The document is a detailed engineering design for the construction of the Panguil Bay Bridge Project Package 1 - Part 2 13 Waterway Realignment. It involves the realignment of 3,169 meters of waterway between Tangub City, Misamis Occidental and the Municipality of Tubod, Lanao del Norte. The design and build contractor will be solely responsible for the integrity of the engineering design and structural performance of the bridge. The contractor will also be fully responsible for any structural defects or failures due to faulty design specifications, except for changes made without the contractor's conformity.

Uploaded by

Adrian Malpaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
373 views29 pages

Department of Public Works and Highways: Republic of The Philippines

The document is a detailed engineering design for the construction of the Panguil Bay Bridge Project Package 1 - Part 2 13 Waterway Realignment. It involves the realignment of 3,169 meters of waterway between Tangub City, Misamis Occidental and the Municipality of Tubod, Lanao del Norte. The design and build contractor will be solely responsible for the integrity of the engineering design and structural performance of the bridge. The contractor will also be fully responsible for any structural defects or failures due to faulty design specifications, except for changes made without the contractor's conformity.

Uploaded by

Adrian Malpaya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 29

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


ROADS MANAGEMENT CLUSTER II (MULTILATERAL) UPMO
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, MANILA, 1018, METRO MANILA

C.Y. 2020 PROJECT


DETAILED ENGINEERING DESIGN (DESIGN AND BUILD) FOR
DESIGN - BUILD FOR THE CONSTRUCTION OF PANGUIL BAY BRIDGE PROJECT
PACKAGE 1 - PART 2 13 WATERWAY REALIGNMENT
TANGUB CITY, MISAMIS OCCIDENTAL – MUNICIPALITY OF TUBOD, LANAO DEL NORTE
STA. 0+000 ~ STA. 3+169
3,169m
PANGUIL BAY BRIDGE

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL


DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

SUBMITTED: CHECKED : RECOMMENDED : APPROVED:

TAE SIK YOUN SOO YOUNG PARK SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
PROJECT MANAGER SR BRIDGE DESIGN ENGINEER PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY
NAMKWANG-KUKDONG-GUMGWANG JV PROJECT MANAGEMENT CONSULTANT ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN FOR TECHNICAL SERVICES
YOOSHIN-PYUNGHWA-KYONGHO JV (MULTILATERAL) UPMO

DATE : DATE : DATE : DATE : DATE :


TABLE OF CONTENTS

DRAWING REMARKS
LOCATION TITLE NO.

LOCATION MAP,VICINITY MAP, AND SITE MAP GEWR-001


GENERAL NOTES , PROPOSED CHANNEL REALIGNMENT LAYOUT AND LEGEND AND ABBREVIATIONS GEWR-002
CHANNEL PROFILE REALIGNED WATERWAY WR-001

TUBOD CHANNEL SECTIONS OF EXISTING ALIGNMENT (STA.) (-)0+100.00, (-)0+080 & (-)0+060.00 WR-002
SIDE CHANNEL SECTIONS OF EXISTING ALIGNMENT (STA.) (-)0+040.00 & (-)0+020.00 WR-003
CHANNEL SECTIONS OF PROPOSED ALIGNMENT (STA.0+000.00 & STA.0+020.00) WR-004
CHANNEL SECTIONS OF PROPOSED ALIGNMENT (STA.0+040.00 & STA.0+060.00) WR-005
CHANNEL SECTIONS OF PROPOSED ALIGNMENT (STA.0+080.00 & STA.0+100.00) WR-006
CHANNEL SECTIONS OF PROPOSED ALIGNMENT (STA.0+120.00 & STA.0+140.00) WR-007
CHANNEL SECTIONS OF PROPOSED ALIGNMENT (STA.0+160.00 & STA.0+180.00) WR-008
CHANNEL SECTIONS OF PROPOSED ALIGNMENT (STA.0+200.00 & STA.0+220.00) WR-009
CHANNEL SECTIONS OF EXISTING ALIGNMENT (STA.) 0+240.00, 0+262.00 & 0+280.00 WR-010
CHANNEL SECTIONS OF EXISTING ALIGNMENT (STA.) 0+300.00 & 0+320.00 WR-011
CHANNEL SECTIONS CUT AND FILL (STA.0+000.00 & STA.0+020.00) WR-012
CHANNEL SECTIONS CUT AND FILL (STA.0+040.00 & STA.0+060.00) WR-013
CHANNEL SECTIONS CUT AND FILL (STA.0+080.00 & STA.0+100.00) WR-014
CHANNEL SECTIONS CUT AND FILL (STA.0+120.00 & STA.0+140.00) WR-015
CHANNEL SECTIONS CUT AND FILL (STA.0+160.00 & STA.0+180.00) WR-016
CHANNEL SECTIONS CUT AND FILL (STA.0+200.00 & STA.0+220.00) WR-017
CHANNEL SECTION WITH FLOOD LEVELS ( BRIDGE STA.2+680 & STA. 2+700 ) WR-018
CHANNEL SECTION WITH FLOOD LEVELS ( BRIDGE STA.2+720 & STA. 2+740 ) WR-019
CHANNEL SECTION WITH FLOOD LEVELS ( BRIDGE STA.2+760 & STA. 2+780 ) WR-020
CHANNEL SECTION WITH FLOOD LEVELS ( BRIDGE STA.2+800 & STA. 2+820 ) WR-021
CHANNEL TYPICAL SECTION DETAIL WR-022
COCO COIR LOGS DETAIL SECTION AND ELEVATION WR-023

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL


DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT TOC
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 001
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF TABLE OF CONTENTS UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
SERIAL OLD NAME NEW NAME
PACKAGE NUMBER
NUMBER
REPORTS 1 AESTHETIC STRATEGY AESTHETIC STRATEGY
REPORTS 2 DESIGN CRITERIA STANDARDS DESIGN CRITERIA STANDARDS
REPORTS 3 DESIGN IMPLEMENTATION PLAN DESIGN IMPLEMENTATION PLAN
REPORTS 4 GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT
REPORTS 5 DED COMBINED SURVEY REPORT
REPORTS 6 FINAL SURVEY REPORT OF PBBP PROJECT TOPO & OCEANOGRAPHICAL SURVEY REPORT
REPORTS 7 MARINE SURVEY REPORT MARINE SURVEY REPORT
REPORTS 8 NAVIGATIONAL CLEARANCE REPORT NAVIGATIONAL CLEARANCE REPORT
REPORTS 9 UTILITIES SURVEY REPORT
REPORTS 10 SEISMIC LOAD REVIEW
DRAWINGS 11 AS-STAKED PLANS STA. 0+000 - STA. 3+169 AS-STAKED PLANS
PACKAGE 1- PART 1 12 RESUBMISSION PACKAGE 1-PART 1 TEMPORARY ROAD
PACKAGE 1- PART 2 13 RESUBMISSION OF PACKAGE 1-PART 2 WATERWAY REALIGNMENT WATERWAY REALIGNMENT

