Operations and Information Management

This document will discuss some crucial operational aspect to the National Agricultural Development Company (NADEC) https://nadec.com.sa/ dairy Milk production company such as how well the inventories within the production system are currently managed, detailed illustration of the critical operations involved within NADEC production system presenting a logical operational flow, identify the two points where the organisation’s delivery system may fail to align its operational performance measure
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views10 pages

Operations and Information Management

This document will discuss some crucial operational aspect to the National Agricultural Development Company (NADEC) https://nadec.com.sa/ dairy Milk production company such as how well the inventories within the production system are currently managed, detailed illustration of the critical operations involved within NADEC production system presenting a logical operational flow, identify the two points where the organisation’s delivery system may fail to align its operational performance measure
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

MSC PROCUREMENT, LOGISTICS AND SUPPLY CHAIN MANAGEMENT

PRESENTED BY : MOHAMED SOROGY


STUDENT ID : @00569443
CODE : OaIM
MODULE : Operations and Information Management
Total Words : 2,811
TABLE OF CONTENTS
MSC PROCUREMENT, LOGISTICS AND SUPPLY CHAIN MANAGEMENT......................................................
Introduction.................................................................................................................................................
The inventories within the production system............................................................................................
NADEC Methodology:..............................................................................................................................
key operations involved within NADEC Production system.........................................................................
organisation’s delivery system may fail to align its operational performance measures.............................
Mishandling Temperature and Storage Condition...................................................................................
Mishandling Wastewater (not recycling).................................................................................................
lean approach could be utilised in the production system to potentially reduce the failings......................
Lean principles.........................................................................................................................................
Lean Tools................................................................................................................................................
three key findings discussing the extent to which the lean approach chosen may assist the
production system with aligning its operational performance measures....................................................
Conclusion...................................................................................................................................................
Ref................................................................................................................................................................

1|Page
INTRODUCTION
This document will discuss some crucial operational aspect to the National Agricultural
Development Company (NADEC) https://nadec.com.sa/ dairy Milk production company such as
how well the inventories within the production system are currently managed, detailed
illustration of the critical operations involved within NADEC production system presenting a
logical operational flow, identify the two points where the organisation’s delivery system may
fail to align its operational performance measures, how a lean approach could be utilised in the
production system to reduce the failings potentially and the three key findings discussing the
extent to which the lean approach may assist the production system with aligning its operational
performance measures

THE INVENTORIES WITHIN THE PRODUCTION SYSTEM


NADEC uses the latest technology to keep pace with the rules of inventory control, demand,
forecast and reordering, to provide the requirements of customers promptly and the right place
through the system ORACLE (ERP, WMS and MRP)
It is an impartial system that gives the authority to all interested stakeholders to access
inventory records related to the activity they are engaged in and linked to the stock and demand
for it to achieve the desired goal of reducing loss and manipulation
NADEC consider its inventory is the cornerstone of all the assets it owns as it is the primary
component of the initial products, under process and the finish products ready for delivery to
customers
 Raw materials items: are being used by the plant in the production. Consist of raw milk,
which kept in silos for 36 hours only to avoid losing product quality or working against
HACCP and food safety standards.
Materials purchased for manufacturing and production to cover the requirements of the
market and future customers
 Work-in-progress (partially manufactured) items that are currently in the production
process. The unpacked goods and packing materials are considered WIP; used to store
condensed milk is in dedicated Bins and butter is stored in tubs. Products that still need
some more work to classify it under finished product.
 Finished outputs or goods: The materials which have already been produced but are still
not sold. They store it in a mega warehouse close to plant in HARAD Farm.
NADEC METHODOLOGY:
1- Set by the inventory policy established by management. The production manager depends
on providing the most significant quantity of all the raw materials used in the production to
ensure smooth production process without affecting or stopping. The opposite relationship
between the marketing manager and the financial manager, the marketing manager wants to
have a full stock of the finished product, in contrast to the business manager who wants to
save all expenses to the maximum extent and if there must be a large number of finished
products, we have to provide a strong justification of that step
2- Integrate inventory within the everyday functions within the company. All asset-related
transactions will be governed by order of purchase, exchange, or depreciation through the
system. The system will be the user's guide through the main inventory screen. It will not

