1.1 OUTLINE
1.1.1 The FC-24 is a compact, high performance controller with microcomputer and
can be applied to all resistance welding machines. It is also lightweight and rug-
ged panel mount type.
Page 4
3.0 RATINGS AND SPECIFICATIONS
Page 5
4.0 NAME AND FUNCTION OF EACH SECTION
13 14 15 16 OFF/ON
WELD POWER THERMO READY START
PROG PROG ① The 7-segment display is blinked when press the button.
OPER OPER
② Change the value for setting by using the button.
① ② ③
③ Complete the setting pressing the button.
Page 6
4.0 NAME AND FUNCTION OF EACH SECTION
START
PROG
: Push button to start the program.
OPER
YES
NO
Input of schedule 0~9 is completed?
YES
PROG
: Finish the programing by this button.
OPER
END
K1 K2 E 02 1 3 5 7 9 11 13 15
G1 G2 03 01 2 4 6 8 10 12 14 16
N.C
N.C
K1
G1
K2
G2
440V
220V
0V
100-240VAC
CONTROL POWER
VALVE COM
VALVE 1
VALVE 2
COM1
START 1
START 2
COM1
MODE1
MODE2
THERMO
OUTPUT
HOLD END
SCR WELD
POWER
Page 7
4.0 NAME AND FUNCTION OF EACH SECTION
SCHE PROG
% % DULE OPER
OFF/ON
WELD POWER THERMO READY START
PANEL CUTOUT
READY START
CURRENT 1
PANEL CUTOUT
CURRENT 2
WELD COUNT
COUNT
AUTO WELD
CLEAR
SCHE PROG
DULE OPER
OFF/ON
Page 8
4.0 NAME AND FUNCTION OF EACH SECTION
Page 9
4.0 NAME AND FUNCTION OF EACH SECTION
Weld Transformer
220/440VAC SCR
Pulse
Generation
Angle
Command
Micro Computer
Phase RAM ROM
Detection
Control
Power
I/O
Pressure
Panel Controller
Output
Page 10
4.0 NAME AND FUNCTION OF EACH SECTION
4.6 CONNECTIONS
SCR
Inside of FC-24
G1
Weld Transformer
K1
G2
K2
E Non Connection
0V
01
Weld Power
200~240VAC
02
380~480VAC
03
1 Control Power
2 100~240VAC
3 Non Connection
4 VALVE COM
5 VALVE 1
6 VALVE 2
7 COM1
8 START 1
9 START 2
COM1
10 COM1
VCC
11 MODE 1
0V
VCC1 12 MODE 2
13
THERMO
14
15
HOLD END
16
Page 11
4.0 NAME AND FUNCTION OF EACH SECTION
MODE SWITCH
OPERATION
SCHEDULE REMARKS
MODE
MODE 1 MODE 2
1 START 1
TWIN HEAD SPOT ON OFF
2 START 2
SEAM DN.S = 0
OFF ON 0~9
BRAZING DN.S(1~9) is Pulsation
BUTT ON ON 0~9
Note : Aftetr changing the mode switch, power OFF/ON the controller.
VALVE 1
VALVE 2
HOLD END
SCHEDULE
SQ UP.S W1 CO W2 DN.S HO OF SQ S1 W1
START 1
START 2
START1, 2
Page 12
4.0 NAME AND FUNCTION OF EACH SECTION
VALVE 1
VALVE 2
HOLD END
SCHEDULE 1 SCHEDULE 2
CU1 CU2 CU1 CU2
SCHEDULE
DON'T CARE
START 1
DON'T CARE
START 2
VALVE 1
VALVE 2
HOLD END
CU1 CU2
SCHEDULE
SQ UP.S W1 CO W2 DN.S HO OF
START 1
START 2
START1, 2
Page 13
4.0 NAME AND FUNCTION OF EACH SECTION
VALVE 1
MOTOR
VALVE 2
HOLD END
REPEAT(DN.S=0)
SCHEDULE
SQ UP.S W1 CO W2 HO W2 HO W2 HO OF
START 1
START 2
START1, 2
VALVE 1
VALVE 2
HOLD END
PULSATION(DN.S=1~9)
SCHEDULE
SQ UP.S W1 CO W2 HO W2 HO W2 HO OF
START 1
START 2
START1, 2
Page 14
5.0 SCHEDULE DATA TABLE
SQUEEZE
UP.S
WELD 1
COOL
WELD 2
DN.S
HOLD
OFF
CURRENT 1
CURRENT 2
Page 15
FORWEL
34-10, Sinseon-ro 329 beon-gil,
Nam-gu, Busan, Korea
Postcode/Zip Code : 48548
Tel: +82 51 6119345
Fax: +82 050 6272580
Website: www.forwel.com
Email: [email protected]