Warehouse - Ground Floor Framing Plan - Part-3 1: C L of Expansion Joint C L of Expansion Joint

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CL OF EXPANSION CL OF EXPANSION

JOINT JOINT
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

8800 9800 9700 9700 9700 9700 9700 9700 9700 9700 9700 9700 9700 9700 9700 5915 4400 7600 5890 7600 9720

GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01
A
C03 C03 C03 PD02 PD02 PD02
C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 PD02 PD02
SOG-200
6615

-0.100 SSL
GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01

GB01
GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01
B
GB01 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 PD05 C03 C03
PD05

PD05
GB01 GB01 GB01

PD02 PD02 PD02

GB01

GB01
PD05
PD05
21540

GB01
GB01
PD05
PD05

GB01

GB01
GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01
C
C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 PD04 PD01 PD01 PD04 PD04 PD04

GB01

GB01
PD05
PD05
8020

GB01

GB01
D

PD05
PD05

GB01

GB01
SOG-200
15675

+0.000 TOS

PD05
PD05
MESH-A252

GB01
GB01
GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01
E

GB01
C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 PD04 PD01 PD01 PD04 PD04 PD04
PD05
PD05

GB01

GB01
PD05
PD05
25000

GB01

GB01
NOTE:

1. ALL OPENING LOCATIONS AND DIMENSIONS SHALL BE VERIFIED FROM


ARCHITECTURAL DRAWINGS BEFORE CONSTRUCTION.

PD05 2. LIMIT OF SLAB LAYOUT AND DIMENSIONS SHALL BE VERIFIED FROM


PD05
ARCHITECURAL DRAWINGS BEFORE CONSTRUCTION.

3. THE CONTRACTOR SHALL PRODUCE SHOP/WORKING DRAWINGS AND

GB01

GB01
SCHEDULES AS NECESSARY FOR COMPLETION OF THE WORKS AND RECORD
DRAWINGS OF THE AS BUILT WORKS, ALL FOR THE ENGINEER'S APPROVAL.

PD05 4. FORMWORKS REMOVAL FOR ALL HORIZONTAL STRUCTURAL ELEMENTS AS


FOLLOWS
GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 PD05 GB01 - BIGGER FROM ( 4 * SPAN LENGTH + 2 ) DAYS OR 14 DAYS FOR ALL
F CANTILEVER.
C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 PD04 PD01 PD01 PD04 PD04 PD04 - BIGGER FROM ( 2 * SHORT SPAN LENGTH + 2 ) DAYS OR 7 DAYS FOR OTHER
SPANS .

GB01
GB01
5. CONTRACTOR TO MAKE SURE THE CONSTRUCTION LOAD IS ALIGNED WITH
DESIGN LOAD OR USE BACK PROPPING TO SUPPORT TO AVOID ANY
ADDITIONAL LOAD MORE THAN THE DESIGN LOAD MAYBE AFFECT THE
STRUCTURAL MEMBERS.
PD05 6. CONTRACTOR'S DETAILED SHOP DRAWINGS SHOULD COMPLY WITH
SOG-200 PD05
APPROVED DRAWINGS AND SBC & ACI-318 DESIGN REQUIREMENTS.

7. CONTRACTOR DETAILED SHOP DRAWIMGS TO BE FULLY COORDINATED


WITH APPROVED DRAWINGS (STRUCTURAL, ARCHITECTURAL, MEP AND

GB01
LANDSCAPE) AND TO BE SUBIMT FOR ENGINEER'S APPROVAL BEFORE

GB01
ERECTION OF FORMWORK.

8. CONTRACTOR DETAILED SHOP DRAWIMGS CONCRETE DIMENSION TO BE


PD05 APPROVED FROM ENGINEERS (STRUCTURAL, ARCHITECTURAL, MEP AND
PD05 LANDSCAPE) BEFORE ERECTION OF FORM WORK.

9. ALL STRUCTURAL DRAWINGS MUST BE COORDINATED WITH


ARCHITECTURAL DRAWINGS BEFORE ERECTION OF FORMORK. ANY

GB01

GB01
DISCRIPANCY MUST BE BROUGHT TO THE NOTICE OF THE ENGINEER FOR
CLARIFICATION.

10. ALL COLUMNS, WALLS & BEAMS ARE SYMMETRICAL ABOUT THE GRID
U.N.O.

11. FOR EXACT SETTING-OUT OF MEP OPENINGS REFER TO RELEVANT


ARCHITECTURAL AND MEP DWGS.
1 WAREHOUSE - GROUND FLOOR FRAMING PLAN - PART-3
133033 SCALE 1 : 200 12. ALL THE FILL CONCRETE IN THE MEP ROOMS AND WET AREAS SHALL BE
COORDINATED WITH ALL THE REQUIRED MEP TRENCHES LAYOUT AND
SERVICES BEFORE CASTING.