2|Page
allow the reduction of the assets unless there are approvals that specify that the primary
surplus of the company and subsequently will not allow the purchase of an asset unless
there are approvals to approve the purchase and the existence of the budget that will enable
it.
3- Continuous Review System, NADEC has carried out the control of the inventory through the
pushing of the warehouse supervisor and inventory staff to drop a periodical visit to the storage
locations in the warehouse and the work of a physical cycle count of the storage places and the
reconciliation between perpetual and physical stock and not to open the door to any differences in
the inventory resulting from spontaneous mistakes or loss or manipulation
4- Ensuring inventory control to provide all the requirements at the right time and place by:
 Purchase control.
Purchase Price:- Provide three quotations per purchase, compare all quotes (comparative
statement), taking into consideration product quality and standard payment terms
Purchase quality & quantity. It is taking into consideration that the materials to be
purchased to cover the consumption of 6: 12 months, which means that the amount of
economic order for different types of materials is not determined
Purchase time. Or Lead Time agreed with suppliers and adjusted on the MRP system to
not contradictory with the production process.
 Storage control. control over perpetual inventory
 Warehouse Accounting. Which includes the implementation of policies and procedures
that govern the power of all activities of the warehouse from the receipt, inspection and
monitoring, storage, distribution. Etc. and linking them to the Oracle system to ensure the
efficiency of the rules of control over the stock and re-demand/re-order it
 Forecasting in Nadec adopted a stock forecasting policy that relates both strategic
planning to operational planning and financial planning, taking into account that both
the mathematical model, the historical data available and the qualitative methods are
based on management experience, taking into account the annual demand for the
desired goods to purchase as a mix of experience between planning management Sales,
monthly meetings of both departments and historical data available.
KEY OPERATIONS INVOLVED WITHIN NADEC PRODUCTION SYSTEM
Production Division Departments QA, Brands and Packaging.
Milk Collection Departments Agriculture, and Logistics Departments.

3|Page
PRODUCTION PROCESS
Input Process Output

Milk Receipt & Dry Product


Raw Milk
Storage

Separation & Butter Effluent from


Water Production
Standardization Tanker Washing
Cleaning Milk
Spills Cheese
Milk Powder
Electric Whey

Pasteurization
Detergents
& Sanitizers

Whole & Air emissions


Refrigerants Skimmed Milk Cheese Combustion
Products Production gases milk
powder dust
Refrigerant
Gases Odor
Cold Storage

Packaging & Distribution Solid Waste


Packaging Damaged
Materials Products. Out of
Date Products
1- Collection & Reception - The milk collection is carried out in tanks, then transferred to the
milk production plant where they are required to be used in the production process, taking
into account that the usual tests must be applied during collection,
2- Storage – as per international agreed standards in Silos (dedicated tanks).
3- Standardisation - or thermization life of milk which’s mean giving milk 72 o C temperature
for 15 seconds to reduce bacteria
4- De-Creaming - To remove the cream from the liquid and transfer it to the butter section the
milk is given both temperature of 60 ° C and 60,000 RPM
5- Pasteurisation - To complete the removal process, milk is heated at 92 ° C temperature for
5 seconds.
6- Evaporation – It is known that the milk starts boiling from 70 degrees Celsius, so it is
necessary to heat the milk pressure of 889 millibars, and milk is affected by four stages of
steaming different initial 56% and 62%, 67% third and 75%

4|Page
7- Spray Drying - By pressing five high-pressure nozzles by throwing 320 degrees of warm
air on the milk
8- Cooling - powder is cooled before storing, Powder stored in bins.
9- Packing – as per production plan Milk will be packed in different packing according to the
required weight
ORGANISATION’S DELIVERY SYSTEM MAY FAIL TO ALIGN ITS OPERATIONAL
PERFORMANCE MEASURES
MISHANDLING TEMPERATURE AND STORAGE CONDITION
1- When not following food safety and HACCP conditions in utilise clean approved tanks,
Soils and equipment;
2- Not maintaining stainless-steel soils and tanks (easy cleaning and opening)
3- Neither shade nor cover collected liquid milk
4- Delaying in Transport liquid milk as after milking.
5- The milk must be collected in a clean place.
6- cleaning the Failing from dirt and any residues of milk
7- Not comply with Temp. Conditions and standards as following:
Temp. Condition and Purpose
Guarantee product quality, if the milk not collected within two
8°C
hours of milking
< 8º C If it is collected daily
< 6ºC If it is not collected daily
not exceed
transferred from the MCC to a dairy processing facility
10ºC
Milk can be transferred to the processing facility within 2 hours
No Cooling
after milking
below 40 °F protect the milk’s quality

