RISK ASSESSMENT FORM
Valid Until :
Facility / Job Location : Specify Activity to be assessed :- Assessment team member Signature
Department:
STG # 5,6 STG # 5&6 (EXCAVATION WORK). 1
MARAFIQ YANBU
2
3
Reviewed By (Hanwha construction Department ): Reviewed By ( Hanwha Safety Section): Approved By (STG 5&6 Project Site Manager):
2. Pre-construction Safety N/A N/A All employees assigned to this task will attend a
Toolbox meeting, which will include the
Meeting pertinent JSAs, Standard Operating Procedure,
types of potential hazards, emergency response,
and actual hazards present and controls for those
hazards.
3. site preparation . Heat stress .L/ physical injury Ensure adequate supply of fresh cool drinking
and illness water or all personal.
PROPRIETARY NOTICE IMPORTANT
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED
EXCEPT UPON WRITTEN PERMISSION BY MARAFIQ. Only document with stamps are considered official.
Power & Water Utility Company Document ID No :
For Jubail and Yanbu (MARAFIQ)
Page: 2
Rev. No.:
RISK ASSESSMENT FORM
Valid Until :
4. Excavation Damage of
under Ground
H / physical injury
fatality
Obtain and review all required as-Built U/G
plant Drawings and prior to activity.
Utility, M / property damage Obtain Excavation permit on top of usual safe
Cave in / wall work permit.
collapse Civil engineer will review the type of soil and
Equipment fall will decide what type of control measures to be
down to done to avoid wall collapse. He will supervise
excavation the excavation work at all times.
Workers Using the safety devise (cable and metal
falling inside detector) before starting the excavation.
excavation In case of excavating near underground services
Hazard to machine will not be used.
public and Only use hand excavation.
traffic Warning lights will be provided in case of road
Equipment crossings. Or around the excavation.
malfunction Observe safe slope ( 45 Degrees-Minimum or
Congested as per soil classification) or
area Heavy equipment and material will not be
Simultaneous allowed near the edge of deep excavation.
activity with Only certified operators will operate heavy
other equipment.
contractors Workers will not be allowed to work close to
Existing the equipment.
PROPRIETARY NOTICE IMPORTANT
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE IS EXPRESSLY PROHIBITED
EXCEPT UPON WRITTEN PERMISSION BY MARAFIQ. Only document with stamps are considered official.
Power & Water Utility Company Document ID No :
For Jubail and Yanbu (MARAFIQ)
Page: 3
Rev. No.:
RISK ASSESSMENT FORM
Valid Until :
Rev. No.:
RISK ASSESSMENT FORM
Valid Until :
6 6 Safety harness
7 7 Safety glass
8 8 Shoes
9 9 helmet
10 10 Gloves
11 11 HARD HAD
12 12 Beacon flashing lamps
13 13
Information to Employees
(Details of job, hazards, risks and safety precautions)
Prior to commencement of job, Authorized Permit Receiver / Supervisor must give information on details of job, hazards, risks and
safety precautions to all personnel involved in the job and obtain their signatures on the form to acknowledge the same.
Sr. Name of the employee Profession ID No. Signature of the employee
I am informed of job details, hazards, risks and safety
precautions in order to perform above job safely.
1
2
3
4
5
Rev. No.:
RISK ASSESSMENT FORM
Valid Until :