13. FOR BEAMS DIMENSIONS AND RFT, REFER TO DRAWING ST-60601.

14. FOR COLUMNS & WALLS SCHEDULES AND DETAILS REFER TO DRAWING
ST-60611.

15. THE CONTRACTOR SHOULD PREPARE THE DESIGN OF THE FORMWORK


AGAINST THE CONSTRUCTION LOAD AND SUBMIT THE CALCULATIONS FOR
LEGEND: THE ENGINEERS' APPROVAL.
STEEL COLUMN SCHEDULE PEDESTAL SCHEDULE
CONTINUOUS COLUMN/WALL
MARK MEMBER SIZE Description MARK SIZE REMARKS 16. CONTRACTOR TO SUBMIT THE REQUIRED CALCULATIONS OF OPEN
TERMINATED COLUMN/WALL EXCAVATION SLOPE STABILITY FOR ENGINEERS' APPROVAL.
SC01 UB 610x229x140 PD01 750 x 350mm
SC02 SHS 400x400x10 PD02 900 x 350mm PLANTED COLUMN 17. CONTRACTOR HAS TO PREPARE AND ADOPT PROPER ERECTION
SC03 UB 610x229x101 PD03 1000 x 450mm METHODOLOGY FOR THE ENGINEERS APPROVAL.
SC04 UB 610x305x238 PD04 600 x 600mm
NOTE: 18.THE STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH
SC05 UC 203x203x46 PD05 500 x 300mm
FAÇADE DRAWINGS, AND ALL FAÇADE REQUIREMENTS SHOULD BE
SC06 UB 838x292x226 FOR GENERAL NOTES AND DETAILS REFER TO DRAWINGS, CONSIDERED BEFORE FIXING THE REINFORCEMENT AND CONCRETE
SC07 UB 610x305x149 POURING.
SC08 UB 914x419x343 P22001-SIE-XX-00-DR-ST-000000
P22001-SIE-XX-00-DR-ST-000002 19. NO WELDING ON STEEL STRUCTURAL MEMBERS ALLOWED ON SITE.
SC09 PFC 260x90x35
P22001-SIE-XX-00-DR-ST-000003
SC10 RHS 500x300x8 P22001-SIE-XX-00-DR-ST-000004 20. MINIMUM STEEL GRADE IS 355 AND MINIMUM BOLT GRADE IS 8.
SC11 RHS 500x300x12 P22001-SIE-XX-00-DR-ST-000005
P22001-SIE-XX-00-DR-ST-000006 21. MINIMUM WELD OF 6mm NEEDS TO BE CONSIDERED AND THE MINIMUM
P22001-SIE-XX-00-DR-ST-000007 ULTIMATE TENSILE STRENGTH OF WELD IS 48.3 KN/CM2(483MPA).
P22001-SIE-XX-00-DR-ST-000008
P22001-SIE-XX-00-DR-ST-000009 22. FOR CONNECTIONS DETAILS REFER TO DRAWINGS ST-30551 & ST-30552.
P22001-SIE-XX-00-DR-ST-000010

CLIENT LEAD CONSULTANT SUB CONSULTANT AOR CONSULTANT KEY PLAN NO DATE DESCRIPTION REV BY PROJECT NAME BUILDING NAME PROJECT STAGE DRAWING TITLE
00 2022/07/22 100% DETAILED DESIGN SIE
01 2022/10/25 REVISED 100% DETAILED DESIGN SIE
MAERSK LOGISTICS CENTRE WAREHOUSE 100% DETAILED DESIGN
JEDDAH PORT DISCIPLINE
WAREHOUSE - GROUND FLOOR FRAMING PLAN - PART-3
JLL MENA
17TH FLOOR,SOUTH TOWER,
GENERAL NOTES:- ST
1. THIS DRAWING IS THE PROPERTY OF STUDIO INTERNATIONAL ENGINEERING CONSULTANTS (SIEC) AND MUST NOT BE RETAINED, COPIED OR USED
ABRAJ ATTAWUNEYA WITHOUT THEIR CONSENT. PROJECT DESCRIPTION BUILDING NUMBER SCALE 1 : 200 ARCHITECT SIEC
KING FAHAD ROAD, SAUDI ARABIA 2. ALL DIMENSIONS SHOWN ARE IN MILLIMETERS, AND LEVELS IN METERS UNLESS OTHERWISE NOTED.
STUDIO INTERNATIONAL ENGINEERING
CONSULTANTS
PO BIX 13547 RIYADH 11414 3. DIMENSIONS ARE NOT TO BE SCALED FROM THIS DRAWING. MASTERPLAN & WAREHOUSE BN02 SHEET ISSUE DATE 2022/10/14 REG. No. ----- DRAWING NUMBER

Emaar Business Park, Bldg. No. 3, 1st Floor, Unit 103, Dubai, UAE
P.O. Box 77890| 04 551 9284 04 551 9285 | WWW.STUDIOI.AE
4. ANY DISCREPANCIES, EITHER BETWEEN WRITTEN DIMENSIONS AND SITE DIMENSIONS, OR WITHIN THESE DRAWINGS SHOULD BE BROUGHT TO THE
IMMEDIATE ATTENTION OF THE ENGINEER BEFORE PROCEEDING WITH THE WORK. BUILDING PLOT NUMBER
DRAWN BY MG/MJ STRUCTURAL ENGINEER SIEC P22001-SIE- WH-00-DR-ST-133033
4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS INCLUDING, BUT NOT LIMITED TO, ARCHITECTURAL, CHECKED BY AA REG. No. -----
STRUCTURAL, MECHANICAL, ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE SPECIFICATIONS. NOT PROVIDED
ISO 9001-2015 | ISO 14001-2015 | OHSAS 18001-2007 PC: PRE-CONCEPT // CC: CONCEPT // SD: SCHEMATIC DESIGN // DD: DETAIL DESIGN // TD: TENDER STAGE // CD: CONTRACT DOCS // IFC: CONSTRUCTION DOCS
6. ALL EXISTING DIMENSIONS / LEVELS INDICATED ON DRAWINGS ARE TO BE VERIFIED ON SITE. APPROVED BY OS MODEL FILE REFERANCE 196-SIE-RVT-WH-01-STR-000001
ORIGINAL PAPER SIZE: A0 (1189x841mm)

You might also like