GENERAL NOTES :
1. Do not scale dimensions from drawing
2ND FLIGHT SHUTTERING MUST NOT BE REMOVED 2. Drawings should be read in conjuction with other
UNTIL HARDENING OF THE 3RD FLIGHT related drawings
3. The contractor should report immediately to Consultant
for any discrepancies found on the drawings and should
252423 22 21 20 19 19 20 21 22 23 24 25
be resolved before the execution of works.
18 17 16 15 14 13 12
12 13 14 15 16 17 18
20
C2
100
20
STAIRCASE PART PLAN (G.F.)
SCALE : NTS
SECTION 1-1
SCALE : 1-25
C2
FIRST FLOOR
B3 C1
120
C2 C:\Users\NAIMA\DESIGN 2\E-SIGNATURE\e-sig.jpg
100
C1 C. L . L STN
AI LUSN
O
C .G
NE T IA
B LA
1767055 - 60 : l eT 737455 - 60 : xaF
75393 :X
OB.O.P E.A.U - ha j rahS
ENG.Aiman Hasan STAIRS BEAM REINFORCEMENT
C. L . L STNAI LUSN
OC .G
NE
1767055-6179+ : leT 737455-6179+ :xaF B.O,.P
75393 :X
O E.A.U - ha j ,rahS
SCALE 1:25
C2 MOHAMED IBRAHIM HASSAN MOHAMED ALMALI
PROPOSED DUPLEX VILLA (G + 1)ONLY
SECTOR: AL RUGAIBA
PLOT N:(1362/GOV)-(49/64 MULK)
PENTHOUSE STAIRCASE DETAILS
B4 B4
JOB NO : 1186 DRWG. NO : S-06
SECTION 2-2
SCALE : 1-25