to Signature (Worker) Signature (Assessor) Date
competency perform activity
Y/N?
This form may be used to record the risk assessment for any University activity whether that be lab or workshop-based, an event, on or off-site
working, etc. Separate templates exist for Biological work, Laser work and Fieldwork.
Only complete a risk assessment if you have a good understanding of the activity being assessed and you have been instructed in the principles
of carrying out a risk assessment (refer to your Business Unit arrangements on risk assessments).
Responsible Person
The manager who is responsible for the activity should approve the risk assessment, this indicates they agree the risk assessment is
sufficiently detailed, they agree the control measures are appropriate and will be implemented and they authorise the work to commence.
The Responsible Person may be a PI in the academic setting or a local line manager or head of section in non-academic sections of
Schools/Faculties and Professional Services.
2 Hazard will occur 2 Minor injury/ill-health 9-15 Moderate Risk Effort required to reduce risk. Moderate
occasionally resource may be required
3 Hazard will occur 3 Injury/Ill-health required 16-25 High/ Work should stop until control measures have
sometimes first aid Substantial/ Intolerable been implemented. Considerable resource
Risk might be required to achieve this
4 Hazard will occur 4 Injury/Ill-health requiring
regularly medical treatment outside
the University
Review Period:
The University advises that all risk assessments are revised every two years to ensure validity. For activities undergoing change, consider a
shorter timeframe for review. For lower risk activities, you may consider a longer timeframe. Comply with your Business Unit arrangements.