PACKAGE 1- PART 3 14 PACKAGE 1-3 DESIGN REPORT ABUTMENT PILES AND ILM YARD PILES ABUTMENT PILES AND ILM YARD PILES

PACKAGE 1- PART 4 15 SUBMISSION OF PACKAGE 1- PART 4 TEMPORARY WORKS- EMBANKMENT AND WHARF TEMPORARY WORKS- EMBANKMENT AND WHARF

PACKAGE 2- PART 1 16 PACKAGE 2-1 STA. 0+000 - STA. 3+169 APPROACH BRIDEGE 1 - PILES

PACKAGE 2- PART2 17 PACKAGE 2-2 MAIN BRIDGE PILES MAIN BRIDGE PILES

PACKAGE 2- PART 2 17 PACKAGE 2-2 APPROACH BRIDGE 2 PILES APPROACH BRIDGE 2 PILES

PACKAGE 3- PART 1 18 APPROACH BRIDGE 1-SUPERSTRUCTURE (GENERAL DRAWINGS) APPROACH BRIDGE 1 & 2MAIN BRIDGE -SUPERSTRUCTURE (GENERAL DRAWINGS)

PACKAGE 3- PART 2 19 APPROACH BRIDGE 1 & 2 AND MAIN BRIDGE-SUPERSTRUCTURE (REINFORCEMENT DRAWINGS) APPROACH BRIDGE 1 & 2 AND MAIN BRIDGE-SUPERSTRUCTURE (REINFORCEMENT DRAWINGS)

PACKAGE 3- PART 3 20 ANCILLARY WORKS ANCILLARY WORKS, CONSTRUCTION SEQUENCE, TEMPORARY WORKS

PACKAGE 3- PART 4 21 ROAD WORKS ROAD WORKS (1/10)

PACKAGE 3- PART 4 22 ALIGNEMENT DESIGN ALIGNEMENT DESIGN (2/10)

PACKAGE 3- PART 4 23 ELECTRICAL PLANS ELECTRICAL PLANS (3/10)

PACKAGE 3- PART 4 24 APPROACH BRIDGE 1 -SUBSTRUCTURE APPROACH BRIDGE 1 -SUBSTRUCTURE (4/10)

PACKAGE 3- PART 4 25 APPROACH BRIDGE 2 -SUBSTRUCTURE APPROACH BRIDGE 2 -SUBSTRUCTURE (5/10)

PACKAGE 3- PART 4 26 MAIN BRIDGE- SUBSTRUCTURE MAIN BRIDGE- SUBSTRUCTURE (6/10)

PACKAGE 3- PART 4 27 EXPANSION JOINTS AND BEARING EXPANSION JOINT AND BEARING (7/10)

PACKAGE 3- PART 4 28 MARINE PLANS MARINE FACILITIES (8/10)

PACKAGE 3- PART 4 29 QUANTITY BILL OF QUANTITIES (9/10)

PACKAGE 3- PART 4 30 MATERIALS SPECIFICATION MATERIALS SPECIFICATION (10/10)

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL


DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
SOO YOUNG PARK BAY BRIDGE PROJECT DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SUBMITTED:
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SERIAL NUMBER TABLE UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
3+
S I T E

00
0

3+
30
0
LOCATION MAP VICINITY MAP SITE MAP
SCALE :NTS SCALE :NTS SCALE :NTS

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL


DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT GEWR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS LOCATION MAP,VICINITY MAP, ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 001
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV AND SITE MAP (MULTILATERAL) UPMO (MULTILATERAL) UPMO
BONIFACIO DRIVE PORT AREA, 652 ZONE 068,
PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF PROPOSED CHANNEL REALIGNMENT LAYOUT
- TUBOD SIDE - SCALE : AS SHOWN

1. IN THE INTERPRETATION OF THESE DRAWINGS, THE


INDICATED DIMENSIONS ELEVATIONS SHALL LEGEND
GOVERN AND DISTANCES OR SIZES SHALL NOT BE 00
0.0
SCALED FOR CONSTRUCTION PURPOSES. 10
-0+

ED
STANDARD CODE REQUIREMENTS SHALL GOVERN STATIONS (EXISTING CREEK)

GE
OVER UNSCALED DRAWINGS.

OF
0. 000

RI
+08
2. UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS FLOW

GH
ARE IN MILLIMETERS AND THE WATERWAY -0

T
OF
STATIONING ARE IN KILOMETERS AND METERS AND

W
SECTIONS ARE IN METERS. BRIDGE RIGHT-OF-WAY
0.000

AY
- 0 + 0 6
3. EXCAVATION OF THE CREEK SHALL CONFORM TO
THE DESIGNED SLOPE OF EMBANKMENT, GRADE CUT
AND SHAPES OF THE REQUIRED CROSS SECTIONS. N O R T H
WITH NO PROJECTION OF ROOTS, STUMPS, ROCKS -0+040.000 FILL
OR SIMILAR MATTERS.

4. THE CONTRACTOR SHALL MAINTAIN AND KEEP OPEN

2+
DOWNSTREAM END -0+020.000 COCO COIR LOGS

60
AND FREE FROM ANY OTHER DEBRIS ALL CHANNELS

ED
STATION:0+020.00

GE
DUG BY HIM UNTIL FINAL ACCEPTANCE OF THE N:890080.107
WORK.

