Fitting
Fitting
IN
Module 2 12 weeks
2.
[
MAIN FEATURES OF THE CURRICULUM
i
l
SYLLABUS FOR FITTING &PLUMBING
MODULE:l
THEORY
*Pipe vice
*Bench vice
· * Time sheets
*PVC pipe
* SW pipes
*Fittings
*Fixtures
* Solder I Lead
4. Testing:
*Water test
* Pressure test
*Smoke test
*Ball test
Practicals :
1. Taps & Valves :
*Awareness of tolerance
*Safety
* Site tidiness
3. Jointing I Assembling GI Pipes :
* Understanding types of pipes & fittings
*Understanding methods ofjoining
* Use of chain wrench
* Interpretation of sketches & drawings
* Joining and assembling GI pipes with supplied fittings
* Importance of line & level
*Awareness of tolerance
*Safety
* Site tidiness
4. PVC Pipe Bending :
*Understanding types of PVC pipes and fittings
*Understanding methods of bending
* Use blow lamp & flame control
* Interpretation of sketches & drawings
* Mark out and cut to size
* Bend PVC pipes
* Importance of line & level
• J * Awareness of tolerance
; *Safety
''
Ii
'}
--1.
* Site tidiness
5. PVC .Jointing :
* Understanding types of PVC pipe joints
* Understanding methods ofjointing
*Use of hand tools
*Use of beveling reamer
* Use of blow lamp & flame control
* Application of solvents
* Assembly methods
* Interpretation of sketches & drawings
* Join PVC pipe
* Importance of line & level
*Awareness oftolerance
* Safety
* Site tidiness
6. S.W. Pipe laying I jointing:
* Understanding types of SW pipe
* Understanding methods oflaying I jointing
* Use of hand tools
* Use of sight rails
* Assembly methods
* Interpretation of sketches & drawings
* Importance of gradient I alignment
* Understanding self cleansing gradients
* Join SW pipe
*Testing methods
* Awareness of tolerance
*Safety
* Site tidiness
.MODULE:2
-l
1. Basic Materials:
"' Galvanized pipes
* Cast iron pipes
*PVC pipe
* SW pipes
* Fittings
*Fixtures
* Solder I Lead
2. Testing:
*Water test
* Pressure test
*Smoke test
* Ball test
3. Safety:
* Health & Safety
* Eye protection
* Hand & Foot protection
* Overall personal safety
*Moving
*Lifting
*Carrying
*Stacking
*Working at heights (Ladders I scaffold)
* Electricity
i
Practicals :
1. Cast Iron Cutting I Jointing :
* Understanding methods of cutting
* Use of hand tools
* Interpretation of sketches & drawings
* Importance of alignment
* Understanding methods ofjointing
* Use of chain wheel
* Introduction to gasket
* Handling lead
* Testing methods
*Awareness of tolerance
*Safety
* Site tidiness
2. Alkathcnc flanging I Jointing :
* Understanding Alkathene Flange
* Forming tools
* Assembly methods
*Types of fittings
*Safety
* Site tidiness
3. Malcing service connections :
* Understanding service connections
* Understanding ferrules, water meter
* Introduction local authority by-laws
* Connect cast iron main with domestic service
* Using ferrule, valve and water metei·
* Testing methods
*Safety
* Site tidiness
4. Connecting house sewer to main :
* Understanding sewer connection to main
* Understanding interceptor traps
* Introduction local authority.by-laws
* Connect interceptor manhole with main sewer using
SW pipes
* Testing methods
* Safety
* Site tidiness
5. Fixing s~mitary Fixtures :
* Understanding, handling, lifting sanitary fixtures
* Care in fitting and leveling
* Introduction local authority by-laws
* Fix low level water closet
* Connect to soil stack, seal connections
* Testing methods
*Safety
* Site tidiness
6. Installing Water Pump, connecting supply pipe:
* Understanding handling water pump
*Understanding working principle of Water pump and
foot valve
* Methods of connections
* Connect pump to pump base
* Connect supply pipes, foot valves, etc.
* Care in fitting and leveling
* Introduction local authority by-laws
*Testing methods
*Safety
* Site tidiness
7. Skill Consolidation Installation Work Project:
* Interpretation of working drawings
* Types of sanitary fixtures and appliances
* Storage cistern, tanks
* Understanding local authority by-laws
* Distribution water supply pipe connections
* Position install sanitary fixtures and appliances
* Testing methods
*Safety
* Site tidiness
... ·.:1·,
\' ·~0i·
. l"j
6. -do- !OOmm
25. Sinks
26. Wash Basin 630x4SO mm
27. Flushing cistcms
28. Hack Saw Blade Y/' X 12"
29. G.l. Nipple Y2" x 2", Y2" x 4", Yl"x 6, Yl"x 9"
30. "S" Trap I X W'
31. "P" Tap 4"