1. The document provides equations to design a J-type well trajectory given the kickoff point (KOP), total depth (TD), build rate, and horizontal departure at TD. 2. It then works through an example to design a J-type well path with a horizontal departure of 2000 feet at a TD of 8000 feet, given a KOP of 1500 feet and build rate of 2.5 degrees/100ft. 3. The key results are: a radius of curvature of 2292 feet, a maximum inclination angle of 18.02 degrees, a measured depth at the end of the build section of 2222 feet, a horizontal departure at the end of the build

Uploaded by

Rayanna Ward
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views4 pages

Well Trajectory Design Example

1. The document provides equations to design a J-type well trajectory given the kickoff point (KOP), total depth (TD), build rate, and horizontal departure at TD. 2. It then works through an example to design a J-type well path with a horizontal departure of 2000 feet at a TD of 8000 feet, given a KOP of 1500 feet and build rate of 2.5 degrees/100ft. 3. The key results are: a radius of curvature of 2292 feet, a maximum inclination angle of 18.02 degrees, a measured depth at the end of the build section of 2222 feet, a horizontal departure at the end of the build

Uploaded by

Rayanna Ward
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Well Trajectory Design

Well Trajectory Design

Equations for J-type well path

Given:

1. KOP, D1
2. build rate, q in deg/100ft
3. horizontal departure at TD (total depth), X3
4. TVD at TD, D3

1. MD at the end of the build section, MDEOB = D1 + LDC


Where

• Length of build section, LDC = (π x r1 x θ) / 180 = θ /q


• Radius of curvature, r1

• Maximum angle of inclination, θ = Ω – τ


• τ = arctan [ (r1-X3)/(D3-D1)]
• Ω = arcsin [r1/√ [(r1-x3)2 + (D3-D1)2]]

2. Horizontal Departure at end of build section, X2 = r1 - r1cos θ


3. TVD at end of build section, D2 = D1 + r1sin θ
4. Total measured depth MDtotal = D1 + LDC + LCB
Where
• Length of tangent section, LCB = r1 /tan Ω
Example

Plan a J-type well path with a horizontal departure of 2000 feet at a TVD of 8000 feet. The
build rate, q, is 2 ½ degrees/100ft and the kickoff point is at 1500 feet. Determine:

1. Radius of curvature, r1
2. Maximum inclination angle, θ
3. MD at the end of the build section, MDEOB
4. Horizontal Departure at the end of the build section, X2
5. Total MD, MDTD

1. Radius of curvature, r1

1 180
r1 =
q 

1 180
r1 =
2.5 / 100 

Radius of curvature, r1 = 2292 feet

2. Maximum inclination angle, θ

r1 r1 − x3
Sin = tan  =
(r1 − x3 ) + (D3 − D1 )
2 2
D3 − D1
2292 − 2000
Sin =
2292 tan  =
8000 − 1500
(2292 − 2000 )2 + (8000 − 1500 )2
sin Ω = 0.3522 tan τ = 0.0449

Ω = 20.62 degrees τ = 2.6 degrees

Therefore, θ = Ω – τ = 20.62 – 2.6 = 18.02 degrees


3. Measured Depth at end of build, MDEOB
𝜃
𝑀𝐷𝐸𝑂𝐵 = 𝐷1 + 𝑞
18.02
MDEOB = 1500 +
2.5 / 100 = 2222 feet

4. Horizontal Departure at the end of the build section, x2

𝑥2 = 𝑟1 (1 − 𝑐𝑜𝑠 𝜃)

x 2 = 2292(1 − cos(18.02 )) = 113 feet

5. Total MD, MDTD


18.02 2292
MD = 1500 + + = 8312 feet
2.5 / 100 tan 20.62