OF
E:586358.296 CENTERLINE OF BANK

EM
5. ALL EXCESS MATERIALS INCLUDING ROCKS OR

BA
NK
BOULDERS, THAT CAN NOT BE USED IN

0+
BOTTOM OF BANK

ME

00
EMBANKMENT SHALL BE DISPOSED AS DIRECTED.

0.0
NT

00
6. MATERIALS ENCOUNTERED IN THE EXCAVATION E TOP OF BANK

0+
IN
EL

02
AND DETERMINED BY THE ENGINEER AS SUITABLE
CREEK BEND 2 DS

0.
OR 0+0

00
FOR TOPPING, ROAD FINISHED SLOPE PROTECTION
SH 40.0 STATION:0+17.93

0
OR OTHER PURPOSES SHALL BE CONSERVED & E R45 00 N:890081.474
UTILIZED AS DIRECTED BY THE ENGINEER.
MAT
I 0+060.000 E:586359.846
R OX ABBREVIATIONS:
7. ALL EXCAVATION SHALL BE FINISHED TO
APP 0.0
00
REASONABLY SMOOTH AND UNIFORM SURFACE. 8 CREEK BEND 2 US

2+
0+0 STATION:0+79.84
EL : ELEVATION

70
SLOPE OF EMBANKMENT SHALL BE PROPERLY
FGL : FINISH GRADE LINE

0
MEASURED AND PREPARED FOR THE INSTALLATION N:890025.264
OF FINISH MATERIALS.
0 .00
0 E:586349.245 HWL : HIGH WATER LEVEL
+1 0
0 MSL : MEAN SEA LEVEL
8. FEATURES OF CONSTRUCTION SHOWN ARE TYPICAL CONTROL POINTS
EGL : EXISTING GRADE LINE

S=0
AND SHALL APPLY GENERALLY THROUGHOUT FOR GPS-2
SIMILAR CONDITIONS. MODIFY TYPICAL DETAILS AS N:890022.116 0. 000 TOB : TOP OF BANK

.4%
REQUIRED TO MEET SPECIAL CONDITIONS. E:586254.868 0+12 CREEK BEND 1 DS BOB : BOTTOM OF BANK
STATION:0+163.49
9. THE CONTRACTOR SHALL EXAMINE THE DRAWINGS 4m 0 0 N:889949.121
AND SHALL NOTIFY THE ENGINEER/ARCHITECT OF 15m 1 4 0.0 E:586383.891
4m 0+
ANY DISCREPANCIES HE MAY FIND BEFORE
PROCEEDING WITH THE WORK, OR DURING
LEGEND AND ABBREVIATIONS
0 CREEK BEND 1 US SCALE :NTS
CONSTRUCTION.
6 0.00
0+ 1 STATION:0+223.41

0.00 0
N:889922.729

0+220.000
00
10. ALL MATERIALS AND WORKMANSHIP SHALL

0+240.000
0
.
E:586431.850

80
CONFORM TO THE LATEST APPLICABLE STANDARD

1
2+

0+

00
OR SPECIFICATIONS. ALL WORKS SHALL CONFORM

0+20
80

0.0
WITH THE BEST PRACTICE PREVAILING IN THE

26
VARIOUS TRADES.

0+
1
R4
11. UNLESS SPECIFICALLY DETAILED ELSEWHERE, THE ITEM NO. DESCRIPTION UNIT QUANTITY
CONTRACTOR SHALL FOLLOW TYPICAL DETAILS AS
1700 (1) CLEARING AND GRUBBING m² 6,500.00
SHOWN IN THESE DRAWINGS.
0+280.000 CHANNEL EXCAVATION
12. CONTRACTOR SHALL ENSURE SMOOTH TRANSITION 1701 (1) m³ 7,100.00
UPSTREAM END UNSUITABLE EXCAVATION
BETWEEN EXISTING AND REALIGNED WATERWAY STATION:0+220.00 1705 (1) FILL AND BACKFILL m³ 3,400.00
,BY UNDERTAKING ANY NECESSARY ADDITIONAL N:889922.102
EXCAVATION AT THE TRANSITION (STA. 0+000 & STA. 0+300.000 COCONET BIO-ENGINEERING SOLUTIONS
E:586428.497 0 622 (2) c m 6,500.00
0+288). SEE WR-001
0 .00 COCO-LOG/FASCINE (CN300)
32
13. RETAIN EXISTING VEGETATION AT BEGINNING AND 0+ 622 (3) b
COCONET BIO-ENGINEERING SOLUTIONS
1,900.00

VEGETATION (VETIVER GRASS SYSTEN)
ENDING POINTS OF THE REALIGNMENT.

SUMMARY OF QUANTITIES

2+
90
SCALE :NTS
GENERAL NOTES

0
SCALE: NTS

NOTES:
NOTE:
1. ALL DIMENSIONS AND ELEVATIONS WERE
VERIFIED DURING CONSTRUCTION. THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.
2. HYDRAULIC DESIGN DATA:
DRAINAGE AREA = 4.36 km² THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
DESIGN DISCHARGE = 50.22 m³/sec INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.
MAXIMUM VELOCITY = 1.56 m/sec
(TIDE-INFLUENCED)
SLOPE = 0.004 m/m
PROPOSED CHANNEL REALIGNMENT LAYOUT TAE SIK YOUN
PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV
SCALE: 1:1000 MTS

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY


LEE SANG HUN
DESIGN MANAGER CONSTRUCTION OF PANGUIL REALIGNMENT (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
GENERAL NOTES, REPUBLIC OF THE PHILIPPINES GEWR
SOO YOUNG PARK BAY BRIDGE PROJECT PROPOSED CHANNEL DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SUBMITTED:
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS REALIGNMENT LAYOUT ,LEGEND ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 002
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV AND ABBREVIATIONS, SUMMARY BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE OF QUANTITIES DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
SPOIL SITE LOCATION 1 AND 4 SPOIL SITE LOCATION 2 AND 3
SCALE :NTS SCALE :NTS

SPOIL SITE LOCATION IDENTIFIED BY THE PROVINCIAL GOVERNMENT OF LANAO DEL NORTE, FOR
THE DONATION OF EXTRACTED SOIL MATERIALS FROM WATERWAY REALIGNMENT WORKS:

1. IN FRONT OF PASALUBONG CENTER AT AGORA COMPOUND ALONG THE NATIONAL HIGHWAY


ILIGAN-ZAMBOANGA ROAD (NEAR SWIMMING POOL AT MCC SPORTS COMPLEX) LOCATED AT
POBLACION, TUBOD, LDN.

2. AT THE BACK OF OLD PROVINCIAL CAPITOL BUILDING LOCATED AT CAPITOL COMPOUND,


PIGCARANGAN, TUBOD, LDN.

3. BESIDES FARMER'S TRAINING CENTER, LEFT SIDE GOING TO MATERIAL RECOVERY


FACILITIES (MRF) CAPITOL COMPOUND, PIGCARANGAN, TUBOD, LDN.

4. IN FRONT OF LANECO AND BESIDES THE PANGUIL BAY BRIDGE ACCESS ROAD ALONG THE
NATIONAL HIGHWAY ILIGAN-ZAMBOANGA ROAD OF POBLACION, TUBOD.

