OVERFLOW
PERIMETER: 236'-0" 33'-0" 221'-0"
SURFACE AREA: 1,100 SQ.FT 63 SQ.FT 216 SQ.FT
WATER DEPTH: 3'-0" - 6'-0" 3'-6" 3'-0"
VOLUME: 28,500 GAL 1,600 GAL 4,850 GAL
TURNOVER: 360 MIN 30 MIN N/A
CIRCULATION RATE: 79 GPM 53 GPM N/A A&A MANUFACTURING
OVERFLOW DESIGN: 1.58 GPM/FT 1.58 GPM/FT N/A (#5714XX) 32” 12" TILED VANISHING
FLOW RATE: 132 GPM 42 GPM N/A PEBBLE TOP DEBRIS EDGE WALL. SLOPE BACK
REMOVAL CHANNEL TOWARDS POOL AT 1:12
CATCH BASIN
PROJECT DATA DRAIN (TYP. OF 2)
2
AQUASTAR (#JE31xx)
FLUSH-MOUNT EYEBALL PUL PRODUCTS (#)
SPA RETURN FITTING 20” OPENFLOW
(TYP. OF 4) PEBBLE TOP
SUCTION COVER
NOTE: IN-FLOOR CLEANING (TYP. OF 2)
12" TILED VANISHING EDGE HEADS NOT SHOWN. DESIGN
WALL. SLOPE BACK BY OTHERS.
TOWARDS SPA AT 1:12
3'-0" W.D.
WATERWAY (#210-3330)
VENTURI TEE #7 SPA JET 1'-9"
FITTING (TYP. OF 8) (6) POOL STEPS AQUASTAR (#JE31xx) FLUSH-MOUNT PENTAIR (#620425)
W.D.
EYEBALL VANISHING EDGE RETURN MICROBRITE RGBW
1 FITTING (TYP. OF 16). PROVIDE COLOR CHANGING LED
SP5 WATTS (#LFN36M1 3/4) BACKFLOW LIGHT (TYP. OF 11)
3'-6" W.D. PREVENTER ON VANISHING EDGE
RETURN LINE (TYP. OF 1)
8650-89
PENTAIR (#5211XX)
SPACOMMAND
TEN-FUNCTION SPA-SIDE
AQUASTAR (#JE31xx)
REMOTE W/ PENTAIR 9" W.D. FLUSH-MOUNT EYEBALL
(#521180) RECESSED
POOL RETURN FITTING
MUDBOX
1 TILED (TYP. OF 8)
SP5.1 BAJA
2
SHELF
SP5
8650-89
2
SP5.1
PUL PRODUCTS (#) 12" POOL COPING
VENTURI SKIMMER ON 12" BOND BEAM
(TYP. OF 2)
Sheet Name
Sheet No.
1
POOL & SPA LAYOUT PLAN
1/4"=1'-0"
SP1
Date Issued
03.11.2023
© 2023
ATER LEVELER
OVERFLOW
1'-2"
14'-6" 2' 1' 44'-10" 1' 2'
1'-2"
2'
1'
11'
14'
1'-2"
1'-3" 17'
2' 1'-2" 2' 1' 10'-6" 1' 2' 1' 13'-6 2"1
20'-1" 6'-11 2"
1
3' 1' 2'
1' 1'
12'-61 2"
1'-6"
11'-61 2"
6' 3'
1'
1'
1'-6" 1'
1' 8650-89
7'-8"
8650-89
1'
4'-8" 8'-10" 1' 2' 1' 6'-8" 4' 22'-115 8" 5'-111 2"
48'-61 8"
4'-5"
1'
Sheet Name
4'-5"
Pool & Spa
Dimension
Plan
Sheet No.
