Data Analysis Project

Data Analysis Project

Data Analyst: (You)

Client/Sponsor:
Cantina Owner

Purpose:
Write a brief description of why this project is happening below. Why is this project happening? What are the goals?
Our goals are to define the top 5 most homelessness-striken areas around treasure valley, Idaho. This
project should define those areas, visualize them on the map and recommend the top 3 areas where the
population is most inclined to volunteer once a week in cantinas for the homeless. By the end of the
project a report must be delivered about the specified data and insights.

Scope / Major Project Activities:


What are the major parts of this project? List out the high-level steps, activities, or stages of the project, and give a
brief description for each.

Activity Description

Data Collect geographical and population data about the different


Collection counties in treasure valley, as well as the different
neighborhoods. In addition to data about homelessness around
those neighborhoods. As well as volunteering data around those
areas.

Getting top 5 homeless stricken Analyzing the collected data and showing the top 5 most
areas homelessness-stricken areas

Getting top 3 volunteering areas From the most homeless areas, getting top 3 most prone-to-
volunteering areas. Visualizing the data in maps and charts.

Delivering final report with Reporting about the findings to the stakeholders. Including
visualization and geographical explicit visualizations.
data

This project does not include:


Specify the things that this project isn’t responsible for doing (out of scope). For instance, “this project does not
involve a summation of 2019 data analysis”
● Analyzing data outside of treasure valley

Page 1 of 2
Data Analysis Project

● Analyzing data older than 4 years


● Suggesting any types of solutions

Deliverables:
A specific list of things that your project will deliver.

Deliverable Description/ Details

A map of treasure valley showing the


areas with highest numbers of
homeless people

A detailed map showing the most


successful volunteering spots in
treasure valley

A report summarizing the findings

Schedule Overview / Major Milestones:


The expected schedule for the project. This can be defined by milestones (e.g. “all data is cleaned and processed”),
periods of time (“Week 1 / Week 2”), or other ways based on the needs of the project.

Milestone Expected Completion Date Description/Details

*Estimated date for completion:


This is my “if all goes well and I have everything I need, this is when I’ll be done” date.

In one month starting now.

Page 2 of 2