NOTE:
NOTE: TECHNICAL DESCRIPTION OF THE LOCATIONS SHALL BE VERIFIED BY THE PROJECT
ENGINEER. THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL


DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT GEWR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 003
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SPOIL SITE LOCATION UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY PROFILE (1/23)
- TUBOD SIDE - SCALE : AS SHOWN

5.00

4.00

3.00

2.00
TOB
1.00

0.00 DFL=+ 0.02m

-1.00 FGL

-2.00

-3.00
TRANSITION (SEE NOTES) REALIGNED WATERWAY
-4.00

-5.00

0.61

1.11
0.44

0.52

0.69

0.78

0.86

0.95

1.03

1.20

1.28

1.36
TOP OF BANK (TOB)

-1.61
-1.86

-1.52

-1.44

-1.36

-1.27

-1.10

-1.02

-0.93
-1.78

-1.69

-1.19
FINISHED GRADE LINE ( FGL )
0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02
DESIGN FLOOD LEVEL
(DFL)
-0.61

-1.31

-0.81
-0.42
-1.86

-1.23

-1.04

-0.67

-1.54

-1.24

-0.83

-0.26

-0.84

-0.98

-1.24

-1.20
0.51
0.87

0.53

0.67

0.43

0.25
1.36
EXISTING GRADE LINE (EGL)
-0+114

-0+100

-0+080

-0+060

-0+040

-0+020

0+000

0+020

0+040

0+060

0+080

0+100

0+120

0+140

0+160

0+180

0+200

0+220

0+240

0+260

0+280

0+300

0+320
CHAINAGE

NOTES:
CHANNEL PROFILE REALIGNED WATERWAY
SCALE: V=1:1000MTS
1. TRANSITION ELEVATION FOR VERIFICATION
H=1:300MTS
PER ACTUAL SITE CONDITION

2. EXTENDED TRANSITION AS NEEDED.

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL


DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS CHANNEL PROFILE REALIGNED ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 001
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF WATERWAY 1/23 UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (2/23)
- TUBOD SIDE - SCALE : AS SHOWN

4 4

2 CL

EL. -0.69

171135
0 EL. -0.82
0 EL. -1.00

-2

-4 -4
-5 0 5 10 15 20

SECTION @ (-) 0+100.00


SCALE: 1:100MTS

4 4

2 CL

0 0 EL. -0.10

484 033
EL. -0.13
EL. -0.61
-2

-4 -4
-15 -10 -5 0 5 10 15 20

SECTION @ (-) 0+080.00


SCALE: 1:100MTS

4 4
CL
EL. 1.66

715
EL. 0.94

1,984
0 0
EL. -1.04

-2

-4 -4
-15 -10 -5 0 5 10 15 20

NOTE:

SECTION @ (-) 0+060.00 THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
SCALE: 1:100MTS PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL


DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR

CHANNEL SECTIONS OF EXISTING ALIGNMENT INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 002
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (2/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (3/23)
- TUBOD SIDE - SCALE : AS SHOWN

4 4

CL
EL. 2.00

516
2
EL.1.49

2,158
0 0
EL.-0.67

-2

-4 -4
-20 -15 -10 -5 0 5 10 15 20

SECTION @ (-) 0+040.00


SCALE: 1:100MTS

CL
2
EL. 1.14

1,873 804
EL. 0.33
0 0

EL. -1.54
-2

-4 -4
-20 -15 -10 -5 0 5 10 15 20

SECTION @ (-) 0+020.00


SCALE: 1:100MTS

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL


DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR

CHANNEL SECTIONS OF EXISTING ALIGNMENT INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 003
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (3/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (4/23)
- TUBOD SIDE - SCALE : AS SHOWN

6 6

4,000 15,000 4,000


4

2 CL

EL. 0.44 (TOB)


0 0

2,300
EL. -1.86 (BOB)
-2

600 600
-4

-6 -6
-20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+000.00
SCALE: 1:100MTS

6 6

4,000 15,000 4,000

CL
2
EL. +0.72 (EGL)

20
EL. +0.52 (TOB)
0 0

2,300
EL. -1.78 (BOB)
-2

600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+020.00
SCALE: 1:100MTS
NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

CHANNEL SECTIONS OF PROPOSED ALIGNMENT THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 004
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (4/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (5/23)
- TUBOD SIDE - SCALE : AS SHOWN

6 6
4,000 15,000 4,000

CL
2

EL. +0.61 (TOB)

0 0

2,300
EL. -1.69 (BOB)
-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+040.00
SCALE: 1:100MTS

EDGE OF EMBANKMENT
6 6
4,000 15,000 4,000 5,024

CL
2
EL. +1.17 (EGL)

479
EL. +0.69 (TOB)
0 0

2,300
EL. -1.61 (BOB)
-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+060.00
SCALE: 1:100MTS

NOTE:

CHANNEL SECTIONS OF PROPOSED ALIGNMENT THE DESIGN AND BUILD CONTRACTOR SHALL
THE INTEGRITY OF THE DETAILED
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE
BE SOLELY RESPONSIBLE FOR
ENGINEERING DESIGN AND THE
OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL


DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 005
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (5/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (6/23)
- TUBOD SIDE - SCALE : AS SHOWN

EDGE OF EMBANKMENT
6 6
4,000 15,000 4,000 3,596

CL
2
EL. +0.78 (TOB)

2,300
0 0

EL. -1.52 (BOB)


-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 17

SECTION @ 0+080.00
SCALE: 1:100MTS

EDGE OF EMBANKMENT
6 6
4,000 15,000 4,000 3,000

CL
2
EL. +0.86 (TOB)

2,300
0 0

EL. -1.44 (BOB)


-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+100.00
SCALE: 1:100MTS
NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

CHANNEL SECTIONS OF PROPOSED ALIGNMENT THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 006
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (6/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (7/23)
- TUBOD SIDE - SCALE : AS SHOWN

6 6

EDGE OF EMBANKMENT
4,000 15,000 4,000 3,751
4

CL

2
EL.+0.95 (TOB)

2,300
0 0

EL. -1.36 (BOB)

-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 -20

SECTION @ 0+120.00
SCALE: 1:100MTS

6 6

EDGE OF EMBANKMENT
4,000 15,000 4,000 4,752

4
CL

2
EL.+1.03 (TOB)

2,300
0 0

EL. -1.27 (BOB)

-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 -20

SECTION @ 0+140.00
SCALE: 1:100MTS

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

CHANNEL SECTIONS OF PROPOSED ALIGNMENT THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 007
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (7/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (8/23)
- TUBOD SIDE - SCALE : AS SHOWN

EDGE OF EMBANKMENT
6 6

4,000 15,000 4,000 4,819


4
C
L

2
EL.+1.11 (TOB)

2,300
0 0
EL. -1.19 (BOB)