1
DIMENSION PLAN
1/4"=1'-0"
SP2
Date Issued
03.11.2023
© 2023
(SP3 Piping Plan not yet
available for this sample
project) 8'-51 2"
3'-2"
4'-5 2"
1
1'-4" 6" 1'-6" 8"
pumps/filters/heaters/etc. and
callouts for other smaller PENTAIR (#263056) FULLFLOXF PENTAIR (#R171096)
THREE WAY VALVE W/ PENTAIR SERIES 320 INLINE
equipment like valves and (#521485) INTELLIVALVE
ACTUATOR (TYP. OF 2)
EROSION CHLORINATOR
8'-51 2"
junction boxes
PENTAIR (#011075)
INTELLIFLO3 VSF 3.0HP
VARIABLE SPEED PUMP
PENTAIR
(#263056) 5'-31 2"
FULLFLOXF
THREE WAY
VALVE
NOTES:
Project No. 2023.183
1. AUTOFILL DOMESTIC WATER SUPPLY BY PLUMBING CONTRACTOR. INSTALL LEVOLOR K2000 SENSING LINE IN SURGE TANK. CONNECT 1" WATER SUPPLY TO EDGE RETURN.
2. INSTALL 1" DRAINAGE LINE BEFORE CARTRIDGE FILTER TO DRAIN EXCESS WATER AS NEEDED. RUN TO LOW SPOT OR RUN TO CLEAN OUTS. COORDINATE DRAINAGE OUTLET LOCATION WITH POOL BUILDER.
3. IN-FLOOR CLEANING SYSTEM LAYOUT BY OTHERS. REFER TO MANUFACTURER DESIGN FOR INSTALLATION INSTRUCTIONS. COORDINATE LOCATION FOR 8-PORT VALVE(S) WITH POOL CONTRACTOR. Sheet Name
4. FIELD ADJUSTMENTS REQUIRED FOR ZERO EDGE OVERFLOW RETURNS. CALIBRATE FLOW RATES TO MINIMIZE WATER SURFACE DISTURBANCE. Fountain
5. HEATER GAS SUPPLY LINE(S) BY PLUMBING CONTRACTOR. PROVIDE GAS SUPPLY CONNECTIONS FOR EACH HEATER SHOWN. REFER TO MFG MANUAL FOR GAS LINE SIZING AND CONNECTION REQUIREMENTS. Equipment
6. ELECTRIC PANEL SIZING BY ELECTRICAL CONTRACTOR. Plan
7. ELECTRICAL DISCONNECT SWITCHES, BONDING, GROUNDING, AND AUTOMATION WIRING REQUIRED FOR POOL EQUIPMENT. REFER TO MFG MANUALS. Sheet No.
8. BONDING, GROUNDING, AND WATER BONDING BY ELECTRICAL CONTRACTOR REQUIRED PER NEC ARTICLE 680 AND ANY STATE AND LOCAL CODES.
1
FOUNTAIN EQUIPMENT PLAN
1-1/2"=1'-0"
SP4.1
Date Issued
03.11.2023
© 2023
PIPE SIZE
LEGEND
1"
11 2"
2"
21 2"
3"
4"
N/A
Sheet Name
3D Fountain
Equipment
Sheet No.
1
3D EQUIPMENT
NOT TO SCALE
SP4.3
Date Issued
03.11.2023
© 2023
67'-8"
8" 8" 1'-10" 1' 5'-6" 28'-8" 10'-8" 1' 2' 1' 1'-6" 7'-6" 1'-6" 1' 1'-10" 8" 8"
101 2"
20'-1" 1' 1'
22'-2"
POOL COPING
+0'-0"
POOL WATERLINE
+0'-0"
pool/spa/etc.
POOL DEEP END POOL DEEP END
-6'-51 4" -6'-51 4"
N/A
Sheet Name
Sections
1.
2.
3.
FINAL FLOOR & WALL THICKNESS SPECIFICATIONS BY STRUCTURAL ENGINEER.
REBAR NOT SHOWN ON PLANS. STEEL SCHEDULE BY STRUCTURAL ENGINEER.
RETAINING WALL ENGINEERING BY OTHERS.
SP5
Date Issued
03.11.2023
© 2023
13" COPING
2" MORTAR BED
1
TOP OF COPING
0'-0"
TOP OF BOND BEAM
-0'-13 4"
12" BOND BEAM
WATERLINE
POOL DECK -0'-443" WATERLINE
MUD BOX
8" CONCRETE WALL 6" OF 11 2" PVC 12"
1 WATERLINE PIPE SLEEVE
2" POOL FINISH TYP.
TILE NIPPLE
R6"
MIN.
