1.1 Pile Co-ordinate Marking Marking Co-ordinates as per Dwg Measure Total Station 100% Dwg / Spec Dwg / Spec IR P W R
Marking Identification Visual Nail / Ribbon Random Dwg / Spec Dwg / Spec IR P W R
Dimensions (Depth & Diameter of hole) Measure MS Tape 100% IS:2911_1_2 Dwg / Spec IR P W R
Post to Post Distance (E-W & N-S) Measure MS Tape 100% IS:2911_1_2 Dwg / Spec ±3mm IR P W R
1.3 Column Post Installation Horizontal Alignment of Post Visual Nylon wire 100% IS:2911_1_2 Single Line ± 5mm IR P W R
Table to Table Distance (E-W & N-S) Measure MS Tape 100% Dwg / Spec Dwg / Spec ±3mm IR P W R
Water Tube Level, Dwg / Spec /
Table to Table Height Difference (N-S) Measure 100% Dwg / Spec IR P W R
MS Tape ±150mm
2 MODULE MOUNTING STRUCTURE CONCRETE
Freedom from cracks, surface flaws, Lamination Visual NA Each lot IS:1786 Physical Check NA P* R R
2.2 Quality of Steel
Physical Properties (Yield Stress, Tensile
Strength, Elongation, Bend & Rebend Test) and Report/Test NA Each lot IS:1786 IS:432 MTC/ELTR P* R R
Chemical Properties
Quality of Coarse Sieve Analysis, Flakiness Index, Aggregate
Once per
2.3 Aggregate Crushing Value/Abrasion Value/Impact Value, Report/Test Lab Instruments IS:2386_1,2,3,4 IS:383 ELTR/TR P* R/W R
Source
(20mm/12.5mm) Specific Gravity and Moisture Content
Sieve Analysis, Fineness Modulus, Specific
2.4 Quality of Fine Aggregate Gravity, Fineness, Silt Content and Moisture Report/Test Lab Instruments Once per IS:2386_1,2,3 IS:383 ELTR/TR P* R/W R
(Sand) Content Source
INSPECTION
COMPONENT / CHARACTERISTICS / INSPECTION TYPE OF QUANTUM OF ACCEPTANCE FORMAT OF
CL.NO INSTRUMENT REF DOCUMENT REMARKS
OPERATION ACTIVITIES PARAMETERS CHECK CHECK NORMS RECORD Contractor TERAS NLCIL
IS:269/IS:8112/IS:12
Cement Grade Report NA Each OPC 43/53, PPC IR P W R
269/IS:1489
Concrete Mixture - Mobile Transit Mixer Report AJAX Fiori / RMC Each IS:1791/IS:12119 Certificate CR P* W R
Rafter Alignment Visual Nylon Wire 100% Dwg / Spec Single Line ± 5mm IR P W R
Rafter Inclination Measure Digi. Inclinometer 100% Dwg / Spec Dwg / Spec ± 1° IR P W R
Bracing & Gusset Plate Arrangement Visual NA 100% Dwg / Spec Dwg / Spec IR P W R
Correct Fasteners used (Size & Grade) Visual NA 100% Dwg / Spec Dwg / Spec IR P W R
Rafter Lower End Ground Clearance Measure Measuring Tape 100% Dwg / Spec Dwg/Spec IR P W R
Up to Rafter Fastener Assembly & Torque
Measure Torque Wrench 100% Dwg / Spec Torque Chart in Dwg IR P W R
Applied
3.1 MMS Assembly Purlin Alignment Visual Nylon wire 100% Dwg / Spec Single Line ± 5mm IR P W R
Purlin Splice Coupler Arrangement Measure MS Tape 100% Dwg / Spec Dwg/Spec IR P W R
Purlin Fastener Assembly & Torque Applied Measure Torque Wrench 100% Dwg / Spec Torque Chart in Dwg IR P W R
Module Alignment Visual Nylon wire 100% Dwg / Spec Single Line ± 5mm IR P W R
Module Fastener Assembly & Torque
Measure Torque Wrench 100% Dwg / Spec Torque Chart in Dwg IR P W R
Applied
Run thro' bolt,
Torque Marking Visual Permanent Marker 100% Dwg / Spec washer, nut, IR P W R
material
Table Identification Visual Paint Random Dwg / Spec Visible IR P R R
INSPECTION
QUANTUM
CL.NO COMPONENT / CHARACTERISTICS / INSPECTION TYPE OF INSTRUMENT OF CHECK REF DOCUMENT ACCEPTANCE FORMAT OF REMARKS
Contractor TERAS NLCIL
4 MODULE MOUNTING ON STRUCTURE
Module Alignment (Top & Bottom) & Sag Visual Nylon wire 100% Dwg / Spec Single Line ± 5mm IR P W R
Module to Module Gap Visual Nylon Wire 100% Dwg / Spec Dwg/Spec IR P W R
Module Inclination (Tilt Angle) Measure Digital Inclinometer 100% Dwg / Spec Dwg / Spec ± 1° IR P W R
Correct Fasteners used (Size & Grade) Visual NA 100% Dwg / Spec Dwg / Spec IR P W R
4.2 Module Mounting
Fastener Assembly & Torque Applied Measure Torque Wrench 100% Dwg / Spec Torque Chart in Dwg IR P W R
No shadow on
Module Shadow Visual NA 100% NA active face of IR R R R
Module
5.1 RO Plant and Pipe Line Fixing of Control Value at required intervals Visual NA Random Dwg / Spec Dwg / Spec IR P W R
Closed Cover Chamber for the control value Visual NA 100% Dwg / Spec Dwg / Spec IR P W R
Good for
Water Testing after installation of RO System Report NA Each IS:456 ELTR P* R R
Construction
4bar pressure at 5
Pressure Test, No leakage & Pipe damage Test Pressure Gauge Each Dwg / Spec TR P* W R
open control values
LEGENDS:
NLCIL-Neyveli Lignite Corporation India Limited, MTC-Material Test Certificate, IR-Inspection Report, TR-Test Report, ELTR-External Lab Test Report, CR-Calibration Report, CC-Curing Card. CTM-Compression Testing
Machine, IS-Indian Standard, RMC-Ready Mix Concrete, MT-Metric Ton, NDT-Non Destructive Test, SOP-Standard Operating Procedure, RO-Reverse Osmosis.
QA-Quality, TPIA-Third Party Inspection Agency, P-Perform, P*-Arrangement, W-Witness, RW-Random Witness, R-Review.
NOTE:
- In case of requirement of any additional activity other than mentioned in this FQP the same shall be incorporated with mutual agreement before commencement of the additional activity.
- Quality of Batching and Lab Set-up (Calibration certificates) shall be taken care at site.
- ELTR - External Laboratory engaged for testing work shall be certified by government approved bodies like NABL (in case of India).
- In case of absence of MTC for Raw Materials, testing shall be carried out at NABL approved laboratory and report shall be ensured and reviewed by Quality Person at site.
- Quantum of check: Quality person at site shall check 100% for any component / operation activities started at first time. After good adherence of the first work, QA person shall follows quantum of check as mentioned in QAP.
- RW: could be performed after getting inspection call from Project team. Performed in such a way that it does not affects the construction progress at site.