-2 600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 -20

SECTION @ 0+160.00
SCALE: 1:100MTS

EDGE OF EMBANKMENT
6 6

4,000 15,000 4,000 6,444


4
CL

2
EL.+1.20 (TOB)

2,300
0 0
EL. -1.10 (BOB)

-2 600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 -20

SECTION @ 0+180.00
SCALE: 1:100MTS
NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

CHANNEL SECTIONS OF PROPOSED ALIGNMENT THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 008
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (8/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (9/23)
- TUBOD SIDE - SCALE : AS SHOWN

6 6

4,000 15,000 4,000


4

C
L
2
EL.+1.28 (TOB)

2,300
0 0
EL. -1.02 (BOB)

-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 -20

SECTION @ 0+200.00
SCALE: 1:100MTS

6 6

4,000 15,000 4,000


4
C
L

2
EL.+1.36 (TOB)

2,300
0 0
EL. -0.93 (BOB)

-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 -20

SECTION @ 0+220.00
SCALE: 1:100MTS

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

CHANNEL SECTIONS OF PROPOSED ALIGNMENT THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 009
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (9/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (10/23)
- TUBOD SIDE - SCALE : AS SHOWN

4 4

CL
2 EL. 1.25

275
EL. 0.98

2,445
0 0

EL. -1.44
-2

-4 -4
-20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+240.00
SCALE: 1:100MTS

4 4

CL EL. 1.38
2

157
EL. 1.22

2,692
0 0

EL. -1.47
-2

-4 -4
-15 -10 -5 0 5 10 15 20

SECTION @ 0+260.00
SCALE: 1:100MTS

4 4

CL EL. 1.50
2

571
EL. 0.93

1,836
0 0
EL. -0.91

-2

-4 -4
-20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+280.00 NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


SCALE: 1:100MTS THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL


DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
CHANNEL SECTIONS OF EXISTING ALIGNMENT INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 010
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (10/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (11/23)
- TUBOD SIDE - SCALE : AS SHOWN

4 4
CL

2 EL. 1.33

397
EL. 0.93

2,085
0 0

EL. -1.15

-2

-4
-25 -20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+300.00
SCALE: 1:100MTS

4 4

CL
2 EL. 0.93

1,512 172
EL. 0.76

0 0
EL. -0.75

-2

-4 -4
-25 -20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+320.00
SCALE: 1:100MTS

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

CHANNEL SECTIONS OF EXISTING ALIGNMENT THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 011
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (11/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (12/23)
- TUBOD SIDE - SCALE : AS SHOWN

6 6
ITEM NO. DESCRIPTION UNIT QUANTITY

CHANNEL EXCAVATION 4,000 15,000 4,000


1701 (1) m2 39.45
UNSUITABLE EXCAVATION 4
1705 (1) FILL AND BACKFILL m2 0.79

COCONET BIO-ENGINEERING CL
622 (2) c m 560
2
SOLUTION
COCO-LOG/FASCINE 300)
EL. 0.44 (TOB)
0 0

2,300
EL. -1.86 (BOB)
-2

600 600
-4

-6 -6
-20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+000.00
SCALE: 1:100MTS

6 6
ITEM NO. DESCRIPTION UNIT QUANTITY
4,000 15,000 4,000
CHANNEL EXCAVATION 2
1701 (1) m 56.71
UNSUITABLE EXCAVATION 4
1705 (1) FILL AND BACKFILL m2 0.08
CL
COCONET BIO-ENGINEERING
622 (2) c m 560
2
SOLUTION
COCO-LOG/FASCINE 300)
EL. +0.72 (EGL)

20
EL. +0.52 (TOB)
0 0

2,300
EL. -1.78 (BOB)
-2

600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+020.00
SCALE: 1:100MTS

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.
CHANNEL SECTIONS CUT AND FILL THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 012
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (12/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (13/23)
- TUBOD SIDE - SCALE : AS SHOWN

6 6
ITEM NO. DESCRIPTION UNIT QUANTITY
4,000 15,000 4,000
CHANNEL EXCAVATION
1701 (1) m2 25.21
UNSUITABLE EXCAVATION 4
1705 (1) FILL AND BACKFILL m2 10.35
CL
COCONET BIO-ENGINEERING
622 (2) c m 560
2
SOLUTION
COCO-LOG/FASCINE 300)
EL. +0.61 (TOB)

0 0

2,300
EL. -1.69 (BOB)
-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+040.00
SCALE: 1:100MTS

EDGE OF EMBANKMENT
6 6
ITEM NO. DESCRIPTION UNIT QUANTITY
4,000 15,000 4,000 5,024
CHANNEL EXCAVATION
1701 (1) m2 58.19
UNSUITABLE EXCAVATION 4
1705 (1) FILL AND BACKFILL m2 0.32
CL
COCONET BIO-ENGINEERING
622 (2) c m 560
2
SOLUTION
COCO-LOG/FASCINE 300) EL. +1.17 (EGL)

479
EL. +0.69 (TOB)
0 0

2,300
EL. -1.61 (BOB)
-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+060.00
SCALE: 1:100MTS

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.
CHANNEL SECTIONS CUT AND FILL THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 013
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (13/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (14/23)
- TUBOD SIDE - SCALE : AS SHOWN

EDGE OF EMBANKMENT
6 6
ITEM NO. DESCRIPTION UNIT QUANTITY
4,000 15,000 4,000 3,596
CHANNEL EXCAVATION
1701 (1) m2 19.2
UNSUITABLE EXCAVATION 4
1705 (1) FILL AND BACKFILL m2 11.90
CL
COCONET BIO-ENGINEERING
622 (2) c m 560
2
SOLUTION
COCO-LOG/FASCINE 300) EL. +0.78 (TOB)

2,300
0 0

EL. -1.52 (BOB)


-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 17

SECTION @ 0+080.00
SCALE: 1:100MTS

EDGE OF EMBANKMENT
6 6
ITEM NO. DESCRIPTION UNIT QUANTITY 4,000 15,000 4,000 3,000
CHANNEL EXCAVATION
1701 (1) m2 23.47
UNSUITABLE EXCAVATION 4
1705 (1) FILL AND BACKFILL m2 10.16
CL
COCONET BIO-ENGINEERING
622 (2) c m 560
2
SOLUTION
COCO-LOG/FASCINE 300) EL. +0.86 (TOB)

2,300
0 0

EL. -1.44 (BOB)


-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 20

SECTION @ 0+100.00
SCALE: 1:100MTS

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.
CHANNEL SECTIONS CUT AND FILL THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 014
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (14/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (15/23)
- TUBOD SIDE - SCALE : AS SHOWN

