Test Report - Ss Tubings: Doc No: E&P 205 Rev No: 00 Eff Date:11/11/2020

This document summarizes the hydrostatic and pneumatic testing of stainless steel tubing. It provides details of the test such as the client, tubing size and location. Both tests were performed by pressurizing the tubing and checking for leaks. The tubing passed both the hydrotest at 380 bar for 1 hour and the pneumatic test at 7 bar with no leaks found. Upon completion, the tubing was connected to the compressor/dispenser system.

Uploaded by

Shaikh sohil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views2 pages

Test Report - Ss Tubings: Doc No: E&P 205 Rev No: 00 Eff Date:11/11/2020

This document summarizes the hydrostatic and pneumatic testing of stainless steel tubing. It provides details of the test such as the client, tubing size and location. Both tests were performed by pressurizing the tubing and checking for leaks. The tubing passed both the hydrotest at 380 bar for 1 hour and the pneumatic test at 7 bar with no leaks found. Upon completion, the tubing was connected to the compressor/dispenser system.

Uploaded by

Shaikh sohil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Doc No : E&P 205

TEST REPORT – SS TUBINGS Rev No : 00


Eff Date :11/11/2020

Client
TPIA
Contractor
Tube Size & Length
Location
HYDRO TEST DETAILS :

TEST INFORMATION TEST 'ON' INTERMEDIATE READINGS TEST OFF


Date & time
Recorded Pressure
(bar or Kg/Cm2)
Test Period :
Calibrated Bourdon test Gauge - Type
Serial Number
Calibration Date Calibration Expiry Date
PNEUMATIC TEST DETAILS :
TEST INFORMATION TEST 'ON' INTERMEDIATE READING TEST OFF
Date & time
Recorded Pressure
(bar or Kg/Cm2)
Test Period :
Calibrated Bourdon test Gauge Type
Serial Number
Calibration Date Calibration Expiry Date

Visual Inspection of SS tubing and fittings Y/N


Proper clamping of SS tubing Y/N
Pressurization of SS tubing at 380 bar pressure for Hydro test. Y/N
Pressure gauge calibrated Y/N
Holding period for the Installation 1 hour, at the raised pressure. Y/N
Checking of fitting joints for tracing any leakage. Y/N
If leakage found Y/N

Depressurized the system and rectify leakage/s Y/N


Hydrotest repeated Y/N
If no leakage found
Y/N
Hydro test accepted Y/N
Flushing of SS tubing with Nitrogen/Air Y/N
Pneumatic Test at 7 bar pressure with nitrogen Y/N
Checking of all fittings with soap solution Y/N
If leakage found Y/N
Depressurized the system and rectify leakage/s Y/N
Y/N
Hydrotest repeated
If no leakage found Y/N

Pneumatic test accepted Y/N


Depressurized of the system and connectivity with Y/N
compressor/dispenser
REMARKS
Contractor TPIA IOAGPL-Projects
Name :
Depressurized of the system and connectivity with compressor/dispenser
Sign
Date :