PENTAIR
1" PVC CONDUIT EXTEND MICROBRITE
8" CONCRETE TO TRANSFORMER LED LIGHT
POOL FLOOR
TUBE
CONDUIT CABLE TO
NOTES: AUTOMATION
NOTES: PANEL
1. MOUNT TRANSFORMER @ 18" MIN. ABOVE WATERLINE.
1. CONCRETE THICKNESS, REINFORCING SCHEDULE, AND CLEAN FILL DEPTH BY STRUCTURAL ENGINEER. 2. LIGHTS ARE FURNISHED W/ 100' CORDS.
POOL WALL BOND BEAM DETAIL 5 TYPICAL LIGHT DETAIL (OPTIONAL) SPA SIDE REMOTE - MUD BOX DETAIL
1 3/4"=1'-0" 3/4"=1'-0"
9 1"=1'-0"
REFER TO SKIMMER
1 PIPING PLAN THROAT
2" POOL VENTURI
FINISH FOR PIPE RETURN
SIZE ELEVATION
INLET
NOTES: NOTES:
NOTES:
1. CONCRETE THICKNESS AND REINFORCING SCHEDULE BY STRUCTURAL ENGINEER. 1. INSTALL PERMACAST GROUND TERMINAL IN PLACE OF PLUG IN ONE SKIMMER PER POOL.
1. SOLVENT WELD CONNECTION TO 11 2" RETURN PIPING REQUIRED. 2. CONNECTION TO GROUND SYSTEM BY ELECTRICAL CONTRACTOR.
2. COLOR MATCH TO POOL FINISH. CONFIRM PART NUMBER ON EQUIPMENT SCHEDULE. 2. USE 4" FITTINGS AT MAIN DRAIN MANIFOLDS.
3. SEE PIPING PLAN FOR MAIN DRAIN SUCTION PIPING SIZE FROM EQUIPMENT ROOM. 3. PROVIDE 2" VACUUM SUCTION FROM SKIMMER CLOSEST TO EQUIPMENT ROOM.
3. RETURNS FOR VANISHING EDGE POOLS TO BE 9" ABOVE FINISH FLOOR.
FLUSH-MOUNT RETURN FITTING DETAIL DEBRIS REMOVAL DRAIN DETAIL VENTURI SKIMMER DETAIL
2 3" = 1'-0" 6 1" = 1'-0" 10 3/8"=1'-0"
SPA WATERLINE
3/4" VACUUM
RELIEF VALVE
6" SPA JET
WATERLINE
NOTES:
SIZING.
SP6 Details shows a list of
NOTES:
1. BALANCING REQUIRED TO EQUALIZE FLOW FOR ALL EDGE RETURNS.
1. HARTFORD LOOP AND AIR SUPPLY VENTING ABOVE WATER LEVEL REQUIRED.
standard details that are
2. VACUUM RELIEF VALVE ON RETURN SIDE REQUIRED TO PREVENT BACKFLOW FROM FLOODING THE
3.
CATCH BASIN OR SURGE TANK.
CHECK VALVE ON SUCTION SIDE REQUIRED TO MAINTAIN PUMP PRIME FROM CATCH BASIN OR SURGE TANK. 2.
REFER TO PIPING PLAN FOR LOCATION(S).
HARTFORD LOOP WILL BE OUTSIDE OF SPA SHELL FOR PERIMETER OVERFLOW SPAS. relevant to this project. Most
3
VACUUM BREAKER DETAIL
7
TYPICAL JET DETAIL of the details needed are
3/4"=1'-0" 1"=1'-0"
already designed & available
HARTFORD LOOP (BOTTOM
SENSOR HOUSING
1
2"
CONDUIT TO K2000
1" COUPLING
OF AIR LINE MUST BE
ABOVE WATERLINE)
to insert into our projects -- we
CONTROL SYSTEM AT
EQUIPMENT ROOM SPA WATERLINE
just need to determine which
SENSOR PROBES
1. SENSOR COMMON PROBE
HIGH WATER LEVEL
details should be included
2. HIGH WATER SENSOR PROBE
3. FILL SENSOR PROBE
EYEBALL
FITTING
based on the features of the
(OPTIONAL) SPA JET
1" EQUALIZER LINE
MINIMUM OPERATING
project
WATER LEVEL (12" TYP.)
N/A
Sheet Name
Details
Sheet No.
SP6
Date Issued
03.11.2023
© 2023