6 6

EDGE OF EMBANKMENT
ITEM NO. DESCRIPTION UNIT QUANTITY
4,000 15,000 4,000 3,751
CHANNEL EXCAVATION 2
1701 (1) m 39.69
UNSUITABLE EXCAVATION 4
1705 (1) FILL AND BACKFILL m2 6.15 CL
COCONET BIO-ENGINEERING
622 (2) c m 560
2
SOLUTION
COCO-LOG/FASCINE 300) EL.+0.95 (TOB)

2,300
0 0

EL. -1.36 (BOB)

-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 -20

SECTION @ 0+120.00
SCALE: 1:100MTS

6 6

EDGE OF EMBANKMENT
ITEM NO. DESCRIPTION UNIT QUANTITY
4,000 15,000 4,000 4,752
CHANNEL EXCAVATION 2
1701 (1) m 33.96
UNSUITABLE EXCAVATION 4
1705 (1) FILL AND BACKFILL m2 11.62 CL
COCONET BIO-ENGINEERING
622 (2) c m 560
2
SOLUTION
COCO-LOG/FASCINE 300) EL.+1.03 (TOB)

2,300
0 0

EL. -1.27 (BOB)

-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 -20

SECTION @ 0+140.00
SCALE: 1:100MTS
NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.
CHANNEL SECTIONS CUT AND FILL THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 015
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (15/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (16/23)
- TUBOD SIDE - SCALE : AS SHOWN

EDGE OF EMBANKMENT
6 6
ITEM NO. DESCRIPTION UNIT QUANTITY

CHANNEL EXCAVATION 4,000 15,000 4,000 4,819


1701 (1) m2 27.64
UNSUITABLE EXCAVATION 4
1705 (1) FILL AND BACKFILL m2 12.39 C
L
COCONET BIO-ENGINEERING
622 (2) c m 560
2
SOLUTION
COCO-LOG/FASCINE 300) EL.+1.11 (TOB)

2,300
0 0
EL. -1.19 (BOB)

-2 600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 -20

SECTION @ 0+160.00
SCALE: 1:100MTS

EDGE OF EMBANKMENT
6 6
ITEM NO. DESCRIPTION UNIT QUANTITY

CHANNEL EXCAVATION
4,000 15,000 4,000 6,444
1701 (1) 2
m 28.06
UNSUITABLE EXCAVATION 4
1705 (1) FILL AND BACKFILL m2 14.56 CL

COCONET BIO-ENGINEERING
622 (2) c m 560
2
SOLUTION
COCO-LOG/FASCINE 300)
EL.+1.20 (TOB)

2,300
0 0
EL. -1.10 (BOB)

-2 600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 -20

SECTION @ 0+180.00
SCALE: 1:100MTS

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.
CHANNEL SECTIONS CUT AND FILL THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 016
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (16/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF WATERWAY SECTIONS (17/23)
- TUBOD SIDE - SCALE : AS SHOWN

6 6
ITEM NO. DESCRIPTION UNIT QUANTITY

CHANNEL EXCAVATION 4,000 15,000 4,000


1701 (1) m2 20.00
UNSUITABLE EXCAVATION 4
1705 (1) FILL AND BACKFILL m2 23.44
C
L
COCONET BIO-ENGINEERING
622 (2) c m 560
2
SOLUTION EL.+1.28 (TOB)
COCO-LOG/FASCINE 300)

2,300
0 0
EL. -1.02 (BOB)

-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 -20

SECTION @ 0+200.00
SCALE: 1:100MTS

6 6
ITEM NO. DESCRIPTION UNIT QUANTITY

CHANNEL EXCAVATION 4,000 15,000 4,000


1701 (1) m2 6.00
UNSUITABLE EXCAVATION 4
1705 (1) FILL AND BACKFILL m2 22.82
C
L

COCONET BIO-ENGINEERING
622 (2) c m 560
2
SOLUTION EL.+1.36 (TOB)
COCO-LOG/FASCINE 300)

2,300
0 0
EL. -0.93 (BOB)

-2
600 600

-4

-6 -6
-20 -15 -10 -5 0 5 10 15 -20

SECTION @ 0+220.00
SCALE: 1:100MTS

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.
CHANNEL SECTIONS CUT AND FILL THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF WATERWAY ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 017
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF SECTIONS (17/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF CHANNEL WITH FLOOD LEVELS (18/23)
- TUBOD SIDE - SCALE : AS SHOWN

EDGE OF ADDTIONAL ROW

EDGE OF RIGHT OF WAY


(SEE DETAIL PACKAGE 1-1 DRAWING # TR02-005)
C
L
300MM GROUTED RIPRAP FGL EL. +7.43

REALIGNED CHANNEL SLOPE LINED WITH 2 2


300MM Ø COCO LOGS - ITEM 622 1 1
30,040 3,605 47,894
CL
TEMPORARY ROAD MSL EL. +2.00
EL. +0.649 EMBANKMENT MATERIALS HWL EL. +0.94
EL. +0.649 (TOB)
2 2
1 1
EGL EL. -1.00

4,000 15,000 4,000 9,949 27,332

23,000 37,281

EL. +0.96M ( 25 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.04M ( 25 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
EL. +0.97M ( 50 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.21M ( 50 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
EL. +0.98M ( 100 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.40M ( 100 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )

SECTION @ STA. 2+680


SCALE: 1:150MTS
EDGE OF ADDTIONAL ROW

EDGE OF RIGHT OF WAY


(SEE DETAIL PACKAGE 1-1 DRAWING # TR02-004)
C
L
300MM GROUTED RIPRAP
FGL EL. +7.15

REALIGNED CHANNEL SLOPE LINED WITH 1.5 1.5


300MM Ø COCO LOGS - ITEM 622 1 1
20,533 6,654 4,023 32,215 986
CL
2 TEMPORARY ROAD 2 MSL EL. +2.00
1 1
EL. +0.734 (TOB) EL. +0.734 EMBANKMENT MATERIALS HWL EL. +0.94
2 2 EGL EL. +0.330
1 1

4,000 15,000 4,000 3,514 20,095

23,000 23,609

EL. +0.97M ( 25 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.12M ( 25 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
EL. +0.99M ( 50 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.30M ( 50 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
EL. +1.02M ( 100 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.48M ( 100 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


SECTION @ STA. 2+700 THE INTEGRITY OF THE DETAILED
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE
CONFIRMATION BY THE PROCURING ENTITY.
ENGINEERING DESIGN AND THE
OF THE APPROVAL OR

