Y2 - CR01 - Create Work Center
Y2 - CR01 - Create Work Center
Publisher Information
File Name
Y2 – CR01_Create Work Center
Link 1
Link 2
Link 3
Link 4
Job Role
Change History
Update the following table as necessary when this document is changed.
Date Name Change Description
Trigger: When a new physical is added, one would need to represent this physical machine in R/3. This
representation is done via the work center.
Business Process Overview
This transaction is used to create work centers in the system. A work center in the system will represent the
physical machine. Each work center will be assigned to a cost center.
Input - Required Fields Field Value / Comments
Plant 8110
Work Center Category Z001 : Machine
Z003 : Labor
Capacity Category 001, 002
Output - Results Comments
New work center within a plant Created
Tips and Tricks
Copying data from an existing work center would expedite data entry and accuracy.
Access Transaction:
Via Menu Path Logistics Production Master Data Create Work Center
Via Transaction Code CR01
Procedure:
Copy From:
3. Tick all the data selection (as shown above) and click .
5. Press ENTER.
8. Press ENTER.
13. Click .
Tear down Formula Formula used in scheduling to O Enter value in Setup formula.
determine operation teardown Enter this formula if setup time is
time. required.
Validity End date Identifies the end of the a R Enter the value in End date.
validity period
Activity Type Activity types describe the R Enter Activity Type for Setup.
activity produced by a cost
center and are measured in
units of time or quantity.
Formula Key Calculation of costs of a work R Enter Formula Key for Setup
center's activity type
Formula Key Calculation of costs of a work R Enter Formula Key for Machine.
center's activity type
Activity Type Activity types describe the R Enter Activity Type for Labor.
activity produced by a cost
center and are measured in
units of time or quantity.
Formula Key Calculation of costs of a work R Enter Formula Key for Setup.
center's activity type