Warehouse - Ground Floor Framing Plan - Part-3 1: C L of Expansion Joint C L of Expansion Joint
Warehouse - Ground Floor Framing Plan - Part-3 1: C L of Expansion Joint C L of Expansion Joint
Warehouse - Ground Floor Framing Plan - Part-3 1: C L of Expansion Joint C L of Expansion Joint
JOINT JOINT
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
8800 9800 9700 9700 9700 9700 9700 9700 9700 9700 9700 9700 9700 9700 9700 5915 4400 7600 5890 7600 9720
GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01
A
C03 C03 C03 PD02 PD02 PD02
C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 PD02 PD02
SOG-200
6615
-0.100 SSL
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01
GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01
B
GB01 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 C02 PD05 C03 C03
PD05
PD05
GB01 GB01 GB01
GB01
GB01
PD05
PD05
21540
GB01
GB01
PD05
PD05
GB01
GB01
GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01
C
C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 PD04 PD01 PD01 PD04 PD04 PD04
GB01
GB01
PD05
PD05
8020
GB01
GB01
D
PD05
PD05
GB01
GB01
SOG-200
15675
+0.000 TOS
PD05
PD05
MESH-A252
GB01
GB01
GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01 GB01
E
GB01
C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 C01 PD04 PD01 PD01 PD04 PD04 PD04
PD05
PD05
GB01
GB01
PD05
PD05
25000
GB01
GB01
NOTE:
GB01
GB01
SCHEDULES AS NECESSARY FOR COMPLETION OF THE WORKS AND RECORD
DRAWINGS OF THE AS BUILT WORKS, ALL FOR THE ENGINEER'S APPROVAL.
GB01
GB01
5. CONTRACTOR TO MAKE SURE THE CONSTRUCTION LOAD IS ALIGNED WITH
DESIGN LOAD OR USE BACK PROPPING TO SUPPORT TO AVOID ANY
ADDITIONAL LOAD MORE THAN THE DESIGN LOAD MAYBE AFFECT THE
STRUCTURAL MEMBERS.
PD05 6. CONTRACTOR'S DETAILED SHOP DRAWINGS SHOULD COMPLY WITH
SOG-200 PD05
APPROVED DRAWINGS AND SBC & ACI-318 DESIGN REQUIREMENTS.
GB01
LANDSCAPE) AND TO BE SUBIMT FOR ENGINEER'S APPROVAL BEFORE
GB01
ERECTION OF FORMWORK.
GB01
GB01
DISCRIPANCY MUST BE BROUGHT TO THE NOTICE OF THE ENGINEER FOR
CLARIFICATION.
10. ALL COLUMNS, WALLS & BEAMS ARE SYMMETRICAL ABOUT THE GRID
U.N.O.
14. FOR COLUMNS & WALLS SCHEDULES AND DETAILS REFER TO DRAWING
ST-60611.
CLIENT LEAD CONSULTANT SUB CONSULTANT AOR CONSULTANT KEY PLAN NO DATE DESCRIPTION REV BY PROJECT NAME BUILDING NAME PROJECT STAGE DRAWING TITLE
00 2022/07/22 100% DETAILED DESIGN SIE
01 2022/10/25 REVISED 100% DETAILED DESIGN SIE
MAERSK LOGISTICS CENTRE WAREHOUSE 100% DETAILED DESIGN
JEDDAH PORT DISCIPLINE
WAREHOUSE - GROUND FLOOR FRAMING PLAN - PART-3
JLL MENA
17TH FLOOR,SOUTH TOWER,
GENERAL NOTES:- ST
1. THIS DRAWING IS THE PROPERTY OF STUDIO INTERNATIONAL ENGINEERING CONSULTANTS (SIEC) AND MUST NOT BE RETAINED, COPIED OR USED
ABRAJ ATTAWUNEYA WITHOUT THEIR CONSENT. PROJECT DESCRIPTION BUILDING NUMBER SCALE 1 : 200 ARCHITECT SIEC
KING FAHAD ROAD, SAUDI ARABIA 2. ALL DIMENSIONS SHOWN ARE IN MILLIMETERS, AND LEVELS IN METERS UNLESS OTHERWISE NOTED.
STUDIO INTERNATIONAL ENGINEERING
CONSULTANTS
PO BIX 13547 RIYADH 11414 3. DIMENSIONS ARE NOT TO BE SCALED FROM THIS DRAWING. MASTERPLAN & WAREHOUSE BN02 SHEET ISSUE DATE 2022/10/14 REG. No. ----- DRAWING NUMBER
Emaar Business Park, Bldg. No. 3, 1st Floor, Unit 103, Dubai, UAE
P.O. Box 77890| 04 551 9284 04 551 9285 | WWW.STUDIOI.AE
4. ANY DISCREPANCIES, EITHER BETWEEN WRITTEN DIMENSIONS AND SITE DIMENSIONS, OR WITHIN THESE DRAWINGS SHOULD BE BROUGHT TO THE
IMMEDIATE ATTENTION OF THE ENGINEER BEFORE PROCEEDING WITH THE WORK. BUILDING PLOT NUMBER
DRAWN BY MG/MJ STRUCTURAL ENGINEER SIEC P22001-SIE- WH-00-DR-ST-133033
4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER RELEVANT DRAWINGS INCLUDING, BUT NOT LIMITED TO, ARCHITECTURAL, CHECKED BY AA REG. No. -----
STRUCTURAL, MECHANICAL, ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE SPECIFICATIONS. NOT PROVIDED
ISO 9001-2015 | ISO 14001-2015 | OHSAS 18001-2007 PC: PRE-CONCEPT // CC: CONCEPT // SD: SCHEMATIC DESIGN // DD: DETAIL DESIGN // TD: TENDER STAGE // CD: CONTRACT DOCS // IFC: CONSTRUCTION DOCS
6. ALL EXISTING DIMENSIONS / LEVELS INDICATED ON DRAWINGS ARE TO BE VERIFIED ON SITE. APPROVED BY OS MODEL FILE REFERANCE 196-SIE-RVT-WH-01-STR-000001
ORIGINAL PAPER SIZE: A0 (1189x841mm)