SCALE: 1:150MTS THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

CHANNEL SECTION WITH FLOOD LEVELS TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF CHANNEL ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 018
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF WITH FLOOD LEVELS (18/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF CHANNEL WITH FLOOD LEVELS (19/23)
- TUBOD SIDE - SCALE : AS SHOWN

EDGE OF RIGHT OF WAY


EDGE OF ADDTIONAL ROW
(SEE DETAIL PACKAGE 1-1 DRAWING # TR02-005)
300MM GROUTED RIPRAP C
L
FGL EL. +6.88

1.5 1.5
1 1
15,105 12,088 3,428 28,693 987

CL
REALIGNED CHANNEL SLOPE LINED WITH TEMPORARY ROAD MSL EL. +2.00
300MM Ø COCO LOGS - ITEM 622
EMBANKMENT MATERIALS HWL EL. +0.94
EL. +0.78 (TOB) EL. +0.78 (TOB)
2 2 EGL EL. +0.180
1 1

500MM THK. ARMOUR ROCK:


2 LAYERS @ 250MM MEDIAN DIA.; S.G.=2.3 - ITEM 1711

4,000 15,000 4,000 3,522 17,692

23,000 21,214

EL. +0.97M ( 25 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.16M ( 25 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
EL. +0.99M ( 50 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.34M ( 50 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
EL. +1.01M ( 100 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.53M ( 100 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )

SECTION @ STA. 2+720


SCALE: 1:100MTS
EDGE OF RIGHT OF WAY
EDGE OF ADDTIONAL ROW

(SEE DETAIL PACKAGE 1-1 DRAWING # TR02-005)


300MM GROUTED RIPRAP C
L
FGL EL. +6.61

1.5 1.5
1 1
16,081 10,590 3,676 26,578 986
CL
REALIGNED CHANNEL SLOPE LINED WITH
TEMPORARY ROAD MSL EL. +2.00
300MM Ø COCO LOGS - ITEM 622
EL. +0.86 (TOB) EL. +0.86 EMBANKMENT MATERIALS HWL EL. +0.94
2 2
1 1 EGL EL. -0.220

500MM THK. ARMOUR ROCK:


2 LAYERS @ 250MM MEDIAN DIA.; S.G.=2.3 - ITEM 1711

4,000 15,000 4,000 3,000 16,901

23,000 19,901

EL. +0.98M ( 25 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.25M ( 25 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
NOTE:
EL. +1.01M ( 50 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.42M ( 50 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
EL. +1.04M ( 100 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.61M ( 100 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL ) THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL

SECTION @ STA. 2+740 DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR


INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

SCALE: 1:100MTS

CHANNEL SECTION WITH FLOOD LEVELS TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF CHANNEL ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 019
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF WITH FLOOD LEVELS (19/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF CHANNEL WITH FLOOD LEVELS (20/23)
- TUBOD SIDE - SCALE : AS SHOWN

EDGE OF RIGHT OF WAY


EDGE OF ADDTIONAL ROW
C
L
300MM GROUTED RIPRAP
(SEE DETAIL PACKAGE 1-1 DRAWING # TR02-005)
FGL EL. +6.33

1.5 1.5
1 1
14,638 12,766 2,613 7,782 10,000 7,845

REALIGNED CHANNEL SLOPE LINED WITH CL


300MM Ø COCO LOGS - ITEM 622 TEMPORARY ROAD MSL EL. +2.00

EL.+0.95 (TOB) EL.+0.95 (TOB) HWL EL. +0.94


2 2 EMBANKMENT MATERIALS EGL -0.057
1 1

4,000 15,000 4,000 3,731 15,395

23,000 19,126

EL. +1.00M ( 25 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.33M ( 25 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
EL. +1.03M ( 50 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.50M ( 50 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
EL. +1.07M ( 100 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.69M ( 100 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
EDGE OF ADDTIONAL ROW

EDGE OF RIGHT OF WAY

SECTION @ STA. 2+760


SCALE: 1:100MTS C
L
300MM GROUTED RIPRAP (SEE DETAIL PACKAGE 1-1 DRAWING # TR02-004)
FGL EL. +6.06

13,491 14,911 8,823 10,000 8,348


1.5 1.5
CL 1 1
REALIGNED CHANNEL SLOPE LINED WITH
300MM Ø COCO LOGS - ITEM 622 TEMPORARY ROAD MSL EL. +2.00

EL.+1.03 (TOB) EL.+1.03 (TOB) HWL EL. +0.94


2 2 EMBANKMENT MATERIALS
1 1 EGL EL. -0.361

4,000 15,000 4,000 4,729 13,823

23,000 18,550

NOTE:
EL. +1.01M ( 25 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.41M ( 25 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
EL. +1.05M ( 50 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.59M ( 50 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL ) THE INTEGRITY OF THE DETAILED
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE
ENGINEERING DESIGN AND THE
OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.
EL. +1.10M ( 100 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.77M ( 100 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL ) THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
SECTION @ STA. 2+780 WITHOUT THE CONFORMITY OF THE CONTRACTOR.

SCALE: 1:100MTS
TAE SIK YOUN

CHANNEL SECTION WITH FLOOD LEVELS PROJECT MANAGER


NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF CHANNEL ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 020
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF WITH FLOOD LEVELS (20/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF CHANNEL WITH FLOOD LEVELS (21/23)
- TUBOD SIDE - SCALE : AS SHOWN

EDGE OF RIGHT OF WAY


EDGE OF ADDTIONAL ROW
C
L
300MM GROUTED RIPRAP
(SEE DETAIL PACKAGE 1-1 DRAWING # TR02-005)
FGL EL. +5.79

13,520 14,985 8,283 10,000 6,871

1.5 1.5
C
L 1 1
REALIGNED CHANNEL SLOPE LINED WITH
300MM Ø COCO LOGS - ITEM 622 TEMPORARY ROAD MSL EL. +2.00
EL.+1.11 (TOB) EL.+1.11 (TOB)
HWL EL. +0.94
2 2
EMBANKMENT MATERIALS
1 1
EGL EL. -0.735

4,000 15,000 4,000 4,819 13,283

23,000 18,117

EL. +1.03M ( 25 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.50M ( 25 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
EL. +1.08M ( 50 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.67M ( 50 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
EL. +1.14M ( 100 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.86M ( 100 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )

