0% found this document useful (0 votes)
89 views1 page

2022 MDSP Catalog-7

The Multi-Disc Screw Press can directly process sludge from oxidation ponds, eliminating thickening tanks and storage tanks. It incorporates flocculation, thickening, dewatering, and filtration into a single continuous process. The screw press dewaters sludge efficiently by compressing it against rings to filter water into the bottom tank while transporting the dewatered sludge out the top. Operators can adjust the end plate to control the dryness of the discharged sludge cake.

Uploaded by

abhijit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views1 page

2022 MDSP Catalog-7

The Multi-Disc Screw Press can directly process sludge from oxidation ponds, eliminating thickening tanks and storage tanks. It incorporates flocculation, thickening, dewatering, and filtration into a single continuous process. The screw press dewaters sludge efficiently by compressing it against rings to filter water into the bottom tank while transporting the dewatered sludge out the top. Operators can adjust the end plate to control the dryness of the discharged sludge cake.

Uploaded by

abhijit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

the dewatering process CONVENTIONAL SYSTEMS

VS. MULTI-DISC SCREW PRESS


FLOCCULATION | THICKENING | DEWATERING | FILTRATION

The Multi-Disc Screw Press is a robust machine


designed for reliability, consistency and continuous
operation. The machine can be fed with sludge
directly from the dewatering and oxidation pit
eliminating the thickening tank and the sludge
storage tank. The machine incorporates multiple
processes all in one single continuous operation. OXIDATION POND CLARIFIER THICKENING TANK SLUDGE
STORAGE TANK
The brief process is as below;
CONVENTIONAL TREATMENT
1. FLOCCULANT PREPARATION
The flocculant is prepared in the flocculant
DIRECT FEED

preparation tanks at the recommended


concentration. MULTI-DISC SCREW PRESS

2. FLOCCULATION
Polymer flocculant is added in the flocculation tank
filled with sludge. Efficient agitation ensures fast
agglomeration and flocculation of the suspended
particles into large flocks that can be separated.

3. SLUDGE THICKENING
The flocks are transported through the thickening
zone onto the dewatering zone. A series of fixed and
moving rings filters the water as the sludge moves to
the dewatering zone. The filtered water flows down
through the rings to the filtered water tank below. is specially designed to move the sludge forward efficiently while gradually compressing 5. DRYNESS & DISCHARGE CONTROL
them by pushing the sludge against the back plate. As the sludge is compressed, most The sludge cake dryness can be adjusted by the adjustable end
4. DEWATERING of the water is squeezed out of the sludge. The squeezed out water from the sludge is plate. The end plate adjustment enables control of the cake dryness
filtered by the series of fixed and moving rings. Clear water flows to the filtered water tank
The sludge is transported from the thickening and the rate of output from the sludge exit port. This is provided to
below. The dewatered sludge exits from the outlet at the top and falls down. The constant
zone to the dewatering zone by the screw handle sludge with varying viscosities.
rotation of the screw ensures the sludge is pushed forward, thickened, dewatered and
conveyor. The spiral conveyor in the screw cylinder exited while filtering the water, all at the same time.