8- Failing in the disinfection process will allow the most harmful bacteria.
9- Leave cream at room temperature, and mix between warm cream and refrigerated one
— failed in Use fresh, pasteurised cream within one to five days of the “sell-by” date.
10- Type of spoilage called rancidity when not storage butter properly.
11- In case wrong storage to butter allowing absorbing odours from other foods rapidly.
12- Not following standards in butter storage such keep butter wrapped in moisture- and
vapour-proof material or in tightly covered containers.
13- Keeping Yogurt covered in the refrigerator more than seven to 10 days past the “sell-
by” date

5|Page
MISHANDLING WASTEWATER (NOT RECYCLING)
1- Discharge wastewater to land:
- Will affects soil structure.
- The negative impact on underlying groundwater and affect its quality.
- The opportunity of adverse effect on vegetation comes from a high salt level.
- Discharge wastewater to sewage will cause Odours.

LEAN APPROACH COULD BE UTILISED IN THE PRODUCTION SYSTEM TO


POTENTIALLY REDUCE THE FAILINGS
LEAN PRODUCTION one of the most important steps to increase productivity and reduce
waste and recommended in dairy factories, which focuses on. Improve performance by adding
value, creating flow, eliminating waste and reducing contrast
LEAN PRINCIPLES
1- Identifying Value Streams by measuring the performance for all available process and
production, to define the amount we need to ask ourselves some questions such a timeline
for manufacturing and delivery? What are the other essential points that must consider?
What is the price point?
2- Define the root cause for each underperformance.
3- Identify each process and the link between it and performance. This will reflect by 50%
more in productivity and efficiency as here we will be sure that after removing waste from
the cycle the rest of steps going smoothly without any blockage or issues affecting the cycle
4- Guarantee to achieve high performance by standardising the process. Avoiding build stock
in advance or carry the cost of storage, vice versa will save money in production and
storage, giving the required product to the customer upon requestion.
5- Maintain the continues improvement by monitoring performance, define accountability and
sustain the lean operation. As the process is not lean without been through the value stream
mapping involving every employee on it.
LEAN TOOLS
5S: Building understanding between employees to organise the work environment and know
how they should work to increase productivity and efficiency
 Sort
 Set in Place
 Shine
 Standardise
 Sustain

Automation: targeting do not have any defective products and reduce any overproduction,
depend on detecting anything up-normal, stop the operation, fix the issue immediately,
investigating the root cause and fix preventive action not to repeat again

6|Page
VSM – VALUE STREAM MAPPING
1- Consider it a project, strat your planning by create project
Define the VSM Scope
charter, define features of the problem, agree on goals and
objectives, dedicate mapping staff, be sure that charter with
Draw Current State Map
leadership team got the required harmony.
2- Draw the roadmap, by defining a current value stream map,
defining current steps, delays, and information flows required
Draw Future State Map to deliver the target product.
3- Assess the current state value stream map in terms of creating
flow by eliminating waste.
Create Value Stream Plan 4- Draw a future state value stream map.
5- Work toward the future state condition.

Implement The Plan

The dairy & juice industry has made a lot of efforts to provide the production requirements
promptly by:
- Process the sorting, processing and storage of finished products to the final
stage of delivery of the product to the distributors.
- Follow up and ensure the provision of sufficient transport fleet to cover the
distribution and transport requirements to meet the needs of the end customer
VSM IS:
The tool used to put us on solid ground to explain to us the comprehensive analysis of the full
scene, describing”
- Where the waste and loss occurs.
- Help us to draw plans to eliminate unnecessary practices in the stages of collection and
storage.
In detail and explained, more will be:
Used to reduce the errors that occur now and especially in the area of receipt of goods received
to the warehouse and Kiva and a number of terms of compliance with the standards and
conditions of receipt agreed upon and the implementation of the process of numerical review
and ensure that dealing with them in the manner recognized in line with the standards
Requirement

Changing VSM that will allow:


Monitoring all activities and practices, moreover will discover all the problems and waste that
we can avoid in the process of collection and storage.