EDGE OF RIGHT OF WAY


SECTION @ STA. 2+800
EDGE OF ADDTIONAL ROW

SCALE: 1:100MTS

C
L
300MM GROUTED RIPRAP
(SEE DETAIL PACKAGE 1-1 DRAWING # TR02-004)
FGL EL. +5.44

14,724 15,455 7,743 10,000 8,348

REALIGNED CHANNEL SLOPE LINED WITH 1.5 1.5


CL 1 1
300MM Ø COCO LOGS - ITEM 622 TEMPORARY ROAD MSL EL. +2.00
EL.+1.20 (TOB) EL.+1.20 (TOB)
HWL EL. +0.94
2 2 EMBANKMENT MATERIALS
1 1 EGL -0.740

4,000 15,000 4,000 6,508 12,746

23,000 19,254

NOTE:
EL. +1.06M ( 25 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.58M ( 25 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL )
THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR
THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
EL. +1.11M ( 50 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.75M ( 50 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL ) PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.
EL. +1.19M ( 100 YEAR RETURN PERIOD / TIDE - INFLUENCED ) EL. +0.94M ( 100 YEAR RETURN PERIOD / LOW WATER LEVEL OUTFALL ) THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL
DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
SECTION @ STA. 2+820 WITHOUT THE CONFORMITY OF THE CONTRACTOR.

SCALE: 1:100MTS
TAE SIK YOUN

CHANNEL SECTION WITH FLOOD LEVELS PROJECT MANAGER


NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF CHANNEL ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 021
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF WITH FLOOD LEVELS (21/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF CHANNEL LINE WITH COCO LOGS (22/23)
- TUBOD SIDE - SCALE : AS SHOWN

REALIGNED CREEK BED

REALIGNED CHANNEL SLOPE LINED


WITH 300MM Ø COCO LOGS - ITEM 622

CL

TOP OF BANK
2 2
1 1
2,000

EL. -0.64M TO EL. -1.56M BOTTOM OF BANK

4,000 15,000 4,000

23,000

NOTES:
1. COCO-LOGS ARE RECOMMENDED FOR THE CHANNEL LINING ALONG THE BANKS WITH TOE PROTECTION.
2. 300MM DIAMETER COCO-LOGS ARE SUFFICIENT TO WITHSTAND MAXIMUM WATER VELOCITY OF 3M/S.
3. ALL COCOLOGS MUST BE MADE OF 100% COIR FIBER NETTING WITH AT LEAST 2.5CM EYE AND FILLED
WITH 60% GRADE E COCOPEAT COVERED WITH 40% GRADE CH-W COIR.
4. LARGER DIAMETER LOGS MAY BE USED IF MORE ECONOMICAL.

CHANNEL TYPICAL SECTION DETAIL


SCALE: 1:50MTS

NOTE:

THE DESIGN AND BUILD CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR


THE INTEGRITY OF THE DETAILED ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
CONFIRMATION BY THE PROCURING ENTITY.

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL


DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS GENERAL DRAWING OF CHANNEL ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 022
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF LINE WITH COCO LOGS (22/23) UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV
BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA
GENERAL DRAWING OF CHANNEL LINED WITH COCO COIR LOGS (23/23)
- TUBOD SIDE - SCALE : AS SHOWN

COCO-COIR LOGS
300MM Ø X 1500MM LENGTH -ITEM 622

2" Ø BAMBOO PEGS/STAKES


DRIVEN AT 450MM MIN. DEPTH FGL
PROVIDE 1/4 " Ø ROPE FOR LACING

300

300
450
COCO COIR LOGS DETAIL SECTION
SCALE: 1:30MTS

COCO-COIR LOGS
300MM Ø X 1500MM LENGTH -ITEM 622
2" Ø BAMBOO PEGS/STAKES
DRIVEN AT 450MM MIN. DEPTH
PROVIDE 1/4 " Ø ROPE FOR LACING
1,500 1,500 1,500 1,500

NOTE:

COCO COIR LOGS DETAIL ELEVATION THE DESIGN AND BUILD CONTRACTOR SHALL
THE INTEGRITY OF THE DETAILED
BE SOLELY RESPONSIBLE FOR
ENGINEERING DESIGN AND THE
PERFORMANCE OF THE STRUCTURE IRRESPECTIVE OF THE APPROVAL OR
SCALE: 1:30MTS CONFIRMATION BY THE PROCURING ENTITY.

THE CONTRACTOR SHALL BE HELD FULLY RESPONSIBLE FOR THE STRUCTURAL


DEFECTS/FAILURES OF THE FACILITIES/STRUCTURES DUE TO FAULTY AND/OR
INADEQUATE DESIGN AND SPECIFICATIONS EXCEPT FOR THE CHANGES MADE
WITHOUT THE CONFORMITY OF THE CONTRACTOR.

TAE SIK YOUN


PROJECT MANAGER
NAMKWANG-KUKDONG-GUMGWANG JV

PREPARED: CHECKED: PROJECT NAME AND LOCATION: SHEET CONTENTS: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

LEE SANG HUN DESIGN - BUILD FOR THE PACKAGE1 - PART2 13 WATERWAY
DESIGN MANAGER CONSTRUCTION OF PANGUIL (SEE COVER SHEET) (SEE COVER SHEET) (SEE COVER SHEET)
REALIGNMENT REPUBLIC OF THE PHILIPPINES
BAY BRIDGE PROJECT WR
SUBMITTED:
SOO YOUNG PARK GENERAL DRAWING OF CHANNEL DEPARTMENTOF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON RICHELIEU FELIPE I. LIM SHARIF MADSMO H. HASIM EDWIN C. MATANGUIHAN MAXIMO L. CARVAJAL
SR. BRIDGE DESIGN ENGINEER TANGUB CITY, MISAMIS LINED WITH COCO COIR LOGS ROADS MANAGEMENT CLUSTER II (MULTILATERAL) PROJECT MANAGER CARETAKER, WATER PROJECTS DIVISION PROJECT DIRECTOR OIC-DIRECTOR UNDERSECRETARY FOR 023
PROJECT MANAGEMENT CONSULTANT
OCCIDENTAL – MUNICIPALITY OF UNIFIED PROJECT MANAGEMENT OFFICE (UPMO) ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN ROADS MANAGEMENT CLUSTER II BUREAU OF DESIGN TECHNICAL SERVICES
TAE SIK YOUN YOOSHIN-PYUNGHWA-KYONGHO JV (23/23) BONIFACIO DRIVE PORT AREA, 652 ZONE 068, (MULTILATERAL) UPMO (MULTILATERAL) UPMO

PROJECT MANAGER NKG JV DATE: TUBOD, LANAO DEL NORTE DATE: DATE: DATE: DATE: DATE:
MANILA, 1018, METRO MANILA