LEAN MANUFACTURING:

7|Page
Will guide management to do:
- The inside production line will develop production and leadership plan, which include
production managers and team leaders.
- Maintain the responsibility in the farms to all staff responsible for milking, fertility or
feed management and giving them the opportunity to [articipate in production planning
and budgeting process.
- Identify professional and fruitful daily, weekly, monthly and annual KPIs for the
production team and management
- Eliminate waste.
- Doing things better in half of the resources as mass production requires.
- Providing higher quality with lesser cost.
- Lean principles and practices as are necessary for successful implementation of lean as
lean practices without knowing lean principles can give short term success but may fail
as long term strategy it presents the review of barriers of lean implementation from the
literature review.
THREE KEY FINDINGS DISCUSSING THE EXTENT TO WHICH THE LEAN APPROACH
CHOSEN MAY ASSIST THE PRODUCTION SYSTEM WITH ALIGNING ITS
OPERATIONAL PERFORMANCE MEASURES
VSM It is a professional and non-profit tool whose main objective is to:
 Detecting problems
 Suggest appropriate solutions
 Redesign and change the root cause of the problem
 Improving performance and quality
 Reduce time, cost and eliminate waste
EFFECTIVE COMMUNICATION.
Value stream mapping depending on the material and information flow to success as the design
of best communication way to information flow will lead to a communicate the business
process and performance with the best way that can everyone understand it and achieve it.
PRODUCT FLOW
 From the concept of delivery, this step can maps steps of the development lifecycle
 Also showing both tasks performed and the person whose perfume it.
TIME LADDER (VALUE STREAM TIMELINE)
Containing two parts:
- Upper portion
The average time that product has to wait in each stage in the process
- Lower portion
The average time when value added to the product during a specific phase.

8|Page
CONCLUSION
In this document, we analysed NADEC's manufacturing production system, which passes
through a critical assessment of the extent to which stocks and assets are currently managed
within NADEC. We have identified two points where the organisation's delivery system
may fail to harmonise its operational performance metrics, which clearly illustrates the
logic and understanding behind it.
We used a simple approach to the production system to reduce the shortcomings discussed.
We have identified three primary outcomes that discuss how the lean approach chosen can
help the production system by aligning operational performance metrics.

REF.
 Bartlett, M.S., 1964. On the Theoretical Specification of Sampling Properties of Auto-Correlated
Time Series. J. Roy. Stat. Soc. B8: 27-41.
 Burki, A. A. Khan, M.A. and Faisal, B. 2004. The state of Pakistan’s dairy sector: An Assessment:
The Pakistan Develop. Rev 43 (2): 149–174.
 Box, G.E.P. and Jenkins, G.M. 1970. Time Series Analysis: Forecasting and Control. Holden-Day,
San Francisco. California, USA.
 Box, G. E. P. and Pierce, D. A. 1970. Distribution of residual autocorrelations in autoregressive-
integrated moving average time series models. J. Am. Stat. Assoc. 65:1509-1526.
 Brown, R.G.1959. Statistical Forecasting for Inventory Control. New York, McGraw-Hill.
 GOP, 2011. Economic Survey of Pakistan (2010-2011), Government of Pakistan, Economic
Adviser’s Wing, Finance Division, Islamabad.
 Holt, C.C. Modigliani, F. Muth, J.F. and Simon, H. A. 1960. Planning, Production, Inventories and
Work Force. Prentice-Hall, Englewood Cliffs, NJ, USA.
 Abdulmalek, F. A. & Rajgopal, J. (2007). Analyzing the benefits of lean manufacturing and value
stream mapping via simulation: a process sector case study. International Journal of production
economics, 107(1), 223-236.
 Hines, P. & Rich, N. (1997). The seven value stream mapping tools. International journal of
operations & production management, 17(1), 46-64.

9|Page

You might also like